Transportation Improvement Program - …...Amended June 13, 2008 FY 2008 – 2011 Transportation...
Transcript of Transportation Improvement Program - …...Amended June 13, 2008 FY 2008 – 2011 Transportation...
Transportation Improvement Program
Fiscal Years 2008 through 2011
Adopted June 8, 2007
Amended
January 11, 2008 March 7, 2008 June 13, 2008
(This page intentionally left blank.)
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
1
Table of Contents
Introduction 3
TIP Development Process 4
Local Revenue & Expenditure Summary 5
Programmed Projects
City of Bloomington 7
Monroe County 22
Town of Ellettsville 28
State of Indiana 30
Bloomington Transit 41
Indiana University Transit 44
Rural Transit 46
Annual Listing of Projects 47
Abbreviations & Acronyms List 51 MPA/UAB Boundary Map 52
Adoption/Amendment Resolutions 53
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
2
(This page intentionally left blank.)
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
3
Introduction The Transportation Improvement Program (TIP) is a strategic capital planning document used by the Bloomington/Monroe County Metropolitan Planning Organization (MPO) to program funding for transportation projects. Pursuant to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), the TIP must include at least four fiscal years, and is updated annually. The TIP includes the list of priority projects to be carried out in each of the four years indicated in the document. The TIP must be consistent with the 2030 Long Range Transportation Plan, the Transit Development Plan, and other planning studies developed by the Bloomington/Monroe County MPO and its local stakeholders. Projects listed in the TIP typically originate in the Long Range Transportation Plan developed by the MPO in cooperation with the respective implementing agencies involved in the planning process. These implementing agencies then carry out the transportation plan’s specific elements in the TIP. As a result, the TIP serves as a strategic management tool that accomplishes the objectives of the MPO transportation plan. The MPO, the Federal Highway Administration (FHWA), and the Federal Transit Administration (FTA) must all determine that new, or amended, TIP documents conform with the State’s Air Quality Plan’s purpose of attaining the National Ambient Air Quality Standards (NAAQS). The only exception is for amendments involving projects explicitly exempted by the U.S. Environmental Protection Agency’s (EPA) conformity regulation. The Bloomington/Monroe County MPO is exempt from the air quality requirements because it has not been designated as a non-attainment area. The TIP must be financially constrained by year and include only those projects for which funding has been identified - using current, or reasonably available, revenue sources. The financial plan in the TIP is developed by the MPO in cooperation with the State of Indiana and area transit operators. In order to enable the MPO to conduct adequate financial planning, both the state and transit operators provide the MPO with information early in the TIP development process. The information provided by these groups concerns the likely amount of Federal and State funding available to the MPO. The TIP may be modified at any time, provided that appropriate public involvement occurs. However, minor TIP amendments may, unless specifically required by the MPO public involvement process, be made without public involvement. Additionally, projects may be advanced from future years to current years, without a TIP amendment so long as each year of the TIP cycle remains fiscally constrained. The TIP must be approved by the MPO and the Governor of the State of Indiana. A conformity determination must also be made by the FHWA and the FTA. Once approved, the TIP then becomes, without modification, part of the Statewide Transportation Improvement Program (STIP). The frequency and cycle for updating the TIP should be compatible with that of the STIP. Project prioritization is an important element of the TIP, especially since the demand for Federal-aid transportation projects usually exceeds the level of Federal funds available for use. State highway projects in the TIP have been prioritized by the Indiana Department of Transportation. Local Federal-aid highway improvement projects programmed by the City of Bloomington, Monroe County and the Town of Ellettsville have been prioritized according to resource availability. Highway improvement projects in the MPO’s urbanized area are prioritized based on the following general hierarchy (refer to page 52 for a map of the MPO’s urbanized area boundary):
1. Unfunded capital projects that have been programmed and are ready for contract letting;
2. Capital projects programmed for construction that will be ready for contract letting in the immediate future;
3. Projects involving traffic operation or system management improvements;
4. Projects programmed for right-of-way acquisition, and
5. Projects programmed for preliminary engineering and/or advanced studies.
Projects initiated locally are jointly prioritized according to the type of activity scheduled in the TIP and the Federal funding category. The process of prioritizing projects is also influenced by state and local policy-level decision making, and the availability of Federal, state, and local funds. Wherever possible, technical and non-technical factors are jointly used to identify projects which have the greatest need for implementation.
