Trung Son Hydropower Plant Procurement Plan Trung Son hydropower Company Limited Date: January 2016 103715 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract...

Page 1: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Trung Son Hydropower Plant

Procurement Plan

Trung Son hydropower Company Limited

Date: January 2016

103715 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

PROCUREMENT PLAN

I. General

1. Project information - Country name: Vietnam (VN),

- Borrower: The Government of the

Socialist Republic of Vietnam

- Project name:

- Location: Trung Son commune, Quan Hoa District, Thanh Hoa province

- Project owner: Trung Son Hydropower Company Limited

- Main parameters of the project:

o Installed capacity (Nlm) : 260 MW (4 x 65 MW),

o Annual average energy (E0): 1018.61 million kWh, o Capacity of reservoir: 150 million m3,

o Schedule of the project implementation:

(i) Preparatory: From 2009 to 2012,

(ii) The project commencement: November 2012,

(iii) Electricity generation of unit 01: October 2016,

(iv) Electricity generation of remaining units: April 2017,

(v) Final completion of the project construction: September 2017.

2. The Bank’s approval date of 1st version of this Procurement Plan: April 27, 2012

3. Date of general procurement notice: November 13, 2010

4. Period covered by this procurement plan: Project Implementation Phase.

Trung Son Hydropower Project

Page 3: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

II. Goods and works and non-consulting services:

1. Prior review threshold:

Procurement methods

Estimated contract value

Prior review threshold Comments

Works

ICB ≥ 10 million USD All contracts

NCB < 10 million USD

L/M Risk: First contract H/S Risk: First 3 contracts

Shopping < 200,000 USD First contract

Goods

ICB ≥ 1 million USD All contracts

NCB <1 million USD

L/M Risk: First contract H/S Risk: First 3 contracts

Shopping < 100,000 USD None

2. Proposed procedures for CDD components (as per paragraph 3.17 of the Guidelines): Procurement of young animals, seeds, seedlings, veterinary medicine, pesticide/insecticide, etc (Package G-EMP-08c), Reservoir clearance “prior to impoundment” (Package W-EMP-06) shall be undertaken by community participation as description in Annex 8 of the PAD. 3. Reference to project operation/procurement manual (if any) :

NA

4. Any other special procurement arrangements: Procurement of the following contract packages was conducted before signing of the Loan Agreement. Expenditures under these contracts incurred after the cut-off date for retroactive financing specified in the Loan Agreement and prior to signing of the Loan Agreement with WB, are eligible for retroactive financing, subject to meeting all the specified conditions of eligibility that would apply to expenditures incurred after the signing. Works contracts of:

(a) Package W-RB-04: Construction of access road ; (b) Package W-RB-05: Construction of bridges; (c) Package W-RB-06: Construction of in-site road; and

Consulting services contracts of:

(a) Package C-RB-05: Construction supervision of access road; (b) Package C-MW-06: consulting services for assisting in preparation of the bidding

documents for the Main Civil Works; (c) Package C-RE-14: Consultant for assisting procurement of packages of the project.

Page 4: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

5. Procurement packages with methods and time schedule: (Exchange rate: 1USD=22,240 VND)

Ref. No. Package name/ Contract

(Description)

Estimated

Cost (thousand

USD)

Contract

Price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

Contract

Price

(USD

thousand)

Procurement

methods

PQ

(yes/no)

Domestic

preference

(yes/no)

Review

by Bank

(prior /

post)

Expected

Bid-

Opening

Date

Contract

Signing

Date/Exp

ected

Date

Notes

Component 1: Dam and Ancillary Construction

234.333,04

205.321,13

4.130,31

209.451,44

W-MW-01 Construction and installation of main works

134.244,60

133.063,85

2.221,82

135.285,67 ICB Yes No Prior Mar. 2012 Oct. 2012 Ongoing

G-MW-02 Procument of Hydro – mechanical Equipment

10.458,77

10.194,02

10.194,02 ICB No No Prior Sep. 2012 Jan. 2013 Ongoing

G-MW-03 Design, supply and installation of electro-

mechanical equipments.

