Smarter Buildings:A smarter way to manage real estate and facilities
Gene Moran, Sales Enablement, IBMJuly 18, 2011
![Page 2: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/2.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
2
Business Value Proposition
![Page 3: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/3.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
3
The need for progress is clear
2025By 2025, buildings worldwide will become the top energy consumers.
1Buildings are the number 1 contributor to global CO2 emissions.
2Real estate is the second largest expense on the income statement for most companies.
In most organizations the real estate portfolio is on the balance sheet as the third most valuable or expensive single asset.
3
42 percentWorldwide, buildings consume 42% of all electricity – up to 50% of which is wasted.
30 percentFacilities investments and operating costs can be more than 30% of corporate annual spending.
![Page 4: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/4.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
4
TRIRIGA’s solutions deliver proven value
OPERATIONSREAL ESTATE PROJECTS FACILITIES
• Improve RE transaction cycle time
• Eliminate penalties& overpayments
• Reduce vacancy rates
• Improve project cycle time• Eliminate budget over-runs• Remove resource
bottlenecks
• Improve space management
• Reduce churn rate• Increase occupancy
rates
• Improve response time • Reduce facility
down-time• Improve facility condition
indexOperationalPerformance(BC Hydro)
Financial Performance (GE)
• Increase return on assets
• Reduce real estate expense
• Increase revenue
• Reduce project costs• Accelerate store delivery• Eliminate costly change
orders
• Reduce occupancy costs
• Increase utilization rate • Reduce move costs
• Reduce cost of operations
• Reduce service costs • Reduce maintenance
costs
EnvironmentalPerformance (Nokia)
• Select sustainable sites
• Eliminate inefficient high cost buildings
• Achieve LEED-NC
• Implement sustainable building design and construction
• Achieve LEED-NC
• Reduce vacant space• Increase space
utilization• Achieve LEED-EB • Achieve LEED-CI
• Reduce energy costs of facility operations
• Reduce emissions offacility operations
• Implement Commissioning• Achieve LEED-EB; LEED-
CI• Achieve Energy Star
Rating
![Page 5: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/5.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
5
Key Value Propositions
RE Portfolio Management
Understand real estate requirements due to expansion or M&A Activities
Visibility to lease/rental transactions events can allow opportunities to secure below market rates or vacate under-performing locations
Incorporate demographics into real estate location decisions
Capital Projects
Ability to identify priorities for funding
Understand project risks and financial benefits of potential investments for better decision making
View performance metrics
Understand payback periods and annual savings
Improve project delivery by accelerating schedules
Accurate costing information by connecting to RSMeans
Space Management
Understand and Improve facility utilization by geography, location, and organization
Implement a mobility strategy
Track locks and keys
Implement streamlined move, add, change processes
Capture paper CAD based documentation in an electronic repository for better access
Reduce response times to repair requests
Reduce inspection violations
Minimize lost productivity resulting from facility downtime
Improve funding visibility for better funding decisions
Maximize maintenance staff utilization
Contain maintenance costs
Increase the frequency of deficiency reporting
Uncover viable environmental projects
Provide data to assist in project prioritization - concrete analysis of financial and environmental benefits
Focus on long-term planning analytics to identify trends and enable comparisons over time
Track financial and environmental progress of the projects against defined targets.
Energy & Environmental Sustainability
Operations
IWMS Areas
![Page 6: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/6.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
6
What does the product do?
![Page 7: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/7.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
7
What is a Smarter Building?
Smarter Buildings…
Are more cost effective by reducing energy and operating costs.
Use active and designed-in techniques to achieve reliability, efficiency and environmental responsibility.
Provide Visibility, Control and Automation to building systems.
Maintain a safer and more secure workplace.
Communicate in real-time to supporting infrastructure (i.e. smart grid, broadband, etc.).
Smarter Buildings are well managed, integrated physical and digital infrastructures that provide optimaloccupancy services in a reliable, cost effective, and sustainable manner.
