TRIUMF a TIER 1 Center for ATLAS CanadaSteven McDonald
TRIUMF Network & Computing Services
iGrid 2005 – San Diego Sept 26th – 29th 2005
* *******
*
*
**
Centre - Country ALICE ATLAS CMS LHCb MB/s
ASCC - Taipei X X 110
CNAF - Italy X X X X 220
PIC - Spain X X X 200
CC-IN2P3 - France X X X X 220
FZK - Germany X X X X 220
RAL - England X X X X 220
BNL –United States X 154
FNAL – United States X 50
TRIUMF - Canada X 75
NIKHEF - Netherlands X X X 175
NORDIC GRID X X X 90
# TIER1 Sites 6 10 7 71,60
0
The TRIUMF Facility
• Located in Vancouver, Canada
• Research is performed locally using the world’s largest 500MeV Cyclotron
• As well as internationally at• CERN-ATLAS• BNL-KOPIO• KEK-Neutrino Experiment
•~400 full-time employees
• Nuclear Physics• Particle Physics• Astrophysics• Material Science
• Proton & PET Therapy• Radiopharmaceuticals • Radioactive beams• Microchip design
Canada’s National Laboratory for sub-atomic physics
Politics & Funding
• TRIUMF 5 yr budget cycle runs 2005-2009, TRIUMF ATLAS Tier1 centre is one of the main TRIUMF programs to be undertaken in that 5 year plan
• However, the Canadian political climate has been somewhat turbulent for the last year with an election expected to be called at the end of the year, consequently funding for ATLAS at TRIUMF has not been fully secured?
• TRIUMF’s 5 yr budget request for an ATLAS Tier1 centre was $8M Capital, with 9 more additional FTE’s
• Two FTE’s were hired last year for ATLAS at TRIUMF
• Until Funding is fully secured TRIUMF’s Core Computing & Networking Group is providing the initial 10G infrastructure, along with CANARIE and HEPnet Canada.
The ATLAS Experiment
• 2000 physicists in 34 countries
• ATLAS Canada ~0.6 TIER1• ~80 Physicists• 4.5% of ATLAS Colab.
• Size of 5 story Building
• millions of channels of data
• Discover the Higgs particle
• 30 million events per second
Year 2007 2008 2009 2010
CPU (kSI2K) 7899 26502 47600 81332
DISK (PB) 5.5 15.5 23 42
TAPE (PB) 3 10 18.5 31
Totals for all 10 TIER1’s integrated over the years
1 kSI2K = 3GHz CPU
Tier0 – Tier1 network meeting in Amsterdam Jan ‘05 made it clear all Tier1 sites would require a 10 Gbps network connection to CERN
This would accommodate the expected sustained data rates with head room for efficiency, burst and recovery traffic.
Sept 1 ‘05
3rd week Sept ‘05
End Oct ‘05
Amsterdam
The TRIUMF-CERN 1GbE Lightpath(s)
• TRIUMF• BCNET• CANARIE• SURFnet• CERN
• 1 GbE circuit • established April 18th 2005
• 2nd GbE circuit established July 19th 2005
ATLAS Tier2 in Canada
TRIUMF
Tier 1
Eastern
Tier2
CERN TIER 0
10G
1G
Dedicated e2e LightpathsCan be lightpathsor on the routed 1Gbps CA*net4research network
~5G ? ?Tier 1
There will be two Tier 2’s Centres in Canada, one in the East and one in the West. Each centre will be a distributed across several sites, with one contact point
Western
Tier2
1G
Tier2’s
CWDM & Lightpaths at TRIUMF
/CA*net4
10 GbE @1550nm
2x 1 GbE @1530nm
2x 1 GbE @1510nm
2x 1 GbE @1690nm
Aug 2002
TRIUMF Local loop to Gigapop & CA*net4 PoP ~ 22km
TRIUMF WAN CWDM Equipment
BCNET 22km
10GbEFoundry Switch -> CERN
MRV CWDM
1610 nm1590 nm1570 nm1550 nm
Potential to Add 2 more1GbE channels
Single Pair Fiber
4 1GbE channelsPassport 8600• ORAN• WESTGRID• 2x CERN
SFP 4 Port Optical Mux
2x GbE TDM
Transfer results over 10GbE circuit
TRIUMF Tier1 → Canada Tier2’s
Participating Canadian Tier2 sites in SC3Simon Fraser UniversityUniversity of VictoriaUniversity of AlbertaUniversity of Toronto
T1-T2 network activity Aug 17 - Aug 24 : All four Tier 2 sites participating
A Daily snap-shot of SC3
10 GbE Lightpaths to CERN 2004-05
TRIUMF CERN
Atlantic Crossing√
√√
√
√
√X
Summary …• Currently,
• 2 x 1 GbE circuits TRIUMF to CERN (since April 18th / July 19th 2005)
• 10 GbE Foundry NI40G’s & NI1500 on loan
• In Progress – To be completed by end of year
• Circuits
• Sept 1st 2005 CANARIE/CA*net4 was delivered a 10GbE circuit between Amsterdam and New York
• 3rd week Sept 2005 CA*net4 add 4th OC192 circuit across Canada
• End of October add a 5th OC192 circuit across Canada
• Still waiting on final Lambda between Amsterdam-CERN (GEANT2 ?)
• 10 GbE Equipment
• Last mile DWDM optics for TRIUMF/BCNET expected by Oct/Nov ‘05
• 10G Foundry Rx-4 switch ordered, expect delivery Oct/Nov ‘05