Cautionary Note Regarding Forward-looking Information This presentation contains certain information that may constitute forward-looking information under applicable Canadian and U.S. securities legislation, including but not limited to information about current expectations on the timing, extent and success of exploration, development and metallurgical sampling activities, the timing and success of mining operations, the optimization of mine plans, milling activity at the PL Mill, the timing and completion of updated mineral resource and reserve estimates in respect of the PL and Nokomis deposits, the Company's intention and ability to monetize mineralized material, project development and related permitting, the financial condition of Minnova and the ability of Minnova to finance exploration and development funding requirements and the ability of Minnova to meet forecast production and cost targets. This forward-looking information entails various risks and uncertainties that are based on current expectations, and actual results may differ materially from those contained in such information. These uncertainties and risks include, but are not limited to, the strength of the global economy; the price of gold; operational, funding and liquidity risks; the degree to which mineral resource estimates are reflective of actual mineral resources; the degree to which factors which would make a mineral deposit commercially viable are present; the risks and hazards associated with underground operations; and the ability of Minnova to fund its substantial capital requirements and operations. Risks and uncertainties about the Company’s business are more fully discussed in the Company’s disclosure materials filed with the securities regulatory authorities in Canada which are available at www.sedar.com. Readers are urged to read these materials. Minnova assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such information unless required by law.
Cautionary Note Concerning Resource Estimate: Historical resources in this presentation are historical estimates that predate NI 43-101 and are not compliant with current definitions, and have not been verified by the company; consequently, they should not be relied on by investors.
Qualified Person Mr. Brian Robertson, B. Sc., P. Eng.., a Director of the Company and a “Qualified Person” under National Instrument 43-101, has reviewed and approved the scientific and technical information in this presentation. Unless otherwise noted, all dollars in this presentation are in C$ dollars.
2
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
Minnova Corp. - Two Value Propositions
EXPLORATION 22km unexplored
3
MINE RE-START Near term Gold Production ~45k opy production
Gold Bars produced in 1988/89 containing 513 oz and 532 oz Au, respectively
+
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
• Low to negative correlation with other asset classes, making it an effective portfolio diversifier
• Generally Positive/Bullish outlook for GOLD and gold linked equities
• Rising global debt – is it a crisis?
• Negative interest rates
• Global political unrest
• Institutions adding GOLD to asset mix
Cases for Gold and Manitoba
GOLD FUNDAMENTALS
• World Class Mining Jurisdiction
• Most Prolific Greenstone Belt in Canada
• Excellent Infrastructure
• Low Cost Electrical Power
• > 100 Years of Mining – 30 Mines
• Historically a High Grade Mining Camp + experienced workforce + Low Cost Suppliers (drillers, road maintenance, etc.)
• No First Nation Issues
MANITOBA FUNDAMENTALS
MINNOVA’S VALUE PROPOSITION
• PL Mine is past-producer & permitted
• Attractive Capital Structure (~28 million shares)
• Key Mining Infrastructure in place = Lower Capex
• High grade LOM average gold grade >7g/t
• Targeting ~45,000 oz annual production
• Low Relative Valuation ~US$20 EV/Rsc oz
4
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
CANADIAN GOLD PROJECTS
• 100% owned past producing , permitted PL Gold Mine • 100% owned satellite Nokomis gold deposit
GOLD PRODUCTION in 2018 1
• Feasibility Study Underway - Targeting mid-2018 Au Production • Forecast production of 40-50k oz. Au per year for 10 years • Average LOM diluted grade 7.2g/t (underground only) • Low capex – Forecast C$25 –C$30 million • Low AISC (<US$1000/oz), Low C1 cash costs (<US$800/oz) • High NPV (~C$130 mln) and IRR (>40%)
KEY INFRASTRUCTURE IN PLACE
• 1,000 tpd mill • Access portal and decline - 7,000 m of underground
development
RESOURCE EXPANSION / EXPLORATION
POTENTIAL
• Measured & Indicated - 208,600 oz grading 5.93g/t (PL) • Inferred – 412,000 oz grading 6.01g/t (PL) • PL and Nokomis Deposits still open to expansion • Excellent “Discovery Potential” on Mine Property and Regionally
INVESTOR ALIGNMENT • Significant insider ownership - aligned with shareholders • Focused on profit and shareholder returns
1) See July 2014 PEA. To be updated upon completion of the Feasibility Study August 2017 2) Assumes US$1200 /oz Au and C$:US$ 0.76
Exceptional Value Proposition Feasibility Study Underway - Producion
5
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
MANAGEMENT AND BOARD DEVELOPMENT (OWNERS) TEAM
Gorden Glenn - Chairman, President & CEO Over 25 years industry experience in finance as Investment Banking/Mining Analyst and including 9 years as a geologist.