![Page 8: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/8.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
8
TRIRIGA and Maximo combine facility, real estate and enterprise asset management
Space & Facilities
Management
Real Estate Portfolio
Management
Energy and EnvironmentSustainability
Capital Project
Management
Integrated Workplace Management Systems (IWMS)
IBM Smarter Building Solutions
Maximo
IBM combines leadership solutions in two markets - Enterprise Asset Management and Integrated Workplace Management Systems (IWMS) - to create comprehensive Smarter Building solutions.
Enterprise Asset
Management
• Preventive maintenance
• Work mgmt• Inventory
mgmt
• Real time operations & energy monitoring
• Real-time analytics
• Event correlation
IntelligentBuilding
Management
![Page 9: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/9.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
12
Operations Management
• Asset mgmt• Work mgmt• Inventory mgmt• Supply chain• Contracts• Key mgmt
Space & Facilities
Management
• Space utilization
• Capacity planning
• Move, add, change
• Reservations
Real Estate Portfolio
Management
• Strategic RE portfolio planning
• Budgeting & forecasting RE expense drivers
• Lease & contract admin
Datacenter Infrastructure Management
• Space, power and cooling optimization
• Allocation planning
• Move, Add, Change
• Cable mgmt
Service Management
• Facilities service desk
• Service level agreements
• Contracted services
• Customer billing
Energy and EnvironmentSustainability
• Utility tracking• Carbon output
measurement• Environmental
opportunity analysis
Capital Project Management
• Condition assessment
• Capital planning• Budgeting • Construction
estimates • Project mgmt
Seven closely-connected sets of business functions are needed to reduce real estate costs and improve facilities management.
Critical business processes address the total building life cycle from construction, design, and project management to leasing, portfolio management, datacenter infrastructure management, maintenance management, energy and environmental sustainability and asset disposition.
With TRIRIGA and Maximo solutions, customers can accomplish these business processes from one vendor.
TRIRIGA and IBM solutions address a total view of facilities and real estate management
Integrated Workplace Management System (IWMS) IBM Adds Two Elements
![Page 10: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/10.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
14
Lease accounting improves lease cash flow and reduces occupancy costs
Project management for plant improvements improves project cycle-times and eliminates budget overruns
Space management for corporate facilities improves space planning and increases facility utilization
Energy and environmental sustainability management reduces costs and risk, while ensuring regulatory compliance
Automated processes for preventive maintenance improve asset reliability, availability and performance
IT and facility help desk and request tracking improves response time and reduces down time
Datacenter and infrastructure visibility, control, and automation ensures critical services are performing to the highest standards in support of operations
Datacenter Operations Facility Mgr, Supervisor
Facilities Engineering
Real Estate VP
Project Mgr
Help Desk Supervisor
Mgr Energy & Utilities
Finance & Acctg
Real Estate Portfolio MgrProcurement
Facility Planner
Facilities Maintenance
Lease Mgr
Corporate Governance
The result is a unified solution for diverse departments and users throughout the organization - i.e Real Estate Lifecycle Management
CIO
![Page 11: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/11.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
15
How To SellWho To Sell To
![Page 12: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/12.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
16
How to qualify – ideal prospect attributes – cheat sheet
![Page 13: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/13.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
17
Who we sell to and business benefits they care about – cheat sheet
![Page 14: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/14.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
18
Customer Case Studies
![Page 15: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/15.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
19
Peer Companies Committed to TRIRIGA
| © 2008 TRIRIGA INC.
Starbuck’s standardized on TRIRIGA for new store rollouts. TRIRIGA Projects was used to build approximately 300 stores a month. TRIRIGA Offline was created to help communicate bids for their 20,000 vendors. Every day that was shaved off the project schedule calculated to an additional million dollars in store revenue.
