Troy Univ Ppp 15 Apr10

42
Public Private Partnerships – Private Solutions For Public Needs VISION PATH FINANCIAL Private Partnerships: A Global Tool for Infrastru

description

Public Private Partnership \'s: A Global Tool for Infrastructure presentation to student and faculty at Troy Univ. Atlanta campus

Transcript of Troy Univ Ppp 15 Apr10

Page 1: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

VISION PATH FINANCIAL

Public Private Partnerships: A Global Tool for Infrastructure

Page 2: Troy Univ Ppp 15 Apr10

AG

EN

DA › Current Economic Outlook and Key Factors

› PPP: An overview

› Examples of PPP’s

› PPP Process Risks and Cost

› Open discussion

Page 3: Troy Univ Ppp 15 Apr10

ECONOMIC OUTLOOK

Page 4: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

International Markets: Slower growth

› Weaker national economies

› Limited migration due to soft housing markets

› Shifting and cautious capital infrastructure investors

› Some bright spots - Growth in China and Canada

› Improving economic indicators

Page 5: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Fiscal Situation: Difficult Times

› Limited growth in tax revenues– Commercial and residential real estate correction– Tax reforms (property, other)

› Less federal, state and local revenues› Federal/National funding at risk

– Stimulus package drop-off after 2010 (U.S.)– Healthcare reforms and costs (Global)

Page 6: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Global UrbanizationThe world’s urban population is projected to grow at twice the annual pace of the total population.

Source: United Nations, 2006

Page 7: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Growth in Govt Funded PPP Programs

Energy PPP’s: Loan Guarantee Programs – US

Page 8: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Anticipated Growth in Infrastructure

Source: Strategy + Business magazine (Spring 2007) by Booz Allen Hamilton, Inc.

During the next 25 years, modernizing and expanding urban infrastructure will require approximately $41 Trillion.

Projected cumulative infrastructure investment needed during the next 25 years to modernize obsolescent systems and meet expanding demand, broken down by region and sector.

Page 9: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

US Infrastructure Report CardOverall Grade = D

ASCE Grading scale: A=Exceptional; B=Good; C=Mediocre; D=Poor; F=FailingSource: 2005 American Society of Civil Engineers (ASCE) Report who gave U.S. infrastructure a “poor” rating based on the condition

Aviation D+

Bridges C

Dams D-

Drinking Water D-

Energy D

Hazardous Waste D

Ports/Waterways D-

Parks and Recreation C-

Rail C-

Roads D

Schools D

Solid Waste C+

Transit D+

Wastewater D-

Page 10: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Education: Drivers behind construction

› Class size reduction› Population growth & migration› Changing Educational Needs

• Technology, computer labs, science labs, bio-science facilities, athletic facilities

› Modernization / replacement of aging facilities› Environmental

• LEED initiative to reduce carbon footprint utility consumption; electricity, water, gas.

Page 11: Troy Univ Ppp 15 Apr10

Public-Private Partnerships: An Overview

Page 12: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

What is PPP?

A Public-Private Partnership is a contractual agreement between a public agency (federal, state or local) and a

private sector entity, or not for profit. Through this agreement, the skills and assets of each sector (public and private) are shared in delivering a service or facility for the

use of the general public. In addition to the sharing of resources, each party shares in the risks and rewards in

the delivery of the service and/or facility.

Page 13: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

PPP is not privatization

PPP Privatization

Asset ownership Usually no irrevocable transfer of assets

Transfer of ownership of assets

Public responsibility Set policy and service levels Regulation

Level of services Mechanism for shared services

Authorities withdraw from service

Risk/Reward Shared Transferred

Mode Partnership Self-interest

Page 14: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

What makes a partnership work?