GEOLOGY - Chris Burchanan, MSc., P. Geo Senior structural geologist with 20 years of experience specialized in structural controls and alteration assemblages of gold systems.
James D. A. White - Director Mr. White is the Managing Partner of Baynes & White, a Toronto-based pension and benefits actuarial consulting firm.
MINING ENGINEERING/PROJECT MANAGEMENT - Malcolm K. Buck, P.Eng., M. Eng. Senior mining engineer with over 30 years experience in project evaluation, implementation and operations.
Brian Robertson - P.Eng., Director Over 30 years experience in corporate management, exploration programs, project management, mine permitting, construction, development and operation as well as the evaluations or corporate acquisitions.
Brian C. LeBlanc, P.Eng. Senior mining engineer with over 35 years experience in operations, including; mine design, planning, cost control, major engineering projects, training and change implementation, geotechnical engineering and safety.
Chris Irwin - LL.M., Interim CFO, Director Mr. Irwin is President of Irwin Professional Corporation, a corporation providing legal services mainly to the natural resource sector.
Curtis Clarke, P.Eng. Senior mining engineer with over 30 years experience in project management, underground and open pit mining operations, equipment evaluation/procurement specialist.
“WISE MINERS” - A Century of Exploration, Development, Operations, Finance and Investment Experience
Management and Directors Aligned and Focused on Shareholder Returns
6
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
MCI:TSXV
Capital Structure (Share data and cash position as of March 31, 2017)
Symbol TSXV: MCI | AGRDF: OTC Pink
Shares Outstanding 28,347,192
Warrants & Options
Options average price $0.64
Warrants average price $0.81
DSU/RSU average price $0.85
6,364,409
2,805,000
3,559,409
1,800,000
Fully Diluted 36,511,601
Market Capitalization (recent price C$0.75/sh)
~$21.5 million
Cash and Equivalents ITM Warrants ITM Options
~$1,000,000 ~$100,000 ~$850,000
Debt ~$1,000,000
Management and Director Ownership
9% basic 14% fully diluted
7
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
Well Structured, Significant Insider
Ownership
www.minnovacorp.ca
PL Mine
8
PL Mine Located in Flin Flon – Snow Lake Gold and Base Metal District
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
• 7000 m of existing underground development
• In-fill drilling programs in support of new reserve and resource estimates
• Update mine plan focused on minimizing dilution (from 2m minimum mining width to 1.5m)
• Planned underground bulk sample and test mining
Significant Underground Development = On Ore Immediately, Reduced Capex
PL Deposit Mine Plan 2m minimum mining width, 4g/t cut-off = 460,000 oz Au
9
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
PL and Nokomis Deposits: Independent* NI 43-101 Mineral Resource Estimates
• Measured & Indicated Resource of 327,900 oz Au
• Inferred Resource of 438,600 oz Au
Both PL and Nokomis deposits are open down dip + along strike
Deposit Cut-off Grade (Au g/t) Resource Category Tonnes (t) Au Grade (g/t) Au Ounces
Open Pit Mineral Resources
PL Deposit In Pit 0.6g/t Measured 123,000 4.41 17,400
0.6g/t Indicated 445,000 4.40 63,000
Nokomis Deposit 0.6g/t Indicated 371,000 3.41 40,700
Total PL and Nokomis In Pit 0.6g/t Measured & Indicated 939,000 4.01 121,100
PL Deposit In Pit 0.6g/t Inferred 45,000 4.87 7,000
Nokomis Deposit 0.6g/t Inferred 247,000 2.41 19,100
Total PL and Nokomis In Pit 0.6g/t Inferred 292,000 2.78 26,100
Shallow Underground Mineral Resources
