October 15, 2015 TUCSON ELECTRIC POWER System Impact Study Revision B PROJECT NUMBER: 137940 PROJECT CONTACT: BOBBY CHAVEZ EMAIL: [email protected] PHONE: (520) 989-0016 Q42

Transcript of TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to...

Page 1: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

October 15, 2015

TUCSON ELECTRIC POWER

System Impact Study

Revision B PROJECT NUMBER: 137940

PROJECT CONTACT: BOBBY CHAVEZ

EMAIL: [email protected] PHONE: (520) 989-0016

Q42

Page 2: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B

System Impact Study

PREPARED FOR:

TUCSON ELECTRIC POWER

PREPARED BY: BOBBY CHAVEZ – (520) 989-0016 – [email protected]

REVISION HISTORY

REV. ISSUE DATE

ISSUED FOR

PREP BY

CHKD BY APPD BY NOTES

A 6/5/15 Prelim BRC TMM JBM Issued for Preliminary Review, not for Implementation

B 9/15/15 Prelim BRC JBM Issued for Preliminary Review, not for Implementation

10/15/2015 Final

“Issued For” Definitions: - “Prelim” means this document is issued for preliminary review, not for implementation - “Appvl” means this document is issued for review and approval, not for implementation - “Impl” means this document is issued for implementation - “Record” means this document is issued after project completion for project file

Page 3: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. Bi

EXECUTIVE SUMMARY

has requested a network resource interconnection from UNS Electric, Inc. (UNSE) to integrate its proposed photovoltaic (PV) generation project into the 69kV system located in the vicinity of the existing Griffith substation located in Mohave County, Arizona, and part of the Tucson Electric Power Co. (TEP) balancing authority. The implementation of the proposed

solar PV project (Project) will be in two phases. Phase I is proposed to be in service by 7/1/2016 with 45 MW of solar. Phase II is proposed to be in service by 12/1/2016 with an additional 25MW of solar for a total project size of 70MW. The generators will be connected by a 500 foot 69kV transmission line with a point of interconnection (POI) being the UNSE Griffith 69kV Substation. Two interconnection locations were evaluated that produced varying mitigation requirements. Option 1 Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV bus via a dedicated 69kV circuit. Results of Option 1, connecting Phase II 70MW solar PV project in and out of the existing 0.55 mile UNSE Yucca Tap – Black Mountain Tap1 69kV circuit, 0.47 miles away from the Yucca Tap 69kV substation. The required mitigation to alleviate various UNSE 69kV circuit overloads are as follows:

(1) Uprate of the 0.47 mile UNSE Yucca Tap 69 kV to Cliffrose 69kV Loop-in circuit from 79MVA to 160MVA. (2) Uprate of the 0.30 mile UNSE Black Mountain – Black Mountain Tap2 69kV circuit from 109MVA to 160MVA. (3) Uprate of the 0.45 mile UNSE Black Mountain Tap2 – Sacramento Substation 69kV circuit from 79MVA to 160MVA. (4) Uprate of the 1.03 mile UNSE Sacramento Substation - Griffith Tap3 69kV circuit from 79MVA to 160MVA. (5) Uprate of the 1.77 mile UNSE Griffith Tap3 – Griffith 69kV circuit from 109MVA to 210MVA. (6) Uprate of the 1.31 mile UNSE Griffith - Yucca Tap 69kV circuit from 79MVA to 160MVA.

Regardless of the Options evaluated for the solar PV interconnection, the required mitigation to alleviate thermal overloads of the existing two UNSE Griffith 230/69kV transformers will require an additional 3rd Griffith 230/69kV transformer. The 3rd Griffith 230/69kV transformer rating, at a minimum, is required to be 80/89MVA, continuous/emergency. Under certain N-1-1 outages, UNSE will require the proposed solar PV project to curtail after the first N-1 sustained outage, to a generation dispatch level so that the continuous rating of the Griffith 230/69kV transformers are not violated if the second N-1 outage were to occur at certain other Griffith generation dispatch scenarios. N-1 outages that require this curtailment are the Griffith 352 feeder and one of the Griffith 230/69kV transformers. For all operating conditions studied, the study showed that the integration of the proposed solar PV project resulted in marginal change in the reactive power margins at all the buses monitored listed in the STUDY METHODOLOGY: Post Transient Analysis section of this report.

Q42Q42

Q42

Q42

Q42

Q42

Q42

Page 4: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. Bii

For all operating conditions studied, the transient stability performance for both pre- and post-project cases resulted in stable and adequately damped response. The contingencies performed under all operating conditions did not result in any WECC/NERC transient voltage dip, voltage duration, or frequency criteria violations. In addition, UNSE Griffith 69kV system is sourced from the WESTERN Griffith 230kV substation; therefore there may be an issue when the generation dispatch in the Griffith 69kV area is greater than the UNSE Griffith 69kV load. Furthermore, if Black Mountain or any generation resource such as the proposed solar PV project was to deliver power on the WESTERN transmission system a transmission service request would need to be made by that entity to WESTERN. WESTERN, as an affected system, has opted to conduct a separate analysis of the impact of such an interconnection and will be provided in Appendix H once it is complete. Any mitigation requirements required due to the back flow from the 70MW PV would be the sole responsibility of Solar PV.

Q42

Q42

Page 5: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. Biii

TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................................. I 

INTRODUCTION ................................................................................................................................ 5 

PROJECT AND INTERCONNECTION INFORMATION ............................................................ 6 

STUDY BASE CASE DESCRIPTION AND ASSUMPTIONS ....................................................... 7 

STUDY METHODOLOGY AND EVALUATION CRITERIA ...................................................... 8 

OPERATING PROCEDURES................................................................................................................... 8 POWER FLOW ANALYSIS .................................................................................................................... 9 POST-TRANSIENT STABILITY ANALYSIS .......................................................................................... 10 TRANSIENT STABILITY ANALYSIS .................................................................................................... 11 SHORT CIRCUIT STUDY .................................................................................................................... 13 

STUDY RESULTS ............................................................................................................................. 13 

POWER FLOW ANALYSIS RESULTS ................................................................................................... 13 POST-TRANSIENT STABILITY ANALYSIS RESULTS ........................................................................... 17 TRANSIENT STABILITY ANALYSIS RESULTS .................................................................................... 17 SHORT CIRCUIT STUDY RESULTS ..................................................................................................... 17 COST ESTIMATES .............................................................................................................................. 17 

CONCLUSIONS ................................................................................................................................. 19 

APPENDIX A: UNSE KINGMAN LOAD FORECAST ................................................................ 20 

APPENDIX B: POWER FLOW CONTINGENCIES .................................................................... 21 

APPENDIX C: TRANSIENT AND POST-TRANSIENT CONTINGENCIES ........................... 22 

APPENDIX D: TRANSIENT STABILITY PLOTS ....................................................................... 23 

APPENDIX E: POST TRANSIENT Q/V ANALYSIS RESULTS ................................................ 24 

APPENDIX F: SHORT CIRCUIT STUDY RESULTS .................................................................. 26 

LIST OF TABLES TABLE 1: BASE CASES USED FOR EVALUATING THE PROPOSED OPERATING CONDITIONS ...................................................................................................................................... 7 

TABLE 2: STABILITY AND POST-TRANSIENT ANALYSIS EVALUATION CRITERIA .. 12 

TABLE 3: 2017HS AND 2017LSP SUMMARY OF RESULTS .................................................... 16 

TABLE 4: EQUIPMENT COST ESTIMATES ............................................................................ 168 

LIST OF FIGURES FIGURE 1: OPTION 1 PROPOSED SOLAR PV PROJECT .................... ERROR! BOOKMARK NOT DEFINED.

FIGURE 2: OPTION 2 PROPOSED SOLAR PV PROJECT AT UNSE SUB ............................................................................................... ERROR! BOOKMARK NOT DEFINED.

Q42

Q42

Page 6: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. Biv

FIGURE 3 – VOLATGE PERFORMANCE PARAMETERS ...................................................... 10

FIGURE 4 – SHORT CIRCUIT MODEL ................................................. 13

Q42

Page 7: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B5

INTRODUCTION

has requested a network resource interconnection from UNS Electric, Inc. (UNSE) to integrate its proposed photovoltaic (PV) generation project into the 69kV system located in the vicinity of the existing Griffith substation located in Mohave County, Arizona, and part of the Tucson Electric Power Co. (TEP) balancing authority. The implementation of the proposed

solar PV project will be in two phases. Phase I is proposed to be in service by 7/1/2016 with 45MW of solar. Phase II is proposed to be in service by 12/1/2016 with an additional 25MW of solar for a total project size of 70MW. The generators will be connected by a 500 foot 69kV transmission line with a point of interconnection (POI) being the UNSE Griffith 69kV Substation. Two locations were evaluated that produced varying mitigation requirements. Option 1 Looped-in the PV into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV bus via a dedicated 69kV circuit. The analysis performed included power flow. The power flow analysis studied the impact of the proposed solar PV project on UNSE and WESTERN transmission systems’ bus voltages and circuit loadings during steady state, single contingency and double contingency operation in accordance with North American Electric Reliability Corporation (NERC) Transmission Planning (TPL), Western Electricity Coordinating Council (WECC) System Performance Criteria and UNSE and WESTERN internal planning criteria. POWER performed all computer simulation work using a power flow base case provided by TEP. POWER modified this power flow model to reflect the addition of the proposed

solar PV project. The analysis evaluated system impacts in the 2017 time-frame for both the heavy summer and light spring operating conditions. The scope of the analysis is to identify the power flow impacts (circuit loadings and bus voltages) on the EHV and local area transmission systems caused solely by the addition of the proposed solar PV project for normal operating conditions (N-0) as well as single (N-1) and ( N-2) multiple contingencies. The analysis preformed Stability Analysis. The study results for the pre-project cases and post-project cases were compared to determine the impact of the proposed PV project on the UNSE and WESTERN transmission systems. OASIS Generator Interconnection Queue projects were included only if they have entered into an Interconnection Agreement or Power Purchase Agreement. Other loads served at transmission voltage levels will be represented based on the best information available regarding their commercial operation dates.

Q42Q42

Q42

Q42

Q42

Q42

Page 8: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B6

PROJECT AND INTERCONNECTION INFORMATION Figure 1 below is the proposed solar PV project detailed interconnection information to the UNSE Griffith substation

Figure 1: Option 1, Proposed solar PV project and UNSE 69kV circuit POI

Figure 2: Option 2, Proposed solar PV project and UNSE Griffith Substation POI

Modeling Assumptions for the proposed solar PV project are as follows:   

Padmount transformer impedance: 5.75% Station transformer size: 66/80 MVA, Z=8.5% Station transformer X/R ratio: 32 Option 2: Length of 69 kV gen-tie: 500 ft Gen-tie conductor: Flicker, 477 ACSR rated 78 MVA Collector feeder: 4/0 AWG AL Collector system feeder length: 5 X 750 ft Dynamic model: AE 1000 NX model WECC approved model

Q42

Q42

Q42

Q42

Page 9: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B7

STUDY BASE CASE DESCRIPTION AND ASSUMPTIONS The analysis was conducted using approved WECC base case models. The WECC models used to evaluate the impact of the proposed solar PV project are provided in Table 1. These cases were reviewed by WESTERN and TEP prior to the insertion of the proposed solar PV project.

Base Case Operating Scenario WECC Base Case 

Name  Date Approved 

2017HS 15hs4a.sav December 5, 2014 2017LSP 17lsp1sa.sav November 6, 2014

TABLE 1: BASE CASES USED FOR EVALUATING THE PROPOSED OPERATING CONDITIONS POWER developed the base cases to include appropriate modeling of the addition of the proposed

solar PV project. provided POWER its project data with adequate detail for modeling purposes. For modeling purposes, merchant generators at Palo Verde were adjusted to meet the additional generation dispatch of the proposed solar PV project.

Q42

Q42Q42

Q42

Q42

Page 10: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B8

STUDY METHODOLOGY AND EVALUATION CRITERIA The following analysis was performed on the proposed solar PV project for both pre-project and post-project cases to determine the impact of the proposed solar PV project on the UNSE and WESTERN interconnected transmission systems. UNSE local Black Mountain generating station was set at various dispatch scenarios ranging from 0 MW (off) to 90 MW (full output). Other renewable generation within the Griffith area includes a 10.3MW hybrid wind/solar project and a 9.0 MW solar project that were dispatched at 0 MW (off) and full output. Evaluation of the UNSE and WESTERN transmission systems for the 2017 heavy summer and light spring operating conditions under local generation operating conditions was done using the Power Flow Contingency list provided in Appendix B. The UNSE load forecast was modeled for each operating condition and can be seen in Appendix A.

Operating Procedures

(1) Liberty-Peacock 345kV transfer trip - this transfer trip removes the Liberty-Peacock 345kV line from service with the loss of either the Liberty 230/345kV transformer or the Liberty phase shifter or the loss of the Mead – Peacock 345kV line and the Peacock 345/230kV transformer.

Q42Q42

Page 11: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B9

Specific studies that were conducted and their evaluation criteria are as follows:

Power Flow Analysis Power flow analysis was performed on both the proposed solar PV project with conditions modeled in the base cases that were discussed in the preceding sections. The base cases were used to simulate the impact and/or benefit of the proposed solar PV project during normal operating conditions (N-0) and under contingency operation (N-1 and N-2). Mitigation for any adverse impacts due to changes in loading or voltage was identified. Simulated contingencies included:

All single transmission circuit outages within the study area (N-1). All single transformer outages within the study, excluding transformers serving only

distribution load (N-1). All Tie Lines to adjacent systems connecting immediately outside the study area (N-1). Multiple contingencies for the all lines in-service. The component elements of any Category D (N-2) contingencies, causing criteria violations

were evaluated as N-1 contingencies on system adjusted base cases – referred to as IOS cases See Appendix B: Power Flow Contingencies for the list of contingencies evaluated. The NERC TPL and WECC System Performance Criteria along with the following criteria were used to assess the adequacy of the studied systems. The steady state power flow analysis related evaluation criteria that was used is summarized below:

Pre-contingency 69 – 345kV bus voltages within the UNSE and WESTERN control areas must be between 0.95 per unit and 1.05 per unit.

Pre-contingency 500kV bus voltages within the UNSE and WESTERN control areas must be between 1.0 per unit and 1.10 per unit.

Post-contingency 69 – 345kV bus voltages within the UNSE and WESTERN control areas must be between 0.95 per unit and 1.10 per unit for N-1 outages and between 0.90 per unit and 1.10 per unit for N-2 outages.

Post-contingency 500kV bus voltages within the UNSE and WESTERN control areas must be between 0.95 per unit and 1.15 per unit.

Maximum voltage deviation allowed at all UNSE and WESTERN buses under contingency conditions is 5% for N-1 and 10% for N-2 contingencies.

Pre-disturbance loading to remain within continuous ratings of all equipment and line conductors.

Post-disturbance loading to remain within emergency ratings of all equipment and line conductors.

System outages were simulated with static VAR devices active, LTCs disabled, phase shifters blocked and area interchange disabled.

Q42

Q42

Page 12: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B10

Post-Transient Stability Analysis

Post-Transient governor power flow was used for Q-V analysis. Post-transient voltage deviations and VAR margin requirements shall meet NERC TPL and WECC System Performance Criteria. Adverse changes in MVAr margin from pre- to post-project were identified and mitigation was proposed as potentially applicable.

The MVAR margin at the following buses shall be monitored to determine the incremental MVAR margin pre- expansion and post- expansion:

Griffith 69kV

Griffith 230kV

Black Mountain 69kV

Cliffrose 69kV

McConnico 230kV

Peacock 230kV

The contingencies simulated for the post-transient analysis are in Appendix C.

See Appendix C for Transient and Post-Transient Contingencies for the list of contingencies that were evaluated.

Q42 Q42

Page 13: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B11

Transient Stability Analysis Transient stability runs were simulated for 15 seconds to ensure the system is stable and positively damped. Stability runs that have not fully damped in 15 seconds will warrant a longer than 15 second simulation based on engineering judgment. The critical contingencies in Appendix C were simulated for the stability analysis. All faults on 345kV or higher voltage facilities were modeled with a 4 cycle clearing time. Transmission facilities with bus voltages less than 345 kV were modeled with a 5 cycle fault clearing time. All faults were simulated as three-phase faults with zero fault impedance. The following buses were monitored and plotted during the Transient Stability simulation runs:

Griffith 69kV

Griffith 230kV

Black Mountain 69kV

Cliffrose 69kV

McConnico 230kV

Peacock 230kV

Transient stability evaluation regional business practice used to evaluate the impact of the project included:

All machines in the interconnected system shall remain in synchronism as demonstrated by their relative rotor angles.

System stability is evaluated based on the damping of the relative rotor angles and the damping of the voltage magnitude swings.

Transient voltage dip regional business practice: The transient voltage dip must not exceed 25% at load buses or 30% at non-load buses for N-1 contingencies. For N-2 contingencies, the transient voltage dip must not exceed 30% at any bus. The maximum duration of the voltage dip of 20% at load buses must not exceed 20 cycles for any N-1 contingency or 40 cycles for any N-2 contingency.

Transient frequency regional business practice: N-1 contingency (WECC/NERC Category B) shall not drop below 59.6 Hz; for 6 cycles or more at load bus. For N-2 contingencies (WECC/NERC Category C), shall not drop below 59.0 Hz for 6 cycles or more at load bus.

A summary of the transient stability analysis evaluation regional business practice is provided in Table 2 and depicted graphically in Figure 2. See Appendix C: Transient and Post-Transient Contingencies for the list of contingencies evaluated.

Page 14: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B12

TABLE 2: STABILITY AND POST-TRANSIENT ANALYSIS EVALUATION CRITERIA

NERC AND WECC CATEGORIES

OUTAGE FREQUENCY ASSOCIATED WITH THE PERFORMANCE CATEGORY (OUTAGE/YEAR)

TRANSIENT VOLTAGE DIP STANDARD

MINIMUM TRANSIENT FREQUENCY STANDARD

POST TRANSIENT VOLTAGE DEVIATION STANDARD

A System Normal

Not Applicable Nothing in addition to NERC

B One Element Out-of-Service

� 0.33

Not to exceed 25% at load buses or 30% at non-load buses. Not to exceed 20% for more than 20 cycles at load buses.

Not below 59.6Hz for 6 cycles or more at a load bus.

Not to exceed 5% at any bus.

C Two or More Elements Out-of-Service

0.033 – 0.33

Not to exceed 30% at any bus. Not to exceed 20% for more than 40 cycles at load buses.

Not below 59.0Hz for 6 cycles or more at a load bus.

Not to exceed 10% at any bus.

D Extreme Multiple-Element Outages

< 0.033 Nothing in addition to NERC

Figure 3 – Voltage Performance Parameters

Page 15: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B13

Short Circuit Study Short circuit studies were performed to evaluate the impact of the addition of the Project on selected substation breaker duties. If the short circuit current interruptible capability1 exceeds the rating, it will be noted as a necessary system upgrade per UNSE standards. TEP/UNSE accesses the short circuit database using ASPEN-One-Liner that is maintained by the Protection, Communications and Metering Group (PCAM). The Project was modeled as depicted in Figure 4.

