Trimble total station

33
OPERATION of Total Station BY G.NAGESH KUMAR SENIOR ASSISTANT PROF. G.P.R.E.C, KURNOOL Sunday, August 14, 20 22 1

Transcript of Trimble total station

Page 1: Trimble total station

April 13, 2023 1

OPERATION of Total Station

BYG.NAGESH KUMAR

SENIOR ASSISTANT PROF.G.P.R.E.C, KURNOOL

Page 2: Trimble total station

April 13, 2023 2

Eye Piece

Touch Screen

Alpha Numeric Keyboard

Tribratch

Horizontal Movement

Vertical Movement

Focus Adjustment

Nomenclature

Page 3: Trimble total station

April 13, 2023 3

Battery

Projected Handle

TelescopeLine of Collimation

Nomenclature

Page 4: Trimble total station

April 13, 2023 4

Track Lights

Physical Bubble

Telescope

Bull Sight eye

Nomenclature

Page 5: Trimble total station

April 13, 2023 5

Laser PlummetBattery

Data Transfer

PC Connection

Pen Drive Slot

Nomenclature

Page 6: Trimble total station

April 13, 2023 6

OPERATION

Page 7: Trimble total station

April 13, 2023 7

Open TRIMBLE ACCESS. Select ‘General Survey’

Page 8: Trimble total station

April 13, 2023 8

Page 9: Trimble total station

April 13, 2023 9

Adjust the Electronic Level Within a limit of + 10”

(both in Turnnion and Sighting)

Page 10: Trimble total station

April 13, 2023 10

Go to ‘Jobs’ and select ‘New Job’.

Page 11: Trimble total station

April 13, 2023 11

Give a name to the new job Enter Accept.

Page 12: Trimble total station

April 13, 2023 12

STATION SETUP [One known co-ordinate and one angle]

Go

Page 13: Trimble total station

April 13, 2023 13

Station Set-up

Page 14: Trimble total station

April 13, 2023 14

Station Set-up/ Measure topo

Page 15: Trimble total station

April 13, 2023 15

Measure topo

Page 16: Trimble total station

April 13, 2023 16

Measure topo/ Map

Page 17: Trimble total station

April 13, 2023 17

Point Manager

Page 18: Trimble total station

April 13, 2023 18

STATION SETUP [Two Known Co-ordinates] Go

Page 19: Trimble total station

April 13, 2023 19

Station Set-up

Page 20: Trimble total station

April 13, 2023 20

Station Set-up

Page 21: Trimble total station

April 13, 2023 21

AREA & PERIMETER Calculation

Page 22: Trimble total station

April 13, 2023 22

Sub-divide Area

Page 23: Trimble total station

April 13, 2023 23

STAKE OUT (Points)

Page 24: Trimble total station

April 13, 2023 24

STAKE OUT (Points)

Page 25: Trimble total station

April 13, 2023

STAKE OUT (Points)

25

Page 26: Trimble total station

April 13, 2023 26

STAKE OUT (Points)

Page 27: Trimble total station

April 13, 2023 27

STAKE OUT (Points)

Page 28: Trimble total station

April 13, 2023 28

DATA Export to Excel (.CSV) format

Page 29: Trimble total station

April 13, 2023 29

DATA Export to Excel (.CSV) format

Page 30: Trimble total station

April 13, 2023 30

Export to AutoCAD format(.DXF) Go

Page 31: Trimble total station

April 13, 2023 31

BACKGROUND MAP

Page 32: Trimble total station

April 13, 2023 32

Active Map

Page 33: Trimble total station

April 13, 2023 33

THANK YOU….