PL Deposit Underground 2.5g/t Measured 27,000 5.12 4,500
2.5g/t Indicated 1,057,000 5.95 202,300
Total PL Underground 2.5g/t Measured & Indicated 1,084,000 5.93 206,800
PL Deposit Underground 2.5g/t Inferred 2,135,000 6.01 412,500
Total In Pit and Shallow Underground Mineral Resources
Total In Pit and Underground 0.6/2.5g/t Measured & Indicated 2,023,000 5.04 327,900
Total In Pit and Underground 0.6/2.5g/t Inferred 2,427,000 5.62 438,600
• By Mr. Eugene Puritch, P.Eng. of P&E Mining Consultants Inc. and Mr. Leon McGarry, B.Sc., P.Geo., of A.C.A. Howe International Limited. of Toronto, Ontario. Mr. Puritch and Mr. McGarry are Independent Qualified Persons as defined under NI 43-101 regulations.
• See April 17, 2014 press release for notes on PL and Nokomis deposits resource estimates •To be updated summer 2017
PL and Nokomis Gold Deposits Demonstrated Expansion Potential
10
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
10,000 meter drill program was initiated in January 2017
• 50 diamond drill holes
• Positive results with multiple high grade gold intercepts over mineable widths
PL Gold Deposit Resource Update Underway
PL Gold Deposit Positive Drill Results Resource Expansion and Upgrade
11
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Hole Location Azimuth
/Incl.
From (m) To (m) Length1
(m)
Au gpt
M-17-04 373349E/6100641N 0/-90 110.00 112.00 2.00 9.29
M-17-05 373293E/6100630N 0/-90 77.00 81.00 4.00 5.19
M-17-06 373169E/6100678N 0/-90 57.65 59.30 1.65 9.39
M-17-07 373245E/6100650N 0/-90 58.65 59.30 0.65 23.28
M-17-09 373199E/6100617N 0/-90 51.50 54.00 2.50 10.88
M-17-10 373212E/6100603N 0/-90 23.00 25.00 2.00 5.47
M-17-11 373220E/6100573N 0/-90 12.30 15.85 3.55 20.23
35.82 36.15 0.33 17.67
62.40 63.95 1.55 6.45
74.85 75.26 0.41 16.61
M-17-12 373250E/6100578N 0/-90 29.00 33.00 4.00 8.79
65.00 68.00 3.00 9.66
M-17-13 373540E/6100725N 0/-90 245.00 246.00 1.00 6.30
M-17-14 373190E/6100630N 0/-90 38.10 46.65 8.55 10.98
M-17-16 373155E/6100700N 0/-90 58.00 60.00 2.00 10.67
84.00 87.25 3.25 5.75
M-17-17 373262E/6100575N 0/-90 63.00 68.00 5.00 16.38
M-17-18 373580E/6100745N 0/-90 166.00 168.00 2.00 5.09
M-17-19 373290E/6100605N 0/-90 89.22 92.00 2.78 37.35
122.00 125.00 3.00 34.34
M-17-20 373283E/6100679N 0/-90 125.00 130.00 5.00 8.60
84.00 87.25 3.25 5.75
M-17-21 373540E/6100725N 0/-90 275.00 279.00 4.00 6.22
M-17-23 373220E/6100695N 0/-90 107.00 112.00 5.00 15.79
M-17-24 373220E/6100720N 0/-90 124.00 125.00 1.00 6.63
2017 PL Deposit Infill/Expansion
Existing underground workings
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
1981 1985 1986 1987 1988 1993 2011 2014
Measured Ounces
Indicated Ounces
M+I Ounces
Inferred Ounces
M+I Grade
Inferred GradeR
eso
urc
e O
un
ces
Gra
de
g/t
MCI:TSXV
PL Deposit Global Resource
Steady Resource Expansion 8 Positive Resource Calculations over 30+ years
12
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Year 1981 1985 1986 1987 1988 1993 2011 2014
Resouce EstimateM avrick P ioneer P ioneer
Kilborn
Feasibility S tudyP ioneer
Kilborn Re-S tart
Feasibility S tudy
M innova
(underground
only)
M innova
(underground
only)
Holes 30 59 213 213 473 473 496 563
M+I (oz) 124,839 684,188 330,947 141,980 206,668
Inferred (oz) 105,693 133,009 178,997 57,946 313,078 203,213 548,286 412,584
Total 105,693 133,009 178,997 182,785 997,266 534,160 690,266 619,252
More Drilling leads to Resource Conversion and Expansion
MCI:TSXV
Regional Infrastructure
• All weather access
• Railroad
• Regional airport
• Grid electricity
• Water
• All mining and processing support services
Underground Development
• Access portal/decline
