Appendix D: Project Listing preface D.0 2015 Plan Update Transportation Outlook 2040 Project List Transportation Outlook 2040 is the metropolitan transportation plan (MTP) for the greater Kansas City region. A major component of the MTP is identifying a list of regionally important projects to improve the transportation of people and goods (highway, transit, etc.). This federally required project listing is intended to help the region identify and prioritize future transportation investments based on goals, strategies and estimated financial resources. The projects in Transportation Outlook 2040 were developed, prioritized, and ultimately selected through a comprehensive and coordinated process involving the general public, regional transportation stakeholders and MARC planning committees. Incorporation by Reference of the MARC Transportation Improvement Program The Transportation Improvement Program (TIP) is a detailed list of projects to be implemented in the next four to five years, and is developed for the metropolitan transportation planning process in accordance with federal regulations (CFR §450.324). The TIP is incorporated into the MTP by reference, and therefore, upon adoption by the MARC Board, the MTP shall include all projects in the most recently approved TIP as well as any future TIP amendments approved before the next MTP update. Financial Constraint Federal planning regulations (CFR §450.322) state that “For the purpose of developing the metropolitan transportation plan, the MPO, public transportation operator(s), and State shall cooperatively develop estimates of funds that will be available to support metropolitan transportation plan implementation.” The regulations also indicate “for illustrative purposes, the financial plan may (but is not required to) include additional projects that would be included in the adopted transportation plan if additional resources beyond those identified in the financial plan were to become available.” Transportation Outlook 2040 includes “constrained” and “unconstrained” project lists. The financial plan described in Appendix E: Financial Capacity demonstrates the availability of funding for projects in the constrained list. The unconstrained list includes those projects that would be included in the plan if additional resources beyond those identified in Appendix E become available. To demonstrate financial constraint in the plan, the costs to operate, maintain and preserve the transportation system, in the MARC MPO region, is deducted from available transportation revenues first, and the remaining balance is available for other transportation investments. The constrained project list includes examples of operations, management and preservation projects in addition to non-preservation roadway and transit projects.

Transcript of Transportation Outlook 2040€¦ · Transportation Outlook 2040 Project List Transportation Outlook...

Appendix D: Project Listing preface D.0 2015 Plan Update

Transportation Outlook 2040 Project List

Transportation Outlook 2040 is the metropolitan transportation plan (MTP) for the greater Kansas City

region. A major component of the MTP is identifying a list of regionally important projects to improve the

transportation of people and goods (highway, transit, etc.). This federally required project listing is intended

to help the region identify and prioritize future transportation investments based on goals, strategies and

estimated financial resources. The projects in Transportation Outlook 2040 were developed, prioritized, and

ultimately selected through a comprehensive and coordinated process involving the general public, regional

transportation stakeholders and MARC planning committees.

Incorporation by Reference of the MARC Transportation Improvement Program

The Transportation Improvement Program (TIP) is a detailed list of projects to be implemented in the next

four to five years, and is developed for the metropolitan transportation planning process in accordance with

federal regulations (CFR §450.324). The TIP is incorporated into the MTP by reference, and therefore, upon

adoption by the MARC Board, the MTP shall include all projects in the most recently approved TIP as well as

any future TIP amendments approved before the next MTP update.

Financial Constraint

Federal planning regulations (CFR §450.322) state that “For the purpose of developing the metropolitan

transportation plan, the MPO, public transportation operator(s), and State shall cooperatively develop

estimates of funds that will be available to support metropolitan transportation plan implementation.”

The regulations also indicate “for illustrative purposes, the financial plan may (but is not required to)

include additional projects that would be included in the adopted transportation plan if additional

resources beyond those identified in the financial plan were to become available.”

Transportation Outlook 2040 includes “constrained” and “unconstrained” project lists. The financial plan

described in Appendix E: Financial Capacity demonstrates the availability of funding for projects in the

constrained list. The unconstrained list includes those projects that would be included in the plan if

additional resources beyond those identified in Appendix E become available.

To demonstrate financial

constraint in the plan, the

costs to operate, maintain

and preserve the

transportation system, in the

MARC MPO region, is

deducted from available

transportation revenues first,

and the remaining balance is

available for other

transportation investments.

The constrained project list

includes examples of

operations, management and

preservation projects in

addition to non-preservation

roadway and transit projects.

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2015 to 2020

City of Bonner Springs

573 South 134th Street widening

Metropolitan to Kansas Avenue

Widening of South 134th Street. Improvements include curb and gutter, sidewalks, storm sewer, pavement markings, street lighting,

and replacement signage.

$4,050,000

Roadway KS 2015 to 2020

City of Bonner Springs

563 Metropolitan Avenue

Improvement Project

Between Nettleton Avenue and Western

City Limit line.

Widening of Metropolitan Avenue . Improvements include curb and gutter, sidewalks, grading improvements, storm sewer, pavement

markings, street lighting, and replacement signage.

$1,900,000

Roadway KS 2015 to 2020

City of Bonner Springs

744 Nettleton Avenue Extension

Nettleton Ave terminus NE side of K-

7 Interchange to Nettleton Ave

terminus south of Kansas Ave

This project includes the construction of a standard width three lane curb and gutter street. Improvements include curb and gutter,

sidewalks, storm sewer, pavement markings, street lighting, and replacement signage.

$2,500,000

Roadway KS 2015 to 2020

City of Bonner Springs

315 138th Street Improvements

between K-32 Highway and Kansas

Avenue

This project includes the widening of a narrow two lane ditched road to a standard width three lane curb and gutter street. Improvements include curb and gutter, sidewalks, storm sewer, pavement markings,

street lighting, and replacement signage.

$8,100,000

Roadway KS 2015 to 2020

City of Bonner Springs

576 Kansas Avenue Improvements

Between 134th Street and 138th Street

This project includes the widening of Kansas Avenue. Improvements include curb and gutter, sidewalks, storm sewer, pavement markings,

street lighting, and replacement signage.

$2,700,000

Roadway KS 2015 to 2020

City of Edgerton 2010 Waverly Road Reconstruction

Waverly Road US-56 to 199th Street

Reconstruction from US-56 to 199th Street; Project includes additional capacity and grade separation at BNSF rail crossing

$30,000,000

Roadway KS 2015 to 2020

City of Edwardsville 87 110th Street/Edwardsville Dr Reconstruction

I-70 to K-32 Reconstruct 110th Street/ Edwardsville Drive from I-70 south to K-32. Current road is a substandard 2 lane road section with a typical roadway width of 18 feet or less, numerous sight distance problems

and an ever increasing volume of traffic to be resolved.

$7,035,580

Roadway KS 2015 to 2020

City of Gardner 419 175th Street Improvements

I-35 to Clare Road The improvement will include 3250 lineal feet of divided arterial street with sidewalks, street lights, storm sewer and a traffic signal at

the Clare Road intersection.

$4,600,000

Roadway KS 2015 to 2020

City of Lansing 300 DeSoto Rd Reconstruction

Ida Street to Eisenhower Road

Reconstruct rural-type 2-lane road to current standard 4-lane facility to accommodate growing traffic demand. Construct RCB. Construct 10 ft. bicycle path and 5 ft. pedestrian sidewalk in accordance with

Trails Master Plan and city policy.

$7,219,000

Constrained Projects page 1 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2015 to 2020

City of Leavenworth 539 Eisenhower Road Construction

155th Street west to (future) 30th Street

(County Road 29)

Construction Eisenhower Road as a four lane road west from K-5 to 155th Street in the last few years. It is proposed that a four lane

roadway would be extended west to County Road 5, and possibly an initial improved two lane roadway west to County Road 29.

$30,000,000

Roadway KS 2015 to 2020

City of Leawood 79 143rd Street Improvements

Nall to Kenneth Road The project will improve the current 2-lane ditch street to a 4-lane street with curb and gutter, streetlights, storm sewer, sidewalk,

bike/hike trail, and bicycle access. A traffic signal will be installed at the intersection of 143rd and Mission Road.

$23,400,000

Roadway KS 2015 to 2020

City of Lenexa 261 87th & I-435 Interchange

87th Street and I-435 interchange

Improvements to the existing interchange to provide capacity on the interchange ramps and on 87th Street to meet the projected traffic

demand.

$5,000,000

Roadway KS 2015 to 2020

City of Lenexa 263 95th Street Improvements

95th Street from Renner to I-35

Improve and widen to 4-lane divided roadway with sidewalks, street lights storm sewers, landscaping and storm water management

BMPs. This project will provide a mixed use trail as this is a MetroGreen Corridor.

$15,000,000

Roadway KS 2015 to 2020

City of Lenexa 256 K-10 & Ridgeview Interchange

K-10 Highway and Ridgeview Road

Improvements to the existing interchange to provide capacity on the interchange ramps and on Woodland Road under K-10 to meet the

projected traffic demand.

$12,000,000

Roadway KS 2015 to 2020

City of Lenexa 254 K-10 & Lone Elm Interchange

K-10 Highway and Lone Elm Road

New interchange including street lights, sidewalks, storm sewers, landscaping and storm water management, BMPs

$20,000,000

Roadway KS 2015 to 2020

City of Olathe 330 Lone Elm Improvements

Old 56 Hwy to 151st Street

Capacity improvement for future K-7 alignment, from a rural 2 lane to 4 lane divided arterial.

$22,100,000

Roadway KS 2015 to 2020

City of Olathe 329 Lone Elm Improvements

167th Street to 171st Street

Capacity improvement for future K-7 alignment, from a rural 2 lane to 4 lane divided arterial.

$8,000,000

Roadway KS 2015 to 2020

City of Olathe 328 Lone Elm Improvements

159th Street to 167th Street

Capacity improvement for future K-7 alignment, from a rural 2 lane to 4 lane divided arterial.