Figure 4: Short Circuit Model

STUDY RESULTS

Power Flow Analysis Results Option 1 models proposed 70MW Phase II solar PV project in-service and dispatched at 70MW under the 2017 Light Spring load scenario with the existing local area Black Mountain generation dispatched at its maximum capacity of 90MW and the renewable generation within the Griffith area dispatched at the total of 19.3MW. The results showed the following:

(1)ALIS overload of the UNSE Cliffrose – Yucca Tap 69kV circuit, rated at 79/79MVA continuous/emergency, by as much as 5.8% with the proposed project operating at 70 MW. If the proposed solar PV project was dispatched at the Phase I output of 45MW, the UNSE Cliffrose – Yucca Tap 69kV circuit would be loaded to 88.0% of its continuous/emergency rating. Additionally, the N-1 outage of the Griffith 352 feeder cause an overload on the UNSE Cliffrose – Yucca Tap 69kV circuit, rated at 79/79MVA continuous/emergency, with total load as much as 101.5% of its continuous/emergency rating. If the proposed solar PV project was dispatched at its Phase I output of

1 IEEE Standard C37.010-1999 “IEEE Application Guide for AC High-voltage Circuit Breakers Rated on a Symmetrical Current Basis”

Q42

Q42

Q42

Q42

Q42

Q42

Page 16: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B14

45MW the UNSE Cliffrose – Yucca Tap 69kV circuit would be loaded to 171.6% of its continuous/emergency rating. The required mitigation to alleviate the UNSE Cliffrose – Yucca Tap 69kV circuit overload due to the addition of the proposed Phase II 90MW solar PV project would require and uprate of the UNSE 0.47 mile Cliffrose – Yucca Tap 69kV circuit from 79MVA to 160MVA. (2) For the N-1 outage of the Cliffrose – Yucca Tap 69kV circuit an overload on the UNSE Black Mountain – Black Mountain Tap2 69kV circuit, rated at 109/109MVA continuous/emergency, by as much as 46.3% above its continuous/emergency rating. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Black Mountain – Black Mountain Tap2 69kV circuit would be overloaded 24.7% above its continuous/emergency rating. The required mitigation to alleviate the UNSE Black Mountain – Black Mountain Tap2 69kV circuit overload due to the addition of the proposed Phase II 90MW solar PV project would require an uprate of the 0.30 mile UNSE Black Mountain – Black Mountain Tap2 69kV circuit from 109MVA to 160MVA. (3) For the N-1 outage of the Cliffrose – Yucca Tap 69kV circuit an overload on the UNSE Black Mountain Tap2 – Sacramento Substation 69kV circuit, rated at 79/79MVA continuous/emergency, with the total being as much as 101.9% of its continuous/emergency rating. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Black Mountain Tap2 – Sacramento Substation 69kV circuit would be overloaded by 72.0% above its continuous/emergency rating. The required mitigation to alleviate the UNSE Black Mountain Tap2 – Sacramento Substation 69kV circuit overload due to the addition of the proposed Phase II 90MW solar PV project would require an uprate of the 0.46 mile UNSE Black Mountain Tap2 – Sacramento Substation 69kV circuit from 79MVA to 160MVA. (4) For the N-1 outage of the Cliffrose – Yucca Tap 69kV circuit an overload on the UNSE Sacramento Substation - Griffith Tap3 69kV circuit, rated at 79/79MVA continuous/emergency, by as much as 92.2% above its continuous/emergency rating. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Sacramento Substation - Griffith Tap3 69kV circuit would be overloaded by 62.3% above its continuous/emergency rating. The required mitigation to alleviate the UNSE Sacramento Substation - Griffith Tap3 69kV circuit overload due to the addition of the proposed Phase II 90MW solar PV project would require and uprate of the 1.03 mile UNSE Sacramento Substation - Griffith Tap3 69kV circuit from 79MVA to 160MVA. (5) For the N-1 outage of the Cliffrose – Yucca Tap 69kV circuit an overload on the UNSE Griffith Tap3 - Griffith 69kV circuit, rated at 109/109MVA continuous/emergency, by as much as 72.1% above its continuous/emergency rating. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Griffith Tap3 - Griffith 69kV circuit would be overloaded by 42.3% above its continuous/emergency rating. Additionally, the N-2 outage of Yucca Tap – Cliffrose 69kV circuit and the Griffith Tap3 – Boriana Tap 69kV circuit causes an overload on the UNSE Griffith Tap3 - Griffith 69kV circuit by as much as 92.0% above its continuous/emergency. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Griffith Tap3 - Griffith 69kV circuit would be overloaded by 62.1% above its continuous/emergency rating. The required mitigation to alleviate the UNSE Griffith Tap3 – Griffith 69kV circuit overload due to the

Q42

Q42

Q42

Q42

Q42

Q42

Q42

Q42

Q42

Page 17: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B15

addition of the proposed Phase II 90MW solar PV project would require and uprate of the 1.77 mile UNSE Griffith Tap3 – Griffith 69kV circuit from 109MVA to 210MVA.

(6)ALIS overload of the UNSE Griffith - Yucca Tap 69kV circuit, rated at 79/79MVA continuous/emergency, was found to be as much as 1.8%. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Griffith - Yucca Tap 69kV circuit would be overloaded by 84.1% above its continuous/emergency rating. Additionally, for the N-1 outage of the Griffith 352 feeder circuit an overload on the UNSE Griffith - Yucca Tap 69kV circuit, rated at 79/79MVA continuous/emergency, by as much as 97.6% above its continuous/emergency rating. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Griffith - Yucca Tap 69kV circuit would be overloaded by 67.7% above its continuous/emergency rating. The required mitigation to alleviate the UNSE Griffith - Yucca Tap 69kV circuit overload due to the addition of the proposed Phase II 90MW solar PV project would require and uprate of the 1.31 mile UNSE Griffith - Yucca Tap 69kV circuit from 79MVA to 160MVA.

For options 1 and 2 with the proposed 70MW Phase II solar PV project in-service and dispatched at 70MW under the 2017 Light Spring load scenario with the existing local area Black Mountain generation dispatched at its maximum capacity of 90MW and the renewable generation within the Griffith area dispatched at the total of 19.3MW, the UNSE Griffith 230/69kV transformer #2, rated at 71.7/89.6MVA continuous/emergency, is overloaded by as much as 49.4% above its emergency rating for the N-1 outage of the parallel Griffith 230/69kV transformer #1. If the proposed

solar PV project was dispatched at its Phase I output of 45MW the UNSE Griffith 230/69kV transformer #2 would still be overloaded by 22.2% above its emergency rating. Additionally, the UNSE Griffith 230/69kV transformer #1 is overloaded by as much at 78.7% above its emergency rating for the N-2 outage of the parallel Griffith 230/69kV transformer #1 and the Griffith 352 feeder. If the proposed solar PV project was dispatched at its Phase I output of 45MW the UNSE Griffith 230/69kV transformer #2 would still be overloaded by 49.4% above its emergency rating. The required mitigation to alleviate the UNSE Griffith 230/69kV transformer overloads due to the addition of the proposed solar PV project would require an additional 3rd Griffith 230/69kV transformer rated at least to 80/89MVA, continuous/emergency. For N-2 outages UNSE will require the proposed solar PV project to curtail its generation dispatch to a level so that the continuous rating of the Griffith 230/69kV transformers are not violated. For both options evaluated, there is generation back flow onto the WESTERN 230kV system. A transmission service request was requested to WESTERN as an affected system to determine the impact on its transmission system which may require additional operating conditions or mitigation.

Q42

Q42

Q42

Q42

Q42

Q42

Q42

Q42

Q42

Page 18: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B16

TABLE 3: 2017HS AND 2017LSP SUMMARY OF RESULTS

YEAR/SEASON

TOTAL UNSE 

Griffith 

Forecasted 

Load

Black 

Mountain 

Dispatch

Other 

Renewable 

generation 

Dispatch

 solar 

PV project 

Dispatch

TOTAL UNSE 

Griffith 

Generation

ALIS

Under 

Outage 

Conditions

Continous 

Loading

Emergency 

Loading Outage

41.9MW 61.0% 48.8% N‐1 of Griffith 230/69kV tranfomrer #1

74.4MW 104.5% 83.6%

N‐2  Griffith 230/69kV transformer #1 & 

Griffith feeder 352 [~33MW of consequential 

load loss]         

86.1MW 124.1% 99.3% N‐1 of Griffith 230/69kV tranfomrer #1

117.8MW 169.5% 131.8%

N‐2  Griffith 230/69kV transformer #1 & 

Griffith feeder 352 [~33MW of consequential 

load loss]         

110.7MW 159.4% 127.6% N‐1 of Griffith 230/69kV transformer #1

141.9MW 206.3% 165.1%

N‐2  Griffith 230/69kV transformer #1 & 

Griffith feeder 352 [~33MW of consequential 

load loss]         

64.1MW 89.4% 71.5% N‐1 of Griffith 230/69kV transformer #1

88.1MW 122.9% 98.3%

N‐2  Griffith 230/69kV transformer #1 & 

Griffith feeder 352 [~25MW of consequential 

load loss]         

108.3MW 152.7% 122.2% N‐1 of Griffith 230/69kV transformer #1

131.5MW 183.4% 149.4%

N‐2  Griffith 230/69kV transformer #1 & 

Griffith feeder 352 [~25MW of consequential 

load loss]         

132.8MW 187.7% 150.2% N‐1 of Griffith 230/69kV transformer #1

155.6MW 223.4% 178.7%

N‐2  Griffith 230/69kV transformer #1 & 

Griffith feeder 352 [~25MW of consequential 

load loss]         

64.0MW

132.8MW

UNSE Griffith Area Generation Dispatch

Griffith 230/69kV Transformer #2 Loading                                      

Continuous rating is 71.7MVA                                                 

Emergency rating is 89.6MVA

Back Flow on the Griffith 

Transfomer(s) onto the 

WESTERN 230kV system

86.1MW

110.7MW

108.3MW

90MW       

(full output)19.3MW

109.3MWPRE PROJECT

90MW       

(full output)19.3MW

PRE PROJECT 109.3MW

42.0MW

Operation Conditon

45MW       

[Phase I]

70MW        

[Phase II]

2017HS 65.36MW 154.3MW

179.3MW

154.3MW

179.3MW

45MW       

[Phase I]

70MW        

[Phase II]

2017LSP 44.20MW

Q42

Page 19: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B17

Post-Transient Stability Analysis Results Post-transient stability analysis was performed on the heavy summer and light spring pre- and post- base cases for 2017 time frame. The post-transient stability analysis showed that for all cases and for all the outages, simulated positive reactive margins were achieved at all the buses monitored.

In general, the study showed that the integration of the proposed solar PV project resulted in marginal change in the reactive power margins at all the buses monitored. Detailed results of the post-transient stability analysis can be found at Appendix E. Transient Stability Analysis Results For all operating conditions studied, the transient stability performance for both pre- and post-project cases resulted in stable and adequately damped response. The contingencies performed under all operating conditions did not result in any WECC/NERC transient voltage dip, voltage duration, or frequency criteria violations. Transient voltage and frequency plots are provided in Appendix D. Short Circuit Study Results The short circuit study with the installation of the 45/70 MW Solar Interconnection at Griffith Substation did not show appreciable impact to the fault duty rating on UNSE’s system. The fault interrupting rating for breakers at Griffith are 40kA gas breakers. A summary of the pre-project and post-project conditions is located in Appendix F. The short circuit analysis table in Appendix H is for information purposes only, however, the analysis did not see any violations. UNSE/TEP reserves the right to conduct additional analysis in the Facilities Study where any necessary requirements will be determined. Cost Estimates The costs listed are a high level estimate of equipment costs and does not include installation or equipment relocation in some instances. The detailed cost of each project will be detailed fully in the Facility Study. Option 1 would require a rebuild of approximately 7 miles of UNSE 69 kV line based on the loading requirements of the 69kV system found in the analysis. The project would also require a breaker at the tap point to the UNSE 69 kV system. Option 2 would require a new 69 kV line approximately 2 miles. The connection point into the 69 kV Griffith yard would require a ring bus configuration for reliability purposes. In this configuration 2 breakers would be required. The cost in the table below does not reflect the cost of the ring bus conversion. A new 69/230 kV transformer would be required as well as a 230 kV breaker and dead ends needed for installation into the Western Griffith 230 kV yard.

Q42

Page 20: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B18

Interconnection Location Equipment Cost Option 1: Tapping the UNSE Yucca Tap – Black Mountain

Tap 69 kV Line

69 kV Line re-conductor of UNSE existing circuits

(~7 miles)

$4.2 million *cost does not reflect price if any distribution under build would need to be

re-strung New 69 kV Line from Project

to Tap ~$600k/mile

69kV Breaker from Project Step up to Tap Point

~$150k

Option 2: Connecting directly into the Griffith 69kV Yard

New 69 kV Line from Project to Griffith 69 kV (~2 miles)

$1.2 million

Installation of 2 new breakers $300k *does not include conversion to a ring bus

configuration 69/230 kV transformer $1.5 million

230 kV breaker & dead ends needed for a new bay in the

Western Griffith 230 kV yard

$540k

Table 4: Equipment Cost Estimates

Page 21: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B19

CONCLUSIONS Presently, there are two Griffith 230/69kV transformers with a total continuous ALIS service transformer capacity of 151.7MVA which may be used to export generation from the UNSE Griffith 69kV area onto the WESTERN 230kV transmission system. The UNSE Griffith 69kV area base load is approximately 44.2MW, during light spring operating conditions, which allows the potential of approximately 195.9MW of generation to be produced within the UNSE Griffith 69kV system. There presently exists a UNSE fossil fueled Black Mountain generator with a generating capacity of 90MW, therefore a total 105.9MW can potentially be connected on the UNSE Griffith 69kV system. However, if an N-1 outage occurs and one of the Griffith 230/69kV transformers was lost, the Griffith continuous transformer capacity would drop from 151.7MVA to 71.7MVA and would require curtailment from the proposed solar PV project and possibly the existing UNSE Black Mountain generator. The reactive power margin study showed that the integration of the proposed solar PV project resulted in marginal change in the reactive power margins at all the buses monitored. For all operating conditions studied, the transient stability performance for both pre- and post-project cases resulted in stable and adequately damped response. The contingencies performed under all operating conditions did not result in any WECC/NERC transient voltage dip, voltage duration, or frequency criteria violations. In addition, the UNSE Griffith 69kV system is sourced from the WESTERN Griffith 230kV substation therefore, there may be an issue when the generation dispatch in the Griffith 69kV area is greater than the UNSE Griffith 69kV load. Furthermore, if Black Mountain or any generation resource connected to the Griffith 69 kV substation was to deliver power on the WESTERN transmission system, a transmission service request would need to be made by that entity to WESTERN. WESTERN, as an affected system, has chosen to conduct a separate analysis of the impact of such an interconnection as an Affected System. Any mitigation required by Western due to the 70 MW PV Afffected System Impact Study would be the sole responsibility of Solar PV.

Q42

Q42

Q42

Page 22: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B20

APPENDIX A: UNSE KINGMAN LOAD FORECAST

Bus Name kV ID ST P Q P Q PF HILLTOP or GRIFFITH

BDRYCONE 69 UE 1 3.82 1.11 2.39 0.70 0.960 GRIFFITH

BORIANA  69 UE 1 2.74 0.80 1.72 0.50 0.960 GRIFFITH

CASSON   69 UE 1 43.72 8.88 25.67 5.21 0.980 HILLTOP

CHLORJCT 69 UE 1 1.01 0.29 0.64 0.19 0.960 GRIFFITH

DOLSPRNG 69 UE 1 5.03 1.47 3.20 0.93 0.960 GRIFFITH

DUVALBOS 69 PL 1 0.60 0.18 0.60 0.18 0.960 GRIFFITH

DUVALWTR 69 PL 1 1.75 0.51 1.75 0.51 0.960 GRIFFITH

EASTERN  69 UE 1 14.47 2.94 8.50 1.73 0.980 HILLTOP

GOLDVALL 69 PL 1 0.00 0.00 0.00 0.00 GRIFFITH

GOLDVALL 69 UE 1 7.94 2.32 5.06 1.48 0.960 GRIFFITH

HIGHWAY  69 UE 1 1.03 0.30 0.65 0.19 0.960 GRIFFITH

INDUSTRL 69 UE 1 13.97 2.84 8.20 1.67 0.980 HILLTOP

JAGERSON 69 UE 1 13.67 2.78 8.02 1.63 0.980 HILLTOP

NORTKING 69 UE 1 8.04 1.63 4.72 0.96 0.980 HILLTOP

PIERFERR 69 UE 1 1.61 0.47 1.02 0.30 0.960 GRIFFITH

SACROSUB 69 PL 1 2.10 0.61 2.10 0.61 0.960 GRIFFITH

SACROSUB 69 UE 1 5.94 1.73 3.02 0.88 0.960 GRIFFITH

SOHI     69 UE 1 2.21 0.64 1.41 0.41 0.960 GRIFFITH

SOTHKING 69 UE 1 6.89 2.01 4.49 1.31 0.960 GRIFFITH

W.GDNVLY 69 PL 1 2.00 0.58 2.00 0.58 0.960 GRIFFITH

W.GDNVLY 69 UE 1 8.95 2.61 4.87 1.42 0.960 GRIFFITH

WILLBECH 69 UE 1 1.61 0.47 1.02 0.30 0.960 GRIFFITH

YUCCASUB 69 UE 1 5.13 1.50 3.26 0.95 0.960 GRIFFITH

GOLDROAD 69 M 1 2.00 0.58 2.00 0.58 0.960 GRIFFITH

WARMSPRG 69 UE 1 4.55 1.06 3.49 0.81 0.974 GRIFFITH

HARRIS 69 WA 1 9.00 1.83 9.00 1.83 0.980 MCONNICO

Charcas‐Mendez 69 UE 1 2.11 0.43 1.24 0.25 0.980 HILLTOP

MERCATOR M 1 3.00 0.88 3.00 0.88 0.960 GRIFFITH

174.89 41.44 113.04 26.97

65.36 19.06 44.20 12.89

95.98 19.49 56.35 11.44

13.55 2.89 12.49 2.64

UNSE KINGMAN LOAD FORECAST

TOTAL KINGMAN LOAD 

TOTAL GRIFFITH LOAD

OTHER (WARMSPRG, HARRIS)

TOTAL HILLTOP LOAD

2017HS  2017LSP

Page 23: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B21

APPENDIX B: POWER FLOW CONTINGENCIES

n1_2.otg

N-1 outages

n2_1.otg

N-2 outages

Page 24: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B22

APPENDIX C: TRANSIENT AND POST-TRANSIENT

CONTINGENCIES

NO FAULT00_no_fault.swt0

Outage DescriptionOutage ID#

1 01_Griffith-Clifrose69.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH - CLIFROSE 69kV LINE

2 02_GriffithT1-XFMR-slo.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH 230/69kV XFMR #1