Page 15: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Benefits of PPP

› Earlier delivery of projects

› Ability to deliver multiple facilities as needed by demand

› Risk shifted (shared) from Public to Private sector

› Cost Savings- Construction- Efficiencies/Innovation- Potential life-cycle costs as private sector invests more up front to

save operating costs- Lower initial costs (e.g., pre-development; construction)

Page 16: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Benefits of PPP

› Positive impact on bond/debt capacity and ratings if private debt used

› Economic development catalyst/increased tax revenues – (e.g., create jobs, impact property values)

› Possible operating expense (vs. capital) treatment

› Increased flexibility for public agency

› Public sector can focus on its’ core competencies

› Innovative funding solutions

› Revenue possibilities and longer-term cash flow

Page 17: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Public-Private Partnerships Confusion(also referred to as PPP, P3, 3P and PFI)

Page 18: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Types of PPP

Degree of Private Sector Involvement

Degr

ee o

f Priv

ate

Sect

or R

isk

Page 19: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Design/Build/Maintain (BOM)

› Private sector:– Designs and builds facility– Signs maintenance contracts

› Public sector:– Finances – Operates

Design/Build – CM@RiskDesign/Build/Maintain (BOM)

Page 20: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Build/Operate/Transfer (BOT)

› Private sector:– Designs and builds facility– Assign operation contracts for non

governmental functions– Provides some or all of financing

› Asset ownership– Transfer to public agency varies

• Can be at end of construction• Can be at end of operation/finance contract• Can be at the option of public agency

Design/Build – CM@RiskDesign/Build/Maintain (BOM)

Build/Operate/Transfer (BOT)

Page 21: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Lease/Develop/Operate

› Private sector:– Leases or buys existing facility– Renovates, modernizes, expands facility

› Public sector– Public agency may provide operation

Design/Build – CM@RiskDesign/Build/Maintain (BOM)

Build/Operate/Transfer (BOT)Lease/Develop/Operate

Page 22: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Tax-Exempt Lease/Bond

› Private sector:– Finances capital assets or involves private

investments› Bond/Lease payment

– Interest payments are tax exempt under State/Federal laws

› Asset ownership– Transferred to public agency at beginning

or end of lease/bond term– May be owned for non for profit Special

Purpose Entity

Design/Build – CM@RiskDesign/Build/Maintain (BOM)

Build/Operate/Transfer (BOT)Lease/Develop/Operate

Lease PurchaseSale/Leaseback

Tax-Exempt Lease/Bond

Page 23: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Private Finance Initiative

› Model developed in UK (used by Canada, Australia, others)

› Risk is mostly transferred to the private sector› Private sector:

– Designs and builds facility– Provides all of financing– Provides maintenance under contract– Provides operations of non-education

functions under contract› Public sector

– Accrues equity as lease payments are made– Own asset at end of lease term

Design/Build – CM@RiskDesign/Build/Maintain (BOM)

Build/Operate/Transfer (BOT)Lease/Develop/Operate

Lease PurchaseSale/Leaseback

Tax-Exempt Lease/BondTurnkey

Private Finance Initiative

Page 24: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

The evolution of PPPs

Operational Focus Strategic Focus

Input-orientation Output-orientation Outcome-orientation

Outsourcing

Design & build, O&M contracts

PPP contracts

Joint Ventures & Strategic Partnerships

Cost Value

Page 25: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Operations

› Only will provide non-governmental services– Food services– Energy and utilities

› Not a necessary component for PPP› Performance guarantees

– Financial penalties

Page 26: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Maintenance

› Can provide complete services– Building maintenance– Grounds maintenance

› Performance guarantees– Financial penalties

• Example: Financial penalties if light bulb is not replaced within 30 minutes of reporting

› Facility must be in proper shape when lease term is up

Page 27: Troy Univ Ppp 15 Apr10
Page 28: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Primary School Example- Knowsley UK

– Introduction– Balfour Beatty Capital was awarded a 25-year, $294 million contract to design and construct seven new

learning centers.– Private investment: $38 million in the project.

• Project overview– Construction of seven state-of-the-art learning centers which will replace all of the existing schools over

a 3-year period.– Maintenance of the schools will be undertaken by a subsidiary of Balfour Beatty.– Balfour Beatty will work with Knowsley Council in the further development of a clear educational vision

examining progressive learning environments and teaching models.

The vision for KnowsleyKnowsley will create learning centers – schools - that will be open in the evenings, on weekends and during the school holidays, making them available for the entire community. The centers will also provide other services for the community, such as healthcare, on the same site.

Education Councilman Larry Nolan said, “So much more is known today about the way children learn, and these new learning centers will be designed to meet their needs.”