$8,000,000

Roadway KS 2015 to 2020

City of Olathe 325 119th Improvements

Lone Elm to Iowa Capacity improvements from 2 lane to 4 lane. $4,000,000

Roadway KS 2015 to 2020

City of Olathe 324 119th Improvements

Iowa to Woodland Capacity improvements from 2 lane to 4 lane. $4,000,000

Roadway KS 2015 to 2020

City of Olathe 323 K-7 Improvements 135th to Old 56 Hwy. Capacity improvement, widening from 4 to 5 lanes. $6,000,000

Constrained Projects page 2 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2015 to 2020

City of Olathe 322 College Blvd and K-7 Interchange

College Blvd and K-7 Interchange

Interchange capacity improvement, installing Roundabouts at the ramp junctions. Extend life of bridge.

$2,000,000

Roadway KS 2015 to 2020

City of Olathe 320 135th St improvements

Clairborne to Mur-Len Capacity improvement, widening from 4 to 6 lanes. $8,000,000

Roadway KS 2015 to 2020

City of Olathe 332 Ridgeview and K-10 Interchange

Ridgeview and K-10 Interchange

Interchange capacity improvement, installing Roundabouts at the ramp junctions. Extend life of bridge.

$2,000,000

Roadway KS 2015 to 2020

City of Overland Park

308 Blue Valley Pkwy Widening

123rd St. to US-69 in Overland Park

The project includes widening Blue Valley Pkwy from a four-lane divided roadway to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$2,500,000

Roadway KS 2015 to 2020

City of Overland Park

287 159th Street reconstruction

Pflumm to Quivira in Overland Park

The project includes reconstruction of 159th Street from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$6,000,000

Roadway KS 2015 to 2020

City of Overland Park

249 Quivira Road reconstruction and

widening

151st St. to 159th St. in Overland Park

The project includes reconstruction of Quivira Road from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$6,000,000

Roadway KS 2015 to 2020

City of Overland Park

299 119th Street Widening

Pflumm to US-69 in Overland Park

The project includes widening 119th Street from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$8,000,000

Roadway KS 2015 to 2020

City of Overland Park

284 151st Street reconstruction

Chadwick to State Line in Overland Park

The project includes reconstruction of 151st Street from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$5,000,000

Constrained Projects page 3 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2015 to 2020

City of Overland Park

306 135th Street Widening

Pflumm to Switzer in Overland Park

The project includes widening 135th Street from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$8,000,000

Roadway KS 2015 to 2020

City of Overland Park

289 159th Street reconstruction

Metcalf to Kenneth in Overland Park

The project includes reconstruction of 159th Street from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$15,000,000

Roadway KS 2015 to 2020

City of Overland Park

293 Quivira Road Widening

119th St. to 143rd St. in Overland Park

The project includes widening Quivira Road from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$12,000,000

Roadway KS 2015 to 2020

City of Overland Park

294 Antioch Road Widening

119th St. to 135th St. in Overland Park

The project includes widening Antioch Road from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$8,000,000

Roadway KS 2015 to 2020

City of Overland Park

296 Metcalf Avenue Widening

119th St. to 135th St. in Overland Park

The project includes widening Metcalf Avenue from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn

lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items

incidental to the street construction.

$8,000,000

Roadway KS 2015 to 2020

City of Overland Park

297 Metcalf Avenue Widening

135th St. to 159th St. in Overland Park

The project includes widening Metcalf Avenue from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn

lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items

incidental to the street construction.

$12,000,000

Roadway KS 2015 to 2020

City of Overland Park

305 119th Street Widening

Nall to Roe in Overland Park

The project includes widening east bound 119th Street to complete a six-lane divided thoroughfare with turn lanes, storm sewers, a raised

median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the street

construction.

$1,000,000

Constrained Projects page 4 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2015 to 2020

City of Overland Park

280 Metcalf Avenue reconstruction

159th St. to 183rd St. in Overland Park

The project includes reconstruction of Metcalf Avenue from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$15,000,000

Roadway KS 2015 to 2020

City of Shawnee 240 Johnson Drive and I-435 Interchange

improvements

Johnson Drive and I-435

This project will include signalization of the on/off ramps related to I-435 and Johnson Drive interchange. This project will also involve geometric improvements to prove exclusive right turn lanes at the

ramps along Johnson Drive.

$2,000,000

Roadway KS 2015 to 2020

City of Shawnee 238 Nieman Road Reconstruction

64th Street to Johnson Drive

This improvements to this segment of Nieman Road will include streetscape items such as paver brick sidewalks, benches, lighting,

and other enhancement features.

$5,000,000

Roadway KS 2015 to 2020

City of Shawnee 235 Quivira Road reconstruction and

widening

47th Street to 52nd Terrace

The project will provide reconstruction, widening, on-street bicycle lanes for a section of Quivira, and sidewalks on each side.

$1,800,000

Roadway KS 2015 to 2020

City of Tonganoxie 447 Laming Road Construction

Laming Road and Leavenworth County

Road to 4th Street.

This project will be built to comply with the planning done in the US 24/40 Corridor Access and Traffic Management Plan.

$2,540,000

Roadway KS 2015 to 2020

City of Tonganoxie 445 Woodfield Drive Extension

Woodfield Drive and Leavenworth County Road 5 thence east to

193rd Street

Comply with the planning provisions in the US 24/40 Corridor Access and Traffic Management Plan

$8,100,000

Roadway KS 2015 to 2020

City of Tonganoxie 446 1st Street Collector First and Ridge thence east to 206th Street

The project is built to comply with the planning goals in US 24/40 Corridor Access and Traffic Management Plan

$8,000,000

Roadway KS 2015 to 2020

Johnson County, Kansas - Public

Works

108 191st Street Improvements

Gardner Road to Four Corners

Construction of 191st Street will provide access to the Gardner Road Interchange on I-35 for the proposed BNSF Intermodal site and

logistics park. The majority of the existing roadway is gravel and will be upgraded to an asphalt roadway 40 feet in width with curb and

gutter.

$14,000,000

Roadway KS 2015 to 2020

KDOT 704 I-70/K-7 Interchange

phases 2, 5, 6, 7, 8 and 16

I-70/K-7 Reconstruction and capacity improvements of the I-70/K-7 Interchange. The interchange concept includes interchanges at I-70,

130th Street, and Kansas Avenue.

$31,800,000

Constrained Projects page 5 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2015 to 2020

KDOT 3014 I-435/State Avenue DDI

I-435/State Avenue interchange

At I-435/State Avenue interchange in Wyandotte County, construction of a diverging diamond interchange to replace existing

configuration

$25,072,000

Roadway KS 2015 to 2020

Leavenworth County 684 Centennial Bridge Rehabilitation

K-92 Bridge Over Missouri River.

Rehabilitate the existing bridge structure, and widen the bridge from two (2) to four (4) lanes to increase capacity.

$42,000,000

Roadway KS 2015 to 2020

Leavenworth County 674 State Highway K-5 Realignment

From K-7 and McIntyre Road to I-

435 at Wolcott Road

Realign K-5 between K-7 and I-435 $39,500,000

Roadway KS 2021 to 2030

City of Gardner 697 175th Street Widening

West of Waverly Road to City Limits

This project includes the widening of 175th Street from a 2-lane ditch section to a 4-lane divided street section along with sidewalk, trail,

street lights, storm sewer, and additional appurtenant items.

$6,500,000

Roadway KS 2021 to 2030

City of Lansing 92 DeSoto Road Reconstruction

4-H Road to Ida Street, including

intersection approaches.

Reconstruct rural-type 2-lane road to current standard 4- lane facility to accommodate growing traffic demand. Replace functionally

obsolete bridge. Construct 10 ft. bicycle path and 5 ft. pedestrian sidewalk in accordance with Trails Master Plan and city policy.

$7,988,750

Roadway KS 2021 to 2030

City of Lansing 224 147th Street Reconstruction

McIntyre Road to 4-H Road

Reconstruct 2 1/2 miles of rural-type 2-lane road to current standard 4-lane facility to accommodate growing traffic demand. Replace

bridges. Construct 10 ft. bicycle path and 5 ft. pedestrian sidewalk in accordance with Trails Master Plan and city policy.

$16,967,500

Roadway KS 2021 to 2030

City of Leawood 65 Mission Road Improvements

135th to 151st Street. Improvement to a 4-lane undivided curb and gutter street with LED streetlights, storm sewer, sidewalks, bike/hike trail, and bike lanes.

$20,400,000

Roadway KS 2021 to 2030

City of Leawood 63 151st Street Improvements

Nall to east City Limit The improvements include widening 151st from a 2-lane ditch street to a 4-lane divided roadway with LED streetlights, traffic signal,

sidewalk, bike/hike trail, and on-street bike lanes.

$14,200,000

Roadway KS 2021 to 2030

City of Lenexa 268 College Boulevard Improvements

Renner Boulevard to Pflumm Road.

Improve and widen to 6-lane divided roadway with sidewalks, street lights storm sewers, landscaping and storm water management BMPs.

$12,000,000

Roadway KS 2021 to 2030

City of Lenexa 267 Lackman Rd Improvements

107th Street to Santa Fe Trail Drive

Improve and widen to 4-lane divided roadway with sidewalks, street lights storm sewers, landscaping and storm water management BMPs.

$6,000,000

Constrained Projects page 6 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Lenexa 262 95th & I-435 Interchange

95th Street and I-435 interchange

Improvements to the existing interchange to provide capacity on the interchange ramps and on the bridge over I-435 to meet the

projected traffic demand. Including bike/ped trail connecting to the Prairie Star Parkway MetroGreen corridor.

$5,000,000

Roadway KS 2021 to 2030

City of Lenexa 260 87th St Improvements

K-7 Highway to Haven Improve and widen to 4-lane divided roadway with sidewalks, street lights storm sewers, landscaping and storm water management BMPs.