65.935,93

41.353,54

86,06

41.439,61 ICB No No Prior Oct. 2012 Aug. 2013

Ongoing

W-RB-04 Construction of access road:

8.164,97

7144,71

985,07

8.129,78 ICB No No Prior Mar. 2011 Jun. 2011 Completed

Lot 1 (W-RB-04.L1) Construction of road from km 0 + 284.32 to km 7

+ 00 2.713,42 2.588,23

371,28

2.794,84

Lot 2 (W-RB-04.L2) Construction of road from km 7 + 00 to km 13

+ 00 3.142,19 2.691,75

489,53

3.010,04

Lot 3 (W-RB-04.L3) Construction of road from km 13 + 00 to km

20.408 2.864,15 2.350,19

124.23

2.324,90

W-RB-05 Construction of bridges (along the access road) 4.409,41 4.926,12

922,39

5.848,51 ICB No No Prior Mar. 2011 Jun. 2011 Completed

Lot 1 (W-RB-05.L1) Construction of Co Luong bridge

951,53

1.075,97

422,91

1.498,88

Lot 2 (W-RB-05.L2) Construction of medium-sized bridges

1.490,84

1.486,12

202,34

1.688,45

Lot 3 (W-RB-05.L3) Construction of Co Me bridge

1.967,04

2.364,03

297,15

2.661,18

W-RB-06 Construction of in-site road: 7.480,29 5.295,05

- 9,33

5.285,71 ICB No No Prior Jul. 2011 Oct. 2011 Completed

Lot 1 (W-RB-06.L1) Construction of in-site road on right and left

banks

3.425,05

2.105,30

- 95,19

2.010,11

Lot 2 (W-RB-06.L2) Construction of road to quarry

4.055,24

3.189,75

85,86

3.275,60

W-RB-08 Construction of Suoi Quanh temporary bridge and

approach road

2.572,35

2.516,44

-182,98

2.333,45 NCB No No Prior Mar. 2012 Jun. 2012

Completed( Drew the

balancesheet in Feb.

2014)

W-PM-01 Construction and Installation of office building on

Project site

846,00

771,64

107,29

878,94 NCB No No Prior Mar. 2012 Jun. 2012 Completed

Page 5: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Ref. No. Package name/ Contract

(Description)

Estimated

Cost (thousand

USD)

Contract

Price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

Contract

Price

(USD

thousand)

Procurement

methods

PQ

(yes/no)

Domestic

preference

(yes/no)

Review

by Bank

(prior /

post)

Expected

Bid-

Opening

Date

Contract

Signing

Date/Exp

ected

Date

Notes

G-RE-09

Purchase of vehicles: specialized vehicle (bus) to

transport TSHPCo staff to the site from Hanoi and

vice versa.

72,03

Shopping No No Post Mar-2016 Apr-2016 Going to be started

G-RB-09.1 Purchase of 02 pick-up vehicles

55.76

55,76

55.76 Shopping No No Prior

May.2012 July.2012

Completed

(Drew the balancesheet

in 2012)

G-PM-02 Supply and installation of additional air

conditioners for site office buidling 17,52

Shopping No No Post Nov-2015 Feb-2016 Under the process of

selection

G-MW-04

Design, supply and integration of 220kV Trung

Son – Nho Quan line differential protection at

Nho Quan site 500kV transformer station

(including equipment tests)

80,00

Shopping No No Post Feb-2016 Mar-2016

Under preparation of

Specifications and

Request for Quotations

Component 3: Social and Environment Impact Management

19.286,19

11.408,62

2.419,34

13.827,96

W-RE-01

Construction of resettlement area No.1 in Quan

Hoa district, Thanh Hoa province (In cluding in

terfieeld pathway)

2.471,35

1.495,77

1.072,93

2.568,71 NCB No No Post Dec. 2013 Feb. 2014 Ongoing

W-RE-02

Construction of resettlement areas No. 2 & 3 in

Muong Lat district, Thanh Hoa province (In

cluding in terfieeld pathway)

316,62

316,62

316,62 NCB No No Post Jan. 2014 Apr. 2014

Terminated Contract on

Apr. 21, 2015

Drew the balancesheet

on Sep. 8, 2015

W-RE-20

Construction of resettlement area No.4 in Moc

Chau district, Son La province (In cluding in

terfieeld pathway)

4.712,70

3.107,64

838,28

3.945,92 NCB No No Post Set. 2013 Nov. 2013 Ongoing

W-RE-03 Construction and installation of 35/0.4 KV line

and station and 0.4 KV line for resettlement areas

1.975,90

1.237,17

294,79

1.531,97

NCB No No Post Apr. 2014 Jun. 2014 Ongoing

Lô số 1

(W-RE-03.L1)