303_GRIFFITH-

MCCONICO230kV.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 230kV BUSCLEAR FAULT at GRIFFITH 230kV BUS in 5 cyclesREMOVE GRIFFITH - MCCONICO 230kV LINE

404_GRIFFITH-

PEACOCK230kV.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 230kV BUSCLEAR FAULT at GRIFFITH 230kV BUS in 5 cyclesREMOVE GRIFFITH - PEACOCK 230kV LINE

5 05_gr152.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH-GRIFTP1A 69 kV LINE (GR152)

6 06_gr252.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GR252 FEEDER

9 09_BLKMTN2-nofault-slo.swt

Trip BLK_MTN2 Generation

7 07_gr352.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GR352 FEEDER

8 08_BLKMTN1-nofault-slo.swt

Trip BLK_MTN1 Generation

Page 25: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B23

APPENDIX D: TRANSIENT STABILITY PLOTS

17hs_0.pdf 17lsp_0.pdf

2017HS Plots 2017LSP Plots

Page 26: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B24

APPENDIX E: POST TRANSIENT Q/V ANALYSIS RESULTS

Table E-1: 2017HS Post Transient Results

BLK MTN dispached at 67MW

BLK MTN dispached at 90MW

BLK MTN OFFBLK MTN

dispached at 22MWBLK MTN

dispached at 90MWBLK MTN OFF

BLK MTN dispached at 90MW

Griffith 230/69kV xfmr backflow is

0MW

Griffith 230/69kV xfmr backflow is

22.8MW

Griffith 230/69kV xfmr backflow is

-66.7MW

Griffith 230/69kV xfmr backflow is

0MW

Griffith 230/69kV xfmr backflow is

67.5MW

Griffith 230/69kV xfmr backflow is

2.7MW

Griffith 230/69kV xfmr backflow is

92.5MW

0_17hs_pre0 1_17hs_pre22.8 2_17hs_pre(-66.7) 3_17hs_pst0-P 1-45)4_17hs_pst67.5-P 1-

455_17hs_pst(-2.7)-P 2-

706_17hs_pst(92.5)-P 2-

70

16804 GRIFFITH 69kV 276.6 272.1 203.1 290.7 276.9 205.1 272.2

19310 GRIFFITH 230kV 750.3 743.5 568.5 778.7 751.6 592.7 745.4

16840 BLK MTN 69kV 265.4 260.6 187.3 279.0 265.5 194.6 263.0

90071 CLIFROSE 69kV 288.5 275.8 201.9 272.7

19056 MCCONICO 230kV 769.4 763.2 639.7 782.1 764.4 665.1 757.1

19314 PEACOCK 230kV 865.0 859.7 653.6 872.3 857.6 808.6 850.2

16804 GRIFFITH 69kV 276.6 859.7 203.1 282.0 272.0 203.1 274.0

19310 GRIFFITH 230kV 750.3 743.5 568.5 760.6 762.9 568.4 748.5

16840 BLK_MTN 69kV 265.4 260.6 187.3 270.6 260.5 187.3 262.6

90071 CLIFROSE 69kV19056 MCCONICO 230kV 769.4 763.2 639.7 774.6 763.1 639.6 763.3

19314 PEACOCK 230kV 865.0 859.7 653.6 869.4 859.5 653.4 858.1

16804 GRIFFITH 69kV 174.1 168.6 95.8 188.1 171.0 101.4 165.9

19310 GRIFFITH 230kV 734.2 764.2 507.9 781.6 645.6 564.9 748.2

16840 BLK_MTN 69kV 169.3 163.8 88.1 183.3 167.3 94.9 162.6

90071 CLIFROSE 69kV 186.9 170.3 104.5 164.5

19056 MCCONICO 230kV 760.1 755.1 572.2 766.7 750.4 634.3 740.5

19314 PEACOCK 230kV 855.5 850.6 705.9 861.1 845.4 775.0 836.4

16804 GRIFFITH 69kV 262.0 255.9 188.0 276.0 258.0 189.7 252.1

19310 GRIFFITH 230kV 516.1 515.6 388.7 537.0 503.5 398.8 492.0

16840 BLK_MTN 69kV 253.1 247.2 176.3 264.0 249.6 182.0 245.2

90071 CLIFROSE 69kV 274.0 256.5 191.0 249.3

19056 MCCONICO 230kV 551.3 547.7 548.5 552.8 542.8 548.0 539.0

19314 PEACOCK 230kV 822.7 810.9 728.2 831.1 796.5 734.3 780.5

16804 GRIFFITH 69kV 267.1 262.2 192.8 281.2 266.7 195.3 261.7

19310 GRIFFITH 230kV 624.7 617.1 467.9 649.6 621.7 487.3 614.0

16840 BLK_MTN 69kV 257.0 252.1 174.0 270.7 256.4 186.4 253.7

90071 CLIFROSE 69kV 279.2 257.0 197.5 258.1

19056 MCCONICO 230kV 698.5 690.3 557.2 712.6 688.1 578.7 678.1

19314 PEACOCK 230kV 763.2 758.1 738.4 768.7 754.7 739.6 748.0

16804 GRIFFITH 69kV 288.1 282.7 217.3 302.2 285.8 216.3 280.0

19310 GRIFFITH 230kV 778.4 769.6 637.1 792.0 766.2 674.4 755.5

16840 BLK_MTN 69kV 275.4 270.0 199.5 288.7 273.3 204.8 270.0

90071 CLIFROSE 69kV 299.7 283.8 212.8 275.9

19056 MCCONICO 230kV 774.7 767.2 707.3 784.8 765.5 709.3 756.6

19314 PEACOCK 230kV 866.4 860.0 816.5 873.6 855.9 816.8 847.3

16804 GRIFFITH 69kV 279.2 273.8 204.8 293.1 277.9 205.7 269.8

19310 GRIFFITH 230kV 769.4 761.7 601.2 777.5 760.6 596.8 740.4

16840 BLK_MTN 69kV 214.4 210.2 135.6 225.9 214.4 141.8 214.2

90071 CLIFROSE 69kV 288.3 274.0 208.4 265.6

19056 MCCONICO 230kV 761.5 754.9 646.4 772.0 753.7 665.8 745.5

19314 PEACOCK 230kV 856.0 849.7 785.3 864.9 847.6 812.1 839.9

16804 GRIFFITH 69kV 291.1 285.1 210.1 302.3 285.6 216.2 278.7

19310 GRIFFITH 230kV 772.5 767.7 603.8 791.9 764.0 617.8 750.2

16840 BLK_MTN 69kV 272.7 267.1 197.4 286.5 270.2 200.0 266.9

90071 CLIFROSE 69kV 300.4 283.6 212.8 269.9

19056 MCCONICO 230kV 774.8 767.0 676.3 784.0 764.2 691.1 754.7

19314 PEACOCK 230kV 865.5 858.8 817.3 872.9 854.5 817.0 845.7

16804 GRIFFITH 69kV 235.3 234.7 203.1 245.9 242.2 205.1 240.0

19310 GRIFFITH 230kV 658.8 662.4 568.5 688.7 681.1 592.7 678.6

16840 BLK_MTN 69kV 225.2 224.4 187.3 235.6 231.5 194.6 230.4

90071 CLIFROSE 69kV 248.2 243.6 201.9 236.6

19056 MCCONICO 230kV 732.3 636.7 639.7 745.5 737.9 665.1 732.7

19314 PEACOCK 230kV 840.3 838.0 653.6 849.1 841.9 808.6 836.8

16804 GRIFFITH 69kV 235.1 234.6 203.1 245.9 242.1 205.1 240.0

19310 GRIFFITH 230kV 658.6 662.4 568.5 688.7 681.0 592.7 678.6

16840 BLK_MTN 69kV 225.0 224.4 187.3 235.6 231.4 194.6 230.3

90071 CLIFROSE 69kV 248.2 243.6 201.9 236.6

19056 MCCONICO 230kV 732.1 636.7 639.7 745.4 737.9 665.1 664.6

19314 PEACOCK 230kV 840.1 838.0 653.6 849.0 841.8 808.6 836.8

9 09_BLKMTN2-nofault-slo.swt

Trip BLK_MTN2 Generation

7 07_gr352.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GR352 FEEDER

8 08_BLKMTN1-nofault-slo.swt

Trip BLK_MTN1 Generation

5 05_gr152.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH-GRIFTP1A 69 kV LINE (GR152)

6 06_gr252.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GR252 FEEDER

303_GRIFFITH-

MCCONICO230kV.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 230kV BUSCLEAR FAULT at GRIFFITH 230kV BUS in 5 cyclesREMOVE GRIFFITH - MCCONICO 230kV LINE

404_GRIFFITH-

PEACOCK230kV.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 230kV BUSCLEAR FAULT at GRIFFITH 230kV BUS in 5 cyclesREMOVE GRIFFITH - PEACOCK 230kV LINE

1 01_Griffith-Clifrose69.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH - CLIFROSE 69kV LINE

2 02_GriffithT1-XFMR-slo.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH 230/69kV XFMR #1

NO FAULT00_no_fault.swt0

2017HS PRE PROJECT2017HS POST PROJECT

PHASE I - 45MW PHASE II - 70MW

Monitored BusOutage DescriptionOutage ID#

2017HS Reactive Power Margin

Page 27: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B25

Table E-2: 2017LSP Post Transient Results

BLK MTN dispached at 67MW

BLK MTN dispached at 90MW

BLK MTN OFFBLK MTN

dispached at 22MWBLK MTN

dispached at 90MWBLK MTN OFF

BLK MTN dispached at 90MW

Griffith 230/69kV xfmr backflow is

0MW

Griffith 230/69kV xfmr backflow is

22.8MW

Griffith 230/69kV xfmr backflow is

-66.7MW

Griffith 230/69kV xfmr backflow is

0MW

Griffith 230/69kV xfmr backflow is

67.5MW

Griffith 230/69kV xfmr backflow is

2.7MW

Griffith 230/69kV xfmr backflow is

92.5MW

0_17hs_pre0 1_17hs_pre22.8 2_17hs_pre(-66.7) 3_17hs_pst0-P 1-45)4_17hs_pst67.5-P 1-

455_17hs_pst(-2.7)-P 2-

706_17hs_pst(92.5)-P 2-

70

16804 GRIFFITH 69kV 244.6 278.6 207.1 217.3 283.7 214.3 277.8

19310 GRIFFITH 230kV 752.8 782.0 715.7 723.0 779.6 717.7 768.9

16840 BLK MTN 69kV 227.5 262.4 189.4 199.6 268.1 197.2 263.1

90071 CLIFROSE 69kV 214.0 279.3 211.1 273.6

19056 MCCONICO 230kV 786.6 812.8 753.5 760.2 811.1 755.4 801.7

19314 PEACOCK 230kV 856.3 876.9 828.9 834.3 872.1 830.1 865.2

16804 GRIFFITH 69kV 244.6 278.6 207.1 209.1 280.7 209.2 280.6

19310 GRIFFITH 230kV 752.8 782.0 715.7 715.6 782.1 715.6 782.0

16840 BLK_MTN 69kV 227.5 262.4 189.4 191.5 264.5 191.6 264.5

90071 CLIFROSE 69kV19056 MCCONICO 230kV 786.6 812.8 753.5 753.4 812.9 753.5 812.8

19314 PEACOCK 230kV 856.3 876.9 828.9 828.7 875.4 828.8 875.2

16804 GRIFFITH 69kV 144.6 177.9 106.2 116.7 179.7 113.4 171.6

19310 GRIFFITH 230kV 753.1 779.4 712.0 722.5 771.6 715.9 755.7

16840 BLK_MTN 69kV 139.0 172.9 100.3 110.6 175.3 107.7 167.8

90071 CLIFROSE 69kV 115.7 178.1 112.5 170.1

19056 MCCONICO 230kV 786.8 808.8 750.5 759.9 799.4 754.1 788.6

19314 PEACOCK 230kV 856.4 865.0 826.7 834.2 856.5 829.3 847.2

16804 GRIFFITH 69kV 224.8 256.6 188.9 196.9 258.3 192.8 250.4

19310 GRIFFITH 230kV 483.3 505.9 452.1 453.4 496.0 444.4 480.9

16840 BLK_MTN 69kV 212.3 245.0 175.9 184.1 247.5 180.6 240.7

90071 CLIFROSE 69kV 194.5 255.1 190.5 247.5

19056 MCCONICO 230kV 593.2 590.8 590.0 589.6 583.4 586.3 579.1

19314 PEACOCK 230kV 798.4 813.3 775.3 770.4 794.3 757.9 777.9

16804 GRIFFITH 69kV 238.2 271.9 200.8 210.7 276.3 207.5 270.0

19310 GRIFFITH 230kV 622.3 649.9 586.6 592.5 645.5 586.2 633.7

16840 BLK_MTN 69kV 222.8 257.4 184.9 194.8 262.4 192.2 257.0

90071 CLIFROSE 69kV 207.7 272.3 204.7 266.2

19056 MCCONICO 230kV 711.0 736.2 677.6 682.0 730.5 675.0 718.1

19314 PEACOCK 230kV 763.3 766.4 750.1 752.9 761.2 749.1 755.1

16804 GRIFFITH 69kV 249.4 282.4 212.8 222.0 286.5 218.5 280.1

19310 GRIFFITH 230kV 755.9 782.6 721.7 726.6 778.2 720.2 766.5

16840 BLK_MTN 69kV 231.5 265.7 194.3 203.7 270.5 200.8 265.0

90071 CLIFROSE 69kV 218.6 282.0 215.2 275.7

19056 MCCONICO 230kV 788.9 813.0 758.3 762.9 809.5 757.1 799.2

19314 PEACOCK 230kV 857.5 875.9 832.1 835.8 869.9 830.8 862.4

16804 GRIFFITH 69kV 244.8 275.6 207.9 217.9 280.7 214.8 274.7

19310 GRIFFITH 230kV 752.8 779.1 716.6 723.4 776.4 717.9 765.6

16840 BLK_MTN 69kV 174.2 210.0 134.5 143.1 216.0 141.9 213.4

90071 CLIFROSE 69kV 214.6 276.3 211.6 270.5

19056 MCCONICO 230kV 786.5 810.2 754.2 760.5 807.1 755.5 798.7

19314 PEACOCK 230kV 856.2 866.3 829.4 834.5 861.7 830.1 854.4

16804 GRIFFITH 69kV 251.1 283.2 215.3 224.1 286.9 220.3 280.2

19310 GRIFFITH 230kV 757.0 782.4 724.1 728.0 777.1 721.0 764.8

16840 BLK_MTN 69kV 230.4 264.0 193.7 202.6 268.5 199.7 262.9

90071 CLIFROSE 69kV 220.6 282.4 217.0 275.9

19056 MCCONICO 230kV 789.8 812.9 760.4 764.1 808.6 757.9 797.9

19314 PEACOCK 230kV 858.4 874.7 833.8 836.9 868.2 831.5 860.3

16804 GRIFFITH 69kV 244.6 244.4 207.1 217.3 252.1 214.3 247.6

19310 GRIFFITH 230kV 752.8 752.6 715.7 723.0 754.8 717.7 746.6

16840 BLK_MTN 69kV 227.5 227.3 189.4 199.6 235.3 197.2 231..6

90071 CLIFROSE 69kV 214.0 248.2 211.1 243.9

19056 MCCONICO 230kV 786.6 786.4 753.5 760.2 788.7 755.4 781.4

19314 PEACOCK 230kV 856.3 856.2 828.9 834.3 858.0 830.1 851.7

16804 GRIFFITH 69kV 207.0 244.4 207.1 217.3 252.1 214.3 247.6

19310 GRIFFITH 230kV 715.5 752.5 715.7 723.0 754.7 717.7 746.6

16840 BLK_MTN 69kV 189.4 227.3 189.4 199.6 235.2 197.2 231.5

90071 CLIFROSE 69kV 214.0 248.1 211.1 243.8

19056 MCCONICO 230kV 753.3 786.4 753.5 760.2 788.6 755.4 781.4

19314 PEACOCK 230kV 828.6 856.2 828.9 834.3 858.0 830.1 851.7

# Outage ID Outage Description Monitored Bus

2017LSP Reactive Power Margin 2017HS PRE PROJECT

2017HS POST PROJECT

PHASE I - 45MW PHASE II - 70MW

0 00_no_fault.swt NO FAULT

1 01_Griffith-Clifrose69.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH - CLIFROSE 69kV LINE

2 02_GriffithT1-XFMR-slo.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH 230/69kV XFMR #1

303_GRIFFITH-

MCCONICO230kV.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 230kV BUSCLEAR FAULT at GRIFFITH 230kV BUS in 5 cyclesREMOVE GRIFFITH - MCCONICO 230kV LINE

404_GRIFFITH-

PEACOCK230kV.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 230kV BUSCLEAR FAULT at GRIFFITH 230kV BUS in 5 cyclesREMOVE GRIFFITH - PEACOCK 230kV LINE

5 05_gr152.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GRIFFITH-GRIFTP1A 69 kV LINE (GR152)

6 06_gr252.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GR252 FEEDER

7 07_gr352.swt

APPLY A 5 CYCLE 3-PHASE FAULT ON THE GRIFFITH 69kV BUSCLEAR FAULT at GRIFFITH 69kV BUS in 5 cyclesREMOVE GR352 FEEDER

8 08_BLKMTN1-nofault-slo.swt

Trip BLK_MTN1 Generation

9 09_BLKMTN2-nofault-slo.swt

Trip BLK_MTN2 Generation

Page 28: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

POWER ENGINEERS, INC.

