tubing, live well, cable deployed, - SPE Aberdeen...deployable ESP …. rigless, retrofit, through...

9
©2018 Zilift Ltd. All Rights reserved. EuALF 2018 - Results from field trials of an all new rigless cable deployable ESP …. rigless, retrofit, through tubing, live well, cable deployed, downhole pumping …

Transcript of tubing, live well, cable deployed, - SPE Aberdeen...deployable ESP …. rigless, retrofit, through...

  • ©2018 Zilift Ltd. All Rights reserved.

    EuALF 2018 - Results from field trials of an all new rigless cable

    deployable ESP

    …. rigless, retrofit, through

    tubing, live well, cable deployed,

    downhole pumping …

  • 2

    ESP Operations – the need for change?

    What’s the problem?

    − Rigs needed for installation and replacement;

    − Replacement delayed due to rig availability;

    − High rig cost and lost / deferred production;

    − Opportunity cost for using rigs to work-over

    failed ESP wells;

    − Risk of reduced PI due to kill fluid;

    A better way: Slim-line, through tubing, cable

    deployed pumps, installed using established

    spooling methods and conventional PCE

    Zilift SpeedDrive 2625 assemblyUS land well demonstration

  • 3

    ESP Operations – the solution

    Retrievable Through

    Tubing Packer

    Pump intake

    Pump

    Pump discharge

    ports (to tubing)

    PM Motor /

    Seal Section

    Cable Head /

    Monitoring Sub

    Power and

    Deployment Cable

    Insert Safety Valve

    with Cable

    Feedthrough

    Tubing Deployed

    Safety Valve

    Safety Valve Control

    Line

    Spool Piece

    Cable Hanger /

    Penetrator

    Existing X-mas Tree

    Completion tubing

    Tubing Hanger

    Variable Frequency Drive

    with Embedded

    Automation

    Remote Monitoring and

    Control Package

    SpeedDrive - A slim-line centrifugal pump system

    made possible by using

    Permanent Magnet Motors

    Applications:

    ✓ Contingency ESP(over failed conventional)

    ✓ Primary ESP

    ✓ Temporary install:-✓ well kick-starting

    ✓ for appraisal wells

    (operating through w/l PCE)

    Delivering:

    ✓ Rigless, retrofit intervention

    ✓ Live well workover

    ✓ Rapid replacement

    ✓ Improved safety

  • 4

    Cable deployment key enablers

    A through-

    tubing pump

    assembly

    Anchor / latch

    Deployment /

    power cable

    Pressure control

    equipment

    Winch and

    sheaves system

    Variable

    frequency drive

    Insert Safety

    Valve when

    required

    Flush spoolable

    cable connector

    for retrieval

  • 5

    − Wellhead tubing bonnet

    − Can replace bonnet for existing ESP

    installations

    − Installed on standard GS running tool

    Wellhead Cable hanger and termination

    Split phase wellhead

    penetration system

    comprising:

    − API Single spool piece

    − 4140 or 13Cr materials

    − 5,000psi pressure rating

    − ¼” control line ports

    − 4kV, 35A, 125ºC rated

    − ATEX and IECEx certified

    Flow through

    hanger

    arrangement

    LMV

    Tubing

    Bonnet

    Tubing

    Hanger

  • 6

    First (cable) Deployment Test in 2016

    Presentation video removed

    This first trial was conduced at a

    drilling training centre in Oklahoma

    The objective was to demonstrate:

    • Anchor / latch setting;

    • BHA free spools from lubricator;

    • RIH

    • BHA latching / unlatching

    • POOH

    Completed under simulated live

    well conditions

    Exercise completed 5 times

    without incident

    Trials were a complete success

  • 7

    Complete Deployment

    The system can be run, operated and retrieved, without a rig

    Click the link to see the presentation video:

    https://preview.tinyurl.com/y8tlsfzw

    https://preview.tinyurl.com/y8tlsfzw

  • 8

    5 trials completed under live well

    conditions with full pressure control:

    − No safety incidents, no damage to equipment;

    − System self spooled to depth;

    − System successfully landed out in anchor

    packer;

    − Surface termination successfully completed;

    − System powered up and fluid confirmed on

    surface and;

    − Successfully re-connected to the deployment

    cable and retrieve to surface under live well

    conditions.

    − Fully horizontal deployment demonstrated

    The full operational life cycle:

    Run. Operate. Retrieve.

    Cable deployment experience

  • 9

    Zilift TorqueDrive

    Email: [email protected]

    Web: www.zilift.com

    Zilift Inc3600 Pegasus Drive, Unit 7

    Bakersfield

    CA 93308 USA

    Tel: +1 661 369 8579

    Zilift Ltd17-19 Greenrole Trading Estate

    Howe Moss Drive, Dyce

    Aberdeen AB21 0GL UK

    Tel: +44 1224 227227

    A Rigless through tubing Cable Deployed ESP using high speed permanent magnet

    motor technology