TRIRIGA is the standard platform within Chevron Business RE ServicesWorking through an application consolidation effortTRIRIGA elevated in IT stack to be a peer application of SAP3
320,000 people in 150+ countriesManaging over 300M square feet of spaceQuantified savings of over $1B after implementing TRIRIGA
Global Real Estate and Facilities standardized on TRIRIGA for all real estate functions globally (Corporate, residential, refineries, stations, land, surplus properties). Consolidating over 100 applications
Elected to standardize on TRIRIGA IWMS for all FedEx companies including FedEx Office retail locations. 100K+ locations, $1.3B in rent expenditures, $100M+ in project expendituresProject currently underway
The State Department standardized on TRIRIGA to help manage their diverse portfolio globally with over 300M sqft in over 100 Countries
![Page 16: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/16.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
20Partial TRIRIGA customer list
![Page 17: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/17.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
22
Wells Fargo Bank
•Manage the dynamic Facilities and Space needs for Mortgage lending and refinancing business. WF has a $24BB mortgage portfolio (#1 in USA)
Strategic Goals Solution Needs
Project Facts
•FM system to integrate with HR, Finance, Purchasing, Security and RE systems•Eliminate manual and duplicate processes•Reduce touch points to “on-board” new team member
• Top-line revenue contribution estimate at over $200MM•($1620/day x 25 days X 5000
• Implemented: CAD integrator, Portfolio, Facilities, Business Connects•Integrated with 6 external systems
Total SQF (Million) 49 MilNumber of Leaes 270Locations 650
• Decrease customer refinancing processing time•Increase revenue days per Mortgage specialist by reducing on-boarding and off boarding times•Ensure security processes are followed
![Page 18: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/18.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
23
Capital One
Capital One is one of the largest credit card/financial companies in the world - Fortune #145.
• Merge new bank acquisitions into corporate infrastructure
• Application consolidation• Employee self-service
Strategic Goals• Consolidate 4 operating companies into a single
application• Upgrade existing application to latest release• Clean up data as it is migrated to new system
Solution Needs
Project Facts
![Page 19: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/19.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
24
TD Bank
TD Bank, America’s Most Convenient Bank®, is one of the 15 largest banks in the United States with $160 billion in assets, and provides Customers with a full range of financial products and services at more than 1,100 retail stores throughout the Northeast, Mid-Atlantic, Metro D.C. and Florida.
Strategic Goals Solution Needs• Centralize all real estate functions throughout• North America.• Consolidate portfolios into central database
• Leading Real Estate application to support AP and AR leasing functions• Ability to support Corporate and Retail branches in single solution• Ability to handle complex Canadian tax calculations and rules
Project Facts
![Page 20: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/20.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
25
FedEx
FedEx is the largest express transportation provider in the world - Fortune #59
• Standardize on a single business process and system for Contract Management, Facilities and Asset Management across 6 operating companies
• Reduce the number of discrete IT systems being used to support the business
Strategic Goals• Develop business processes to support the
collective companies• Follow stringent IT deployment requirements• Deploy all TRIRIGA modules in a phased approach
over 3 years
Solution Needs
Project Facts
![Page 21: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/21.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
26
General Electric
Fortune 5 Global Company with 5500 plus sites in 120 countries. Conglomerate of 18 major Businesses with unique Asset Classes
Strategic Goals• Cost Savings (drive cost savings within portfolio)• Effectiveness (reduce cycle time on projects)• Consistency (consistency of Deal
Analysis/Procedures)• Risk Reduction (global, System-Based Controls)• Governance (Corp oversight, align workflow w/
policy)• Data Transparency (centralized data for reporting
Solution Requirements• Single web-enabled solution that supports end-to-end
RE lifecycle planning, analysis, development, delivery, operations, facilities planning and execution
• Flexible Business Driven Rules, Data Views and Approvals
Project Facts• 5500 Locations• 305 million sf• $2.1B Annual RE Spend• 1200 Active RE Transactions• Global Deployment – 120 countries• 25 Languages
• Consolidated 28 disparate systems• Modules : RE, FM, Operations, ESS• First Go Live 2003 – Global RE – 90 days!• Next : Upgrading to TRIRIGA 10• RESULTS: ROI - Portfolio Rightsizing with $198m in
first 18 months
![Page 22: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/22.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
28
City of New York