PHX 171-1408 (SR-06) TEP (10/15/15) 137940 BRC REV. B26

APPENDIX F: SHORT CIRCUIT STUDY RESULTS

fault study-2015 DS.pdf

Q42

Page 29: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:04 2015

Page 10_17lsp_pre0_00_no_fault.chf

Q42

Page 30: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:03 2015

Page 10_17lsp_pre0_00_no_fault.chf

Q42

Page 31: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:08 2015

Page 10_17lsp_pre0_01_Griffith-Clifrose69.chf

Q42

Page 32: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:07 2015

Page 10_17lsp_pre0_01_Griffith-Clifrose69.chf

Q42

Page 33: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:10 2015

Page 10_17lsp_pre0_02_GriffithT1-XFMR-slo.chf

Q42

Page 34: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:10 2015

Page 10_17lsp_pre0_02_GriffithT1-XFMR-slo.chf

Q42

Page 35: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:13 2015

Page 10_17lsp_pre0_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 36: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:12 2015

Page 10_17lsp_pre0_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 37: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:18 2015

Page 10_17lsp_pre0_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 38: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:17 2015

Page 10_17lsp_pre0_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 39: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:29 2015

Page 10_17lsp_pre0_05_gr152.chf

Q42

Page 40: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:28 2015

Page 10_17lsp_pre0_05_gr152.chf

Q42

Page 41: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:31 2015

Page 10_17lsp_pre0_06_gr252.chf

Q42

Page 42: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:31 2015

Page 10_17lsp_pre0_06_gr252.chf

Q42

Page 43: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:36 2015

Page 10_17lsp_pre0_07_gr352.chf

Q42

Page 44: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:35 2015

Page 10_17lsp_pre0_07_gr352.chf

Q42

Page 45: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:38 2015

Page 10_17lsp_pre0_08_BLKMTN1-nofault-slo.chf

Q42

Page 46: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:38 2015

Page 10_17lsp_pre0_08_BLKMTN1-nofault-slo.chf

Q42

Page 47: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:41 2015

Page 10_17lsp_pre0_09_BLKMTN2-nofault-slo.chf

Q42

Page 48: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:41 2015

Page 10_17lsp_pre0_09_BLKMTN2-nofault-slo.chf

Q42

Page 49: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:47 2015

Page 11_17lsp_pre45.0_00_no_fault.chf

Q42

Page 50: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:46 2015

Page 11_17lsp_pre45.0_00_no_fault.chf

Q42

Page 51: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:50 2015

Page 11_17lsp_pre45.0_01_Griffith-Clifrose69.chf

Q42

Page 52: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:49 2015

Page 11_17lsp_pre45.0_01_Griffith-Clifrose69.chf

Q42

Page 53: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:53 2015

Page 11_17lsp_pre45.0_02_GriffithT1-XFMR-slo.chf

Q42

Page 54: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:53 2015

Page 11_17lsp_pre45.0_02_GriffithT1-XFMR-slo.chf

Q42

Page 55: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:58 2015

Page 11_17lsp_pre45.0_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 56: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:32:57 2015

Page 11_17lsp_pre45.0_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 57: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:01 2015

Page 11_17lsp_pre45.0_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 58: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:00 2015

Page 11_17lsp_pre45.0_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 59: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:06 2015

Page 11_17lsp_pre45.0_05_gr152.chf

Q42

Page 60: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:05 2015

Page 11_17lsp_pre45.0_05_gr152.chf

Q42

Page 61: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:10 2015

Page 11_17lsp_pre45.0_06_gr252.chf

Q42

Page 62: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:10 2015

Page 11_17lsp_pre45.0_06_gr252.chf

Q42

Page 63: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:14 2015

Page 11_17lsp_pre45.0_07_gr352.chf

Q42

Page 64: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:13 2015

Page 11_17lsp_pre45.0_07_gr352.chf

Q42

Page 65: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:18 2015

Page 11_17lsp_pre45.0_08_BLKMTN1-nofault-slo.chf

Q42

Page 66: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:17 2015

Page 11_17lsp_pre45.0_08_BLKMTN1-nofault-slo.chf

Q42

Page 67: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:21 2015

Page 11_17lsp_pre45.0_09_BLKMTN2-nofault-slo.chf

Q42

Page 68: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:20 2015

Page 11_17lsp_pre45.0_09_BLKMTN2-nofault-slo.chf

Q42

Page 69: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:25 2015

Page 12_17lsp_pre(-44.4)_00_no_fault.chf

Q42

Page 70: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:24 2015

Page 12_17lsp_pre(-44.4)_00_no_fault.chf

Q42

Page 71: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:30 2015

Page 12_17lsp_pre(-44.4)_01_Griffith-Clifrose69.chf

Q42

Page 72: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:29 2015

Page 12_17lsp_pre(-44.4)_01_Griffith-Clifrose69.chf

Q42

Page 73: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:35 2015

Page 12_17lsp_pre(-44.4)_02_GriffithT1-XFMR-slo.chf

Q42

Page 74: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:34 2015

Page 12_17lsp_pre(-44.4)_02_GriffithT1-XFMR-slo.chf

Q42

Page 75: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:38 2015

Page 12_17lsp_pre(-44.4)_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 76: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:37 2015

Page 12_17lsp_pre(-44.4)_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 77: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:41 2015

Page 12_17lsp_pre(-44.4)_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 78: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:41 2015

Page 12_17lsp_pre(-44.4)_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 79: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:48 2015

Page 12_17lsp_pre(-44.4)_05_gr152.chf

Q42

Page 80: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:47 2015

Page 12_17lsp_pre(-44.4)_05_gr152.chf

Q42

Page 81: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:51 2015

Page 12_17lsp_pre(-44.4)_06_gr252.chf

Q42

Page 82: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:50 2015

Page 12_17lsp_pre(-44.4)_06_gr252.chf

Q42

Page 83: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:54 2015

Page 12_17lsp_pre(-44.4)_07_gr352.chf

Q42

Page 84: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:33:54 2015

Page 12_17lsp_pre(-44.4)_07_gr352.chf

Q42

Page 85: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:01 2015

Page 12_17lsp_pre(-44.4)_08_BLKMTN1-nofault-slo.chf

Q42

Page 86: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:00 2015

Page 12_17lsp_pre(-44.4)_08_BLKMTN1-nofault-slo.chf

Q42

Page 87: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:06 2015

Page 12_17lsp_pre(-44.4)_09_BLKMTN2-nofault-slo.chf

Q42

Page 88: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:05 2015

Page 12_17lsp_pre(-44.4)_09_BLKMTN2-nofault-slo.chf

Q42

Page 89: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:23 2015

Page 13_17lsp_pst0-P1-45_00_no_fault.chf

Q42

Page 90: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:22 2015

Page 13_17lsp_pst0-P1-45_00_no_fault.chf

Q42

Page 91: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:30 2015

Page 13_17lsp_pst0-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 92: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:29 2015

Page 13_17lsp_pst0-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 93: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:36 2015

Page 13_17lsp_pst0-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 94: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:35 2015

Page 13_17lsp_pst0-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 95: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:42 2015

Page 13_17lsp_pst0-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 96: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:41 2015

Page 13_17lsp_pst0-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 97: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:49 2015

Page 13_17lsp_pst0-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 98: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:48 2015

Page 13_17lsp_pst0-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 99: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:54 2015

Page 13_17lsp_pst0-P1-45_05_gr152.chf

Q42

Page 100: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:34:53 2015

Page 13_17lsp_pst0-P1-45_05_gr152.chf

Q42

Page 101: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:01 2015

Page 13_17lsp_pst0-P1-45_06_gr252.chf

Q42

Page 102: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:00 2015

Page 13_17lsp_pst0-P1-45_06_gr252.chf

Q42

Page 103: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:05 2015

Page 13_17lsp_pst0-P1-45_07_gr352.chf

Q42

Page 104: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:04 2015

Page 13_17lsp_pst0-P1-45_07_gr352.chf

Q42

Page 105: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:08 2015

Page 13_17lsp_pst0-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 106: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:07 2015

Page 13_17lsp_pst0-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 107: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:12 2015

Page 13_17lsp_pst0-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 108: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:11 2015

Page 13_17lsp_pst0-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 109: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:19 2015

Page 14_17lsp_pst89.8-P1-45_00_no_fault.chf

Q42

Page 110: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:18 2015

Page 14_17lsp_pst89.8-P1-45_00_no_fault.chf

Q42

Page 111: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:27 2015

Page 14_17lsp_pst89.8-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 112: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:26 2015

Page 14_17lsp_pst89.8-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 113: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:37 2015

Page 14_17lsp_pst89.8-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 114: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:35 2015

Page 14_17lsp_pst89.8-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 115: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:48 2015

Page 14_17lsp_pst89.8-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 116: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:47 2015

Page 14_17lsp_pst89.8-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 117: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:57 2015

Page 14_17lsp_pst89.8-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 118: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:35:56 2015

Page 14_17lsp_pst89.8-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 119: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:02 2015

Page 14_17lsp_pst89.8-P1-45_05_gr152.chf

Q42

Page 120: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:01 2015

Page 14_17lsp_pst89.8-P1-45_05_gr152.chf

Q42

Page 121: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:08 2015

Page 14_17lsp_pst89.8-P1-45_06_gr252.chf

Q42

Page 122: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:07 2015

Page 14_17lsp_pst89.8-P1-45_06_gr252.chf

Q42

Page 123: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:15 2015

Page 14_17lsp_pst89.8-P1-45_07_gr352.chf

Q42

Page 124: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:13 2015

Page 14_17lsp_pst89.8-P1-45_07_gr352.chf

Q42

Page 125: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:19 2015

Page 14_17lsp_pst89.8-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 126: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:18 2015

Page 14_17lsp_pst89.8-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 127: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:23 2015

Page 14_17lsp_pst89.8-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 128: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:22 2015

Page 14_17lsp_pst89.8-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 129: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:29 2015

Page 15_17lsp_pst25.3-P2-70_00_no_fault.chf

Q42

Page 130: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:28 2015

Page 15_17lsp_pst25.3-P2-70_00_no_fault.chf

Q42

Page 131: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:34 2015

Page 15_17lsp_pst25.3-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 132: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:33 2015

Page 15_17lsp_pst25.3-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 133: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:39 2015

Page 15_17lsp_pst25.3-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 134: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:38 2015

Page 15_17lsp_pst25.3-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 135: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:45 2015

Page 15_17lsp_pst25.3-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 136: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:44 2015

Page 15_17lsp_pst25.3-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 137: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:50 2015

Page 15_17lsp_pst25.3-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 138: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:49 2015

Page 15_17lsp_pst25.3-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 139: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:54 2015

Page 15_17lsp_pst25.3-P2-70_05_gr152.chf

Q42

Page 140: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:53 2015

Page 15_17lsp_pst25.3-P2-70_05_gr152.chf

Q42

Page 141: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:00 2015

Page 15_17lsp_pst25.3-P2-70_06_gr252.chf

Q42

Page 142: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:36:58 2015

Page 15_17lsp_pst25.3-P2-70_06_gr252.chf

Q42

Page 143: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:06 2015

Page 15_17lsp_pst25.3-P2-70_07_gr352.chf

Q42

Page 144: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:05 2015

Page 15_17lsp_pst25.3-P2-70_07_gr352.chf

Q42

Page 145: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:12 2015

Page 15_17lsp_pst25.3-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 146: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:11 2015

Page 15_17lsp_pst25.3-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 147: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:18 2015

Page 15_17lsp_pst25.3-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 148: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:16 2015

Page 15_17lsp_pst25.3-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 149: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:24 2015

Page 16_17lsp_pst114.7-P2-70_00_no_fault.chf

Q42

Page 150: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:23 2015

Page 16_17lsp_pst114.7-P2-70_00_no_fault.chf

Q42

Page 151: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:32 2015

Page 16_17lsp_pst114.7-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 152: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:31 2015

Page 16_17lsp_pst114.7-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 153: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:37 2015

Page 16_17lsp_pst114.7-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 154: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:36 2015

Page 16_17lsp_pst114.7-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 155: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:45 2015

Page 16_17lsp_pst114.7-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 156: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:43 2015

Page 16_17lsp_pst114.7-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 157: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:52 2015

Page 16_17lsp_pst114.7-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 158: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:51 2015

Page 16_17lsp_pst114.7-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 159: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:58 2015

Page 16_17lsp_pst114.7-P2-70_05_gr152.chf

Q42

Page 160: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:37:57 2015

Page 16_17lsp_pst114.7-P2-70_05_gr152.chf

Q42

Page 161: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:06 2015

Page 16_17lsp_pst114.7-P2-70_06_gr252.chf

Q42

Page 162: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:05 2015

Page 16_17lsp_pst114.7-P2-70_06_gr252.chf

Q42

Page 163: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:13 2015

Page 16_17lsp_pst114.7-P2-70_07_gr352.chf

Q42

Page 164: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:12 2015

Page 16_17lsp_pst114.7-P2-70_07_gr352.chf

Q42

Page 165: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:21 2015

Page 16_17lsp_pst114.7-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 166: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:20 2015

Page 16_17lsp_pst114.7-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 167: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:29 2015

Page 16_17lsp_pst114.7-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 168: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2017 LSP1-S BASE CASENOVEMBER 6, 2014ALL COMMENTS FROM TSS REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:38:28 2015

Page 16_17lsp_pst114.7-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 169: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:42 2015

Page 10_17hs_pre0_00_no_fault.chf

Q42

Page 170: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:41 2015

Page 10_17hs_pre0_00_no_fault.chf

Q42

Page 171: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:45 2015

Page 10_17hs_pre0_01_Griffith-Clifrose69.chf

Q42

Page 172: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:44 2015

Page 10_17hs_pre0_01_Griffith-Clifrose69.chf

Q42

Page 173: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:48 2015

Page 10_17hs_pre0_02_GriffithT1-XFMR-slo.chf

Q42

Page 174: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:47 2015

Page 10_17hs_pre0_02_GriffithT1-XFMR-slo.chf

Q42

Page 175: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:51 2015

Page 10_17hs_pre0_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 176: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:50 2015

Page 10_17hs_pre0_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 177: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:54 2015

Page 10_17hs_pre0_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 178: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:53 2015

Page 10_17hs_pre0_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 179: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:57 2015

Page 10_17hs_pre0_05_gr152.chf

Q42

Page 180: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:56 2015

Page 10_17hs_pre0_05_gr152.chf

Q42

Page 181: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:00 2015

Page 10_17hs_pre0_06_gr252.chf

Q42

Page 182: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:23:59 2015

Page 10_17hs_pre0_06_gr252.chf

Q42

Page 183: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:03 2015

Page 10_17hs_pre0_07_gr352.chf

Q42

Page 184: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:02 2015

Page 10_17hs_pre0_07_gr352.chf

Q42

Page 185: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:06 2015

Page 10_17hs_pre0_08_BLKMTN1-nofault-slo.chf

Q42

Page 186: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:05 2015

Page 10_17hs_pre0_08_BLKMTN1-nofault-slo.chf

Q42

Page 187: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:09 2015

Page 10_17hs_pre0_09_BLKMTN2-nofault-slo.chf

Q42

Page 188: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:09 2015

Page 10_17hs_pre0_09_BLKMTN2-nofault-slo.chf

Q42

Page 189: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:12 2015

Page 11_17hs_pre22.8_00_no_fault.chf

Q42

Page 190: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:12 2015

Page 11_17hs_pre22.8_00_no_fault.chf

Q42

Page 191: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:15 2015

Page 11_17hs_pre22.8_01_Griffith-Clifrose69.chf

Q42

Page 192: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:15 2015

Page 11_17hs_pre22.8_01_Griffith-Clifrose69.chf

Q42

Page 193: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:19 2015

Page 11_17hs_pre22.8_02_GriffithT1-XFMR-slo.chf

Q42

Page 194: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:18 2015

Page 11_17hs_pre22.8_02_GriffithT1-XFMR-slo.chf

Q42

Page 195: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:22 2015

Page 11_17hs_pre22.8_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 196: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:21 2015

Page 11_17hs_pre22.8_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 197: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:26 2015

Page 11_17hs_pre22.8_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 198: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:26 2015

Page 11_17hs_pre22.8_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 199: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:30 2015

Page 11_17hs_pre22.8_05_gr152.chf

Q42

Page 200: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:29 2015

Page 11_17hs_pre22.8_05_gr152.chf

Q42

Page 201: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:34 2015

Page 11_17hs_pre22.8_06_gr252.chf

Q42

Page 202: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:34 2015

Page 11_17hs_pre22.8_06_gr252.chf

Q42

Page 203: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:38 2015

Page 11_17hs_pre22.8_07_gr352.chf

Q42

Page 204: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:38 2015

Page 11_17hs_pre22.8_07_gr352.chf

Q42

Page 205: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:42 2015

Page 11_17hs_pre22.8_08_BLKMTN1-nofault-slo.chf

Q42

Page 206: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:41 2015

Page 11_17hs_pre22.8_08_BLKMTN1-nofault-slo.chf

Q42

Page 207: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:45 2015

Page 11_17hs_pre22.8_09_BLKMTN2-nofault-slo.chf

Q42

Page 208: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:45 2015

Page 11_17hs_pre22.8_09_BLKMTN2-nofault-slo.chf

Q42

Page 209: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:49 2015

Page 12_17hs_pre(-66.7)_00_no_fault.chf

Q42

Page 210: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:48 2015

Page 12_17hs_pre(-66.7)_00_no_fault.chf

Q42

Page 211: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:52 2015

Page 12_17hs_pre(-66.7)_01_Griffith-Clifrose69.chf

Q42

Page 212: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:52 2015

Page 12_17hs_pre(-66.7)_01_Griffith-Clifrose69.chf

Q42

Page 213: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:57 2015

Page 12_17hs_pre(-66.7)_02_GriffithT1-XFMR-slo.chf

Q42

Page 214: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:56 2015

Page 12_17hs_pre(-66.7)_02_GriffithT1-XFMR-slo.chf

Q42

Page 215: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:00 2015

Page 12_17hs_pre(-66.7)_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 216: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:24:59 2015

Page 12_17hs_pre(-66.7)_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 217: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:04 2015

Page 12_17hs_pre(-66.7)_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 218: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:03 2015

Page 12_17hs_pre(-66.7)_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 219: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:08 2015

Page 12_17hs_pre(-66.7)_05_gr152.chf

Q42

Page 220: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:07 2015

Page 12_17hs_pre(-66.7)_05_gr152.chf

Q42

Page 221: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:12 2015

Page 12_17hs_pre(-66.7)_06_gr252.chf

Q42

Page 222: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:11 2015

Page 12_17hs_pre(-66.7)_06_gr252.chf

Q42

Page 223: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:15 2015

Page 12_17hs_pre(-66.7)_07_gr352.chf

Q42

Page 224: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:14 2015

Page 12_17hs_pre(-66.7)_07_gr352.chf

Q42

Page 225: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:19 2015

Page 12_17hs_pre(-66.7)_08_BLKMTN1-nofault-slo.chf

Q42

Page 226: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:18 2015

Page 12_17hs_pre(-66.7)_08_BLKMTN1-nofault-slo.chf

Q42

Page 227: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:22 2015

Page 12_17hs_pre(-66.7)_09_BLKMTN2-nofault-slo.chf

Q42

Page 228: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:21 2015

Page 12_17hs_pre(-66.7)_09_BLKMTN2-nofault-slo.chf

Q42

Page 229: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:26 2015

Page 13_17hs_pst0-P1-45_00_no_fault.chf

Q42

Page 230: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:25 2015

Page 13_17hs_pst0-P1-45_00_no_fault.chf

Q42

Page 231: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:31 2015

Page 13_17hs_pst0-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 232: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:30 2015

Page 13_17hs_pst0-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 233: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:35 2015

Page 13_17hs_pst0-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 234: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:34 2015

Page 13_17hs_pst0-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 235: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:40 2015

Page 13_17hs_pst0-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 236: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:39 2015

Page 13_17hs_pst0-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 237: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:45 2015

Page 13_17hs_pst0-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 238: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:44 2015

Page 13_17hs_pst0-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 239: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:48 2015

Page 13_17hs_pst0-P1-45_05_gr152.chf

Q42

Page 240: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:47 2015

Page 13_17hs_pst0-P1-45_05_gr152.chf

Q42

Page 241: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:52 2015

Page 13_17hs_pst0-P1-45_06_gr252.chf

Q42

Page 242: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:51 2015

Page 13_17hs_pst0-P1-45_06_gr252.chf

Q42

Page 243: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:55 2015

Page 13_17hs_pst0-P1-45_07_gr352.chf

Q42

Page 244: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:54 2015

Page 13_17hs_pst0-P1-45_07_gr352.chf

Q42

Page 245: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:59 2015

Page 13_17hs_pst0-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 246: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:25:58 2015

