TSP Must Fit Within An Overall Agency ITS Plan. Transit Priority Data Needs Vehicle Location...
-
date post
22-Dec-2015 -
Category
Documents
-
view
214 -
download
0
Transcript of TSP Must Fit Within An Overall Agency ITS Plan. Transit Priority Data Needs Vehicle Location...
TSP Must Fit Within An Overall Agency ITS Plan
Transit Priority Data Needs
• Vehicle Location– Speed
• Door & Lift Status– Predictions
• Passenger Counting
• Stop Location– Near side– Far side
• Vehicle Routing– Stopping– Turning
• Schedule Adherence
• Vehicle Identification
CEE582
Let’s Just Look at AVL Systems
Do we want one AVL system that meets all needs,
or multiple AVL systems?
AVL Systems
• GPS• Sign Post (beacon)• Dead Reckoning
• Sign Post + Dead reckoning• GPS + Dead reckoning
AVL Systems
• Does the bus know where the bus is, does the traffic management center know where the bus is, or does some device in the field know where the bus is?
• Information provided• Communication required• Flexibility / content of that message
AVL Systems
• How do you intend to use that information?– Fleet management?– Labor management?– Labor oversight?– Automated control?– Security?
AVL Implementation Issues
• Political• Technical• Institutional• Financial• Legal
CEE582
AVL Implementation Issues
• Political – Big Brother– Who gets to know where the bus is?– Who controls that data?– How will that data be used?
• Homeland security?
CEE582
AVL Implementation Issues
• Technical– Move to proactive fleet management– Which technology is best?
• Purchase price• Maintenance / operations price• Long term value, including flexibility
– Not really “plug and play” yet– Reliability of communication network
TSP-Related Systems
CEE582
Transit Management Center
• Location Monitoring• Schedule Information• Desired Headway• Ridership Monitoring• Service type
CEE582
Traffic Management Center
• Signal System Management• Signal Coordination• Signal Timing• Priority Restrictions• Feedback
CEE582
Traffic Signal
• Services request for priority• Resolve conflicting priority
requests• Recovery from priority request
CEE582
Scenario 1 FleetManagement
Center
TrafficManagement
Center
PriorityRequestServer
PossiblyIntegrated
FleetVehicle
TrafficSignal
Controller
PriorityRequest
Generator
Coordinator
CEE582
Scenario 2 TrafficManagement
Center
PriorityRequestServer
PossiblyIntegrated
FleetVehicle
TrafficSignal
Controller
FleetManagement
Center
PriorityRequest
Generator
Coordinator
CEE582
Scenario 3
PriorityRequestServer
PossiblyIntegrated
FleetVehicle
TrafficSignal
Controller
FleetManagement
Center
Coordinator
TrafficManagement
Center
PriorityRequest
Generator
CEE582
Scenario 4 FleetManagement
Center
TrafficManagement
Center
PriorityRequestServer
PossiblyIntegrated
FleetVehicle
TrafficSignal
Controller
PriorityRequest
Generator
Coordinator
CEE582
Logical System Model
PriorityRequest
Generator
PriorityRequestServer
Priority Request
Feed Back
FleetVehicle
FleetOperations
Management
TrafficSignal
TrafficManagement
VehicleInformation
RequestStatus
Criteria
Status
PriorityTiming
Status
Signal TimingParameters
Status
DataExchange
CEE582
CEE582
Driver logs on to DriverDisplay Unit (ID, Rte, Run)
Dynamic data passed to Tagby Tag Interface Unit
Static and dynamic data passedfrom tag to roadside antenna/
reader
Tag data verified and passed toroadside TPR Generator
Static data resident on tag(system, agency, vehicle ID)
No
Lateness, passenger loaddata passed to tag from
AVL, APC (future)
Is route/trip eligible?
Is emergencyvehicle preemption
active?
No
Yes
Driver logs on to DriverDisplay Unit (ID, Rte, Run)
Dynamic data passed to Tagby Tag Interface Unit
Static and dynamic data passedfrom tag to roadside antenna/
reader
Tag data verified and passed toroadside TPR Generator
Static data resident on tag(system, agency, vehicle ID)
No
Lateness, passenger loaddata passed to tag from
AVL, APC (future)
Is route/trip eligible?
Is emergencyvehicle preemption
active?
No
Yes
CEE582
Priority request tosignal controller
No priorityrequest to
signalcontroller
Has minimum TPRinterval passed?
Is bus later than X?
Is bus load greaterthan X?
Yes
Yes
Yes
No
Yes
No
No(future capability)
(future capability)
Priority request tosignal controller
No priorityrequest to
signalcontroller
Has minimum TPRinterval passed?
Is bus later than X?
Is bus load greaterthan X?
Yes
Yes
Yes
No
Yes
No
No(future capability)
(future capability)
TSP Implementation Issues
• Confusing array of technical choices: detection, communications, control strategies, integration with other systems
• Complex organizational issues in multi-agency and multi-jurisdictional setting
• Need better guidance to navigate choices and issues
CEE582
More TSP Implementation Issues
• Lack of standardized reporting on impacts and benefits to allow comparisons
• Practical information hard to obtain by practitioners
• All simulation and optimization tools, and traffic controllers are not well suited for TSP
CEE582