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
4
TIP Development Process
Spending letter received from INDOT
Evaluation of projects in the current Fiscal Year's
TIP, and request for projects
Project requests submitted
Projects prioritized and funding allocated
TIP amendments Policy Committee meeting
TIP endorsed by Policy Committee and the State
of Indiana
Tech
nica
l and
Citi
zens
Adv
isor
y C
omm
ittee
mee
tings
ser
ve a
s pu
blic
m
eetin
gs fo
r the
prio
ritiz
atio
n of
the
subm
itted
pro
ject
requ
ests
.
All projects and programming recommendations (i.e. the Alternative Transportation and Greenways System Plan) must be consistent with the Bloomington/Monroe County Long Range Transportation Plan.
The Policy Committee is asked for their endorsement of the TIP. The final version of the program is provided to INDOT and all other appropriate state and federal agencies for their review and approval/modification.
An annual spending letter from INDOT is sent out to inform local agencies of their spendable dollar figures for the fiscal years included in the TIP. The TIP must be fiscally-constrained, identifying only the specific financial resources available for program and project funding.
The programs and projects for the current TIP are evaluated by all the responsible local agencies to assess their status. Meetings are held with represenatives from Monroe County, the City of Bloomington, the Town of Ellettsville, Bloomington Transit, Rural Transit, Indiana University, and the Citizens Advisory Committee.
Local agencies are asked to submit all projects that they would like included in the TIP, along with estimated costs for each fiscal year.
MPO staff reviews all the project requests and programs, prioritized projects and funding assistance that go into the TIP.
The draft TIP document is presented to the Policy Committee for final review of projects, prioritization, and funding assistance.
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
5
Local Revenue & Expenditure Summary In order to remain fiscally constrained, the Transportation Improvement Program must balance estimated project expenditures with expected funding revenues. In addition, each particular source of funding must be used in a manner consistent with its designated purpose. The process of balancing expenditures across the portfolio of available funds requires cooperation and support from all of the MPO stakeholders. The Fiscal Year used for the purposes of the TIP begins on July 1 and ends on June 30. Thus, Fiscal Year 2008 begins on July 1, 2007 and ends on June 30, 2008. The tables in this section summarize the projected local revenues and expenditures for Fiscal Years 2008 through 2011. They do not include programmed funds or projects for the State of Indiana, as these are subject to statewide financial constraints beyond the purview of the MPO. Non-local revenue forecasts are based on past receipts, projections from the FHWA, FTA, and INDOT, anticipated Federal spending authorization levels, and consultations with appropriate Federal and state funding agencies. Local funding forecasts are derived from a similar methodology and through extensive coordination with local agencies. Project expenditures are based on realistic cost estimates provided by the implementing agency for each project. Projected Revenues for Local Projects The table below summarizes the projected funding available, by funding source, for programming in the FY 2008-2011 TIP. The STP line highlights estimated spending authority available through 2011 from the SAFETEA-LU transportation bill. The TEA-21 line shows spending authority that was carried over from the previous transportation bill through special TIP amendments. This table does not include Federal revenues that may be added through special Congressional earmarks in the future. Any project utilizing such funds has been marked as “Illustrative” and is not counted in the fiscal constraint analysis.