Page 13_17hs_pst0-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 247: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:04 2015

Page 13_17hs_pst0-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 248: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:03 2015

Page 13_17hs_pst0-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 249: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:08 2015

Page 14_17hs_pst67.5-P1-45_00_no_fault.chf

Q42

Page 250: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:07 2015

Page 14_17hs_pst67.5-P1-45_00_no_fault.chf

Q42

Page 251: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:12 2015

Page 14_17hs_pst67.5-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 252: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:11 2015

Page 14_17hs_pst67.5-P1-45_01_Griffith-Clifrose69.chf

Q42

Page 253: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:16 2015

Page 14_17hs_pst67.5-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 254: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:15 2015

Page 14_17hs_pst67.5-P1-45_02_GriffithT1-XFMR-slo.chf

Q42

Page 255: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:20 2015

Page 14_17hs_pst67.5-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 256: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:19 2015

Page 14_17hs_pst67.5-P1-45_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 257: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:25 2015

Page 14_17hs_pst67.5-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 258: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:24 2015

Page 14_17hs_pst67.5-P1-45_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 259: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:29 2015

Page 14_17hs_pst67.5-P1-45_05_gr152.chf

Q42

Page 260: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:28 2015

Page 14_17hs_pst67.5-P1-45_05_gr152.chf

Q42

Page 261: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:34 2015

Page 14_17hs_pst67.5-P1-45_06_gr252.chf

Q42

Page 262: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:33 2015

Page 14_17hs_pst67.5-P1-45_06_gr252.chf

Q42

Page 263: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:38 2015

Page 14_17hs_pst67.5-P1-45_07_gr352.chf

Q42

Page 264: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:37 2015

Page 14_17hs_pst67.5-P1-45_07_gr352.chf

Q42

Page 265: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:42 2015

Page 14_17hs_pst67.5-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 266: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:41 2015

Page 14_17hs_pst67.5-P1-45_08_BLKMTN1-nofault-slo.chf

Q42

Page 267: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:46 2015

Page 14_17hs_pst67.5-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 268: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:45 2015

Page 14_17hs_pst67.5-P1-45_09_BLKMTN2-nofault-slo.chf

Q42

Page 269: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:50 2015

Page 15_17hs_pst(-2.7)-P2-70_00_no_fault.chf

Q42

Page 270: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:49 2015

Page 15_17hs_pst(-2.7)-P2-70_00_no_fault.chf

Q42

Page 271: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:55 2015

Page 15_17hs_pst(-2.7)-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 272: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:54 2015

Page 15_17hs_pst(-2.7)-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 273: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:59 2015

Page 15_17hs_pst(-2.7)-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 274: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:26:58 2015

Page 15_17hs_pst(-2.7)-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 275: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:05 2015

Page 15_17hs_pst(-2.7)-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 276: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:04 2015

Page 15_17hs_pst(-2.7)-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 277: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:11 2015

Page 15_17hs_pst(-2.7)-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 278: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:09 2015

Page 15_17hs_pst(-2.7)-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 279: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:16 2015

Page 15_17hs_pst(-2.7)-P2-70_05_gr152.chf

Q42

Page 280: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:14 2015

Page 15_17hs_pst(-2.7)-P2-70_05_gr152.chf

Q42

Page 281: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:40 2015

Page 15_17hs_pst(-2.7)-P2-70_06_gr252.chf

Q42

Page 282: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:38 2015

Page 15_17hs_pst(-2.7)-P2-70_06_gr252.chf

Q42

Page 283: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:47 2015

Page 15_17hs_pst(-2.7)-P2-70_07_gr352.chf

Q42

Page 284: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:27:46 2015

Page 15_17hs_pst(-2.7)-P2-70_07_gr352.chf

Q42

Page 285: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:04 2015

Page 15_17hs_pst(-2.7)-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 286: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:03 2015

Page 15_17hs_pst(-2.7)-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 287: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:11 2015

Page 15_17hs_pst(-2.7)-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 288: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:10 2015

Page 15_17hs_pst(-2.7)-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 289: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:15 2015

Page 16_17hs_pst(92.5)-P2-70_00_no_fault.chf

Q42

Page 290: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:14 2015

Page 16_17hs_pst(92.5)-P2-70_00_no_fault.chf

Q42

Page 291: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:19 2015

Page 16_17hs_pst(92.5)-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 292: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:18 2015

Page 16_17hs_pst(92.5)-P2-70_01_Griffith-Clifrose69.chf

Q42

Page 293: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:23 2015

Page 16_17hs_pst(92.5)-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 294: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:22 2015

Page 16_17hs_pst(92.5)-P2-70_02_GriffithT1-XFMR-slo.chf

Q42

Page 295: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:27 2015

Page 16_17hs_pst(92.5)-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 296: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:26 2015

Page 16_17hs_pst(92.5)-P2-70_03_GRIFFITH-MCCONICO230kV.chf

Q42

Page 297: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:32 2015

Page 16_17hs_pst(92.5)-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 298: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:30 2015

Page 16_17hs_pst(92.5)-P2-70_04_GRIFFITH-PEACOCK230kV.chf

Q42

Page 299: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:36 2015

Page 16_17hs_pst(92.5)-P2-70_05_gr152.chf

Q42

Page 300: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:35 2015

Page 16_17hs_pst(92.5)-P2-70_05_gr152.chf

Q42

Page 301: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:40 2015

Page 16_17hs_pst(92.5)-P2-70_06_gr252.chf

Q42

Page 302: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:39 2015

Page 16_17hs_pst(92.5)-P2-70_06_gr252.chf

Q42

Page 303: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:45 2015

Page 16_17hs_pst(92.5)-P2-70_07_gr352.chf

Q42

Page 304: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:43 2015

Page 16_17hs_pst(92.5)-P2-70_07_gr352.chf

Q42

Page 305: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:49 2015

Page 16_17hs_pst(92.5)-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 306: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:47 2015

Page 16_17hs_pst(92.5)-P2-70_08_BLKMTN1-nofault-slo.chf

Q42

Page 307: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Frequency

59.40

60.60

59.4000 a fbul 16804 GRIFFITH 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19310 GRIFFITH 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 16840 BLK_MTN 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 90071 CLIFROSE 69.0 0 0.0 1 1 60.6000 59.4000 a fbus 19056 MCCONICO 230.0 0 0.0 1 1 60.6000 59.4000 a fbus 19314 PEACOCK 230.0 0 0.0 1 1 60.6000

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:53 2015

Page 16_17hs_pst(92.5)-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 308: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Voltage

0.75

1.25

0.7500 a vbul 16804 GRIFFITH 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19310 GRIFFITH 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 16840 BLK_MTN 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 90071 CLIFROSE 69.0 0 0.0 1 1 1.2500 0.7500 a vbus 19056 MCCONICO 230.0 0 0.0 1 1 1.2500 0.7500 a vbus 19314 PEACOCK 230.0 0 0.0 1 1 1.2500

Time( sec )-1.0 15.0

PV SolarSystem Impact Study

WESTERN ELECTRICITY COORDINATING COUNCIL2015 HEAVY SUMMER OPERATING CASEDECEMBER 5, 2014ALL COMMENTS FROM TSS AND OC REVIEW ARE INCLUDED

C:\PDS\TEP\LV\TS

Sat Jun 27 18:28:52 2015

Page 16_17hs_pst(92.5)-P2-70_09_BLKMTN2-nofault-slo.chf

Q42

Page 309: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n1_2_otg.txt[10/21/2015 10:29:43 AM]

# Contingency Selection Criteria: From zone 162 to 162; 0 kV to 500 kV # Contingency List DOES NOT include status off Elements # ******************Single Contingencies Lines and Transfromers**************LINE_1 "GRIFFITH - GRIFTP1A 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 0#LINE_2 "GRIFFITH - YUCCATAP 69kV #1 " 1.000B2B_2 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 00#LINE_3 "GRIFFITH - GRIFTAP3 69kV #1 " 1.000B2B_3 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 00LINE_4 "DAVIS - RIVIERA 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 0LINE_5 "DAVIS - MEAD N 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 0LINE_6 "DAVIS - LONGTIN 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 0LINE_7 "DAVIS - TOPOCK 230kV #2 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0LINE_8 "DAVIS - MCCULLGH 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0LINE_9 "LIBERTY - PEACOCK 345kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0LINE_10 "MCCONICO - DAVIS 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0LINE_11 "MCCONICO - GRIFFITH 230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0LINE_12 "MCCONICO - HARRIS 230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0LINE_13 "HILLTOP - MCCONICO 230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0LINE_14 "GRIFFITH - PEACOCK 230kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0LINE_15 "PEACOCK - HILLTOP 230kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0LINE_16 "PEACOCK - MEAD 345kV #1 " 1.000

Q42

Page 310: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n1_2_otg.txt[10/21/2015 10:29:43 AM]

line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0LINE_17 "RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0LINE_18 "NKINGTAP - GVTAP 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0LINE_19 "SOHI - CHLORJCT 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0LINE_20 "PIERFERR - HIGHWAY 69kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0LINE_21 "GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0LINE_22 "BORIANTP - GOLDROAD 69kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0LINE_23 "GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0LINE_24 "GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0XFMR_25 "HILLTOP1 69/HILLTOP 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0XFMR_26 "HILLTOP2 69/HILLTOP 230kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0XFMR_27 "GRIFFITH 69/230kV #1 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0XFMR_28 "DAVISG1 14/DAVIS 230kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0XFMR_29 "DAVISG2 14/DAVIS 230kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0XFMR_30 "DAVISG3 14/DAVIS 230kV #1" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0XFMR_31 "DAVISG4 14/DAVIS 230kV #1" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0XFMR_32 "DAVISG5 14/DAVIS 230kV #1" 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0XFMR_33 "DAVIS 230/ 69kV #1 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0XFMR_34 "DAVIS 230/ 69kV #2 " 1.000

Q42

Page 311: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n1_2_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0XFMR_35 "GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0XFMR_36 "GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0XFMR_37 "GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0XFMR_38 "PEACOCK 345/230kV #1 " 1.000 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0XFMR_39 "GRIFFITH 69/230kV #2 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0XFMR_40 "BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0XFMR_41 "BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0XFMR_42 "HARRIS 69/230kV #1 " 1.000 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0XFMR_43 "HARRIS 69/230kV #2 " 1.000 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0# ****************************End of Single Contingencies*********************# ******************Generator Contingencies **********************************GEN_44 "BLK_MTN1 13.8kV #1 ( 47) " 1.000 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0GEN_45 "BLK_MTN2 13.8kV #1 ( 47) " 1.000 gen "BLK_MTN2 13.80" "1 " 0 #epcl "redispatch.p" 0# ****************************End of Generator Contingencies********************# **************************Shunt Contingencies ********************************# ****************************End of Shunt Contingencies********************# **************************SVD Contingencies ******************************# ****************************End of SVD Contingencies**********************end# End of Contingency List, 45 Contingencies Added to List

Q42

Page 312: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

# Contingency Selection Criteria: From zone 162 to 162; 0 kV to 500 kV # Contingency List DOES NOT include status off Elements # ****************************End of Single Contingencies*********************# ******************Double Line Contingencies**********************************DBLIN_1 "GRIFFITH - GRIFTP1A 69kV #1 & GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 #B2B_1 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 00DBLIN_2 "GRIFFITH - GRIFTP1A 69kV #1 & GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 #B2B_2 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 00DBLIN_3 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS - RIVIERA 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 0DBLIN_4 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS - MEAD N 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 0DBLIN_5 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS - LONGTIN 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 0DBLIN_6 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS - TOPOCK 230kV #2 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0DBLIN_7 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS - MCCULLGH 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_8 "GRIFFITH - GRIFTP1A 69kV #1 & LIBERTY - PEACOCK 345kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_9 "GRIFFITH - GRIFTP1A 69kV #1 & MCCONICO - DAVIS 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_10 "GRIFFITH - GRIFTP1A 69kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_11 "GRIFFITH - GRIFTP1A 69kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0

Q42

Page 313: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

0DBLIN_12 "GRIFFITH - GRIFTP1A 69kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_13 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_14 "GRIFFITH - GRIFTP1A 69kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_15 "GRIFFITH - GRIFTP1A 69kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_16 "GRIFFITH - GRIFTP1A 69kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_17 "GRIFFITH - GRIFTP1A 69kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_18 "GRIFFITH - GRIFTP1A 69kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_19 "GRIFFITH - GRIFTP1A 69kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_20 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_21 "GRIFFITH - GRIFTP1A 69kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_22 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_23 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_24 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr3" 1.000#B2B_24 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0

Q42

Page 314: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

#B2B_24 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 00DBLIN_25 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS - RIVIERA 230kV #1" 1.000#B2B_25 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 0DBLIN_26 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS - MEAD N 230kV #1" 1.000#B2B_26 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 0DBLIN_27 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS - LONGTIN 230kV #1" 1.000#B2B_27 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 0DBLIN_28 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS - TOPOCK 230kV #2" 1.000#B2B_28 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0DBLIN_29 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS - MCCULLGH 230kV #1" 1.000#B2B_29 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_30 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & LIBERTY - PEACOCK 345kV #1" 1.000#B2B_30 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_31 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & MCCONICO - DAVIS 230kV #1" 1.000#B2B_31 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_32 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & MCCONICO - GRIFFITH 230kV

Q42

Page 315: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

#1" 1.000#B2B_32 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_33 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & MCCONICO - HARRIS 230kV #1" 1.000#B2B_33 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_34 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & HILLTOP - MCCONICO 230kV #1" 1.000#B2B_34 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_35 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH - PEACOCK 230kV #1" 1.000#B2B_35 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_36 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & PEACOCK - HILLTOP 230kV #1" 1.000#B2B_36 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_37 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & PEACOCK - MEAD 345kV #1" 1.000#B2B_37 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_38 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & RNDVLYTP - PEACOCK 230kV #1" 1.000#B2B_38 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_39 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & NKINGTAP - GVTAP 69kV #1" 1.000#B2B_39 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0

Q42

Page 316: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

0DBLIN_40 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & SOHI - CHLORJCT 69kV #1" 1.000#B2B_40 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_41 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & PIERFERR - HIGHWAY 69kV #1" 1.000#B2B_41 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_42 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFTAP2 - SKINGTAP 69kV #1" 1.000#B2B_42 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_43 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & BORIANTP - GOLDROAD 69kV #1" 1.000#B2B_43 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_44 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFTAP3 - BORIANTP 69kV #1" 1.000#B2B_44 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_45 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH - CLIFROSE 69kV #1" 1.000#B2B_45 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_46 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS - RIVIERA 230kV #1" 1.000#B2B_46 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 0DBLIN_47 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS - MEAD N 230kV #1" 1.000#B2B_47 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0

Q42

Page 317: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 0DBLIN_48 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS - LONGTIN 230kV #1" 1.000#B2B_48 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 0DBLIN_49 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS - TOPOCK 230kV #2" 1.000#B2B_49 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0DBLIN_50 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS - MCCULLGH 230kV #1" 1.000#B2B_50 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_51 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & LIBERTY - PEACOCK 345kV #1" 1.000#B2B_51 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_52 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & MCCONICO - DAVIS 230kV #1" 1.000#B2B_52 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_53 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & MCCONICO - GRIFFITH 230kV #1" 1.000#B2B_53 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_54 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & MCCONICO - HARRIS 230kV #1" 1.000#B2B_54 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_55 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & HILLTOP - MCCONICO 230kV #1" 1.000

Q42

Page 318: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

#B2B_55 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_56 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH - PEACOCK 230kV #1" 1.000#B2B_56 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_57 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & PEACOCK - HILLTOP 230kV #1" 1.000#B2B_57 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_58 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & PEACOCK - MEAD 345kV #1" 1.000#B2B_58 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_59 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & RNDVLYTP - PEACOCK 230kV #1" 1.000#B2B_59 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_60 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & NKINGTAP - GVTAP 69kV #1" 1.000#B2B_60 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_61 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & SOHI - CHLORJCT 69kV #1" 1.000#B2B_61 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_62 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & PIERFERR - HIGHWAY 69kV #1" 1.000#B2B_62 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0

Q42

Page 319: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_63 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFTAP2 - SKINGTAP 69kV #1" 1.000#B2B_63 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_64 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & BORIANTP - GOLDROAD 69kV #1" 1.000#B2B_64 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_65 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFTAP3 - BORIANTP 69kV #1" 1.000#B2B_65 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_66 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH - CLIFROSE 69kV #1" 1.000#B2B_66 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_67 "DAVIS - RIVIERA 230kV #1 & DAVIS - MEAD N 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 0DBLIN_68 "DAVIS - RIVIERA 230kV #1 & DAVIS - LONGTIN 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 0DBLIN_69 "DAVIS - RIVIERA 230kV #1 & DAVIS - TOPOCK 230kV #2 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0DBLIN_70 "DAVIS - RIVIERA 230kV #1 & DAVIS - MCCULLGH 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_71 "DAVIS - RIVIERA 230kV #1 & LIBERTY - PEACOCK 345kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_72 "DAVIS - RIVIERA 230kV #1 & MCCONICO - DAVIS 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_73 "DAVIS - RIVIERA 230kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0

Q42

Page 320: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_74 "DAVIS - RIVIERA 230kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_75 "DAVIS - RIVIERA 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_76 "DAVIS - RIVIERA 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_77 "DAVIS - RIVIERA 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_78 "DAVIS - RIVIERA 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_79 "DAVIS - RIVIERA 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_80 "DAVIS - RIVIERA 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_81 "DAVIS - RIVIERA 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_82 "DAVIS - RIVIERA 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_83 "DAVIS - RIVIERA 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_84 "DAVIS - RIVIERA 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_85 "DAVIS - RIVIERA 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_86 "DAVIS - RIVIERA 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0

Q42

Page 321: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_87 "DAVIS - MEAD N 230kV #1 & DAVIS - LONGTIN 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 0DBLIN_88 "DAVIS - MEAD N 230kV #1 & DAVIS - TOPOCK 230kV #2 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0DBLIN_89 "DAVIS - MEAD N 230kV #1 & DAVIS - MCCULLGH 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_90 "DAVIS - MEAD N 230kV #1 & LIBERTY - PEACOCK 345kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_91 "DAVIS - MEAD N 230kV #1 & MCCONICO - DAVIS 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_92 "DAVIS - MEAD N 230kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_93 "DAVIS - MEAD N 230kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_94 "DAVIS - MEAD N 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_95 "DAVIS - MEAD N 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_96 "DAVIS - MEAD N 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_97 "DAVIS - MEAD N 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_98 "DAVIS - MEAD N 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_99 "DAVIS - MEAD N 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_100 "DAVIS - MEAD N 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0

Q42

Page 322: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_101 "DAVIS - MEAD N 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_102 "DAVIS - MEAD N 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_103 "DAVIS - MEAD N 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_104 "DAVIS - MEAD N 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_105 "DAVIS - MEAD N 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_106 "DAVIS - LONGTIN 230kV #1 & DAVIS - TOPOCK 230kV #2 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 0DBLIN_107 "DAVIS - LONGTIN 230kV #1 & DAVIS - MCCULLGH 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_108 "DAVIS - LONGTIN 230kV #1 & LIBERTY - PEACOCK 345kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_109 "DAVIS - LONGTIN 230kV #1 & MCCONICO - DAVIS 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_110 "DAVIS - LONGTIN 230kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_111 "DAVIS - LONGTIN 230kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_112 "DAVIS - LONGTIN 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_113 "DAVIS - LONGTIN 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0