Construction and installation of 35/0.4KV line

and station and 0.4 KV line for resettlement areas

in Thanh Hoa province

1.501,02

953,60

294,79

1.248,40

Lô số 2

(W-RE-03.L2)

Construction and installation of 35/0.4KV line

and station and 0.4 KV line for resettlement area

in Son La province

474,88

283,57

283,57

1. Terminated contract

on May 16, 2015,

remaining volume of

work was transferred to

Lot 1

2.Added 75 households

in Tay Ta Lao village to

ve supplied with power

to this Lot;

Page 6: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Ref. No. Package name/ Contract

(Description)

Estimated

Cost (thousand

USD)

Contract

Price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

Contract

Price

(USD

thousand)

Procurement

methods

PQ

(yes/no)

Domestic

preference

(yes/no)

Review

by Bank

(prior /

post)

Expected

Bid-

Opening

Date

Contract

Signing

Date/Exp

ected

Date

Notes

W-RE-04

Construction of irrigation scheme and domestic

water supply system (resettlement areas No.1,2

and 3) in Thanh Hoa province

1.332,12

927,91

927,91 NCB No No Post Jan. 2014 Mar. 2014 Ongoing

W-RE-21

Construction of irrigation scheme and domestic

water supply system (resettlement area No.4) in

Son La province

761,20

476,99

52,03

529,01 NCB No No Post Sep. 2013 Nov. 2013 Ongoing

W-RE-05 Field reclamation in Thanh Hoa province

604,90

358,85

358,85 NCB No No Post Jun. 2014 Nov. 2014 Ongoing

W-RE-06 Field reclamation in Son La province

48,19

46,11

46,11

Shopping No No Post Jun. 2014 Oct. 2014 Ongoing

W-EMP-01 Upgrading and improvement of commune health

centers

58,45

Shopping No No Post Fer.-2016 Mar-2016 Going to be started

W-EMP-03 Establishment of control posts and improvement

of physical demarcation of reserve areas

16,13

Direct

contracting No No Prior No Jan-2016

Under the process of

contract negotiation

W-EMP-06 Reservoir clearance (prior to impoundment)

59,80

Đấu thầu cộng

đồng

No No

Prior

Apr.-2016 Apr.-2016 Going to be started

Lot No. 1

(W-EMP-06.L1)

Area No.1 of vegetation to be cleared in the

reservoir - Trung Son commune, Thanh Hoa.

province

10,79

Lot No. 2

(W-EMP-06.L2)

Area No.2 of vegetation to be cleared in the

reservoir - Trung Son commune, Thanh Hoa

province

10,79

Lot No. 3

(W-EMP-06.L3)

Area No.3 of vegetation to be cleared in the

reservoir - Trung Son commune, Thanh Hoa

province

8,99

Lot No. 4

(W-EMP-06.L4)

Area No.4 of vegetation to be cleared in the

reservoir - Trung Son commune, Thanh Hoa

province

10,57

Lot No. 5

(W-EMP-06.L5)

Removal of public works and cleansing residential

area and graveyards, Trung Son commune, Quan

Hoa district, Thanh Hoa province

4,05

Lot No. 6

(W-EMP-06.L6)

Removal of public works and cleansing residential

area and graveyards – Muong Ly commune,

Muong Lat district, Thanh Hoa province

6,74

Lot No. 7

(W-EMP-06.L7)

Removal of public works and cleansing residential

area and graveyards – Trung Ly commune,

Muong Lat district, Thanh Hoa province

1,35

Lot No. 8

(W-EMP-06.L8)

Removal of public works and cleansing residential

area and graveyards – Tam Chung commune,

Muong Lat district, Thanh Hoa province

3,82

Page 7: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Ref. No. Package name/ Contract

(Description)

Estimated

Cost (thousand

USD)

Contract

Price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

Contract

Price

(USD

thousand)

Procurement

methods

PQ

(yes/no)

Domestic

preference

(yes/no)

Review

by Bank

(prior /

post)

Expected

Bid-

Opening

Date

Contract

Signing

Date/Exp

ected

Date

Notes

Lot No. 9

(W-EMP-06.L9)

Removal of public works, suspension bridge and

cleansing residential area and graveyards – Tan

Xuan commune, Van Ho district, Son La province

2,70

G-EMP-04 Purchase of supporting equipment for protected

areas

21,78

20,01

20,01 Shopping No No Post Sep. 2013 Nov. 2013

Completed

(Drew balancesheet on

Janary 23, 2014)