2008 2009 2010 2011 TOTAL
TEA-21 $ 1,646,767 $ - $ - $ - $ 1,646,767
STP $ 3,013,527 $ 2,720,869 $ 2,720,869 $ 2,720,869 $ 11,176,134
State $ 200,000 $ - $ - $ - $ 200,000
TE $ 2,749,610 $ - $ 1,000,000 $ - $ 3,749,610
HES $ 1,053,500 $ - $ - $ - $ 1,053,500
Bridge $ - $ 52,800 $ - $ 96,000 $ 148,800
FTA 5307/09 $ 4,658,384 $ 6,430,960 $ 1,540,574 $ 1,214,693 $ 13,844,611
FTA 5311 $ 560,000 $ 594,000 $ 594,000 $ 594,000 $ 2,342,000
JARC/NewFreedom $ 225,000 $ 234,000 $ 243,360 $ 253,094 $ 955,454
PMTF $ 1,958,000 $ 1,991,500 $ 2,025,670 $ 2,060,523 $ 8,035,693
Farebox $ 1,140,000 $ 1,185,600 $ 1,233,024 $ 1,282,345 $ 4,840,969
SRTS $ 711,500 $ - $ - $ - $ 711,500
Local $ 7,161,706 $ 9,351,530 $ 6,777,093 $ 11,942,254 $ 35,232,583
TOTAL $ 25,077,994 $ 22,561,259 $ 16,134,590 $ 20,163,779 $ 83,937,622
Fiscal YearFunding Source
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
6
Programmed Expenditures for Local Projects The table below summarizes the programmed local expenditures, by funding source, for projects in the FY 2008-2011 TIP. The available STP funding has been programmed to ensure a 5% reserve to cover project cost overruns. Any usage of funds from this reserve will be subject to the MPO’s Change Order Policy. The TEA-21 funding carried over from the previous transportation bill has been fully programmed and will remain assigned to the projects it was allocated to at the end of that funding cycle.
2008 2009 2010 2011 TOTAL
TEA-21 $ 1,646,767 $ - $ - $ - $ 1,646,767
STP $ 2,121,859 $ 3,575,051 $ 2,279,223 $ 1,960,911 $ 9,937,045
State $ 200,000 $ - $ - $ - $ 200,000
TE $ 2,749,610 $ - $ 1,000,000 $ - $ 3,749,610
HES $ 1,053,500 $ - $ - $ - $ 1,053,500
Bridge $ - $ 52,800 $ - $ 96,000 $ 148,800
FTA 5307/09 $ 4,658,384 $ 6,430,960 $ 1,540,574 $ 1,214,693 $ 13,844,611
FTA 5311 $ 560,000 $ 594,000 $ 594,000 $ 594,000 $ 2,342,000
JARC/NewFreedom $ 225,000 $ 234,000 $ 243,360 $ 253,094 $ 955,454
PMTF $ 1,958,000 $ 1,991,500 $ 2,025,670 $ 2,060,523 $ 8,035,693
Farebox $ 1,140,000 $ 1,185,600 $ 1,233,024 $ 1,282,345 $ 4,840,969
SRTS $ 711,500 $ - $ - $ - $ 711,500
Local $ 7,161,706 $ 9,351,530 6,777,093$ $ 11,942,254 $ 35,232,583
TOTAL $ 24,186,326 $ 23,415,441 $ 15,692,944 $ 19,403,821 $ 82,698,533
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
7
Programmed Projects: City of Bloomington
Project: Curry Pike (City Phase)Location: State Road 45 to Constitution Ave
Description: Local 250,000$
DES#: 0300858
Support: LRTP, GPP
Allied Projects: Curry Pike, Phase 2 (County Project) -$ 250,000$ -$ -$ TOTAL
2010 2011
Fiscal YearCity of Bloomington Projects Funding
Source
Road reconstruction, widening to 4 lanes with channelized intersections, traffic signals, sidewalks, concrete curbs & gutters, drainage, and landscaping. (~.63 miles long)
PE
2008 2009
RO
WC
ON
INDUSTRIAL BLVD
LIBER
TY D
R
CURRY PI KE
ROLL AVE
CONSTITUTION AVE
STATE RO
AD 37
OAK LEAF DR
HIC
KORY LE
AF DR
WALNUT LEAF DR
FARMER AVE
OODLYN DR
LEN OAKS DR
STATE RO
AD 37
OAKDALE DR
BASS
WOO
D CI
STAT
E RO
AD 3
7 RA
MP
PECAN LN
STATE ROAD 37 RAM
P
OAKDALE DRSTATE R
OAD 45
EONAR
D S
PRIN
GS
RD
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
8
Programmed Projects: City of Bloomington