$26,000,000

Roadway KS 2021 to 2030

City of Lenexa 253 Lone Elm improvements

Prairie Star Parkway to K-10 Highway.

Improve and widen to 4-lane divided roadway with sidewalks, street lights storm sewers, landscaping and storm water management BMPs.

$5,000,000

Roadway KS 2021 to 2030

City of Lenexa 255 K-10 & Woodland Interchange

K-10 Highway and Woodland Road

Improvements to the existing interchange to provide capacity on the interchange ramps and on Woodland Road under K-10 to meet the

projected traffic demand.

$5,000,000

Roadway KS 2021 to 2030

City of Olathe 480 Ridgeview Improvements

KC Road to 135th Street.

Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 355 Ridgeview Improvements

119th Street to 127th Street

Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 354 Old 56 Improvements

K-7 Hwy to Bridge Capacity improvement from a rural 2 lane to 4 lane divided arterial. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 520 135th St Improvements

Mur-Len to Black Bob Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 353 Old 56 Improvements

Bridge to 151st Capacity improvement from a rural 2 lane to 4 lane divided arterial. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 352 KC Road Improvements

Renner to Ridgeview Capacity improvement, widening from 4 to 5 lanes. $11,000,000

Roadway KS 2021 to 2030

City of Olathe 351 College Blvd Improvements

Lone Elm to Woodland Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2021 to 2030

City of Olathe 347 119th St Improvements

Ridgeview to Renner Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 346 119th St Improvements

Renner to I-35. Capacity improvement, widening eastbound lanes from 2 to 3 lanes. $2,500,000

Constrained Projects page 7 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Olathe 498 175th Improvements

K-7 Hwy to Ridgeview Capacity improvement from a rural 2 lane to 4 lane divided arterial. $13,000,000

Roadway KS 2021 to 2030

City of Olathe 490 Black Bob Improvements

135th Street to 139th Street

Capacity improvement, widening from 4 to 6 lanes. $2,000,000

Roadway KS 2021 to 2030

City of Olathe 491 Black Bob Improvements

151st Street to 159th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2021 to 2030

City of Olathe 492 College Blvd Improvements

West city limits to Clare

Capacity improvements from 2 lane to 4 lane. $20,000,000

Roadway KS 2021 to 2030

City of Olathe 493 Pflumm Improvements

143rd Street to 151st Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2021 to 2030

City of Olathe 494 Woodland and K-10 Interchange

Woodland and K-10 Interchange

Interchange capacity improvement, installing Roundabouts at the ramp junctions.

$2,000,000

Roadway KS 2021 to 2030

City of Olathe 487 151st Construction Old 56 Hwy to Lone Elm

Construct missing link of 151st Street, including bridge over BNSF railroad and Cedar Creek. Construct 4 lane divided arterial.

$15,000,000

Roadway KS 2021 to 2030

City of Olathe 478 Ridgeview Improvements

College Blvd to 119th Street.

Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 484 127th Improvements

K-7 Hwy to Iowa. Capacity improvements from 2 lane to 4 lane. $7,000,000

Roadway KS 2021 to 2030

City of Olathe 511 Black Bob Improvements

127th Street to 135th Street

Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 482 K-7 Future Realignment

171st Street to 183rd Street.

Realignment of existing K-7 Hwy in compliance with the K-7 corridor plan.

$0

Roadway KS 2021 to 2030

City of Olathe 481 135th Bridge widening

135th Street bridge over I-35.

Bridge widening and geometric modifications to serve increased traffic demand.

$6,000,000

Roadway KS 2021 to 2030

City of Olathe 337 135th Improvements

Hedge Lane to K-7 Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 479 Ridgeview Improvements

K-10 to College Blvd. Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 489 159th Improvements

Ridgeview to Mur-Len Roadway project to improve capacity from 2 lanes to four lanes. $13,000,000

Constrained Projects page 8 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Olathe 510 Black Bob Improvements

119th Street to 127th Street

Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 486 127th Improvements

Woodland to Ridgeview

Capacity improvements from 2 lane to 4 lane. $19,000,000

Roadway KS 2021 to 2030

City of Olathe 336 135th Improvements

Black Bob to Pflumm Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 335 127th and K-7 Interchange

127th and K-7 (future interchange)

New Roundabout Interchange replacing an at-grade intersection. $2,000,000

Roadway KS 2021 to 2030

City of Olathe 333 119th Improvements

Black Bob to Pflumm Capacity improvement, widening from 4 to 6 lanes. $6,000,000

Roadway KS 2021 to 2030

City of Olathe 136 119th and K-7 capacity

improvement

119th and K-7 interchange

Interchange capacity improvement, installing Roundabouts at the ramp junctions. Extend life of bridge.

$3,000,000

Roadway KS 2021 to 2030

City of Olathe 345 119th Improvements

K-7 to Lone Elm Increase from 2 lanes to 4 lanes $13,000,000

Roadway KS 2021 to 2030

City of Olathe 344 135th Improvements

Ridgeview to Clairborne

Capacity improvement, widening from 4 to 6 lanes. $8,000,000

Roadway KS 2021 to 2030

City of Overland Park

291 175th/179th St Widening

Lackman to Metcalf in Overland Park

The project includes widening 175th/179th Street from a two-lane roadway to a four-lane divided thoroughfare with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA

compliant facilities, restoration and other items incidental to the street construction.

$25,000,000

Roadway KS 2021 to 2030

City of Overland Park

269 Quivira Road reconstruction

179th St. to 191st St. in Overland Park

The project includes reconstruction of Quivira Road from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$7,500,000

Roadway KS 2021 to 2030

City of Overland Park

276 Antioch Road reconstruction

167th St. to 179th St. in Overland Park

The project includes reconstruction of Antioch Road from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$7,500,000

Constrained Projects page 9 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Overland Park

278 Antioch Road reconstruction

179th St. to 199th St. in Overland Park

The project includes reconstruction of Antioch Road from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$12,500,000

Roadway KS 2021 to 2030

City of Overland Park

706 US-69 Improvements

(Phase I)

151st Street to I-435 Reconstruct US-69 and add through lanes from 135th St. to I-435, construct northbound collector-distributor (C-D) road between 135th

& Blue Valley Pkwy, and construct auxiliary lanes from 151st St. to 135th St.

$210,000,000

Roadway KS 2021 to 2030

City of Overland Park

281 Kenneth Road reconstruction

143rd St. to 159th St. in Overland Park

The project includes reconstruction of Kenneth Road from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$10,000,000

Roadway KS 2021 to 2030

City of Overland Park

3000 Quivira Road reconstruction

159th St. to 179th St. in Overland Park

The project includes reconstruction of Quivira Road from an unimproved two-lane roadway to a four-lane divided thoroughfare

with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other

items incidental to the street construction.

$15,000,000

Roadway KS 2021 to 2030

City of Overland Park

290 167th Street reconstruction

Antioch to Metcalf in Overland Park

The project includes reconstruction of the 167th Street interchange as a full access diamond, reconstruction of 167th Street from an

unimproved two-lane roadway to a four-lane divided thoroughfare with turn lanes, storm sewers, a raised median, sidewalks, street

lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the street construction.

$22,000,000

Roadway KS 2021 to 2030

City of Overland Park

292 199th Street Widening

Antioch to US-69 in Overland Park

The project includes widening 199th Street from a two-lane roadway to a four-lane divided thoroughfare with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant

facilities, restoration and other items incidental to the street construction.

$2,500,000

Roadway KS 2021 to 2030

City of Overland Park

309 135th Street Widening

Switzer to Nall in Overland Park

The project includes widening 135th Street from a six-lane divided thoroughfare to a eight-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$12,000,000

Constrained Projects page 10 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Overland Park

307 151st Street Widening

Rosehill to Nall in Overland Park

The project includes widening 151st Street from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction. T

$18,000,000

Roadway KS 2021 to 2030

City of Overland Park

295 Antioch Road Widening

135th St. to 167th St. in Overland Park

The project includes widening Antioch Road from a four-lane divided thoroughfare to a six-lane divided thoroughfare with turn lanes,

storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities, restoration and other items incidental to the

street construction.

$16,000,000

Roadway KS 2021 to 2030

City of Shawnee 67 Monticello Road widening

Midland Drive to 7900 Block

The project will provide reconstruction and widening of Monticello Road, from Midland Drive to the 7900 block. Monticello Road, from

71st Street south, will follow a new alignment. In addition to the road widening, this project includes on-street bicycle lanes, a recreational trail on the west side of Monticello and a sidewalk on the east side. A

roundabout will be installed at the new 75th and Monticello Road intersection.

$13,700,000

Roadway KS 2021 to 2030

City of Shawnee 233 Lackman Road Renner Road

75th Street to Johnson Drive

The project will provide reconstruction and widening of Lackman Road, from 75th Street to Johnson Drive. Lackman Road does not

currently exist between 63rd Street and Johnson Drive. In addition to the road widening, this project includes off-street recreational trail

facilities on one side and a standard sidewalk on the other.

$10,000,000

Roadway KS 2021 to 2030

City of Shawnee 228 Woodland Road reconstruction and

widening

71st Street to 7900 Block

The project will provide reconstruction and widening of Woodland Road, from the 7100 Block to the 7900 block. Woodland Road, from approximately the 7700 block north, will follow a new alignment. In addition to the road widening, a segment of Woodland will include

on-street bicycle lanes and sidewalks on each side.

$6,700,000

Roadway KS 2021 to 2030

City of Shawnee 236 Shawnee Mission Parkway Widening

Pflumm Road to I-435 This project would widen the existing roadway to 6 lanes, provide improved drainage, and provide better ramp access at Lackman and

Maurer.

$15,000,000

Roadway KS 2021 to 2030

City of Shawnee 229 75th Street reconstruction and

widening

Monticello Road to Mize Road

The project will provide reconstruction and widening of 75th Street, from Monticello Road to Mize Road. In addition to the road

widening, this project includes on-street bicycle lanes, and sidewalks on both sides of the street.

