Option A
Option B
30/06/19DMLHIssue for review1.015/08/19BELHIssue for public consultation1.112/02/20BELH2.0 Preferred option for review17/02/20BELH2.1 Preferred option for public consultation
PROPOSED SHARED PATH & ASSOCIATED WORKS
A.H.D.M.G.A.
TUGGERAWONG SHARED PATH
BASE SCALE FOR A3 PLAN
REVISION DETAILS
APPROVED-
RECOMMENDED-
OF
APPRDRAWN DATE
CENTRAL COAST COUNCILREFERENCE FILES
CERTIFIED:DESIGNED:SURVEYED:
SHEET
SURVEY:DESIGN:
HEIGHT DATUM:COORDINATE SYSTEM:
REVI
SION
:
PREPARED BY-
ECM
IR N
o:PR
OJEC
T No
:
CAD
FILE
:Q:\M
ajor D
esign
and T
rans
port\
Desig
n Data
\Tug
gera
wong
\Tug
gera
wong
Sha
red P
ath D
esign
Stag
e 2 to
4 F2
018-
0146
1\Rou
te op
tions
- sta
ge 5\
Tugg
erwo
ng S
hare
d Path
Stag
e 5 P
reffe
rred R
oute
Optio
n - R
ev2.1
.dwg D
ATE
PRIN
TED:
06/03
/2020
- 9:2
0 AM
CONSULTATION DRAWINGSSTAGE 5 PREFERRED ROUTE OPTION
01
F2
01
8/0
14
61
01
2.1
1:3000PLAN
120901:3000
0 603015 150PLAN
DATE: Feb. 2020
DATE: Feb. 2020CENTRAL COAST COUNCILROAD TRANSPORT DRAINAGE & WASTE
Option C
Option DOption EWOLSELEY
A
VENUE
Tuggerawong Shared Path Stage 5 Preferred Route Option
Viewing
platforms
Link to
amenities
at the oval
Elevated boardwalk
over the water around
the Rocky Point
DonSmallOval
Option C (Preferred)
Along Palmer Street, High Street and
Marine Parade then onto Rocky Point,
with a ramp to foreshore reserve, and
continue to Don Small Oval.
Ramp to lower
foreshore
Ramp to lower
foreshore
Stage 4
WYON
G
RIVER
TUGGERAHLAKE
PALMER STREET
HIGH STREET
MARINE
PARADE
STLEONARDS STREET
HASTINGS STREET
AVENUEBAYVIEW
COLBLACK CLOSE
ROCKY
TACOMA
TUGGERAWONG
RockyPoint
POINTHigh impact on the flora
and fauna along the
edge of the bush land.
Does not provide the
desired level of
recreational outcomes.
Potential visual and privacy
impacts on the properties
adjacent to the proposed
elevated ramp between Marine
Parade and Bayview Avenue.
Proposed salt marsh regeneration
including land reclamation works to
allow the shared path to be further
away from property boundaries.
Potential impact on the
marine environment
and high construction
cost of the board walk
around the Rocky Point.
Along the eastern side of Rock Point.
- High impact on the environmentally
sensitive foreshore forest.
- Potential odour impact from black
ooze caused by rotten wrack .
Ramp to lower
foreshore
The cost savings that the preferred Option C provides over the popular Option A are
estimated at $1.2M to $1.5M. These savings would mean that up to 3,000 metres of
additional shared path could be constructed to reduce missing links in the shared
pathway network.
The next step will be to complete a concept design for the preferred Option C. Further
public consultation will then be undertaken.
Options
Length (m)
on foreshore
Total
length (m)
Trees
impacted
Construction
cost ($M)
Option A 1,480 1,480260 to 310 4.2 to 5.1
Option B 1,295 1,405170 to 200 4.8 to 5.8
Option C 1,010 1,405160 to 190 3.0 to 3.6
Option D785
1,125140 to 170 2.5 to 3.0
Option E210
1,020160 to 200 3.1 to 3.7
Elevated boardwalk follow the
existing trail through the bush land
to reduce impact on trees and
encourage salt marsh regeneration.