TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER

Transcript of TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated...

Page 1: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER

Page 2: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC) 2

Agenda

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

1. TSC – who we are and where we want to go

2. Integrated Capacity Management – from tinkering holes to holistic thinking

Long-term to hourly forecasting

Common Grid Model

Grid Security Assessment

Capacity Calculation

3. Discussion

Page 3: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

TSC TSOs and their mission: Reliable, safe and efficient power for Europe.

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013 3

Page 4: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

Launched in December 2008

Cooperation to foster regional European coordination for system security

Decentralised approach (grid security and approval of remedial actions)

TSOs remain responsible for system security incl. operational planning

TSC's TSOs cover 10 European countries with about 185 million inhabitants and 1.13 million square kilometres.

New: Joint Office in Munich (24/7)

Open to the participation of other TSOs

4

Our initiative

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 5: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

Strong partnership of equals: TSOs within TSC

5 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 6: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

“ ”

Transmission System Operator Security Cooperation (TSC)

“Good leaders create a vision, articulate the vision, passionately own the vision, and relentlessly drive it to completion.”

JACK WELSH

6 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 7: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

To ensure keeping a high level of overall system security in European electricity grid

To further enhance operational cooperation amongst TSO

To be best in class service provider for grid security assessment and capacity calculation

To support member TSOs to provide competitive and reliable services

To help TSOs to better manage their expanding operations

7

Our mission

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 8: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC) 8

Our vision

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

TSC grants member TSOs with long-term to real-time control over their operations, with respect to integrating wind energy and handling increases in cross-border trading and electricity transmission.

Page 9: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

TSC TSOs – Joint Office

9 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 10: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

The TSC IT Platform delivers valuable data to TSOs and security initiatives (centralised or decentralised)

TSC is compatible with all (TSO-internal) forms of organization

TSC is extendable at will to other TSOs (also in other synchronous areas)

10

Honing System Security in Europe

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013 Fore

cast

Data

n-1

Results

TSC countries

Coreso countries

Other countries

Page 11: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

“ ”

Transmission System Operator Security Cooperation (TSC)

Capacity Management Module means a module containing up to date available Cross Zonal Capacity in real time for allocating Cross Zonal Capacity in a continuous manner.

ENTSO-E GLOSSARY, NETWORK CODES

11 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 12: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

Capacity Management is the process of planning, analyzing, sizing, and optimizing capacity to satisfy (current and future agreed) demand in a timely manner and in the most efficient way possible.

12

The steps of Capacity Management

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Monitoring

Analysis

Modeling

Optimising

Change/ Action

Demand Supply

Page 13: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

Times they are changing

13 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 14: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

Mid to Long Term Operational Planning (MLTOP)

Capacity Calculation (D-2F)

Day Ahead Congestion Forecast (DACF), successfully implemented

Intraday Congestions Forecast (IDCF), successful testing phase

14

Operational Planning Processes

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 15: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC) 15

Extending Operational Planning

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

D-2

Forecast of European grid conditions

Merging of individual datasets

Common Grid Model

Capacity Calculation

Y-1 / M-1

European LT scenario production

Individual LT case production

Merging individual cases

Calculation and allocation of LT-capacities

Page 16: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

The harmonisation of individual grid models allows optimised use of available capacities.

16

Common Grid Model (ENTSO-E)

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Common Grid Model (CGM)

TSO …

TSO B

TSO A

Capacity Calculation

Validation

Allocation

Page 17: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

The power grid security assessment is an indices system to prevent accidents and secure safety of supply. There are five kinds of indices: Capability of supplying power safely Static voltage security Topological vulnerability Transient security and Risk indices

Overload Low voltage Voltage collapse Angle instability …

The evaluation results are subjective and dynamic.

17

Grid Security Assessment

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Capability of supplying

Power safely

Static voltage security

Topo-logical

vulnera-bility

Transient security

Risk Indices

Page 18: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

TSC on the way to become a European capacity calculation centre

Service provider linked to capacity calculation

One single interface to regional calculation

Data hub for necessary information

Knowledge provider

IT hosting entity or SPOC

TSC’s TSOs agreed to facilitate the transfer of capacity calculation functions for CWE, CEE and Northern Italian borders form SSC & CAO to TSC

18

Capacity Calculation (D-2F)

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Service provider

Single interface to the regional cap calc

Data hub

Knowledge provider

IT hosting entity or SPOC

Page 19: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

Need: Increase of uncertainties, esp. renewables, new devices (PST, HVDC), Intraday Market

Objectives

Continuous & automatic update of forecast data and security analysis results for coming hours

Detect any potential issue on the grid: anticipation

Provide information to the TSOs so that they can implement remedial actions on time

Ask for power plants to start

Cancellation of outage

Cross-border remedial actions, redispatching ...

19

Intra Day Congestion Forecast (IDCF)

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 20: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC) 20

Improved/additional services

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

As from 1 July 2013, 24/7 rolling forecast process in trial run

CTDS Users check and assess the quality of results (model contains remedial actions etc.)

CTDS Operation for IDCF rolling forecast performed fully automatically

Conference calls to discuss the results of IDCF contingency assessment on demand

Parallel operation of DACF and IDCF Rolling Forecast Process

Page 21: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC)

TSOs developed a future proof planning process

Process follows ENTSO-E NC OPS requirements

Planning process is aligned long term system development procedures at each TSC and ENTSO-E (TYNDP)

TSO developed a standardised machine and human readable data exchange format

Interfaces to Risk Assessment Tools

21

Operational Planning Process for Mid to Long Term Horizon

TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

MLTOP tool

TSO A

TSO B

TSO C TSO D

TSO …

Page 22: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

“ ”

Transmission System Operator Security Cooperation (TSC)

You can't just simply ‘plan’ for capacity and leave it at that. Capacity needs to be managed proactively with proper monitoring, alerting, and optimization.

SCOTT HEROLD, IT LUMINARY

22 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013

Page 23: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Let’s talk … E-MAIL: [email protected]

WEBSITE: WWW.TSCNET.EU

23

Page 24: TSC Long Term Vision and Integrated Capacity Management · TSC Long Term Vision and Integrated Capacity Management ... security assessment and capacity calculation ... IT hosting

Transmission System Operator Security Cooperation (TSC) 24 TSC Vision / Capacity Management, European Utility Week, Amsterdam, 2013