Largest City in United States with 9M Population, 100,000 buildings and 4M Metric tons of GHG Emissions
Strategic Goals
• Achieve Mayor Bloomberg’s published goals – Reduce 2017 to below 2006 levels
• Reduce $800M annual energy bill• Reduce GHG from buildings – 64% of cities
emissions
Solution Requirements
• Single source of truth to “collect, access and report”
• Streamline processes • Flexibility – accommodate future change• Facilitate cross-agency access and projects
Project Facts
• 100,000 Buildings• 4M Metric tons GHG tracked• First Go-Live 2010• Modules : TREES, Project • EPA ENERGY STAR Integration
![Page 23: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/23.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
29
ConocoPhillips
ConocoPhillips is a worldwide integrated energy company - 4th on Fortune 500
Strategic Goals
• Integrated solution for all facility requirements – Space, Move, SFP, CAD
• Manage 20M SQFT in North America• Improve productivity - “Faster and Smarter”
Solution Requirements
• Ability to implement their best practices on a global basis
• Manage facilities as a strategic initiative• Success – Multiple prior failures
Project Facts
• Teamed with TRIRIGA to build Strategic Facility Planning (SFP) for a new level of agility around real estate assets
• Industry Expertise & Product Maturity after multiple failures with low-end solutions, custom development and ERP Attempts
• Application Expansion - technology elimination
![Page 24: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/24.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
33
Typical Deployment Architecture - Software
![Page 25: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/25.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
34
TRIRIGA Workplace Solution – One Technology Platform, One Common User Experience
Pre-built MetricsCrystal Reports
Time-trendsCAD Reports
My Reports
Enterprise-class DatabaseDocument Repository
Web-based ConfigurationUpgrade Management
TRIRIGA Business Connect
TRIRIGA Off-line
TRIRIGA Data Connect
ESRI GIS Server
AutoCADMicroStation
Real EstateProjects
FacilityOperations
Sustainability
Performance Management and Reporting
Role/Process-based Navigation
Single Technology Platform
Award-winning Applications
Simple-to-Use InterfaceAdapts to User Needs
RemindersQuick Links
My Bookmarks
Interoperability
![Page 26: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/26.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
35
TRIRIGA Core Components
Geographies
Locations
Organizations
Vendors
People
Specifications
Assets
Contracts
Customer Self Service
News
Graphics
Document Management
Reporting
WPM Metrics
GIS Mapping
GANTT Schedules
TRIRIGA Real Estate
Portfolio Planning
Site Selection
Transaction Management
Lease Administration
Lease Accounting
AR Tenant Tracking
Payment Processing
Client Requests
TRIRIGA Projects
Program Management
Fund Management
Scope Management
Cost Management
Schedule Management
Resource Management
Quality Management
Vendor Engagement
Procurement
TRIRIGA Facilities
Space Management
Space Chargeback
Space Requests
Strategic Planning
Move Management
Reservation Management
Personnel Provisioning
CAD Management
Receiving
Invoicing
Requests
Tasks
Contact Center
Service Management
Warranty Management
Preventive Maintenance
Facility Assessment
Security/Key Management
Inventory Management
Capital Planning
Resource Planning
CO2 Emission Tracking
Utility Tracking
Waste Disposal
Water Consumption
Green Opportunities Tracking
LEED/BREEAM Certification
Energy Star Integration
TRIRIGA EnvironmentalTRIRIGA Operations
Role-based Applications
TRIRIGA Workplace Enterprise-Class Applications
![Page 27: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/27.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
36
RE Portfolio Management
Understand real estate requirements due to expansion or M&A Activities
Visibility to lease/rental transactions events can allow opportunities to secure below market rates or vacate under-performing locations
Incorporate demographics into real estate location decisions
Capital Projects
Ability to identify priorities for funding
Understand project risks and financial benefits of potential investments for better decision making
View performance metrics
Understand payback periods and annual savings
Improve project delivery by accelerating schedules
Accurate costing information by connecting to RSMeans
Space Management
Understand and Improve facility utilization by geography, location, and organization
Implement a mobility strategy
Track locks and keys
Implement streamlined move, add, change processes
Capture paper CAD based documentation in an electronic repository for better access
Reduce response times to repair requests
Reduce inspection violations
Minimize lost productivity resulting from facility downtime
Improve funding visibility for better funding decisions
Maximize maintenance staff utilization
Contain maintenance costs
Increase the frequency of deficiency reporting
Uncover viable environmental projects
Provide data to assist in project prioritization - concrete analysis of financial and environmental benefits
Focus on long-term planning analytics to identify trends and enable comparisons over time
Track financial and environmental progress of the projects against defined targets.