Q42

Page 323: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_114 "DAVIS - LONGTIN 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_115 "DAVIS - LONGTIN 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_116 "DAVIS - LONGTIN 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_117 "DAVIS - LONGTIN 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_118 "DAVIS - LONGTIN 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_119 "DAVIS - LONGTIN 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_120 "DAVIS - LONGTIN 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_121 "DAVIS - LONGTIN 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_122 "DAVIS - LONGTIN 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_123 "DAVIS - LONGTIN 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_124 "DAVIS - TOPOCK 230kV #2 & DAVIS - MCCULLGH 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 0DBLIN_125 "DAVIS - TOPOCK 230kV #2 & LIBERTY - PEACOCK 345kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_126 "DAVIS - TOPOCK 230kV #2 & MCCONICO - DAVIS 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_127 "DAVIS - TOPOCK 230kV #2 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0

Q42

Page 324: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_128 "DAVIS - TOPOCK 230kV #2 & MCCONICO - HARRIS 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_129 "DAVIS - TOPOCK 230kV #2 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_130 "DAVIS - TOPOCK 230kV #2 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_131 "DAVIS - TOPOCK 230kV #2 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_132 "DAVIS - TOPOCK 230kV #2 & PEACOCK - MEAD 345kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_133 "DAVIS - TOPOCK 230kV #2 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_134 "DAVIS - TOPOCK 230kV #2 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_135 "DAVIS - TOPOCK 230kV #2 & SOHI - CHLORJCT 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_136 "DAVIS - TOPOCK 230kV #2 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_137 "DAVIS - TOPOCK 230kV #2 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_138 "DAVIS - TOPOCK 230kV #2 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_139 "DAVIS - TOPOCK 230kV #2 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_140 "DAVIS - TOPOCK 230kV #2 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0

Q42

Page 325: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_141 "DAVIS - MCCULLGH 230kV #1 & LIBERTY - PEACOCK 345kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 0DBLIN_142 "DAVIS - MCCULLGH 230kV #1 & MCCONICO - DAVIS 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_143 "DAVIS - MCCULLGH 230kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_144 "DAVIS - MCCULLGH 230kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_145 "DAVIS - MCCULLGH 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_146 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_147 "DAVIS - MCCULLGH 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_148 "DAVIS - MCCULLGH 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_149 "DAVIS - MCCULLGH 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_150 "DAVIS - MCCULLGH 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_151 "DAVIS - MCCULLGH 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_152 "DAVIS - MCCULLGH 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_153 "DAVIS - MCCULLGH 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_154 "DAVIS - MCCULLGH 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0

Q42

Page 326: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_155 "DAVIS - MCCULLGH 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_156 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_157 "LIBERTY - PEACOCK 345kV #1 & MCCONICO - DAVIS 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 0DBLIN_158 "LIBERTY - PEACOCK 345kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_159 "LIBERTY - PEACOCK 345kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_160 "LIBERTY - PEACOCK 345kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_161 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_162 "LIBERTY - PEACOCK 345kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_163 "LIBERTY - PEACOCK 345kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_164 "LIBERTY - PEACOCK 345kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_165 "LIBERTY - PEACOCK 345kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_166 "LIBERTY - PEACOCK 345kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_167 "LIBERTY - PEACOCK 345kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0

Q42

Page 327: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_168 "LIBERTY - PEACOCK 345kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_169 "LIBERTY - PEACOCK 345kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_170 "LIBERTY - PEACOCK 345kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_171 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_172 "MCCONICO - DAVIS 230kV #1 & MCCONICO - GRIFFITH 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 0DBLIN_173 "MCCONICO - DAVIS 230kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_174 "MCCONICO - DAVIS 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_175 "MCCONICO - DAVIS 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_176 "MCCONICO - DAVIS 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_177 "MCCONICO - DAVIS 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_178 "MCCONICO - DAVIS 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_179 "MCCONICO - DAVIS 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_180 "MCCONICO - DAVIS 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_181 "MCCONICO - DAVIS 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0

Q42

Page 328: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_182 "MCCONICO - DAVIS 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_183 "MCCONICO - DAVIS 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_184 "MCCONICO - DAVIS 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_185 "MCCONICO - DAVIS 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_186 "MCCONICO - GRIFFITH 230kV #1 & MCCONICO - HARRIS 230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 0DBLIN_187 "MCCONICO - GRIFFITH 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_188 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_189 "MCCONICO - GRIFFITH 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_190 "MCCONICO - GRIFFITH 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_191 "MCCONICO - GRIFFITH 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_192 "MCCONICO - GRIFFITH 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_193 "MCCONICO - GRIFFITH 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_194 "MCCONICO - GRIFFITH 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0

Q42

Page 329: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_195 "MCCONICO - GRIFFITH 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_196 "MCCONICO - GRIFFITH 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_197 "MCCONICO - GRIFFITH 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_198 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_199 "MCCONICO - HARRIS 230kV #1 & HILLTOP - MCCONICO 230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 0DBLIN_200 "MCCONICO - HARRIS 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_201 "MCCONICO - HARRIS 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_202 "MCCONICO - HARRIS 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_203 "MCCONICO - HARRIS 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_204 "MCCONICO - HARRIS 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_205 "MCCONICO - HARRIS 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_206 "MCCONICO - HARRIS 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_207 "MCCONICO - HARRIS 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_208 "MCCONICO - HARRIS 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0

Q42

Page 330: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_209 "MCCONICO - HARRIS 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_210 "MCCONICO - HARRIS 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_211 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH - PEACOCK 230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_212 "HILLTOP - MCCONICO 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_213 "HILLTOP - MCCONICO 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_214 "HILLTOP - MCCONICO 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_215 "HILLTOP - MCCONICO 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_216 "HILLTOP - MCCONICO 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_217 "HILLTOP - MCCONICO 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_218 "HILLTOP - MCCONICO 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_219 "HILLTOP - MCCONICO 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_220 "HILLTOP - MCCONICO 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_221 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0

Q42

Page 331: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_222 "GRIFFITH - PEACOCK 230kV #1 & PEACOCK - HILLTOP 230kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 0DBLIN_223 "GRIFFITH - PEACOCK 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_224 "GRIFFITH - PEACOCK 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_225 "GRIFFITH - PEACOCK 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_226 "GRIFFITH - PEACOCK 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_227 "GRIFFITH - PEACOCK 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_228 "GRIFFITH - PEACOCK 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_229 "GRIFFITH - PEACOCK 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_230 "GRIFFITH - PEACOCK 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_231 "GRIFFITH - PEACOCK 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_232 "PEACOCK - HILLTOP 230kV #1 & PEACOCK - MEAD 345kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 0DBLIN_233 "PEACOCK - HILLTOP 230kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_234 "PEACOCK - HILLTOP 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_235 "PEACOCK - HILLTOP 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0

Q42

Page 332: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_236 "PEACOCK - HILLTOP 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_237 "PEACOCK - HILLTOP 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_238 "PEACOCK - HILLTOP 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_239 "PEACOCK - HILLTOP 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_240 "PEACOCK - HILLTOP 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_241 "PEACOCK - MEAD 345kV #1 & RNDVLYTP - PEACOCK 230kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 0DBLIN_242 "PEACOCK - MEAD 345kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_243 "PEACOCK - MEAD 345kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_244 "PEACOCK - MEAD 345kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_245 "PEACOCK - MEAD 345kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_246 "PEACOCK - MEAD 345kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_247 "PEACOCK - MEAD 345kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_248 "PEACOCK - MEAD 345kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0

Q42

Page 333: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_249 "RNDVLYTP - PEACOCK 230kV #1 & NKINGTAP - GVTAP 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 0DBLIN_250 "RNDVLYTP - PEACOCK 230kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_251 "RNDVLYTP - PEACOCK 230kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_252 "RNDVLYTP - PEACOCK 230kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_253 "RNDVLYTP - PEACOCK 230kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_254 "RNDVLYTP - PEACOCK 230kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_255 "RNDVLYTP - PEACOCK 230kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_256 "NKINGTAP - GVTAP 69kV #1 & SOHI - CHLORJCT 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 0DBLIN_257 "NKINGTAP - GVTAP 69kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_258 "NKINGTAP - GVTAP 69kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_259 "NKINGTAP - GVTAP 69kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_260 "NKINGTAP - GVTAP 69kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_261 "NKINGTAP - GVTAP 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_262 "SOHI - CHLORJCT 69kV #1 & PIERFERR - HIGHWAY 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0

Q42

Page 334: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 0DBLIN_263 "SOHI - CHLORJCT 69kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_264 "SOHI - CHLORJCT 69kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_265 "SOHI - CHLORJCT 69kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_266 "SOHI - CHLORJCT 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_267 "PIERFERR - HIGHWAY 69kV #1 & GRIFTAP2 - SKINGTAP 69kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 0DBLIN_268 "PIERFERR - HIGHWAY 69kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_269 "PIERFERR - HIGHWAY 69kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_270 "PIERFERR - HIGHWAY 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_271 "GRIFTAP2 - SKINGTAP 69kV #1 & BORIANTP - GOLDROAD 69kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 0DBLIN_272 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_273 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0DBLIN_274 "BORIANTP - GOLDROAD 69kV #1 & GRIFTAP3 - BORIANTP 69kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 0DBLIN_275 "BORIANTP - GOLDROAD 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0

Q42

Page 335: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBLIN_276 "GRIFTAP3 - BORIANTP 69kV #1 & GRIFFITH - CLIFROSE 69kV #1 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 0# ****************************End of Double Line Contingencies*****************# ******************Double Transformer Contingencies***************************DBXF_277 "HILLTOP1 69/HILLTOP 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0DBXF_278 "HILLTOP1 69/HILLTOP 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0DBXF_279 "HILLTOP1 69/HILLTOP 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_280 "HILLTOP1 69/HILLTOP 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_281 "HILLTOP1 69/HILLTOP 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_282 "HILLTOP1 69/HILLTOP 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_283 "HILLTOP1 69/HILLTOP 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_284 "HILLTOP1 69/HILLTOP 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_285 "HILLTOP1 69/HILLTOP 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_286 "HILLTOP1 69/HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_287 "HILLTOP1 69/HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_288 "HILLTOP1 69/HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0

Q42

Page 336: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBXF_289 "HILLTOP1 69/HILLTOP 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_290 "HILLTOP1 69/HILLTOP 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_291 "HILLTOP1 69/HILLTOP 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_292 "HILLTOP1 69/HILLTOP 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_293 "HILLTOP1 69/HILLTOP 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_294 "HILLTOP1 69/HILLTOP 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_295 "HILLTOP2 69/HILLTOP 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0DBXF_296 "HILLTOP2 69/HILLTOP 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_297 "HILLTOP2 69/HILLTOP 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_298 "HILLTOP2 69/HILLTOP 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_299 "HILLTOP2 69/HILLTOP 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_300 "HILLTOP2 69/HILLTOP 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_301 "HILLTOP2 69/HILLTOP 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_302 "HILLTOP2 69/HILLTOP 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00"

Q42

Page 337: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_303 "HILLTOP2 69/HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_304 "HILLTOP2 69/HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_305 "HILLTOP2 69/HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_306 "HILLTOP2 69/HILLTOP 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_307 "HILLTOP2 69/HILLTOP 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_308 "HILLTOP2 69/HILLTOP 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_309 "HILLTOP2 69/HILLTOP 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_310 "HILLTOP2 69/HILLTOP 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_311 "HILLTOP2 69/HILLTOP 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_312 "GRIFFITH 69/230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_313 "GRIFFITH 69/230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_314 "GRIFFITH 69/230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_315 "GRIFFITH 69/230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0

Q42

Page 338: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBXF_316 "GRIFFITH 69/230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_317 "GRIFFITH 69/230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_318 "GRIFFITH 69/230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_319 "GRIFFITH 69/230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_320 "GRIFFITH 69/230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_321 "GRIFFITH 69/230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_322 "GRIFFITH 69/230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_323 "GRIFFITH 69/230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_324 "GRIFFITH 69/230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_325 "GRIFFITH 69/230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_326 "GRIFFITH 69/230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_327 "GRIFFITH 69/230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_328 "DAVISG1 14/DAVIS 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_329 "DAVISG1 14/DAVIS 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00"

Q42

Page 339: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_330 "DAVISG1 14/DAVIS 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_331 "DAVISG1 14/DAVIS 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_332 "DAVISG1 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_333 "DAVISG1 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_334 "DAVISG1 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_335 "DAVISG1 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_336 "DAVISG1 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_337 "DAVISG1 14/DAVIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_338 "DAVISG1 14/DAVIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_339 "DAVISG1 14/DAVIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_340 "DAVISG1 14/DAVIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_341 "DAVISG1 14/DAVIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_342 "DAVISG1 14/DAVIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0

Q42

Page 340: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBXF_343 "DAVISG2 14/DAVIS 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_344 "DAVISG2 14/DAVIS 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_345 "DAVISG2 14/DAVIS 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_346 "DAVISG2 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_347 "DAVISG2 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_348 "DAVISG2 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_349 "DAVISG2 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_350 "DAVISG2 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_351 "DAVISG2 14/DAVIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_352 "DAVISG2 14/DAVIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_353 "DAVISG2 14/DAVIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_354 "DAVISG2 14/DAVIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_355 "DAVISG2 14/DAVIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_356 "DAVISG2 14/DAVIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00"

Q42

Page 341: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_357 "DAVISG3 14/DAVIS 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_358 "DAVISG3 14/DAVIS 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_359 "DAVISG3 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_360 "DAVISG3 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_361 "DAVISG3 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_362 "DAVISG3 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_363 "DAVISG3 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_364 "DAVISG3 14/DAVIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_365 "DAVISG3 14/DAVIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_366 "DAVISG3 14/DAVIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_367 "DAVISG3 14/DAVIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_368 "DAVISG3 14/DAVIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_369 "DAVISG3 14/DAVIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0

Q42

Page 342: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBXF_370 "DAVISG4 14/DAVIS 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0DBXF_371 "DAVISG4 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_372 "DAVISG4 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_373 "DAVISG4 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_374 "DAVISG4 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_375 "DAVISG4 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_376 "DAVISG4 14/DAVIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_377 "DAVISG4 14/DAVIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_378 "DAVISG4 14/DAVIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_379 "DAVISG4 14/DAVIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_380 "DAVISG4 14/DAVIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_381 "DAVISG4 14/DAVIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_382 "DAVISG5 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0DBXF_383 "DAVISG5 14/DAVIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00"

Q42

Page 343: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_384 "DAVISG5 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_385 "DAVISG5 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_386 "DAVISG5 14/DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_387 "DAVISG5 14/DAVIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_388 "DAVISG5 14/DAVIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_389 "DAVISG5 14/DAVIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_390 "DAVISG5 14/DAVIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_391 "DAVISG5 14/DAVIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_392 "DAVISG5 14/DAVIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_393 "DAVIS 230/ 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0DBXF_394 "DAVIS 230/ 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_395 "DAVIS 230/ 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_396 "DAVIS 230/ 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0

Q42

Page 344: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBXF_397 "DAVIS 230/ 69kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_398 "DAVIS 230/ 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_399 "DAVIS 230/ 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_400 "DAVIS 230/ 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_401 "DAVIS 230/ 69kV #1 & HARRIS 69/230kV #1 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_402 "DAVIS 230/ 69kV #1 & HARRIS 69/230kV #2 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_403 "DAVIS 230/ 69kV #2 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0DBXF_404 "DAVIS 230/ 69kV #2 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_405 "DAVIS 230/ 69kV #2 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_406 "DAVIS 230/ 69kV #2 & PEACOCK 345/230kV #1 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_407 "DAVIS 230/ 69kV #2 & GRIFFITH 69/230kV #2 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_408 "DAVIS 230/ 69kV #2 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_409 "DAVIS 230/ 69kV #2 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_410 "DAVIS 230/ 69kV #2 & HARRIS 69/230kV #1 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00"

Q42

Page 345: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_411 "DAVIS 230/ 69kV #2 & HARRIS 69/230kV #2 " 1.000 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_412 "GRIFFITH 230/GRIFFTH1 18kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0DBXF_413 "GRIFFITH 230/GRIFFTH1 18kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_414 "GRIFFITH 230/GRIFFTH1 18kV #1 & PEACOCK 345/230kV #1 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_415 "GRIFFITH 230/GRIFFTH1 18kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_416 "GRIFFITH 230/GRIFFTH1 18kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_417 "GRIFFITH 230/GRIFFTH1 18kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_418 "GRIFFITH 230/GRIFFTH1 18kV #1 & HARRIS 69/230kV #1 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_419 "GRIFFITH 230/GRIFFTH1 18kV #1 & HARRIS 69/230kV #2 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_420 "GRIFFITH 230/GRIFFTH2 18kV #2 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0DBXF_421 "GRIFFITH 230/GRIFFTH2 18kV #2 & PEACOCK 345/230kV #1 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_422 "GRIFFITH 230/GRIFFTH2 18kV #2 & GRIFFITH 69/230kV #2 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_423 "GRIFFITH 230/GRIFFTH2 18kV #2 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0

Q42

Page 346: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

DBXF_424 "GRIFFITH 230/GRIFFTH2 18kV #2 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_425 "GRIFFITH 230/GRIFFTH2 18kV #2 & HARRIS 69/230kV #1 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_426 "GRIFFITH 230/GRIFFTH2 18kV #2 & HARRIS 69/230kV #2 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_427 "GRIFFITH 230/GRIFFTH3 18kV #3 & PEACOCK 345/230kV #1 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0DBXF_428 "GRIFFITH 230/GRIFFTH3 18kV #3 & GRIFFITH 69/230kV #2 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_429 "GRIFFITH 230/GRIFFTH3 18kV #3 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_430 "GRIFFITH 230/GRIFFTH3 18kV #3 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_431 "GRIFFITH 230/GRIFFTH3 18kV #3 & HARRIS 69/230kV #1 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_432 "GRIFFITH 230/GRIFFTH3 18kV #3 & HARRIS 69/230kV #2 " 1.000 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_433 "PEACOCK 345/230kV #1 & GRIFFITH 69/230kV #2 " 1.000 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0DBXF_434 "PEACOCK 345/230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_435 "PEACOCK 345/230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_436 "PEACOCK 345/230kV #1 & HARRIS 69/230kV #1 " 1.000 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_437 "PEACOCK 345/230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00"

