TRR ARB PresentationWomen at Work Website Redesign
![Page 2: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/2.jpg)
Operational Concept Overview
Sanath BhandarySrikanth Madhava
![Page 3: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/3.jpg)
Operational Concept Overview
● Old Business Workflow○ Registration○ Feedback○ Check-in○ Report Generation
● Drawback of existing workflow
● Proposed new operational concept
![Page 4: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/4.jpg)
Goals
● Automate the existing manual processes involved in Registration, Feedback collection, Report generation and Check-in
● Redesign the website to make it more interactive
![Page 5: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/5.jpg)
Organizational Goals
● Convenient data management through data centralization
● Increase operational efficiency through automation
● Increase number of users via website redesign
● Assist in raising funds through proposal of reports
![Page 6: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/6.jpg)
Additional Features
● Integrating Google Analytics
● Responsive Design
![Page 7: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/7.jpg)
TRR Outline
1. Demo of Initial Operation Capability - Rohit, Nishant
2. Support Plan - Praneet
3. Test Cases, Procedures, and Results - Dinesh, Praneet
4. Quality Focal Point - Brian
5. Transition Plan - Phaneendra
![Page 8: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/8.jpg)
Transition Objectives
● Beta Testing phase in Dev environment.
● Guidelines for Transition.
● Dev Support till 12/15/2014.
![Page 9: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/9.jpg)
Transition Strategy
● Source files (php, html) will be zipped and uploaded in the team website and BitBucket repository will be created for future development.
● Training for transition of website from dev environment to production environment by 12/08/2014
![Page 10: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/10.jpg)
Demo of Initial Operational Capability
Nishant JaniRohit Kudva
![Page 11: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/11.jpg)
Support Plan
Praneet Surana
![Page 12: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/12.jpg)
Support Plan
● The system has been tested by the implementation team and is ready for use.
● A user manual and training will provided to the client to overcome any issues that arise after delivering the final deliverable
● The development team will not be making any additional changes to the system.
![Page 13: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/13.jpg)
Test Cases, Procedures, and Results
Dinesh YeduguruPraneet Surana
![Page 14: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/14.jpg)
Testing
● Testing by implementation team
● Testing by the client
● Final testing will be done at the client site and the implementation team will be present to document any known issues and bugs.
![Page 15: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/15.jpg)
Test Cases
● TC-01 Registration Form
● TC-02-01 Online Check-in
● TC-02-02 Check-in multiple services
● TC-03 Feedback
● TC-04 Report Generation
● TC-05 Social Media Integration
● TC-06 Blogging
● TC-07 Private Management Portal
![Page 16: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/16.jpg)
Test Procedures
● Manual testing of registration form, feedback form, report generation and online check-in through edge cases and many test case combinations to ensure test coverage.
● Verification was done to ensure that the data was being entered to the Neon CRM and correct reports were generated.
● Any bugs found were documented.
![Page 17: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/17.jpg)
● Phase #1 - 11/15/2014Online check-in, online registration form, feedback form and report generation module were successfully tested in this phase.
● Phase #2 - 11/30/2014All Capabilities tested including social media integration
and private management portal.
● Phase #3 - 12/08/2014 Final Training and Testing on deployment site.
Test Results
![Page 18: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/18.jpg)
Quality Focal Point
Brian Bousman
![Page 19: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/19.jpg)
Bug Activity Over Time
![Page 20: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/20.jpg)
Technical Debt
WC 3379 – This Win Condition could not be satisfied because of insufficient time to design and implement automating this report
![Page 21: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/21.jpg)
Traceability MatrixOCD WinWin SSAD Use Case Test Case
OC-1 Online Registration
WC_3189 UC-1 TC-1
OC-2 Onsite check-in WC_3190 UC-3 TC-02-01, TC-02-02
OC-3 Feedback WC_3192 UC-2 TC-03
OC-4 Private management portal
WC_3193 UC-4, UC-5 TC-07
OC-5 Report generation
WC_3373, 74, 75, 76, 77, 78, 79
UC-6 TC-04
OC-6 Social media integration
WC_3195 UC-9 TC-05
OC-7 Blogs WC_3196 UC-8 TC-06
![Page 22: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/22.jpg)
Transition PlanPhaneendra Maryala
![Page 23: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/23.jpg)
● Regular Computers with Operating System - Windows , Mac or Linux
● No extra hardware
Hardware Preparations
![Page 24: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/24.jpg)
Software Preparations
● Modern Web browser is required - IE 9+, Mozilla Firefox 31+, Google Chrome 34+ and Safari
● The browser should be HTML 5 compliant
![Page 25: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/25.jpg)
● No specific site preparation is required
● A desktop or laptop with the mentioned requirements
● Staff Plan : WaW website admin to maintain the website.
Site and Staff Plan
![Page 26: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/26.jpg)
Operational Training
● Demo the system to client
● Client operate it alone
● Correct the wrong steps and take the feedback suggested.
![Page 27: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/27.jpg)
Date Time
Location
Contents Person being traine
d
Responsible personnel
Training Manual
12/8/14 TBD TBD - Website/Blog management
- Registration - Feedback features
Cecilia Avila
Nishant Jani,Srikanth Madhava
WordPress admin User Manual
Project User Manual
12/8/2014 TBD TBD - Onsite Check-in / Reporting Training
Cecilia Avila
Rohith Kudva,Sanath Bhandary
phpMyAdminUser manual
Training
![Page 28: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/28.jpg)
Stakeholder Roles and Responsibilities
Date Role Responsibilities Location
12/01/2014 TA’s, Team, Client Transition ReadinessReview ARB evaluation
USC
12/02/2014 - 12/04/2014
Prototyper, Tester, Project Manager
Perform final requirements checks and testing, resolve any issues
USC
12/08/2014 Team, Client Client training and feedback
USC
12/08/2014 Team, Client Deliver the system USC
![Page 29: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/29.jpg)
Milestone Plan
Milestones Date for completion
Drive through major features developed by client
11/18/2014
Final testing by implementation Team 12/06/2104
Client Training and acceptance testing 12/08/2014
Deliver the final project to the Client 12/08/2014
![Page 30: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/30.jpg)
Required Resources
● Entire implementation team has to be present during client training, testing and final delivery of the project
● Basic hardware and software requirements as stated earlier
● No additional staff or personnel required for installation or maintenance.
![Page 31: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/31.jpg)
Software Product Elements
● Jquery, Bootstrap, Google Analytics libraries and other resources required for the working of the Women At Work project
● The WordPress theme template, image gallery plugin, phpMyAdmin
● User manual will be included along with the rest of the files
![Page 32: TRR ARB Presentation Women at Work Website Redesign.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e015503460f94aeb58a/html5/thumbnails/32.jpg)
Thank You !!