$13,700,000

Constrained Projects page 11 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Shawnee 230 67th Street Construction

Gleason Road to Mize Road

The proposed 67th Street does not exist today but would extend 67th west of Gleason Road and connect to Mize Road. This project

includes pedestrian sidewalks on both sides.

$6,700,000

Roadway KS 2021 to 2030

City of Shawnee 241 K-7 Highway Interchanges

improvements

K-7 Intersections at 43rd Street, 47th

Street, 71st Street, 75th Street, Shawnee Mission Parkway and

83rd Street.

Convert all at-grade intersections along K-7 Highway to separated interchanges.

$75,000,000

Roadway KS 2021 to 2030

City of Shawnee 232 Renner Road reconstruction and

widening

79th Street to Holliday Drive

The project will provide reconstruction and widening of Renner Road, from Holliday Drive to the 7900 block. In addition to the road

widening, this project includes on-street bicycle lanes, and sidewalks on each side.

$22,000,000

Roadway KS 2021 to 2030

City of Shawnee 231 Shawnee Mission Parkway Widening

K-7 Highway to I-435 This project would widen the existing roadway to 6 lanes, provide improved drainage, and provide new bridge structures over I-435, K-7

Highway, and over mill creek Railroad.

$35,000,000

Roadway KS 2021 to 2030

City of Tonganoxie 431 206th Street Parkway Phase II

From US 24/40 south to future Honey Creek

Road alignment

comply with the planning in the US 24/40 Corridor Access and Traffic Management Plan

$10,625,000

Roadway KS 2021 to 2030

City of Tonganoxie 443 206th Street Parkway Phase III

206th Street and Honey Creek Road thence south and

west to the to Leavenworth County

Road 1 between Honey Creek Road and Hemphill Road

Comply with the Tonganoxie Comprehensive Plan $9,860,000

Roadway KS 2021 to 2030

City of Tonganoxie 458 14th Street Construction

14th Street and US 24/40 thence east to

214 Street

The construction of this route is planned in the US 24/40 Corridor Access and Traffic Management Plan

$2,188,000

Roadway KS 2021 to 2030

City of Tonganoxie 450 East Street Extension

4th Street and East Street, thence south

Honey Creek Road

This project is built to comply with the provisions of US 24/40 Corridor Access and Traffic Management Plan

$8,500,000

Constrained Projects page 12 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

City of Tonganoxie 411 206th Street Parkway Phase I

Leavenworth County Road 5 thence south

to US 24/40

Comply with the planning goals in US 24/40 Corridor Access and Traffic Management Plan

$459,000

Roadway KS 2021 to 2030

City of Tonganoxie 460 Washington Street Construction

Washington Street and US 24/40 going

east along Washington Street to

198th Street

The project includes a new street and a new bridge over Tonganoxie Creek. It also builds a pedestrian crossing onto the Tonganoxie Creek

Bridge as a part of the SRTS plan.

$12,750,000

Roadway KS 2021 to 2030

Johnson County, Kansas - Public

Works

120 199th Street Improvement

Stilwell Community area to Mission Road

Improvement of a rural standard roadway to a 40 wide street with curb and gutter. The project includes a railroad grade separation.

$7,500,000

Roadway KS 2021 to 2030

KDOT 3004 K-7 upgrade 175th Street to 215th Street

Modify K-7 to freeway design standards $60,500,000

Roadway KS 2021 to 2030

KDOT 3002 K-7 upgrade 43rd Street to K-10 Modify K-7 to freeway design standards $46,200,000

Roadway KS 2021 to 2030

KDOT 655 I-35 Reconstruction I-435 to 67th Street Reconstruct, widen, and implement operations strategies along approximately 5 miles of I-35 in order to meet the corridors needs

and future expected travel demand.

$140,000,000

Roadway KS 2021 to 2030

KDOT 3003 K-7 intersection enhancements

K-7 from Lansing to State Ave

Construct expressway intersection enhancements from the City of Lansing to State Avenue.

$21,000,000

Roadway KS 2021 to 2030

KDOT 3010 I-70/K-7 Interchange (phases 9-15)

I-70/K-7 Interchange Complete phases 9-15 of interchange improvements. The interchange concept includes interchanges at I-70, 130th Street, and Kansas Avenue. K-7 will have collector-distributor roads to separate through traffic from ramp traffic, and the project will extend from

Kansas Avenue on the south to 130th St. on the north.

$292,500,000

Roadway KS 2021 to 2030

KDOT 3015 I-70/I-435 Interchange

Flyover Ramp

I-70/I-435 Interchange At I-70/I-435 interchange in Wyandotte County, construction of a flyover ramp from I-435 NB to I-70 WB

$77,000,000

Roadway KS 2021 to 2030

KDOT 3001 K-7 Arterial street enhancements

125th Street to I-35 in Olathe

Construct arterial street enhancements along K-7 from the end of the 4 lane freeway at the signal at 127th south along Lone Elm to I-35. 

$47,300,000

Constrained Projects page 13 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2021 to 2030

Leavenworth County 698 West Leavenworth / Lansing K-7

Bypass

K-7 west of Fort Leavenworth, then south around the west city limits of Leavenworth and

Lansing to the intersection of K-7 and McIntyre Road

The West Leavenworth / Lansing K-7 Bypass will eliminate Numerous cross-streets, curb cuts, and traffic signals.

$62,000,000

Roadway KS 2021 to 2030

Unified Government of WYCO/KCK

407 I-70 and Turner Diagonal

Interchange Re-configuration

I-70 and Turner Diagonal

Re-configuration and reconstruction of existing interchange. New interchange would be more traditional configuration (probably a

diamond) and would eliminate several long circuitous ramps and a bridge, as well as restore acres of adjacent land for development.

$20,000,000

Roadway KS 2021 to 2030

Unified Government of WYCO/KCK

422 I-35 and Lamar Avenue

Interchange

I-35 and Lamar Avenue (24th St) in

Kansas City, KS

replacing and realigning all ramps, as well as widening and replacing the bridge. Also included is construction of a fly-over bridge on 24th

St. over the immediately adjacent BNSF Railroad main line.

$18,000,000

Roadway KS 2031 to 2040

City of Gardner 720 US-56 Improvements

Moonlight Road to I-35; interchange at

New Century Parkway

The project will consist of expanding US-56 to 6 lanes and will necessitate major modifications or reconstruction of the interchange

of US-56 and New Century Parkway.

$50,000,000

Roadway KS 2031 to 2040

City of Lansing 223 West Gilman Road Extension

Willow Street to DeSoto Road

Extend Gilman Road (new location) per Lansing Comprehensive Plan. Provide separate Bicycle path and pedestrian sidewalk per Lansing

Master Trails Plan and City Policy.

$3,148,800

Roadway KS 2031 to 2040

City of Lansing 198 4-H Road Reconstruction

DeSoto Road to K-7(US-73)(Main Street).

Reconstruct rural-type 2-lane road to current standard 4-lane facility to accommodate growing traffic demand. Construct 10 ft. bicycle path and 5 ft. pedestrian sidewalk in accordance with Trails Master

Plan and city policy.

$6,622,000

Roadway KS 2031 to 2040

City of Leawood 74 Kenneth Road Widening

138th to 143rd Street The project will widen the current 2-lane road to a 4-lane undivided roadway. The improvements will include relocating the existing

sidewalks along both sides. The existing streetlights will be relocated and replaced with LED lights. The road will be widening at specific locations to accommodate left turn movements and possible bike

lanes.

$3,200,000

Roadway KS 2031 to 2040

City of Lenexa 248 New Interchange at Clare and K-10

Clare Road and K-10 Highway

New interchange at Clare and K-10 Highway to provide access and connectivity.

$20,000,000

Constrained Projects page 14 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2031 to 2040

City of Lenexa 203 83rd Street Improvements

Gleason to West city limits

Improve and widen to 4-lane divided roadway with sidewalks, street lights storm sewers, landscaping and storm water management BMPs.

$20,000,000

Roadway KS 2031 to 2040

City of Lenexa 247 Canyon Creek Blvd & K-10 Interchange

Canyon Creek Boulevard and K-10

Highway

Modify and improve the existing Canyon Creek Boulevard and K-10 interchange to provide the needed capacity to support the

anticipated development

$5,000,000

Roadway KS 2031 to 2040

City of Lenexa 246 Prairie Star Parkway & K-10

interchange

Prairie Star Parkway and K-10

Construction of a new interchange at Prairie Star Parkway and K-10 to provide access and connection to Prairie Star Parkway and areas in

western Lenexa.

$20,000,000

Roadway KS 2031 to 2040

City of Lenexa 244 Prairie Star Parkway

improvements

Mize Road to K-10 Highway.

4-lane divided roadway including sidewalks and a 10-foot wide bike/ped trail along one side. Also included are street lights, storm

sewers, landscaping and storm water management BMPs

$15,400,000

Roadway KS 2031 to 2040

City of Olathe 516 Ridgeview Improvements

159th Street to 167th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 517 Ridgeview Improvements

167th Street to 175th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 519 Moonlight Interchange at K-10

Moonlight at K-10 Hwy New interchange needed on K-10 Hwy to serve increase demand due to economic development.

$15,000,000

Roadway KS 2031 to 2040

City of Olathe 507 159th Improvements

Mur-Len to Black Bob Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 514 Pflumm Improvements

151st Street to 159th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 513 Black Bob Improvements

167th Street to 175th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 495 KC Road Improvements

North city limits to Renner Road

Capacity improvement, widening from 4 to 5 lanes. $5,000,000

Roadway KS 2031 to 2040

City of Olathe 512 Black Bob Improvements

159th Street to 167th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 509 159th Improvements

West city limits to Lone Elm

Capacity improvements from 2 lane to 4 lane. $26,000,000

Constrained Projects page 15 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2031 to 2040

City of Olathe 515 Ridgeview Improvements

151st Street to 159th Street

Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 496 151st Bridge widening at I-35

151st Street and I-35 Interchange.