Q42

Page 347: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_438 "GRIFFITH 69/230kV #2 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_439 "GRIFFITH 69/230kV #2 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_440 "GRIFFITH 69/230kV #2 & HARRIS 69/230kV #1 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_441 "GRIFFITH 69/230kV #2 & HARRIS 69/230kV #2 " 1.000 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_442 "BLK_MTN1 14/BLK_MTN 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0DBXF_443 "BLK_MTN1 14/BLK_MTN 69kV #1 & HARRIS 69/230kV #1 " 1.000 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_444 "BLK_MTN1 14/BLK_MTN 69kV #1 & HARRIS 69/230kV #2 " 1.000 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_445 "BLK_MTN2 14/BLK_MTN 69kV #1 & HARRIS 69/230kV #1 " 1.000 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0DBXF_446 "BLK_MTN2 14/BLK_MTN 69kV #1 & HARRIS 69/230kV #2 " 1.000 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0DBXF_447 "HARRIS 69/230kV #1 & HARRIS 69/230kV #2 " 1.000 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0# *********************End of Double Transformer Contingencies*****************# ******************Double Generator Contingencies***************************DBGEN_448 "BLK_MTN1 13.8kV #1 ( 47) & BLK_MTN2 13.8kV #1 ( 47) " 1.000 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0# ********************End of Double Generators Contingencies************# ******************Paired Lines and Transformers Contingencies****************LNXFR_449 "GRIFFITH - GRIFTP1A 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000

Q42

Page 348: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_450 "GRIFFITH - GRIFTP1A 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_451 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_452 "GRIFFITH - GRIFTP1A 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_453 "GRIFFITH - GRIFTP1A 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_454 "GRIFFITH - GRIFTP1A 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_455 "GRIFFITH - GRIFTP1A 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_456 "GRIFFITH - GRIFTP1A 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_457 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_458 "GRIFFITH - GRIFTP1A 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_459 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_460 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_461 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_462 "GRIFFITH - GRIFTP1A 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00"

Q42

Page 349: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

0LNXFR_463 "GRIFFITH - GRIFTP1A 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_464 "GRIFFITH - GRIFTP1A 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_465 "GRIFFITH - GRIFTP1A 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_466 "GRIFFITH - GRIFTP1A 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_467 "GRIFFITH - GRIFTP1A 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_468 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & HILLTOP1 69/HILLTOP 230kV " 1.000#B2B_468 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_469 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & HILLTOP2 69/HILLTOP 230kV " 1.000#B2B_469 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_470 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH 69/230kV #1 " 1.000#B2B_470 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_471 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVISG1 14/DAVIS 230kV " 1.000#B2B_471 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_472 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVISG2 14/DAVIS 230kV " 1.000#B2B_472 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0

Q42

Page 350: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_473 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVISG3 14/DAVIS 230kV " 1.000#B2B_473 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_474 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVISG4 14/DAVIS 230kV " 1.000#B2B_474 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_475 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVISG5 14/DAVIS 230kV " 1.000#B2B_475 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_476 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS 230/ 69kV #1 " 1.000#B2B_476 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_477 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & DAVIS 230/ 69kV #2 " 1.000#B2B_477 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_478 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH 230/GRIFFTH1 18kV " 1.000#B2B_478 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_479 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH 230/GRIFFTH2 18kV " 1.000#B2B_479 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_480 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH 230/GRIFFTH3 18kV " 1.000#B2B_480 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0

Q42

Page 351: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_481 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & PEACOCK 345/230kV #1 " 1.000#B2B_481 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_482 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & GRIFFITH 69/230kV #2 " 1.000#B2B_482 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_483 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & BLK_MTN1 14/BLK_MTN 69kV " 1.000#B2B_483 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_484 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & BLK_MTN2 14/BLK_MTN 69kV " 1.000#B2B_484 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_485 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & HARRIS 69/230kV #1 " 1.000#B2B_485 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_486 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & HARRIS 69/230kV #2 " 1.000#B2B_486 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_487 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & HILLTOP1 69/HILLTOP 230kV " 1.000#B2B_487 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_488 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & HILLTOP2 69/HILLTOP 230kV " 1.000#B2B_488 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0

Q42

Page 352: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_489 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH 69/230kV #1 " 1.000#B2B_489 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_490 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVISG1 14/DAVIS 230kV " 1.000#B2B_490 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_491 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVISG2 14/DAVIS 230kV " 1.000#B2B_491 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_492 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVISG3 14/DAVIS 230kV " 1.000#B2B_492 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_493 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVISG4 14/DAVIS 230kV " 1.000#B2B_493 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_494 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVISG5 14/DAVIS 230kV " 1.000#B2B_494 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_495 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS 230/ 69kV #1 " 1.000#B2B_495 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_496 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & DAVIS 230/ 69kV #2 " 1.000#B2B_496 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00"

Q42

Page 353: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

0LNXFR_497 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH 230/GRIFFTH1 18kV " 1.000#B2B_497 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_498 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH 230/GRIFFTH2 18kV " 1.000#B2B_498 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_499 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH 230/GRIFFTH3 18kV " 1.000#B2B_499 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_500 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & PEACOCK 345/230kV #1 " 1.000#B2B_500 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_501 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & GRIFFITH 69/230kV #2 " 1.000#B2B_501 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_502 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & BLK_MTN1 14/BLK_MTN 69kV " 1.000#B2B_502 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_503 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & BLK_MTN2 14/BLK_MTN 69kV " 1.000#B2B_503 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_504 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & HARRIS 69/230kV #1 " 1.000#B2B_504 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0

Q42

Page 354: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_505 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & HARRIS 69/230kV #2 " 1.000#B2B_505 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_506 "DAVIS - RIVIERA 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_507 "DAVIS - RIVIERA 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_508 "DAVIS - RIVIERA 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_509 "DAVIS - RIVIERA 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_510 "DAVIS - RIVIERA 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_511 "DAVIS - RIVIERA 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_512 "DAVIS - RIVIERA 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_513 "DAVIS - RIVIERA 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_514 "DAVIS - RIVIERA 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_515 "DAVIS - RIVIERA 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_516 "DAVIS - RIVIERA 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_517 "DAVIS - RIVIERA 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0

Q42

Page 355: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_518 "DAVIS - RIVIERA 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_519 "DAVIS - RIVIERA 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_520 "DAVIS - RIVIERA 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_521 "DAVIS - RIVIERA 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_522 "DAVIS - RIVIERA 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_523 "DAVIS - RIVIERA 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_524 "DAVIS - RIVIERA 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_525 "DAVIS - MEAD N 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_526 "DAVIS - MEAD N 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_527 "DAVIS - MEAD N 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_528 "DAVIS - MEAD N 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_529 "DAVIS - MEAD N 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_530 "DAVIS - MEAD N 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_531 "DAVIS - MEAD N 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0

Q42

Page 356: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_532 "DAVIS - MEAD N 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_533 "DAVIS - MEAD N 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_534 "DAVIS - MEAD N 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_535 "DAVIS - MEAD N 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_536 "DAVIS - MEAD N 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_537 "DAVIS - MEAD N 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_538 "DAVIS - MEAD N 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_539 "DAVIS - MEAD N 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_540 "DAVIS - MEAD N 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_541 "DAVIS - MEAD N 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_542 "DAVIS - MEAD N 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_543 "DAVIS - MEAD N 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_544 "DAVIS - LONGTIN 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0

Q42

Page 357: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_545 "DAVIS - LONGTIN 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_546 "DAVIS - LONGTIN 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_547 "DAVIS - LONGTIN 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_548 "DAVIS - LONGTIN 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_549 "DAVIS - LONGTIN 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_550 "DAVIS - LONGTIN 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_551 "DAVIS - LONGTIN 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_552 "DAVIS - LONGTIN 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_553 "DAVIS - LONGTIN 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_554 "DAVIS - LONGTIN 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_555 "DAVIS - LONGTIN 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_556 "DAVIS - LONGTIN 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_557 "DAVIS - LONGTIN 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_558 "DAVIS - LONGTIN 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0

Q42

Page 358: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_559 "DAVIS - LONGTIN 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_560 "DAVIS - LONGTIN 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_561 "DAVIS - LONGTIN 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_562 "DAVIS - LONGTIN 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_563 "DAVIS - TOPOCK 230kV #2 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_564 "DAVIS - TOPOCK 230kV #2 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_565 "DAVIS - TOPOCK 230kV #2 & GRIFFITH 69/230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_566 "DAVIS - TOPOCK 230kV #2 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_567 "DAVIS - TOPOCK 230kV #2 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_568 "DAVIS - TOPOCK 230kV #2 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_569 "DAVIS - TOPOCK 230kV #2 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_570 "DAVIS - TOPOCK 230kV #2 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_571 "DAVIS - TOPOCK 230kV #2 & DAVIS 230/ 69kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0

Q42

Page 359: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_572 "DAVIS - TOPOCK 230kV #2 & DAVIS 230/ 69kV #2 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_573 "DAVIS - TOPOCK 230kV #2 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_574 "DAVIS - TOPOCK 230kV #2 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_575 "DAVIS - TOPOCK 230kV #2 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_576 "DAVIS - TOPOCK 230kV #2 & PEACOCK 345/230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_577 "DAVIS - TOPOCK 230kV #2 & GRIFFITH 69/230kV #2 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_578 "DAVIS - TOPOCK 230kV #2 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_579 "DAVIS - TOPOCK 230kV #2 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_580 "DAVIS - TOPOCK 230kV #2 & HARRIS 69/230kV #1 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_581 "DAVIS - TOPOCK 230kV #2 & HARRIS 69/230kV #2 " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_582 "DAVIS - MCCULLGH 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_583 "DAVIS - MCCULLGH 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_584 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_585 "DAVIS - MCCULLGH 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0

Q42

Page 360: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_586 "DAVIS - MCCULLGH 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_587 "DAVIS - MCCULLGH 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_588 "DAVIS - MCCULLGH 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_589 "DAVIS - MCCULLGH 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_590 "DAVIS - MCCULLGH 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_591 "DAVIS - MCCULLGH 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_592 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_593 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_594 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_595 "DAVIS - MCCULLGH 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_596 "DAVIS - MCCULLGH 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_597 "DAVIS - MCCULLGH 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_598 "DAVIS - MCCULLGH 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0

Q42

Page 361: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_599 "DAVIS - MCCULLGH 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_600 "DAVIS - MCCULLGH 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_601 "LIBERTY - PEACOCK 345kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_602 "LIBERTY - PEACOCK 345kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_603 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_604 "LIBERTY - PEACOCK 345kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_605 "LIBERTY - PEACOCK 345kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_606 "LIBERTY - PEACOCK 345kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_607 "LIBERTY - PEACOCK 345kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_608 "LIBERTY - PEACOCK 345kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_609 "LIBERTY - PEACOCK 345kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_610 "LIBERTY - PEACOCK 345kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_611 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_612 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0

Q42

Page 362: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_613 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_614 "LIBERTY - PEACOCK 345kV #1 & PEACOCK 345/230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_615 "LIBERTY - PEACOCK 345kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_616 "LIBERTY - PEACOCK 345kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_617 "LIBERTY - PEACOCK 345kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_618 "LIBERTY - PEACOCK 345kV #1 & HARRIS 69/230kV #1 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_619 "LIBERTY - PEACOCK 345kV #1 & HARRIS 69/230kV #2 " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_620 "MCCONICO - DAVIS 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_621 "MCCONICO - DAVIS 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_622 "MCCONICO - DAVIS 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_623 "MCCONICO - DAVIS 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_624 "MCCONICO - DAVIS 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_625 "MCCONICO - DAVIS 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0

Q42

Page 363: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_626 "MCCONICO - DAVIS 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_627 "MCCONICO - DAVIS 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_628 "MCCONICO - DAVIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_629 "MCCONICO - DAVIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_630 "MCCONICO - DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_631 "MCCONICO - DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_632 "MCCONICO - DAVIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_633 "MCCONICO - DAVIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_634 "MCCONICO - DAVIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_635 "MCCONICO - DAVIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_636 "MCCONICO - DAVIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_637 "MCCONICO - DAVIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_638 "MCCONICO - DAVIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_639 "MCCONICO - GRIFFITH 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0

Q42

Page 364: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_640 "MCCONICO - GRIFFITH 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_641 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_642 "MCCONICO - GRIFFITH 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_643 "MCCONICO - GRIFFITH 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_644 "MCCONICO - GRIFFITH 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_645 "MCCONICO - GRIFFITH 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_646 "MCCONICO - GRIFFITH 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_647 "MCCONICO - GRIFFITH 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_648 "MCCONICO - GRIFFITH 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_649 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_650 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_651 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_652 "MCCONICO - GRIFFITH 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0

Q42

Page 365: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_653 "MCCONICO - GRIFFITH 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_654 "MCCONICO - GRIFFITH 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_655 "MCCONICO - GRIFFITH 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_656 "MCCONICO - GRIFFITH 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_657 "MCCONICO - GRIFFITH 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_658 "MCCONICO - HARRIS 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_659 "MCCONICO - HARRIS 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_660 "MCCONICO - HARRIS 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_661 "MCCONICO - HARRIS 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_662 "MCCONICO - HARRIS 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_663 "MCCONICO - HARRIS 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_664 "MCCONICO - HARRIS 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_665 "MCCONICO - HARRIS 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_666 "MCCONICO - HARRIS 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0

Q42

Page 366: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_667 "MCCONICO - HARRIS 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_668 "MCCONICO - HARRIS 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_669 "MCCONICO - HARRIS 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_670 "MCCONICO - HARRIS 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_671 "MCCONICO - HARRIS 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_672 "MCCONICO - HARRIS 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_673 "MCCONICO - HARRIS 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_674 "MCCONICO - HARRIS 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_675 "MCCONICO - HARRIS 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_676 "MCCONICO - HARRIS 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_677 "HILLTOP - MCCONICO 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_678 "HILLTOP - MCCONICO 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_679 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0

Q42

Page 367: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_680 "HILLTOP - MCCONICO 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_681 "HILLTOP - MCCONICO 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_682 "HILLTOP - MCCONICO 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_683 "HILLTOP - MCCONICO 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_684 "HILLTOP - MCCONICO 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_685 "HILLTOP - MCCONICO 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_686 "HILLTOP - MCCONICO 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_687 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_688 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_689 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_690 "HILLTOP - MCCONICO 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_691 "HILLTOP - MCCONICO 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_692 "HILLTOP - MCCONICO 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_693 "HILLTOP - MCCONICO 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0

Q42

Page 368: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_694 "HILLTOP - MCCONICO 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_695 "HILLTOP - MCCONICO 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_696 "GRIFFITH - PEACOCK 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_697 "GRIFFITH - PEACOCK 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_698 "GRIFFITH - PEACOCK 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_699 "GRIFFITH - PEACOCK 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_700 "GRIFFITH - PEACOCK 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_701 "GRIFFITH - PEACOCK 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_702 "GRIFFITH - PEACOCK 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_703 "GRIFFITH - PEACOCK 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_704 "GRIFFITH - PEACOCK 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_705 "GRIFFITH - PEACOCK 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_706 "GRIFFITH - PEACOCK 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0

Q42

Page 369: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_707 "GRIFFITH - PEACOCK 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_708 "GRIFFITH - PEACOCK 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_709 "GRIFFITH - PEACOCK 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_710 "GRIFFITH - PEACOCK 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_711 "GRIFFITH - PEACOCK 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_712 "GRIFFITH - PEACOCK 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_713 "GRIFFITH - PEACOCK 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_714 "GRIFFITH - PEACOCK 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_715 "PEACOCK - HILLTOP 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_716 "PEACOCK - HILLTOP 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_717 "PEACOCK - HILLTOP 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_718 "PEACOCK - HILLTOP 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_719 "PEACOCK - HILLTOP 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_720 "PEACOCK - HILLTOP 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0

Q42

Page 370: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_721 "PEACOCK - HILLTOP 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_722 "PEACOCK - HILLTOP 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_723 "PEACOCK - HILLTOP 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_724 "PEACOCK - HILLTOP 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_725 "PEACOCK - HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_726 "PEACOCK - HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_727 "PEACOCK - HILLTOP 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_728 "PEACOCK - HILLTOP 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_729 "PEACOCK - HILLTOP 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_730 "PEACOCK - HILLTOP 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_731 "PEACOCK - HILLTOP 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_732 "PEACOCK - HILLTOP 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_733 "PEACOCK - HILLTOP 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0

Q42

Page 371: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_734 "PEACOCK - MEAD 345kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_735 "PEACOCK - MEAD 345kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_736 "PEACOCK - MEAD 345kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_737 "PEACOCK - MEAD 345kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_738 "PEACOCK - MEAD 345kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_739 "PEACOCK - MEAD 345kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_740 "PEACOCK - MEAD 345kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_741 "PEACOCK - MEAD 345kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_742 "PEACOCK - MEAD 345kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_743 "PEACOCK - MEAD 345kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_744 "PEACOCK - MEAD 345kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_745 "PEACOCK - MEAD 345kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_746 "PEACOCK - MEAD 345kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_747 "PEACOCK - MEAD 345kV #1 & PEACOCK 345/230kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0

Q42

Page 372: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_748 "PEACOCK - MEAD 345kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_749 "PEACOCK - MEAD 345kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_750 "PEACOCK - MEAD 345kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_751 "PEACOCK - MEAD 345kV #1 & HARRIS 69/230kV #1 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_752 "PEACOCK - MEAD 345kV #1 & HARRIS 69/230kV #2 " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_753 "RNDVLYTP - PEACOCK 230kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_754 "RNDVLYTP - PEACOCK 230kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_755 "RNDVLYTP - PEACOCK 230kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_756 "RNDVLYTP - PEACOCK 230kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_757 "RNDVLYTP - PEACOCK 230kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_758 "RNDVLYTP - PEACOCK 230kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_759 "RNDVLYTP - PEACOCK 230kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_760 "RNDVLYTP - PEACOCK 230kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0

Q42

Page 373: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_761 "RNDVLYTP - PEACOCK 230kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_762 "RNDVLYTP - PEACOCK 230kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_763 "RNDVLYTP - PEACOCK 230kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_764 "RNDVLYTP - PEACOCK 230kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_765 "RNDVLYTP - PEACOCK 230kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_766 "RNDVLYTP - PEACOCK 230kV #1 & PEACOCK 345/230kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_767 "RNDVLYTP - PEACOCK 230kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_768 "RNDVLYTP - PEACOCK 230kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_769 "RNDVLYTP - PEACOCK 230kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_770 "RNDVLYTP - PEACOCK 230kV #1 & HARRIS 69/230kV #1 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_771 "RNDVLYTP - PEACOCK 230kV #1 & HARRIS 69/230kV #2 " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_772 "NKINGTAP - GVTAP 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_773 "NKINGTAP - GVTAP 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_774 "NKINGTAP - GVTAP 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0

Q42

Page 374: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_775 "NKINGTAP - GVTAP 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_776 "NKINGTAP - GVTAP 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_777 "NKINGTAP - GVTAP 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_778 "NKINGTAP - GVTAP 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_779 "NKINGTAP - GVTAP 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_780 "NKINGTAP - GVTAP 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_781 "NKINGTAP - GVTAP 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_782 "NKINGTAP - GVTAP 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_783 "NKINGTAP - GVTAP 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_784 "NKINGTAP - GVTAP 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_785 "NKINGTAP - GVTAP 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_786 "NKINGTAP - GVTAP 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_787 "NKINGTAP - GVTAP 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0