• 7000 m underground development
1000 tpd mill
• Crusher
• Fine Ore bin (3 Compartment)
• Ball Mill
• Rod Mill
• Floatation tanks
• Leach Tanks
• CIL
• Gold furnace
• Laboratory
• Office
PL Mine Infrastructure In Place
13
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
The Right Geology, Structure and Geophysics
• Numerous untested, airborne VTEM anomalies on property and regionally
• New interpretation of the Puffy fold has fold strike potential of over 3 km
• Historic drilling only tested targeted structures /stratigraphy at very shallow depths, well up dip from the top of the conductor • PUF 119 intersected 1 m grading 34g/t
at ~115m vertical • First hole of 2017 drill program • Awaiting assay results on this NEW
Discovery • 2011 MCI drill hole tested down dip projection
of BIF intersecting 23.7g/t over 0.5 m at ~250m vertical • Priority target for follow-up drilling in
2017
PL Deposit
Airborne VTEM
Structural Lineament Study
14
Significant Property Wide and Regional Exploration Potential
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Commercial Equipment Selection Criteria Proven mechanized mining
• Alimak stope development
Small size (Alimak, ULP/XLP) equipment to achieve:
• minimal mine openings
• targeted narrow stope heights
• safely and efficiently in moving ore out of the stope
Electric/battery powered to:
• capitalize on Manitoba’s low industrial power costs
Proven operational performance:
• emphasis on equipment used in comparable shallow dipping-narrow vein mine settings
Other considerations:
• maintenance and safety factors
• operate remotely/autonomously
Small, Mechanized Narrow Vein Development - Shallow Dip Mining is Feasible 15
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
Creating a Modern Mine with Proven, Narrow-Vein, Mining Equipment
www.minnovacorp.ca
Future Exploration and Development Plans
Exploration and Infill Drilling Program Resource Conversion and Expansion
• PL and Nokomis deposits still open down dip/on strike Test Regional Exploration Potential
• Initially target mine area exploration targets • Numerous structural and geophysical targets remain untested • Historic data review /compilation highlights untested potential • Belt has not been extensively explored for gold and exploration focus will expand
Development Feasibility Study Underway - Fall 2017 completion date
• Upgrade resource to Measured and indicated (0 to -150m) • Target Reduced Mining Widths to Achieve Higher Mill Head Grade • Current mine plan forecasts a diluted mill head of 7.2 g/t based on conservative 2 m
minimum mining width • Feasibility Study in support of re-start with initial underground test mining and bulk
sampling program targeted for fall 2017 • Targeting use of proven ULP and XLP equipment to potential reduce diluted mining widths
to between 1 and 1.5 m • NEW metallurgy test work to optimize gravity circuit and overall process flow sheet –
targeting increased gold recoveries of over 90%
Any of the Above Initiatives can Support Significant Value Appreciation
16
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Value Proposition
• Increasing Gold Resource Size and Production Profile leads to High Market Valuation
17
Klondex Mines
Metals X
Alacer Gold
Richmont Mines Premier Gold
Roxgold
Teranga Gold
Argonaut Gold
Wesdome
Silver Lake Resources
Ramelius Resources
Primero Mining
Doray Minerals
Jaguar Mining Timmins Gold
Royal Nickel
Anaconda
Metanore Minnova1
Galane
Integra
0
50
100
150
200
250
300
$0 $100 $200 $300 $400 $500 $600 $700 $800
Market Capitalization (C$mm)
20
16
Au
eq
Pro
du
ctio
n (