G-EMP-02.A

Purchase of medical equipments, tools for health

care centres of affected communes

22,37

Shopping No No Post

Feb-2016

Mar.-2016 Going to be started

G-EMP-02.B Purchase of micro-nutrients for affected

communes

30,04

Shopping No No Post

Feb-2016

Mar.-2016 Going to be started

G-EMP-08.a1 Procurement of seeds, seedlings (CLIP pilot

phase)

0,31

0,29

0,29 Shopping No No Post May 2013 July. 2013

Completed

(Drew balancesheet on

Sep. 26, 2013)

G-EMP-08.a2 Procurement of young animals (CLIP pilot phase)

7,18

7,09

7,09 Shopping No No Post May 2013 July. 2013

Completed

(Drew balancesheet on

January 16, 2014)

G-EMP-08.a3 Procurement of fertilizer and feedstuff (CLIP pilot

phase)

12,38

18,35

18,35 Shopping No No Post May 2013 July 2013

Completed

(Drew balancesheet on

January 16, 2014)

G-EMP-08b-1 Procurement of seeds, seedlings for pilot CLIP

(transitional phase)

7,73

5,58

5,58 Shopping No No Post May 2014 Jun. 2014

Completed

(Drew balancesheet on

on Sep. 25, 2014)

G-EMP-08b-2 Procurement of young animals for pilot CLIP

(transitional phase)

4,18

4,33

4,33 Shopping No No Post May 2014 Jun. 2014

Completed

(Drew balancesheet on

Sep. 29, 2014)

G-EMP-08b-4 Procurement of feedstuff for pilot CLIP

(transitional phase)

9,38

7,26

7,26

Shopping No No Post May 2014 July 2014

Completed

(Drew balancesheet on

Sep. 29, 2014)

G-EMP-08b-5

Procurement of fertilizer of various kinds

and powdered lime for pilot CLIP

(transitional phase)

9,58

4,23

4,23

Shopping No No Post May 2014 July 2014

Completed

(Drew balancesheet on

Nov. 4, 2014)

G-EMP-08.c

Procurement of young animals, seeds, seedlings,

veterinary medicine, insecticide / pesticide, etc

(CLIP scale-up phase)

921,12

Shopping

(Community

participation)

No No Prior No

Apr.-2016 Going to be started

G-EMP-09 Compensatory releasing fish

83,18

Shopping No No Post Mar. 2016 Jun- 2016 Going to be started

W-RE-22 Construction of Muong Lat Gauge Station

and Specialized Works

246,87

NCB No No Post Dec.-2015 Feb.-2016 Under the process of

selection

Page 8: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Ref. No. Package name/ Contract

(Description)

Estimated

Cost (thousand

USD)

Contract

Price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

Contract

Price

(USD

thousand)

Procurement

methods

PQ

(yes/no)

Domestic

preference

(yes/no)

Review

by Bank

(prior /

post)

Expected

Bid-

Opening

Date

Contract

Signing

Date/Exp

ected

Date

Notes

G-RE-23

Supply and Installation of Specialized

Equipments and Materials for Muong Lat

Gauge Station

52,55

Shopping No No Post Feb.-2016 Apr.-2016

Under the process of

preparation of

Specifications and Request

for Quotations

W-RB-10 Construction of Anti-flood road in reservoir

area

2.982,27

1.212,46

161,31

1.373,77 NCB No No Post Nov.-2014 Dec.-2014 Ongoing

Lot 1 (W-RB-10.L1) Construction of Na On - Ta Com Road

2.088,03

834,94

200,04

1.034,98

Lot 2 (W-RB-10.L2) Construction of Pom - Pom Khuong Road

894,24

377,52

- 38,73

338,79

W-RE-02.B Construction of remaining works of resettlement

areas No.2 & 3

2.517,45

2.161,96

2.161,96 Direct

contracting No No Prior No Oct.-2015 Ongoing

Component 4: Capacity Development and Scale-up

432,45

42,66

42,66

G-RE-11 Purchasing communication equipment and

materials

81,12

6,58

6,58 Shopping No No Post Mar.-2015 Apr.-2015

Purchase

G-RE-17 Production and printing communication products

71,47

36,08

36,08 Shopping No No Post Sep. 2012 July-2014

Ongoing

W-RE-19 Construction of Memorial and Traditional House 279,87

NCB No No Post Jun.-2016 Aug.-2016 Not yet started

TOTAL

254.051,69

216.772,14

6.549,66

223.322,07

Page 9: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

III. Selection of Consultant

1. Prior-review thresholds:

Selection method Estimated contract value Prior-review thresholds

Comments

Consulting

services

QCBS/QBS ≥ 300,000 USD All contracts

CQS < 300,000 USD

- The first contract;