Energy & Environmental Sustainability
Operations
IWMS Areas
Business Outcomes
![Page 28: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/28.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
37
Deployment Architecture - Technology
![Page 29: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/29.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
38
GUI BuilderGUI Builder
Real Property (Single) Platform
• Robust/Configurable UI• Dynamic UI• Data validation
• Unlimited Field count• Graphical• Manage Data
Relationships
Data ModelerData Modeler
• Report any field• Report on any object• Graphs and Summaries• Incorporate into
dashboard
Report BuilderReport Builder• Localization Standards - UOM - Date/Time formats - Language - Currency• Language Editor• Currency Editor
InternationalizationInternationalization
• Automate business process
• Automate application functions
• Rich Logic• Data manipulation
Workflow BuilderWorkflow Builder
GUI BuilderGUI Builder
– Streamline and reduce the number of databases– Provide ability for systems to be more responsive to future changes to support—Support those unique business rules that make our customers competitive—Support global customers—Support communication between other key solutions
Strategic Platform ObjectivesStrategic Platform Objectives
![Page 30: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/30.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
41
Aynchronous
Synchronous
Client Web Server Application Server Report Server Database Server
Sample System Diagram
Segregate asynchronous processing to dedicated application servers Support for simple load balancing (upon login) Priority processing option for end of month heavy loads SAN or NAS database storage is supported Support for VMware
• Apache 2• MSFT IIS 6
• JBoss 4.2• WebSphere 6.1• WebSphere ND 6.1• WebLogic 11, 10
• SQL Server 2008, 2005
• Oracle 11, 10
• Windows 7, Vista, XP• Internet Explorer 8, 7
• SAP Crystal Report Server Embedded 2008
• SAP Business Objects Enterprise XI 3.1
Configuration Options:
![Page 31: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/31.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
42
Interoperability
![Page 32: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/32.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
43
TRIRIGA Offline extends the supply chain and simplifies user experience
TRIRIGA On-Line Work Task
TRIRIGA Off-Line Work Task (Excel)
TRIRIGA auto-creates and sends
emailed form auto-updates record
![Page 33: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/33.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
44
Roadmap
![Page 34: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/34.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
45
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion.
Product roadmap for facilities, real estate, energy and environmental sustainability solutions
2010 2011 2012 2013/2014
IBM Intelligent Building Management Solution
TRIRIGA
TRIRIGA 10RELEASED Oct 2010
Maximo 7.5
RELEASED May 2011
TRIRIGA 10.x4Q 2011
IIBM 1.x
TRIRIGA 10.x
IIBM 1.1
2Q 2011
• FASB lease accounting compliance
• Translations: French, Spanish, Brazilian Portuguese
• Reservation management
• Additional translations
• IWMS enhancements
• Asset management and industry solution enhancements
• Enhanced analytics
• Integrated portfolio and operational performance planning
Maximo
Converged Platform
Converged Platform
• Converged Maximo and TRIRIGA platform
• Additional translations and globalization
• Utilities for upgrade automation (data and configurations)
Maximo 7.x
![Page 35: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/35.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
46
Joint Customer ExamplesCDC – Center for Disease Control CDC uses Maximo to inventory and control diseases in their labs; TRIRIGA for IWMS, Federal Real Property
Reporting, and comply with EO 13327.
Sandia National Labs Using TRIRIGA for Facility Condition Assessment and Space and Move Management, integrating with Maximo.
Tennessee Valley Authority (Power) TVA implemented Maximo over the past several years for nuclear, hydro, fossil and corporate operations (a
significant implementation). They are implementing TRIRIGA for Space Management, Move Management, TREES and Facility Assessment.
Plan to integrate the 2 systems so that Move Project Tasks are created and worked on the Maximo side and the Task completion details are sent back to the TRIRIGA Move Project.
Unicco UGL - Outsource RE Service Provider - Uses both Maximo and TRIRIGA for Facility Maintenance, depending on customer needs. Selected TRIRIGA to support business expanding globally into IWMS Services.
Boeing Uses Maximo for Operations and Maintenance, and all Self-Service requests - all tickets are opened in Maximo, all
requests orginate and stay within Maximo. TRIRIGA - for all non-O&M requests these requests , the ticket originates in Maximo and is routed via batch-
integration to TRIRIGA including Project requests, Lock and Key, Mail Codes and Space and Moves. Project funding requests are approved within TRIRIGA which kicks off WO based on that approval.