Page 29: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

K-12 Examples

“The pieces in our puzzle box have the following words on them; planning objectives, educational program goals, expertise, capability, capital funding, construction bonds, school improvement, tax incentives, housing, affordable housing, public programs and services, school choice, charter schools, private financing, flexibility, inflexibility, profit motive, bottom line, debt service, tax liability, public goals and objectives, early childhood development, responsibility, priorities, political considerations, repeat business, classroom space, community space, community learning, career education, etc.

The bottom line is that we in the D.C. Public Schools see {public-private partnerships} as an opportunity and valuable tool in the arsenal of school facility improvements and accommodation of educational program needs.”

Dr. Paul Vance, Superintendent, Washington, D.C. Public School Board

Page 30: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Higher Ed Example

University of Central Florida was able to build a convocation center where state funding was not available for such projects.

Example of PPP at University of Central Florida:

Page 31: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Hospital Example – Birmingham UK– Introduction– In June 2006, Balfour Beatty Capital was awarded a

40-year, $1.1 billion public-private partnership (PPP) project for Birmingham New Hospitals in the UK.

– Total committed investment is $46 million.› Project overview

– Relocates most of south Birmingham’s key clinical and mental health facilities to a single site

– Construction is being undertaken over 62 months through a joint venture between Balfour Beatty Construction and Haden Young.

› FM Services: Balfour Beatty Capital is responsible for the facilities management services at the hospitals. This has been subcontracted to Haden Building Management, the Balfour Beatty Group facilities management company.

Page 32: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Loudoun County Govt Center – Leesburg VA

› 158,000 SF, five-story government center including administrative headquarters and 418-space parking garage.

› Scattered operations consolidated in two locations and capitalized using tax-exempt bonds, creating ~$1 million in annual savings (~$22 million cumulative savings over lease term).

› County outsourced financing, design, development, and construction risk, realizing savings of ~10% of project costs.

› Private Partner: Gilbane Development Company

Page 33: Troy Univ Ppp 15 Apr10

Process Risks

Page 34: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Process Risks

Risk Solution

Reputation Loss of reputation because a partner reneges on agreement Thorough pre-screening of partner

Expectation Unrealistic expectation- Include stakeholders in process- Clearly communicate status at every milestone

ProjectPrivate partner unable to deliver due to financial resources or experience

Select partner that can bring resources to accomplish goals

LegalProject being derailed due to violations of procurement or delivery laws

Research laws prior to RFP/RFQ process and ensure the document is compliant

Political Process can derail due to political fighting

Get political agreement prior to process

Page 35: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Balancing Risk with Costs

› The greater the transfer of risk, the higher the price› Project costs could grow and become prohibitively expensive› Transfer risk when it makes good economic sense

Hurdle

Risk

Costs Optimal risk transfer

Page 36: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Cost Over Time

Time

Cost

to P

ublic

Sec

tor

PPP approachPublic funding

Traditional funding of projects contains peaks and valleys in spending

PPP creates a steady, predictable, and affordable financing source

Page 37: Troy Univ Ppp 15 Apr10

PPP – A Combining of Strengths

Page 38: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Combining of Strengths

› Legal authority› Protection of procurement

polices› Broad perspective to

meet public needs› Personnel is dedicated

but constrained› Capital resources and

under utilized assets

(Result of market competition)›Management efficiency›Workplace efficiencies›Capital management›Newer technologies›Cash flow management›Personnel expertise

Public Sector Strengths

Private Sector Strengths100%

Effectiveness

Page 39: Troy Univ Ppp 15 Apr10

Vision Path Financial

Page 40: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Additional Information› National Council for Public-Private Partnerships

- www.ncppp.org- Articles, papers and other resources on PPPs

› American Society of Civil Engineers- www.asce.org- Infrastructure report card

› US DOT – National Strategy to Reduce Congestion- www.fightgridlocknow.gov- Includes sample legislation authorizing PPPs

› US EPA – Sustainable Infrastructure for Water and Wastewater- www.epa.gov/waterinfrastructure/index.html- Advocates full cost pricing

Page 41: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Contact info:

Steve AllenPresident and CFO

Vision Path Financial, LLC404-993-2500

[email protected]

Vision Path Financial

Page 42: Troy Univ Ppp 15 Apr10

Public Private Partnerships – Private Solutions For Public Needs

Vision Path Financial

Public Private Partnerships: A Global Tool for Infrastructure