Capacity improvement, widening bridge between Interchange ramps from 4 to 6 lanes.

$15,000,000

Roadway KS 2031 to 2040

City of Olathe 497 175th Improvements

Hedge Lane to Lone Elm

Capacity improvement from a rural 2 lane to 4 lane divided arterial. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 499 175th Improvements

Lone Elm to K-7 Hwy Capacity improvement from a rural 2 lane to 4 lane divided arterial. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 506 159th Improvements

Lone Elm to K-7 Hwy Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 500 175th Improvements

Mur-Len to Black Bob Capacity improvement from a rural 2 lane to 4 lane divided arterial. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 505 159th Improvements

Black Bob to Pflumm Capacity improvements from 2 lane to 4 lane. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 504 151st Improvements

West city limits to Old 56 Hwy

Capacity improvements from 2 lane to 4 lane. $15,000,000

Roadway KS 2031 to 2040

City of Olathe 501 175th Improvements

Ridgeview to Mur-Len Capacity improvement from a rural 2 lane to 4 lane divided arterial. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 502 175th Improvements

West City limits to Hedge Lane.

Capacity improvement from a rural 2 lane to 4 lane divided arterial. $13,000,000

Roadway KS 2031 to 2040

City of Olathe 503 135th Improvements

West city limits to Lakeshore Drive

Capacity improvements from 2 lane to 4 lane. $5,000,000

Roadway KS 2031 to 2040

City of Overland Park

282 Kenneth/State Line Road

reconstruction

159th St. to 199th St. in Overland Park

The project includes reconstruction of Kenneth Road and State Line Road from an unimproved two-lane roadway to a four-lane divided

thoroughfare with turn lanes, storm sewers, a raised median, sidewalks, street lights, traffic signals, ADA compliant facilities,

restoration and other items incidental to the street construction.

$25,000,000

Roadway KS 2031 to 2040

City of Tonganoxie 701 US Highway 24/40 Construction

Kansas Highway 16 south to Leavenworth

County Highway 1

Construct 4 lanes on US Highway 24/40 from Kansas Highway 16 south to Leavenworth County Highway 1

$6,290,000

Constrained Projects page 16 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2031 to 2040

City of Tonganoxie 705 Leavenworth County Road 1

Upgrade

US Highway 24/40 to I-70

Upgrade Leavenworth County Highway 1 from a 2-lane county road to a 4-lane Parkway.

$12,750,000

Roadway KS 2031 to 2040

City of Tonganoxie 477 Hemphill Road Reconstruction

US 24/40 east to 206th Street

Reconstruct Hemphill Road starting at it intersection with US 24/40 thence east to 206th Street

$9,000,000

Roadway KS 2031 to 2040

City of Tonganoxie 476 Leavenworth County Road

Frontage Roads Build

US 24/40 to the Kansas Turnpike

Tonganoxie Interchange

Build reverse frontage roads on both sides of Leavenworth County Road 1 from US 24/40 to the Kansas Turnpike Tonganoxie Interchange

$18,000,000

Roadway KS 2031 to 2040

City of Tonganoxie 475 Honey Creek Parkway

between 222nd Street and 206th Street

This project is planned in the Tonganoxie Comprehensive Plan. $8,500,000

Roadway KS 2031 to 2040

City of Tonganoxie 473 East Side Collector East Side Collector and 14th Street thence south to Kansas Avenue

This road is planned in the Tonganoxie Comprehensive Plan $2,125,000

Roadway KS 2031 to 2040

City of Tonganoxie 472 West Side Collector 4th Street west of US 24/40 thence south and west along the

approximate horizontal alignment of US 24/40 to Honey

Creek Road.

This project is planned in the US 24/40 Corridor Access and Traffic Management Plan

$7,435,000

Roadway KS 2031 to 2040

City of Tonganoxie 466 4th Street Construction

Pleasant Street east to 198th Street

This project is being built to comply with the planning done in the US 24/40 Corridor Access and Traffic Management Plan.

$8,775,000

Roadway KS 2031 to 2040

KDOT 894 Johnson County Gateway Project -

Phase 2

Various Reconstruction and capacity improvements to the I-435/I-35/K-10 interchange in Johnson County, KS

$300,000,000

Roadway KS 2031 to 2040

Unified Government of WYCO/KCK

464 Leavenworth Road Improvements

K-7 to I-435 Widening and reconstructing existing 2-lane rural-type roadway into 4-lane urban street including lighting, and signalization as warranted.

$18,000,000

Roadway KS 2031 to 2040

Unified Government of WYCO/KCK

415 Donahoo Road Parkway

Improvements

K-7 to I-435 Replacement of existing two lane roadway with a four lane parkway with landscaped median, turn lanes, and other urban amenities.

$20,000,000

Constrained Projects page 17 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway KS 2031 to 2040

Unified Government of WYCO/KCK

461 Leavenworth Road Improvements

between I-635 and 91st Street

Reconstruct and widen Leavenworth Road (K-5) to a 3-lane facility which would provide for dedicated left turn lanes at major

intersections, and a continuous center lane for left turns at other locations. Also, included would be a landscaped area and

bicycle/pedestrian path adjacent to the road.

$20,000,000

Roadway KS 2031 to 2040

Unified Government of WYCO/KCK

452 Polfer Road Construction

115th St to Hutton Road

Construct new 1 mile segment of Polfer Road, extending existing alignment east one mile to connect to Polfer Road.

$6,200,000

Roadway MO 2015 to 2020

City of Grandview 787 I-49/US 71 Outer Roads

Blue Ridge Boulevard to MO 150

This project will entail converting the Outer Roadways of I-49 from one way to two way traffic. It includes improvements to the existing

outer roads, existing City streets in the vicinity of the Main Street interchange, and construction of a new roadway between E 129th

Street and Highgrove Rd. It also adds roundabout interstate access on the north and southbound sections of I-49 near 140th Street. This

could require up to three phases of construction projects to complete.

$15,000,000

Roadway MO 2015 to 2020

City of Independence

202 39th Street Bridge Replacement

39th Street Bridge Over the Little Blue

River

This project will replace an obsolete two lane bridge on 39th Street over the Little Blue River. The new bridge will have four through

traffic lanes and sidewalks.

$3,000,000

Roadway MO 2015 to 2020

City of Kansas City, MO

646 Shoal Creek Pkwy Reconstruction

Platte Purchase Dr. to Holly St.

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES AND PARKWAY STANDARDS

$4,846,600

Roadway MO 2015 to 2020

City of Kansas City, MO

577 Lees Summit Road Reconstruction

Phelps Road to US 40 RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $12,833,250

Roadway MO 2015 to 2020

City of Kansas City, MO

549 Cookingham Rd Reconstruction

Platte Purchase Dr to Oak Trwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $14,910,000

Roadway MO 2015 to 2020

City of Kansas City, MO

339 135th Street Reconstruction

MO-150 to Oak RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $7,000,000

Roadway MO 2015 to 2020

City of Kansas City, MO

578 Lees Summit Road Reconstruction

Lakewood Blvd to Phelps Road

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $11,498,095

Roadway MO 2015 to 2020

City of Kansas City, MO

689 Tiffany Springs Pkwy Improvement

Amity to I-29 NEW 4 LANE FACILITY AND INTERCHANGE IMPROVEMENT $15,336,000

Constrained Projects page 18 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2015 to 2020

City of Kansas City, MO

729 NW 64th Street Improvements

Cosby to Roanridge CAPACITY IMPROVEMENTS TO ROUTE 45/NW 64TH STREET AND I-29 INTERCHANGE INCLUDING OUTER ROAD RELOCATION

$16,655,000

Roadway MO 2015 to 2020

City of Kansas City, MO

555 Englewood Rd Reconstruction

Waukomis Drive to US 169

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $13,632,000

Roadway MO 2015 to 2020

City of Kansas City, MO

696 Tiffany Springs Road Construction

Congress Ave to Skyview Ave

NEW 4 LANE FACILITY ON NEW ALIGNMENT $9,230,000

Roadway MO 2015 to 2020

City of Kansas City, MO

562 Green Hills Reconstruction

NW 72nd Street to Barry Road

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $8,660,500

Roadway MO 2015 to 2020

City of Kansas City, MO

543 Congress Ave Reconstruction

NW 112th Street to Cookingham Drive

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $7,497,600

Roadway MO 2015 to 2020

City of Kansas City, MO

582 Lees Summit Road Reconstruction

85th Street to Gregory RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $13,216,650

Roadway MO 2015 to 2020

City of Kansas City, MO

392 22nd/23rd Street Reconstruction

Brooklyn to I-70 RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $10,738,220

Roadway MO 2015 to 2020

City of Kansas City, MO

618 Northwood Reconstruction

City Limits (Riverside) to Prairie View Drive

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $7,668,000

Roadway MO 2015 to 2020

City of Kansas City, MO

546 Congress Ave Reconstruction

Ambassador Dr to NW 108th Street

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $7,497,600

Roadway MO 2015 to 2020

City of Lees Summit 118 Blackwell Interchange

Improvements

Intersection of Blackwell Road

(Extension) and US 50 Highway

The extension of Blackwell Road from Shenandoah Drive to the extension of Oldham Parkway (approx. 1 mile) with a diamond

interchange at US 50 Highway and auxiliary highway lanes between the Blackwell interchange and Todd George Parkway interchange.

The project includes the extension of Oldham Parkway from Ransom Road/Todd George Parkway to Smart Road (approx. 2 miles) and the extension of Blue Parkway to Shenandoah Drive (approx. 0.5 mile).