![Page 36: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/36.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
47
TRIRIGA Pricing Overview
![Page 37: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/37.jpg)
48 | © 2008 TRIRIGA INC.
Filtered Pricing Model
Core Modules Cost Ratio
Real Estate $7,900 2:1
Projects $5,000 4-5:1
Facilities $7,900 2:1
O&M $7,900 4-5:1
TREES Contact TRIRIGA Rep
Analytics Layer Cost Ratio
WPM Real Estate * Enterprise
WPM Projects * Enterprise
WPM Facilities * Enterprise
WPM Operations * Enterprise
ESS & other extensions
*
* ~25% - 30% additional to core module
![Page 38: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/38.jpg)
49 | © 2008 TRIRIGA INC.
Number of Modules
TRIRIGA Scope & Cost Averages
1 2 3 4 5 1 2 3 4 5
100 – 250k
250 – 500k
500 – 700k
750 – 900k
1.0 – 2.0m
2.5+m
There are examples of <750k in this quadrant
There are examples of >750k in this quadrant
![Page 39: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/39.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
51
Additional Information
![Page 40: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/40.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
52
Tivoli / Maximo: Tivoli/TRIRIGA:Maximo Sales Resources:
Rod DuceMaximo Sales [email protected] (T/L: 70-32112)
Joe BaahTRIRIGA Sales Integration [email protected] 505 3612
Chee Kin NgSolution Sales [email protected] (T/L: 9919 2036)
TRIRIGA Sales Resources:Mark MullaneyTRIRIGA Sales [email protected]
Roger RittenhouseTRIRIGA Sales and [email protected]
John ClarkDirector, [email protected]
Rich Caplow
Strategy and Product [email protected]
Dave Gasdia
Product Management
978-899-2657
Kim Woodbury
Product Manager, Space [email protected]
Toni Hodge Gene Moran
Sales Enablement Sales Enablement
[email protected] [email protected]
540-729-6186 702-932-4444 x7018
![Page 41: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/41.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
53
Education and Content Links
On Software Sellers Workplace: http://w3103.ibm.com/software/xl/portal/content?synKey=N299655G01388H26
On PartnerWorld, https://www.ibm.com/partnerworld/wps/servlet/mem/ContentHandler/N299655G01388H26
Go to TRIRIGA Sales Landing page SSW; http://w3-103.ibm.com/software/xl/portal/content?synKey=C801150T72000H40
On Partner World, https://www.ibm.com/partnerworld/wps/servlet/mem/ContentHandler/C801150T72000H40
![Page 42: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/42.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
54
QUESTIONS?
[email protected] for more questions
![Page 43: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/43.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
55
![Page 44: tririga-overview-for-bps](https://reader038.fdocuments.in/reader038/viewer/2022102411/5460ae9eaf79593a708b54cb/html5/thumbnails/44.jpg)
© 2011 IBM Corporation
Smarter Buildings on a Smarter Planet
60
Maximo and TRIRIGA Solutions (as of Close)
Add-on Solutions
Additional options, used with core or industry solutions, provide deeper functionality for specific needs.Additional options, used with core or industry solutions, provide deeper functionality for specific needs.
MaximoService Provider
MaximoScheduler
MaximoReal Time Asset
Locator
MaximoMobile
MaximoCalibration
MaximoLinear Asset
Manager
MaximoAsset
Configuration Manager
MaximoEveryplace
MaximoArchiving
MaximoChange &
Corrective Action Manager
MaximoERP Adapters
SMART Mobile (Syclo)
MaximoSpatial
TRIRIGA Energy Star Connector
TRIRIGA CAD Integrator
TRIRIGA Strategic Facility
Planning
TRIRIGA Facility
Assessment
TRIRIGA GIS Connector for
ESRI
TRIRIGA Connector for
RSMeans
Maximofor Energy
Optimization
Integration Adapters
Commercially-supported integration to other enterprise and 3rd party systems.Commercially-supported integration to other enterprise and 3rd party systems.