Q42

Page 375: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_788 "NKINGTAP - GVTAP 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_789 "NKINGTAP - GVTAP 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_790 "NKINGTAP - GVTAP 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_791 "SOHI - CHLORJCT 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_792 "SOHI - CHLORJCT 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_793 "SOHI - CHLORJCT 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_794 "SOHI - CHLORJCT 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_795 "SOHI - CHLORJCT 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_796 "SOHI - CHLORJCT 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_797 "SOHI - CHLORJCT 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_798 "SOHI - CHLORJCT 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_799 "SOHI - CHLORJCT 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_800 "SOHI - CHLORJCT 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_801 "SOHI - CHLORJCT 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0

Q42

Page 376: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_802 "SOHI - CHLORJCT 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_803 "SOHI - CHLORJCT 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_804 "SOHI - CHLORJCT 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_805 "SOHI - CHLORJCT 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_806 "SOHI - CHLORJCT 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_807 "SOHI - CHLORJCT 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_808 "SOHI - CHLORJCT 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_809 "SOHI - CHLORJCT 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_810 "PIERFERR - HIGHWAY 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_811 "PIERFERR - HIGHWAY 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_812 "PIERFERR - HIGHWAY 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_813 "PIERFERR - HIGHWAY 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_814 "PIERFERR - HIGHWAY 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0

Q42

Page 377: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_815 "PIERFERR - HIGHWAY 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_816 "PIERFERR - HIGHWAY 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_817 "PIERFERR - HIGHWAY 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_818 "PIERFERR - HIGHWAY 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_819 "PIERFERR - HIGHWAY 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_820 "PIERFERR - HIGHWAY 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_821 "PIERFERR - HIGHWAY 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_822 "PIERFERR - HIGHWAY 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_823 "PIERFERR - HIGHWAY 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_824 "PIERFERR - HIGHWAY 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_825 "PIERFERR - HIGHWAY 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_826 "PIERFERR - HIGHWAY 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_827 "PIERFERR - HIGHWAY 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_828 "PIERFERR - HIGHWAY 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0

Q42

Page 378: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_829 "GRIFTAP2 - SKINGTAP 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_830 "GRIFTAP2 - SKINGTAP 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_831 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_832 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_833 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_834 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_835 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_836 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_837 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_838 "GRIFTAP2 - SKINGTAP 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_839 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_840 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_841 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0

Q42

Page 379: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_842 "GRIFTAP2 - SKINGTAP 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_843 "GRIFTAP2 - SKINGTAP 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_844 "GRIFTAP2 - SKINGTAP 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_845 "GRIFTAP2 - SKINGTAP 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_846 "GRIFTAP2 - SKINGTAP 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_847 "GRIFTAP2 - SKINGTAP 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_848 "BORIANTP - GOLDROAD 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_849 "BORIANTP - GOLDROAD 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_850 "BORIANTP - GOLDROAD 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_851 "BORIANTP - GOLDROAD 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_852 "BORIANTP - GOLDROAD 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_853 "BORIANTP - GOLDROAD 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_854 "BORIANTP - GOLDROAD 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_855 "BORIANTP - GOLDROAD 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0

Q42

Page 380: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_856 "BORIANTP - GOLDROAD 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_857 "BORIANTP - GOLDROAD 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_858 "BORIANTP - GOLDROAD 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_859 "BORIANTP - GOLDROAD 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_860 "BORIANTP - GOLDROAD 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_861 "BORIANTP - GOLDROAD 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_862 "BORIANTP - GOLDROAD 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_863 "BORIANTP - GOLDROAD 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_864 "BORIANTP - GOLDROAD 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_865 "BORIANTP - GOLDROAD 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_866 "BORIANTP - GOLDROAD 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_867 "GRIFTAP3 - BORIANTP 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_868 "GRIFTAP3 - BORIANTP 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0

Q42

Page 381: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_869 "GRIFTAP3 - BORIANTP 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_870 "GRIFTAP3 - BORIANTP 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_871 "GRIFTAP3 - BORIANTP 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_872 "GRIFTAP3 - BORIANTP 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_873 "GRIFTAP3 - BORIANTP 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_874 "GRIFTAP3 - BORIANTP 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_875 "GRIFTAP3 - BORIANTP 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_876 "GRIFTAP3 - BORIANTP 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0LNXFR_877 "GRIFTAP3 - BORIANTP 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_878 "GRIFTAP3 - BORIANTP 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_879 "GRIFTAP3 - BORIANTP 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_880 "GRIFTAP3 - BORIANTP 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_881 "GRIFTAP3 - BORIANTP 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_882 "GRIFTAP3 - BORIANTP 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0

Q42

Page 382: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_883 "GRIFTAP3 - BORIANTP 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_884 "GRIFTAP3 - BORIANTP 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_885 "GRIFTAP3 - BORIANTP 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0LNXFR_886 "GRIFFITH - CLIFROSE 69kV #1 & HILLTOP1 69/HILLTOP 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" 0LNXFR_887 "GRIFFITH - CLIFROSE 69kV #1 & HILLTOP2 69/HILLTOP 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" 0LNXFR_888 "GRIFFITH - CLIFROSE 69kV #1 & GRIFFITH 69/230kV #1 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" 0LNXFR_889 "GRIFFITH - CLIFROSE 69kV #1 & DAVISG1 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_890 "GRIFFITH - CLIFROSE 69kV #1 & DAVISG2 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_891 "GRIFFITH - CLIFROSE 69kV #1 & DAVISG3 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_892 "GRIFFITH - CLIFROSE 69kV #1 & DAVISG4 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_893 "GRIFFITH - CLIFROSE 69kV #1 & DAVISG5 14/DAVIS 230kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" 0LNXFR_894 "GRIFFITH - CLIFROSE 69kV #1 & DAVIS 230/ 69kV #1 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" 0LNXFR_895 "GRIFFITH - CLIFROSE 69kV #1 & DAVIS 230/ 69kV #2 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" 0

Q42

Page 383: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNXFR_896 "GRIFFITH - CLIFROSE 69kV #1 & GRIFFITH 230/GRIFFTH1 18kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" 0LNXFR_897 "GRIFFITH - CLIFROSE 69kV #1 & GRIFFITH 230/GRIFFTH2 18kV #2" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" 0LNXFR_898 "GRIFFITH - CLIFROSE 69kV #1 & GRIFFITH 230/GRIFFTH3 18kV #3" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" 0LNXFR_899 "GRIFFITH - CLIFROSE 69kV #1 & PEACOCK 345/230kV #1 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" 0LNXFR_900 "GRIFFITH - CLIFROSE 69kV #1 & GRIFFITH 69/230kV #2 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" 0LNXFR_901 "GRIFFITH - CLIFROSE 69kV #1 & BLK_MTN1 14/BLK_MTN 69kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_902 "GRIFFITH - CLIFROSE 69kV #1 & BLK_MTN2 14/BLK_MTN 69kV #1" 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" 0LNXFR_903 "GRIFFITH - CLIFROSE 69kV #1 & HARRIS 69/230kV #1 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" 0LNXFR_904 "GRIFFITH - CLIFROSE 69kV #1 & HARRIS 69/230kV #2 " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" 0# ************************End of Paired Lines and Xfmers*************************# ******************Paired Lines and Generatorsrs Contingencies******************LNGEN_905 "GRIFFITH - GRIFTP1A 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_906 "GRIFFITH - GRIFTP1A 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" line "GRIFFITH 69.00" "GRIFTP1A 69.00" "1 " 1 0 #epcl "redispatch.p" 0LNGEN_907 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & BLK_MTN1 13.8kV #1 ( 0) " 1.000#B2B_907 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0

Q42

Page 384: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_908 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) & BLK_MTN2 13.8kV #1 ( 0) " 1.000#B2B_908 "GR-YUCCATAP 69 + BKMTP1-BKM 69kV (gr252) " 1.000 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" line "GRIFFITH 69.00" "YUCCATAP 69.00" "1 " 1 0 line "BKMTNTP1 69.00" "BLK_MTN 69.00" "1 " 1 0 #epcl "redispatch.p" 0LNGEN_909 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & BLK_MTN1 13.8kV #1 ( 0) " 1.000#B2B_909 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_910 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) & BLK_MTN2 13.8kV #1 ( 0) " 1.000#B2B_910 "GR-GRTP3 69kV + BKMTP2-BKM 69kV (gr352) " 1.000 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" line "GRIFFITH 69.00" "GRIFTAP3 69.00" "1 " 1 0 line "BKMTNTP2 69.00" "BLK_MTN 69.00" "1 " 1 0 #epcl "redispatch.p" 0LNGEN_911 "DAVIS - RIVIERA 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_912 "DAVIS - RIVIERA 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" line "DAVIS 230.00" "RIVIERA 230.00" "1 " 1 0 #epcl "redispatch.p" 0LNGEN_913 "DAVIS - MEAD N 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_914 "DAVIS - MEAD N 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "MEAD N 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_915 "DAVIS - LONGTIN 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0

Q42

Page 385: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

#epcl "redispatch.p" 0LNGEN_916 "DAVIS - LONGTIN 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "LONGTIN 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_917 "DAVIS - TOPOCK 230kV #2 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_918 "DAVIS - TOPOCK 230kV #2 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "TOPOCK 230.00" "2 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_919 "DAVIS - MCCULLGH 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_920 "DAVIS - MCCULLGH 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "DAVIS 230.00" "MCCULLGH 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_921 "LIBERTY - PEACOCK 345kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0LNGEN_922 "LIBERTY - PEACOCK 345kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "LIBERTY 345.00" "PEACOCK 345.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0LNGEN_923 "MCCONICO - DAVIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_924 "MCCONICO - DAVIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "MCCONICO 230.00" "DAVIS 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_925 "MCCONICO - GRIFFITH 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0

Q42

Page 386: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_926 "MCCONICO - GRIFFITH 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "MCCONICO 230.00" "GRIFFITH 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_927 "MCCONICO - HARRIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_928 "MCCONICO - HARRIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "MCCONICO 230.00" "HARRIS 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_929 "HILLTOP - MCCONICO 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_930 "HILLTOP - MCCONICO 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "HILLTOP 230.00" "MCCONICO 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_931 "GRIFFITH - PEACOCK 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_932 "GRIFFITH - PEACOCK 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "GRIFFITH 230.00" "PEACOCK 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_933 "PEACOCK - HILLTOP 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_934 "PEACOCK - HILLTOP 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "PEACOCK 230.00" "HILLTOP 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_935 "PEACOCK - MEAD 345kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000

Q42

Page 387: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_936 "PEACOCK - MEAD 345kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "PEACOCK 345.00" "MEAD 345.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_937 "RNDVLYTP - PEACOCK 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0LNGEN_938 "RNDVLYTP - PEACOCK 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "RNDVLYTP 230.00" "PEACOCK 230.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0LNGEN_939 "NKINGTAP - GVTAP 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_940 "NKINGTAP - GVTAP 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "NKINGTAP 69.00" "GVTAP 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_941 "SOHI - CHLORJCT 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_942 "SOHI - CHLORJCT 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "SOHI 69.00" "CHLORJCT 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_943 "PIERFERR - HIGHWAY 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_944 "PIERFERR - HIGHWAY 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "PIERFERR 69.00" "HIGHWAY 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0

Q42

Page 388: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

LNGEN_945 "GRIFTAP2 - SKINGTAP 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_946 "GRIFTAP2 - SKINGTAP 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "GRIFTAP2 69.00" "SKINGTAP 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_947 "BORIANTP - GOLDROAD 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_948 "BORIANTP - GOLDROAD 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "BORIANTP 69.00" "GOLDROAD 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_949 "GRIFTAP3 - BORIANTP 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_950 "GRIFTAP3 - BORIANTP 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "GRIFTAP3 69.00" "BORIANTP 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0LNGEN_951 "GRIFFITH - CLIFROSE 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0LNGEN_952 "GRIFFITH - CLIFROSE 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " 1.000 line "GRIFFITH 69.00" "CLIFROSE 69.00" "1 " 1 0 gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0# ********************End of Paired Lines and Generators***********************# ***************Paired Transformer and Generatorsrs Contingencies*************XFGN_953 "HILLTOP1 69/HILLTOP 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_954 "HILLTOP1 69/HILLTOP 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "HILLTOP1 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP1 12.00" gen "BLK_MTN2 13.80" "1 " 0

Q42

Page 389: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

EPCL "soln.p" #epcl "redispatch.p" 0XFGN_955 "HILLTOP2 69/HILLTOP 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_956 "HILLTOP2 69/HILLTOP 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "HILLTOP2 69.00" "HILLTOP 230.00" "1 " 0 "HILLTOP2 12.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_957 "GRIFFITH 69/230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_958 "GRIFFITH 69/230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "GRIFFITH 69.00" "GRIFFITH 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_959 "DAVISG1 14/DAVIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_960 "DAVISG1 14/DAVIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVISG1 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_961 "DAVISG2 14/DAVIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_962 "DAVISG2 14/DAVIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVISG2 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_963 "DAVISG3 14/DAVIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_964 "DAVISG3 14/DAVIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVISG3 13.60" "DAVIS 230.00" "1 " 0 " 0.00"

Q42

Page 390: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_965 "DAVISG4 14/DAVIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_966 "DAVISG4 14/DAVIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVISG4 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_967 "DAVISG5 14/DAVIS 230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_968 "DAVISG5 14/DAVIS 230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVISG5 13.60" "DAVIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_969 "DAVIS 230/ 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_970 "DAVIS 230/ 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVIS 230.00" "DAVIS 69.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_971 "DAVIS 230/ 69kV #2 & BLK_MTN1 13.8kV #1 ( 47) " tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_972 "DAVIS 230/ 69kV #2 & BLK_MTN2 13.8kV #1 ( 47) " tran "DAVIS 230.00" "DAVIS 69.00" "2 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_973 "GRIFFITH 230/GRIFFTH1 18kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_974 "GRIFFITH 230/GRIFFTH1 18kV #1 & BLK_MTN2 13.8kV #1 ( 47) "

Q42

Page 391: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

tran "GRIFFITH 230.00" "GRIFFTH1 18.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_975 "GRIFFITH 230/GRIFFTH2 18kV #2 & BLK_MTN1 13.8kV #1 ( 47) " tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_976 "GRIFFITH 230/GRIFFTH2 18kV #2 & BLK_MTN2 13.8kV #1 ( 47) " tran "GRIFFITH 230.00" "GRIFFTH2 18.00" "2 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_977 "GRIFFITH 230/GRIFFTH3 18kV #3 & BLK_MTN1 13.8kV #1 ( 47) " tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_978 "GRIFFITH 230/GRIFFTH3 18kV #3 & BLK_MTN2 13.8kV #1 ( 47) " tran "GRIFFITH 230.00" "GRIFFTH3 18.00" "3 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" epcl "redispatch.p" 0XFGN_979 "PEACOCK 345/230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_980 "PEACOCK 345/230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "PEACOCK 345.00" "PEACOCK 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_981 "GRIFFITH 69/230kV #2 & BLK_MTN1 13.8kV #1 ( 47) " tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_982 "GRIFFITH 69/230kV #2 & BLK_MTN2 13.8kV #1 ( 47) " tran "GRIFFITH 69.00" "GRIFFITH 230.00" "2 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_983 "BLK_MTN1 14/BLK_MTN 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0

Q42

Page 392: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

file:///T|/TransPlan/Private/Interconnection%20Studies/ Reports/Attachments/n2_1_otg.txt[10/21/2015 10:29:43 AM]

XFGN_984 "BLK_MTN1 14/BLK_MTN 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "BLK_MTN1 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_985 "BLK_MTN2 14/BLK_MTN 69kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 epcl "redispatch.p" 0XFGN_986 "BLK_MTN2 14/BLK_MTN 69kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "BLK_MTN2 13.80" "BLK_MTN 69.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_987 "HARRIS 69/230kV #1 & BLK_MTN1 13.8kV #1 ( 47) " tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_988 "HARRIS 69/230kV #1 & BLK_MTN2 13.8kV #1 ( 47) " tran "HARRIS 69.00" "HARRIS 230.00" "1 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0XFGN_989 "HARRIS 69/230kV #2 & BLK_MTN1 13.8kV #1 ( 47) " tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" gen "BLK_MTN1 13.80" "1 " 0 #epcl "redispatch.p" 0XFGN_990 "HARRIS 69/230kV #2 & BLK_MTN2 13.8kV #1 ( 47) " tran "HARRIS 69.00" "HARRIS 230.00" "2 " 0 " 0.00" gen "BLK_MTN2 13.80" "1 " 0 EPCL "soln.p" #epcl "redispatch.p" 0# ********************End of Paired Xfmers and Generators*************************end# End of Contingency List, 990 Contingencies Added to List

Q42

Page 393: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

System One Line with Solar installation

System model assumptions:

Phase II, 70 MW final build

Delta-Wye main step-up transformer, 66/80 MVA, Z=8.5%

500 ft. 477 ACSR conductor 69 kV gen-tie line

750 ft. 4/0 34.5 kV collector conductor (five total equivalent)

PV inverters & padmount transformers aggregated as 34.5 kV generator

Inverter fault duty = 150% nameplate capacity

Q42

ua01963
Rectangle
ua01963
Rectangle
ua01963
Typewritten Text
ua01963
Typewritten Text
ua01963
Typewritten Text
ua01963
Typewritten Text
ua01963
Typewritten Text
ua01963
Typewritten Text
Page 394: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

Study Results

FAULT DUTY

PRE-PROJECT OPTION #1 OPTION #2

BUS NAME NOM.

KV 3LG (A)

2LG (A)

1LG (A)

LL (A)

3LG (A)

2LG (A)

1LG (A)

LL (A)

3LG (A)

2LG (A)

1LG (A)

LL (A)

ARCO BKR 69 3279 3439 2709 3228 3787 3482 2717 3272 3798 3492 2724 3280

BLACK MTN 69 12121 12709 12954 10504 12866 13999 14335 10926 12760 13545 13714 10905

GRIFFITH 69 13009 14453 15116 11269 13732 15645 16188 11711 13782 15991 16542 11700

GRIFFITH 230 13841 14847 15042 11988 13973 14990 15180 12091 13984 15013 15217 12100

HILLTOP-1 69 4880 5518 5794 4226 4874 5532 5786 4221 4875 5533 5787 4222

HILLTOP-2 69 4892 5575 5823 4236 4886 5567 5815 4231 4886 5568 5816 4232

HILLTOP 230 10091 9942 9139 8740 10141 9981 9163 8776 10147 9987 9169 8781

NAVAJO BKR 69 10725 10779 10178 9289 11281 11433 10834 9653 11268 11393 10762 9643

SACREMENTO 69 11371 11742 11657 9851 12023 12744 12771 10250 11958 12488 12366 10228

YUCCA 69 3614 3282 2315 3128 3679 3334 2332 3178 3680 3335 2332 3179

Page 395: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

69/34.5 kV Transformer

Page 396: TUCSON ELECTRIC POWER Q42 · Looped-in the Project into the existing 69kV line from Yucca Tap to Black Mountain Tap1. Option 2 connected the Project directly into the Griffith 69kV

PV Generator/Inverter