The interchange will have roundabout intersections, as will the intersections of Blackwell Road at Shenandoah Drive and

Shenandoah Drive at Blue Parkway.

$23,700,000

Roadway MO 2015 to 2020

City of Lees Summit 208 Lees Summit Road Widening

Colbern Road to Lee’s Summit West City

Limits

Widen Lee’s Summit Road from a two-lane unimproved road to a four-lane urban standard with turn lanes and traffic signal

improvements between the existing intersection of Colbern Road and the Lee’s Summit West City Limit (approx. 1 mile).

$8,660,000

Constrained Projects page 19 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2015 to 2020

City of Liberty 234 I-35 and Pleasant Valley Interchange

Interim Improvements

I-35 and Pleasant Valley Road/South

Liberty Parkway

The project area effects the Interstate 35 On- and Off-Ramps at US Highway 69 and Pleasant Valley Road, US Highway 69 between

proposed Flintlock Road and Pleasant Valley Road, Pleasant Valley Road (PVR) between Church Road and Swan Avenue, South Liberty Parkway (extension of PVR) between Swan Avenue and Plummer

Road, the extension of Flintlock Road from South Liberty Parkway to US Highway 69, and improvements along Garrison Road.

$0

Roadway MO 2015 to 2020

City of Pleasant Hill 600 Business 7 Highway

Improvements

7 Highway to 58 Highway

This project will resurface Business 7 Highway install bike lanes, and reconstruct sidewalks including ADA ramps.

$2,000,000

Roadway MO 2015 to 2020

City of Raytown 654 350 Highway & Blue Ridge Boulevard

Intersection Improvements

MO-350 and Blue Ridge Boulevard

Intersection, Raytown, Missouri.

Modification of a limited access intersection to provide full access in all directions to support activity center, transit interconnectivity and

metro green connection.

$20,000,000

Roadway MO 2015 to 2020

City of Raytown 604 350 Highway & Raytown Rd. Intersection

Alignment Study

350 Hwy from Sterling to Maple

This study calls for the divided 350 highway through Raytown to be combined within the eastbound 350 highway right-of-way. Walking

and Biking trails are also part of the project along 350 highway.

$36,988,517

Roadway MO 2015 to 2020

MoDOT 3009 I-435 N 48th Street to Missouri River

Add auxiliary lane to I-435 from Parvin Rd to MO river bridge; reconstruct I-435/MO 210 interchange as diverging diamond (project

157 is Phase 1)

$18,000,000

Roadway MO 2015 to 2020

MoDOT 3007 I-435 Phase 2 Improvements

Kansas state line to west of I-49

Phase 2 - Operational, capacity and safety improvements along corridor; project 160 is Phase 1

$21,000,000

Roadway MO 2015 to 2020

TDD - Transportation Development

District (Partners in Progress)

805 US 71 & Route 291 Interchange

Improvements

I-49/US-71 and MO 291 Interchange

This project includes modifications to the I-49/US-71 & MO 291 Interchange and modifications to MO 291 in Harrisonville

$23,200,000

Roadway MO 2021 to 2030

City of Gladstone 316 N. Broadway Street

Improvement

Englewood Road to NW 76th Street

The project will include improvements to N. Broadway from Englewood Road to NW 76th Street. Portions of the existing roadway

are 2 lane in each direction.

$7,000,000

Constrained Projects page 20 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2021 to 2030

City of Independence

225 39th Street Improvements

from the West City limits east to Crysler

Avenue.

Project will improve the last section of 39th Street from two lanes to three lanes. The roadway will be widened on the existing alignment

with striping for a center turn lane. New curb and gutters will be installed and the storm sewers will be updated. Five foot sidewalks

will be placed on both sides of the road with new street lighting.

$4,000,000

Roadway MO 2021 to 2030

City of Independence

349 M-7 Highway Improvements

intersection with Pink Hill Road, north to

U.S. 24 Highway

The M-7 Highway Improvements, Pink Hill Road to U.S. 24 Highway, will improve approximately six miles of M-7 Highway into a four lane street with curbs and sidewalks between Pink Hill Road and U.S. 24

Highway.

$30,000,000

Roadway MO 2021 to 2030

City of Independence

361 M-78 Highway Improvements

Speck Road northeast to Truman Road

The M-78 Highway Improvements, Speck to Truman Road, will improve the existing M-78 Highway from two lanes to four lanes in Eastern Independence. The construction of curbs, sidewalks, and

storm sewers will be included with this project.

$12,500,000

Roadway MO 2021 to 2030

City of Independence

372 Winner Road Improvements

U.S. 24 Highway southeast to Sterling

Avenue

Project will improve the existing Winner Road from two lanes to three lanes in most areas. The roadway will be widened on the existing alignment with striping for a center turn lane except for

where the road must narrow for conflicts. New curb and gutters will be installed and the storm sewers will be updated. Five foot

sidewalks will be placed on both sides of the road with new street lighting.

$7,200,000

Roadway MO 2021 to 2030

City of Kansas City, MO

700 Woodland Reconstruction

Shoal Creek Pkwy to I-435

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $16,188,000

Roadway MO 2021 to 2030

City of Kansas City, MO

522 Amity Rd Reconstruction

MO-152 to Tiffany Springs Pkwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $13,206,000

Roadway MO 2021 to 2030

City of Kansas City, MO

521 85th Street Reconstruction

Troost to Prospect RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $10,576,160

Roadway MO 2021 to 2030

City of Kansas City, MO

541 North Brighton Avenue

Reconstruction

Pleasant Valley Road to NE 76th Street

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $14,049,125

Roadway MO 2021 to 2030

City of Kansas City, MO

605 Little Blue Road Reconstruction

Woodson to Noland RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $14,995,200

Roadway MO 2021 to 2030

City of Kansas City, MO

570 Indiana Ave widening

Barry Road to Shoal Creek Pkwy

WIDEN IMPROVED FACILITY TO 4 LANES $7,313,000

Constrained Projects page 21 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2021 to 2030

City of Kansas City, MO

608 Maplewoods Parkway

Reconstruction

NE 96th Street to Shoal Creek Pkwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES AND PARKWAY STANDARDS

$24,360,000

Roadway MO 2021 to 2030

City of Kansas City, MO

609 Maplewoods Parkway

Reconstruction

M-1 to SPRUCE RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES AND PARKWAY STANDARDS

$6,688,600

Roadway MO 2021 to 2030

City of Kansas City, MO

2000 Shoal Creek Pkwy Enhancements

NE 108th to Woodland Ave

ADDITIONAL 2 LANES TO PARKWAY STANDARDS $6,400,000

Roadway MO 2021 to 2030

City of Kansas City, MO

2004 East Longview Pkwy Construction

MO-350 to E 82nd Street

NEW 4 LANE PARKWAY FACILITY $10,530,300

Roadway MO 2021 to 2030

City of Kansas City, MO

620 NW 108th Construction

Congress Ave to Skyview Ave

NEW 4 LANE FACILITY TO REPLACE UNIMPROVED ROAD $8,990,000

Roadway MO 2021 to 2030

City of Kansas City, MO

579 Lees Summit Road Reconstruction

Gregory to Lakewood Blvd

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $16,614,000

Roadway MO 2021 to 2030

City of Kansas City, MO

420 Ambassador Rd Construction

NW Plaza Circle to NW 128th Street

NEW 4 LANE FACILITY $17,863,600

Roadway MO 2021 to 2030

City of Kansas City, MO

567 Holmes Rd Reconstruction

Martha Truman to 115th

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $11,991,900

Roadway MO 2021 to 2030

City of Kansas City, MO

547 Cookingham Rd Reconstruction

Woodland Ave to I-435

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $19,820,000

Roadway MO 2021 to 2030

City of Kansas City, MO

557 Front Street Reconstruction

I-35 to Chouteau RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $47,925,000

Roadway MO 2021 to 2030

City of Kansas City, MO

680 Tiffany Springs Pkwy Construction

N. Revere to Green Hills Road

NEW 4 LANE PARKWAY FACILITY $11,400,000

Roadway MO 2021 to 2030

City of Kansas City, MO

550 Cookingham Rd Reconstruction

Oak Trwy to Woodland Ave

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $13,951,500

Roadway MO 2021 to 2030

City of Kansas City, MO

642 Red Bridge Reconstruction

Blue River to US 71 RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $23,004,000

Roadway MO 2021 to 2030

City of Kansas City, MO

673 Shoal Creek Pkwy Construction

I-435 to NE 108th NEW 4 LANE PARKWAY FACILITY TO REPLACE UNIMPROVED ROAD $49,940,000

Constrained Projects page 22 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2021 to 2030

City of Kansas City, MO

637 Pleasant Valley Reconstruction

N Brighton to Searcy Creek Pkwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $19,880,000

Roadway MO 2021 to 2030

City of Kansas City, MO

551 Cookingham Rd Reconstruction

I-435 to Skyview Ave RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $13,632,000

Roadway MO 2021 to 2030

City of Kansas City, MO

678 Skyview Reconstruction

NW 108th Street to Cookingham Drive

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $14,200,000

Roadway MO 2021 to 2030

City of Lees Summit 122 Pryor Road Widening

Longview Road to M-150 Highway

Widen Pryor Road from a two-lane interim road standard to a four-lane urban standard with turn lanes and warranted traffic signals between Longview Road and M-150 Highway (approx. 3.5 miles).

$14,250,000

Roadway MO 2021 to 2030

City of Lees Summit 121 Todd George Interchange/US 50

Highway Reconstruction

Todd George Interchange at US 50

Highway

Reconstruct/widen the existing interchange at Todd George Parkway/Ranson Road and US 50 Highway. Capacity improvements

will upgrade the existing 4-lane arterial with single left-turn lanes to a 6-lane arterial with dual left-turn lanes and provide necessary

intersection separation.