00
0’s
)
1) PL Mine production forecast ~45,000 oz per annum Source; company and analyst reports
Investment Highlights
• Permitted to re-start underground mining operations
• Ragged TMF to be listed on Schedule 2 of MMER
• Near-term gold production, with excellent exploration upside
• Major infrastructure already in place
• 1,000 tpd mill, ancillary facilities, Access ramp and 7,000 m of underground workings
• All weather road access, grid power, railway
• M+I Rsc 327,900 oz Au and Inf Rsc of 438,600 oz - still open to expansion
• Production rate from underground operation at 600 tpd grading over 7g/t
• Average annual production of over 43,000 ounces of gold
• Mine life 10 years, producing over 400,000 ounces of gold
A lower risk VALUE PROPOSITION with Exceptional Opportunities to Optimize the Development Plan and Expand Gold Resource
Upcoming Milestones and Catalysts
Reduce minimum mining width to <1.5 m
Drill – exploration and expansion targeting >1 m oz
Maximize +70% Gold recovery from gravity
18
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Gorden Glenn, Chairman, President & CEO Tel: +1 647 985 2785 [email protected] 365 Bay Street, Suite 400, Toronto, Ontario M5H 2V1 www.minnovacorp.ca
Contact Us
19
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
Appendix
20
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Check out the following links to see how proven mechanized equipment paired with innovation will change the way we can mine narrow vein deposits safely and efficiently
Alimak/Raise Climber Stope Development https://www.youtube.com/watch?v=oMD1mmrWbWc Dok-Ing XLP Reef Dozer https://www.youtube.com/watch?v=hhmV1c8JSx8 Brokk equipment https://www.youtube.com/watch?v=ALaH4JCyTuc CMTI mini- robotic dozers http://www.miningweekly.com/article/sibanye-displays-new-mining-machine-at-joburg-indaba-2015-10-14 http://www.cmti.co.za/MM-MT1000.htm
21
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Optimization with Proven and Commercial Equipment
22
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
Mining Method (Conventional)
www.minnovacorp.ca
• Alimak Stope Development combined with proven Jackleg drill and Slusher/Scaper
• Targeting narrow vein mining - Focus on GRADE over TONNES
• Ultra and Extra-Low Profile (ULP/XLP) mining equipment to achieve minimal mine development and targeted narrow stope heights
Remote and Autonomous controls
23
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
www.minnovacorp.ca
Mining Equipment Fleet Selection ULP Ore Mucking and Handling
Small Size 1.2m w x 1.8m h
• Small scale electric/hydraulic mining/drilling equipment is replacing old single jackleg drills
• Electric/hydraulic equipment can perform drilling and excavation duties
• Greatly improves mine safety
• Remote and autonomous controls
Drift and Stope Drilling and Mucking
24
TSX
V:
MC
I | A
GR
DF:
OTC
Pin
k
Mining Equipment Fleet Selection Drilling and Mucking
www.minnovacorp.ca
Innovative Thinking to re-start the PL Mine – NOT your average mining company
• Re-starting a past producing, shallow dipping, narrow vein mine requires Innovative Thinking
• Innovative new drilling-blasting-mucking technologies
• Innovative new reef boring, slot/raise boring techniques
• Minnova is committed to employing the state of the art equipment and technology to re-start the PL Mine
• We are working with global leaders in equipment manufacturing and innovation to unlock the value of the PL Mine for our stakeholders
• Attractive capital structure with ~28 million shares outstanding
• Low relative EV/oz of gold at <US$20/resource ounce