- Audit: All contracts

Single

Source

Selection

Requirements set out in

paragraphs 3.9 – 3.13 of the

Consultant Guidelines

All contracts

Individuals

Requirements set out in

Section V of the Consultant

Guidelines

Only exceptional

contracts, 20,000 USD

Page 10: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

2.Consulting assignments with selection methods and time schedule: (Exchange rate: 1USD=22,240 VND)

Ref. No. Package name/ Description of assignment

Estimated

cost

(thousand

USD)

Contract

price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

contract

price

(USD

thousand)

Selection

method

Review by

Bank

(prior /

post)

Expected

Proposals

Submissio

n

Date

Contract

Signing

Date/

expected

date

Notes

Component 1: Dam and Ancillary Construction 5,638.80 10,490.25

-347.89

10,142.36

C-RB-05 Construction supervision consultant of Trung Son access

road 472.63

310.98

310.98 QCBS Prior Feb. 2009 Jun. 2011 Minutes of A-B Approval

Record dated October 3,

2012

C-RB-06 Construction Supervision assistance:

Trung Son Access Road “Remaining duration”

44.96

24.24

8.68

32.91 IC Post May. 2012

Terminated contract on

October 8, 2012

Completed

C-MW-03

Construction Supervision on main work. in-site service

road system and assisting PMB in contractor selection for

main work – Trung Son Hydro power project.

4,060.55 9.204.00

-476.59

8.727.41 QCBS Prior Nov. 2011 Aug. 2012 On-going

C-MW-06

Services to assist TSHPCo in finalizing bidding

documents for Main Civil Works

(a) Mechanical and Equipment expert

(b) Civil/hydropower expert

(c) Procurement Expert

134.89

100.30

-13.95

86.35 IC Prior Jun. 2011 Completed

C-MW-04 Project Technical Advisor Panel (for Dam Safety)

505.28

508.97

37.34

546.31 IC-SSS Prior Dec. 2014

On-going

C-RE-01

Construction supervision - resettlement sites in Thanh Hoa

and Son La provinces (road and electric system are

included)

234.45

228.33

96.63

324.96 CQS Post Jan. 2014 July. 2014 On-going

C-RE-02 Supervision - field reclamation and irrigation scheme

105.16

94.19

94.19 CQS Post Jan. 2014 Apr. 2014

Under process of contract

termination

C-PM-01 Consulting services - translation and interpretation

80.78

19.24

19.24 IC Post Aug. 2012

On-going

Component 3: Social and Environment Impact Management

3,646.39 3,386.83

181.37

3,568.20

C-SO-02 IMC Social – for all RLDP activities (except for access

and in-site roads) 514.32 470.68

-1.99

468.69 QCBS Prior Jan. 2012 Nov. 2012 On-going

C-EMP-03 Livelihoods and Social Technical Assistance Consultant -

international

129.13 147.75

101.22

248.97 IC Post

Sep. 2012 On-going

C-EMP-04.1

Consultants for pilot implementation of CLIP packages -

national

45.91

40.79

95.28

136.08 IC Post Aug. 2012

On-going

Page 11: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Ref. No. Package name/ Description of assignment

Estimated

cost

(thousand

USD)

Contract

price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

contract

price

(USD

thousand)

Selection

method

Review by

Bank

(prior /

post)

Expected

Proposals

Submissio

n

Date

Contract

Signing

Date/

expected

date

Notes

C-EMP-04.1c Meeting. training. study tour. etc (CLIP pilot phase)

16.82

9.30

9.30 SOE/

Workshop Prior/Post Jun. 2013 Completed

C-EMP-04.1d Meeting. training. study tour … for pilot CLIP

(transitional phase)

27.84

27.84

27.84 SOE/

Workshop Prior/Post No Jan. 2014 Completed

C-EMP-04.2 Consultant for scaling up CLIP packages

531.38

521.26

521.26 QCBS Prior Feb. 2014 Oct.2014 On-going

C-RE-05 Mid-term and final evaluation of RLDP implementation

92.68

80.72

80.72 CQS Post May 2014 Apr. 2015 On-going

C-RE-12 Baseline Survey - for RLDP of Trung Son hydropower

project

44.50

42.70

42.70 CQS Prior Jun. 2012 Oct. 2012

Drew balancesheet on Jan.