$18,000,000

Roadway MO 2021 to 2030

City of Liberty 587 I-35/MO 152 Interchange

improvements

I-35/MO 152 Interchange improvements including: bridge widening to accommodate necessary lanes and the improvement of left turn movements exiting off I-35; improvements to the sidewalk and

pedestrian facilities

$10,000,000

Roadway MO 2021 to 2030

City of Liberty 585 I-35/M-291 Interchange

Improvements

I-35 / M-291 Interchange

Interchange modifications at I-35 and M-291. By replacing the aging bridge, eliminating traffic signals, coordinating signals and expanding

M291 with additional lanes.

$12,500,000

Roadway MO 2021 to 2030

City of Liberty 631 Pleasant Valley I-35 Interchange modifications

Pleasant Valley Road / I-35 / US-69 Interchange.

Interchange modifications at I-35 & Pleasant Valley Road & US-69 $0

Roadway MO 2021 to 2030

City of Peculiar 449 211th Street & I-49/U.S. 71 Highway

Interchange

I-49/U.S 71 Highway at future 211th Street

in northern Peculiar

The 211th Street & I-49/U.S. 71 Interchange project is proposed in conjunction with a new 5-mile segment of 211th Street extending

from State Route J to State Route Y.

$14,289,588

Roadway MO 2021 to 2030

City of Peculiar 601 211th Street Extension

State Route J to State Route Y in Cass County

The 211th Street project is proposed in conjunction with a new interchange at 211th Street and I-49/U.S. 71 Highway. The

interchange will be a separate Transportation Outlook 2040 project submission. 211th will be the primary traffic mover through this

center, and will also serve as one segment of a principal arterial road linking the City with cities and counties to the east and west.

$40,000,000

Constrained Projects page 23 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2021 to 2030

City of Pleasant Hill 204 M-7 Highway Improvements

M-7 Highway from 50 Highway to 163rd

Street.

This project will continue improvements already made to M-7 Highway in south Blue Springs and in Pleasant Hill south of 163rd

Street. The project will expand the highway to 4 lanes, with center left turn lanes where needed, and install curbs, gutters, designated

bike lanes, and sidewalks on each side.

$20,000,000

Roadway MO 2021 to 2030

City of Pleasant Valley

3016 Pleasant Valley Road

Sobbie Rd to western city limit

Widen Pleasant Valley Road to 3‐lane cross section with sidewalks and add retaining walls where needed. Incorporate complete streets

elements such as sidewalks and/or multi-use paths as feasible.

$4,100,000

Roadway MO 2021 to 2030

Platte County 653 Improvements to MO 92 - Phase 1

Leavenworth to I-29 Safety Improvements, Widening to accommodate current capacity, Multi-modal shared use path, Park and Ride facility at MO-169.

$40,000,000

Roadway MO 2031 to 2040

City of Kansas City, MO

586 Lewis and Clark Expwy

Construction

I-435 to Sugar Creek NEW 2 LANE FACILITY $63,800,000

Roadway MO 2031 to 2040

City of Kansas City, MO

771 Red Bridge Reconstruction

State Line to Holmes RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $17,556,000

Roadway MO 2031 to 2040

City of Kansas City, MO

769 Raytown Road Reconstruction

87th Street to I-470 RECONSTRUCT EXISTING ROADWAY AND WIDEN TO 4 LANES $11,233,650

Roadway MO 2031 to 2040

City of Kansas City, MO

776 Wornall Road Reconstruction

Red Bridge Rd to 135th Street

RECONSTRUCT EXISTING ROADWAY AND WIDEN TO 3 LANES $33,655,050

Roadway MO 2031 to 2040

City of Kansas City, MO

2001 Line Creek Pkwy Construction

Tiffany Springs Pkwy to Shoal Creek

Parkway

NEW 4 LANE PARKWAY FACILITY $20,797,700

Roadway MO 2031 to 2040

City of Kansas City, MO

566 Green Hills Reconstruction

MO-152 to NW 108th Street

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $17,750,000

Roadway MO 2031 to 2040

City of Kansas City, MO

2005 Line Creek Pkwy Construction

Stage Coach to Tiffany Springs Parkway

NEW 4 LANE PARKWAY FACILITY $16,477,300

Roadway MO 2031 to 2040

City of Kansas City, MO

2006 Wornall Road Reconstruction

Ward Parkway to Red Bridge Rd

RECONSTRUCT EXISTING ROAD TO PARKWAY STANDARDS $23,100,600

Roadway MO 2031 to 2040

City of Kansas City, MO

621 NW 108th Reconstruction

Skyview Ave to Platte Purchase Dr

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $17,980,000

Constrained Projects page 24 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2031 to 2040

City of Kansas City, MO

524 Barry Road Reconstruction

Union Chapel to Chariton

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $13,667,500

Roadway MO 2031 to 2040

City of Kansas City, MO

526 Barry Road Reconstruction

Highland Ave to Indiana Ave

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $6,390,000

Roadway MO 2031 to 2040

City of Kansas City, MO

545 North Brighton Avenue

Reconstruction

Barry Road TO Shoal Creek Pkwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $11,715,000

Roadway MO 2031 to 2040

City of Kansas City, MO

548 Cookingham Rd Reconstruction

Skyview Ave to Platte Purchase Dr

RECONSTRUCT EXISTING ROAD AND WIDEN TO 6 LANES. $19,820,000

Roadway MO 2031 to 2040

City of Kansas City, MO

554 Eastern Rd Reconstruction

Cookingham Driveto City Limits

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $12,141,000

Roadway MO 2031 to 2040

City of Kansas City, MO

624 NW 72nd Improvements

NW Prairie View to Roanridge

INTERSECTION AND INTERCHANGE IMPROVEMENTS $12,840,000

Roadway MO 2031 to 2040

City of Kansas City, MO

632 Parvin Road Extension

Kentucky Ave to Route 210

NEW 4 LANE FACILITY EXTENSION $51,758,000

Roadway MO 2031 to 2040

City of Kansas City, MO

633 Platte Purchase Reconstruction

NW 76th Street to Barry Road

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $9,487,375

Roadway MO 2031 to 2040

City of Kansas City, MO

635 Platte Purchase Reconstruction

MO-152 to Tiffany Springs pkwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $9,372,000

Roadway MO 2031 to 2040

City of Kansas City, MO

641 Raytown Road Reconstruction

I-435 to Blue Ridge Cut-Off

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES AND PARKWAY STANDARDS

$16,600,000

Roadway MO 2031 to 2040

City of Kansas City, MO

558 Front Street Reconstruction

Chouteau to I-435 RECONSTRUCT EXISTING ROAD $30,615,200

Roadway MO 2031 to 2040

City of Kansas City, MO

725 Blue Ridge Blvd Reconstruction

St Andrews Drive to Grandview City Limits

RECONSTRUCT EXISTING ROADWAY AND WIDEN TO 3 LANES $21,132,000

Roadway MO 2031 to 2040

City of Kansas City, MO

568 Holmes Rd Reconstruction

Blue Ridge to Martha Truman

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $13,781,100

Roadway MO 2031 to 2040

City of Kansas City, MO

569 Holmes Rd Reconstruction

135th to Blue Ridge RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $5,644,500

Roadway MO 2031 to 2040

City of Kansas City, MO

571 Interurban Rd Reconstruction

Cookingham to Route 92

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $28,116,000

Constrained Projects page 25 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Roadway MO 2031 to 2040

City of Kansas City, MO

687 Tiffany Springs Pkwy Construction

I-435 to Amity Ave NEW 4 LANE FACILITY AND INTERCHANGE $59,640,000

Roadway MO 2031 to 2040

City of Kansas City, MO

591 Line Creek Pkwy Reconstruction

I-29 to Bell Street RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $17,466,000

Roadway MO 2031 to 2040

City of Kansas City, MO

594 Line Creek Pkwy Reconstruction

I-29 TO NW 68TH STREET

RECONSTRUCT EXISTING ROAD AND WIDEN TO 4 LANES. $24,600,000

Roadway MO 2031 to 2040

City of Kansas City, MO

617 NE 96th Reconstruction

North Oak to Maplewoods Pkwy

RECONSTRUCT EXISTING ROAD AND WIDEN TO 3 LANES. $9,372,000

Roadway MO 2031 to 2040

City of Kansas City, MO

723 107th Street Reconstruction

Hillcrest Rd to Raytown Rd

RECONSTRUCT EXISTING ROADWAY AND WIDEN TO 3 LANES $12,335,000

Roadway MO 2031 to 2040

City of Kansas City, MO

724 Bannister Road Reconstruction

James A Reed to Raytown Road

RECONSTRUCT EXISTING ROADWAY AND WIDEN TO 4 LANES $21,132,000

Transit KS 2015 to 2020

MARC 804 I-70 West Express Bus Enhancements

CBD to K-7 New express bus service along the I-70 corridor from the CBD to K-7 $10,927,000

Transit KS 2021 to 2030

Johnson County Transit

581 Metcalf/Shawnee Mission Parkway

transit service

Johnson County, Kansas

The project will provide enhanced transit service and support development and the redevelopment of Metcalf Avenue

$13,842,000

Transit KS 2021 to 2030

Johnson County Transit

588 Shawnee Mission Parkway transit

service

Metcalf to K-7 Enhance transit service on Shawnee Mission Pkwy from Metcalf to K-7

$38,463,000

Transit MO 2015 to 2020

KCATA 2011 Regional Fare Collection System

Regional Upgrade of fare collection system including new technologies that would be used across the entire system.

$6,556,000

Transit MO 2015 to 2020

KCATA 413 Prospect Bus Rapid Transit

Prospect Corridor from the downtown CBD to the vicinity of 85th Street in south

Kansas City

This Project will design, construct and implement a new bus rapid transit line in a corridor running from Downtown Kansas City,

Missouri south along Prospect Ave. to the vicinity of 95th St. with potential legs to the area of Bannister and Hillcrest Roads in south

Kansas City. It will include BRT vehicles with hybrid electric propulsion systems, enhanced transit stations, pavement

improvements, ITS improvements, passenger amenities and information displays, transit centers and park and ride facilities.

$46,987,000

Constrained Projects page 26 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Transit MO 2015 to 2020

KCATA 2012 Regional Vanpool Expansion Program

Regional Regional expansion of the vanpool program. $2,732,000

Transit MO 2015 to 2020

KCATA 2013 Regional Mobility Management

Regional Implementation of a regional one-call center, and expansion of Paratransit Services

$5,464,000

Transit MO 2015 to 2020

KCATA 803 I-70 East Express Bus Enhancements

CBD to eastern Jackson County

Enhanced express bus service along the I-70 corridor from the CBD to eastern Jackson County

$11,200,000

Transit MO 2015 to 2020

KCATA 433 State Avenue Corridor Bus Rapid

Transit

Wyandotte County, KS and Kansas City, MO

This project will implement Bus Rapid Transit in the State Avenue Corridor from Village West in western Wyandotte County to

Downtown Kansas City, Kansas and Downtown Kansas City, Missouri. This project will include design, construction, and acquisition of BRT

stations, transit centers, BRT vehicles, transit traffic signal priority, ITS improvements, passenger information and amenities, and paving,

and sidewalk improvements.

$13,113,000

Transit MO 2015 to 2020

KCATA 2018 I-435 Express Bus Between Johnson County and Kansas

City, MO

New express bus service along the I-435 corridor from Johnson County to Kansas City, MO

$36,060,000

Transit MO 2015 to 2020

KCATA 2019 Leavenworth County Express Bus

Kansas City, KS, Kansas City, MO, and

Leavenworth, KS

New express bus service to Leavenworth County serving locations in Kansas City, KS and Kansas City, MO

$2,185,000

Transit MO 2015 to 2020

KCATA 302 System Preservation

Kansas City, Missouri Purchase new revenue vehicles (buses). Vehicles will replace those vehicles (buses) that have met their useful life in accordance with FTA guidelines. Some vehicles will also be used to expand transit service

as funding permits.

$54,636,000

Transit MO 2015 to 2020

KCATA 428 North Oak Bus Rapid Transit Improvement

Downtown Kansas City, MO. through North Kansas City,

Gladstone and Kansas City north to

approximately Missouri Highway 152.

This Project will design, construct and implement a new bus rapid transit line in the North Oak corridor from Downtown Kansas City to

Missouri 152 in the Northland. It will include BRT vehicles with hybrid electric propulsion systems, enhanced stations, pavement improvements, ITS improvements, passenger amenities, transit

centers and park and ride facilities.

$27,318,000

Constrained Projects page 27 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Transit MO 2015 to 2020

KCATA 423 Independence Ave. transit service

CBD to E Jackson County

Enhance transit service along Independence Ave from CBD to Eastern Jackson County

$27,318,000

Transit MO 2015 to 2020

MARC 801 I-35 North Express Bus Enhancements

CBD to Northern Clay/Platte County

Enhanced express bus service along the I-35 north corridor from the CBD to northern Clay and Platte Counties

$13,842,000

Transit MO 2015 to 2020

MARC 800 I-29 Express Bus Enhancements

CBD to Airport and Platte County

Enhanced express bus service along the I-29 corridor from the CBD to Platte County, including Kansas City International Airport

$13,842,000

Transit MO 2021 to 2030

KCATA 435 Regional Park and Ride Lot

Development

Locations throughout the metropolitan

area.

This project will plan, design, and construct new park and ride lots in the Kansas City metropolitan area.

$6,921,000

Transit MO 2021 to 2030

KCATA 2023 System Preservation

Regional System preservation includes replacement of buses at the end of their useful life and preservation of other facilities and assets.

$138,423,000

Transit MO 2021 to 2030

KCATA 2020 St. Joseph Express Bus

Between Kansas City and St. Joseph, MO

New express bus service between St. Joseph and Kansas City, MO $6,921,000

Transit MO 2021 to 2030

KCATA 2021 US-169 Express Bus CBD to northern Clay County

New express bus along the US-169 corridor from the CBD to northern Clay County

$2,768,000

Transit MO 2021 to 2030

KCATA 2017 M-350 Express Bus CBD to eastern Jackson County

Enhanced express bus service along the MO-350 corridor from the CBD to eastern Jackson County

$10,036,000

Transit MO 2021 to 2030

KCATA 2016 US-40 Enhanced Transit Service

CBD to eastern Jackson County

Enhance transit service along the US-40 corridor from the CBD to eastern Jackson County

$6,921,000

Transit MO 2021 to 2030

KCATA 382 Radio Communications

System\ITS Upgrade &

Improvements

Greater KCATA Service area

Project is to upgrade and expand existing radio communication infrastructure and real-time passenger information systems. It will

include hardware upgrades required to meet FCC mandates, replacement of aging equipment, additional security cameras, and

dynamic passenger information systems.

$16,611,000

Transit MO 2021 to 2030

KCATA 2015 US-24 Enhanced Transit Service

CBD to eastern Jackson County

Enhance transit service along the US-24 corridor from the CBD to eastern Jackson County

$23,016,000

Transit MO 2021 to 2030

KCATA 2014 Regional/KCATA Downtown Transit Center and Super

stops

Regional Reorganization of downtown transit routing and construction of supper stops and related amenities.

$24,916,000

Constrained Projects page 28 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Transit MO 2021 to 2030

MARC 802 US-71/I-49 Bus Enhancements

CBD to Cass County Enhanced express bus service along the US-71/I-49 corridor from the CBD to Cass County

$12,112,000

Transit MO 2031 to 2040

KCATA 2024 System Preservation

Regional System preservation includes replacement of buses at the end of their useful life and preservation of other facilities and assets.

$183,300,000

Transit MO 2031 to 2040

KCATA 364 New Transit Maintenance and

Service Facility

TBD A new facility and/or facilities will be necessary due to the age of the facility and the need to provide for greater efficiencies.

$124,644,000

Constrained Projects page 29 of 29Appendix D / Transportation Outlook 2040 2015 Plan Update

Operations, management and preservation projects

Category State Time Period Sponsor Project ID Facility/Program Location Description Capital Cost

Management & Operations

MO 2015 to 2020 MARC 205 RideShare program

Greater Kansas City metropolitan area - Jackson, Clay and Platte counties

in MO; Johnson, Wyandotte and Leavenworth in KS

The RideShare program is a free service that assists individual commuters and employers with identifying and using alternatives to driving alone, including carpooling and

vanpooling, transit, bicycling, walking and telecommuting.

$0

Management & Operations

MO 2015 to 2020 MoDOT 215 Motorist Assist Operations -

Missouri

Various Counties, Various Corridors on the state highway system in Missouri.

This program allows for the continued operation of the Motorist Assist program on the Missouri side of the KC region. This

includes the staff time, fleet and materials required to manage traffic incidents on the state highway system.

$18,440,000

Management & Operations

MO 2015 to 2020 MoDOT 214 KCScout ITS Operations

Various Counties, Various Corridors including I-70, I-435, I-470, US 71, I-29

and I-35.

This project is to provide support needed to continue to operate and maintain the KC Scout system in the Kansas City

Region.

$45,580,000

Roadway KS 2015 to 2020 KDOT 1000 I-70 Bridge Replacements

I-70 (Lewis & Clark Viaduct) Construct Phase 1 of the selected alternative from the completed study of Project No. 70-105 KA-2130-01 (Westbound

I-70 River Truss over the Kansas River). This includes Units 1 through 7 of Bridge #030 and Unit 3 of Bridge #173.

$57,500,000

Roadway MO 2015 to 2020 MoDOT 227 I-70/I-435 Interchange

Bridge Replacements

I-70/I-435 Phase 1 - Replace 4 bridges $30,000,000

Roadway MO 2015 to 2020 MoDOT 160 I-435 Bridge Replacements

W of Kansas State Line to W of I-49 Phase 1 - Replace 4 existing bridges at Wornall and Holmes Rd and rehabilitate 4 existing bridges at 103rd St and Blue River

$49,000,000

Roadway MO 2021 to 2030 MoDOT 2025 Broadway Bridge Replacements

Broadway & US-169 Phase 1 - Broadway Bridge replacement $140,000,000

Roadway MO 2031 to 2040 MoDOT 191 I-70 Bridge Replacements

I-435 to I-470 Phase 1 - Replace bridges at Pittman Rd, Blue Ridge Blvd, Crysler Ave, Phelps Rd and UP railroad overpass

$25,000,000

Roadway MO 2031 to 2040 MoDOT 157 I-435 Bridge Rehab Missouri River Bridge Phase 1 - Replace/rehab Missouri River Bridge $80,500,000

O&M/Preservation Projects page 1 of 1Appendix D / Transportation Outlook 2040 2015 Plan Update

>>Operations,

Management and Preservation*

Non-Preservation

2015 to 2020 $ 200,520,000 $ 856,684,6122021 to 2030 $ 140,000,000 $ 2,398,096,2232031 to 2040 105,500,000$ 1,498,420,775$

Roadway Projects Summary *Operations, management and preservation projects include:1. Replacement/reconstruction projects greater than $30 million on the National Highway System(NHS);2. Interchange reconstruction projects requiring a break-in-access/access justification report; and3. Regional programs intended to improve operation and management of the transportationsystem.These projects are examples of the types of activities necessary to preserve and maintain thetransportation system. As explained in Appendix E Financial Capacity Analysis (page E-15), the costof system operations, maintenance and preservation is deducted first from future transportationrevenues, and the remaining balance is available for other types of projects.

2015 to 2020 272,180,000$ 2021 to 2030 300,950,000$ 2031 to 2040 307,944,000$

Transit Projects Summary