9, 2014

C-EMP-16 Salvage of physical cultural resources

189.19

171.78

171.78 SSS Prior Sep. 2013 Apr. 2015 On-going

C-EMP-07 Assessment of need to upgrade health care system of

affected communes

13.22

13.21

13.21 IC Post Sep. 2014 On-going

C-EMP-08 Capacity building for health workers and program on

community’s awareness raising for construction phase

149.35

127.69

127.69 CQS Post Feb. 2014 May. 2014 On-going

C-EMP-09 Consultant on Monitoring and Evaluation of Epidemic –

Under PHAP for Construction Phase

57.51

44.95

44.95 CQS Post Jun. 2013 Oct. 2013 On-going

C-RE-07 Strengthening capacity of stakeholders for implementing

RLDP

9.29

8.32

8.32 CQS Post Feb. 2013 May 2013

Drew balancesheet on Dec.

31, 2013

C-ENV-01 IMC Environmental - Main Civil Works and resettlement

sites

467.91

426.42

426.42 QCBS Prior Jun. 2012 Dec. 2013 On-going

C-EMP-15 Environmental quality monitoring and pollution

assessment consultant (construction phase)

248.09

242.70

-13.53

229.17 QCBS Prior Jun. 2012 Dec. 2013 On-going

C-EMP-22 Preparation of environment protection commitment (EPC)

and EMP for resettlement sites

32.02

31.59

31.59 CQS Post Jul. 2012 Dec. 2012 Drew balance sheet on Sep.

19, 2014

Page 12: Trung Son Hydropower Plant - All Documents...NoPrior Jan-2016 Under the process of contract negotiation W-EMP-06 Reservoir clearance (prior to impoundment) 59,80 Đấu thầu cộng

Ref. No. Package name/ Description of assignment

Estimated

cost

(thousand

USD)

Contract

price

(thousand

USD)

Additional

cost during

implementa

tion

(USD

thousand)

Total

contract

price

(USD

thousand)

Selection

method

Review by

Bank

(prior /

post)

Expected

Proposals

Submissio

n

Date

Contract

Signing

Date/

expected

date

Notes

C-EMP-10

Consultant for Implementation of Program on Monitoring

Impacts on Rare Species and Raising Staff Capacity in

Biodiversity

104.96 78.86

78.86 CQS Post Aug. 2013 Jun. 2014 On-going

C-EMP-12 Development of a community-based forest management

plan

64.13

47.71

47.71 CQS Post Jan. 2014 Oct.2014 On-going

C-EMP-13 Research and assessment of Tiger preservation

36.81

33.66

33.66 CQS Post May 2014 Apr.2015 On-going

C-EMP-14 Detailed design for reservoir clearance

48.50

46.33

46.33 CQS Post Nov. 2013 Mar. 2014 On-going

C-EMP-17 Changes monitoring and guiding to fish breeding and

fishing 115.53 87.01

87.01 CQS Post Apr. 2014 Apr.2015 On-going

C-EMP-19 Water Quality Model - optimizing management of

reservoir water quality

61.43

55.25

55.25 CQS Post Aug. 2014 Apr.2015 On-going

C-EMP-20

Cumulative Impact Assessment. Feasibility of Intact River

Management and Optimized Water Management on the

Ma River Basin

261.92

249.10

249.10

CQS Post Feb. 2014 Apr.2015 On-going

C-SO-03 Panel of Social and Environmental Experts (POE)

390.62

386.20

0.40

386.60 IC Prior Mar. 2014 On-going

Component 4: Capacity Development and Scale-up

480.19

84.16

0.09

84.26

C-RE-09 Training to scale up capacity of TSHPCo staff

184.55

2.30

0.85

3.16 SOE/

Workshop Prior/Post Apr. 2014 Jun. 2014

Drew balancesheet on Nov.

26, 2014

C-RE-15 Study tours to implemented projects by TSHPCo/EVN

staff

208.49

5.61

5.61 SOE/

Workshop Prior/Post Jan. 2012 Aug.2013 Ong-going

C-RE-18 Training on Governance and Anti-Corruption in

Construction Supervision

25.24

14.34

14.34 IC-SSS Prior Jun. 2013

Drew balancesheet on Oct.

2, 2013

C-RE-20 Consultant to implement communication plan

61.19

61.19

-0.76

61.15 IC Post Dec.2014 On-going

TOTAL

9,765.38 13,961.24

-166.42

13,794.82