Project: Sare Road (Phase I) PE Local 80,000$
Location: Rogers Road to David Drive
Description: Local 75,000$
STP 640,000$
DES#: To Be Assigned Local 160,000$
Support: LRTP, GPP, BATGSP
Allied Projects: n/a 80,000$ 75,000$ -$ 800,000$
Fiscal Year
2008 2009 2010 2011
TOTAL
Road reconstruction, channelized intersections, roundabout construction at Rogers Road intersection, drainage, sidewalks/sidepath, and landscaping. (~.18 miles long)
RO
WC
ON
City of Bloomington Projects Funding Source
D ROGERS RD ROGERS RD
DAVID DR
DANIEL S
DANIEL ST
KENSINGTON PARK DR
DAN
IEL ST
MU
LBER
RY LN
D
BUTTONWOOD LNST JAMES CT
FORR
ESTE
R
DAVID DR
BERRY CT
SET PL
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
9
Programmed Projects: City of Bloomington
Project: Rogers Street & Country Club DriveLocation:
Description: Local 250,000$
STP 2,007,948$
DES#: 0401308 Local 415,724$
Support: LRTP
Allied Projects: Rogers Street Sidepath 2,673,672$ -$ -$ -$
Fiscal Year
2008 2009 2010 2011
TOTAL
PE
Intersection modernization with a new traffic signal, turn lanes, sidewalk/sidepath, roadway widening and stormwater drainage improvements.
RO
WC
ON
Intersection of Rogers Street and Country Club Drive
City of Bloomington Projects Funding Source
COUNTRY
WALL
S DR
RO
GER
S S
T
WALLS DR
COUNTRY CLUB DR
BRYAN
ST
EN D
R
TON DR RALSTON DR
FORD A
VE
WATSON ST
RO
GER
S ST
MADISO
N S
T
COUNTRY CLUB DRLUB DR
MILTO
N D
R
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
10
Programmed Projects: City of Bloomington
Project: SR 45/46 Pedestrian OverpassLocation:
Description: State 200,000$
STP 300,000$
DES#: 9968230 Local 75,000$
Support: LRTP, GPP, BATGSP
Allied Projects: State Road 45/46 Bypass 200,000$ -$ -$ 375,000$ TOTAL
PE
Construction of new pedestrian overpass to facilitate crossing of upgraded State Road 45/46 Bypass. R
OW
CO
N
Intersection of 10th Street & SR 45/46 Bypass
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
10TH ST
STATE ROAD 45 46 BYP ASS
10TH STD
RIVE
T O H
IL LTOP
GA
RD
ENS
10TH ST
STATE ROAD 46
LLS
DA L
E D
R
CLA R
K
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
11
Programmed Projects: City of Bloomington
Project: West 3rd Street Bond 150,000$
Location: State Road 37 to Landmark Avenue
Description: TEA-21 1,586,767$ Bond 1,232,705$
STP 1,757,312$ 407,000$
DES#: 0300766 Bond 1,245,600$ 2,818,088$
Support: LRTP, GPP, BATGSP
Allied Projects: n/a 2,969,472$ 1,245,600$ 4,575,400$ 407,000$
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
TOTAL
PE
Road reconstruction, channelized intersections, drainage improvements, sidewalks/sidepath, landscaping and signalization. (~.90 miles long)
RO
WC
ON
CO
RY L N
ANN
A
2ND STCO
RY L N
ANN
A LEE L N
JOH
NSO
N A
VE
KIMBL E D
R
J OH
NS O
N A V E
E DR
LEJAC LNBEAUMONT LNKI
MBL
E D
R
THAN DR
FRAN
KLIN
RD
3RD ST 3RD ST
JACO
B DR
3RD ST
GATES D
R
GAT
ES D
R
WESTPLEX A
3RD ST
LAND
MAR
K AVE
BLOOMFIE
S
FAIRFIE LD
DR
3RD ST
OW
ENS
DR
STAT
E R
OAD
37
RAM
P
3RD ST
HAY
KIRKW
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
12
Programmed Projects: City of Bloomington
Project: North Campus Area Study TEA-21 60,000$
Location: Dunn Street to State Road 45/46 Bypass Local 15,000$
Description:
DES#: 0400319
Support: LRTP
Allied Projects: n/a 75,000$ -$ -$ -$
Fiscal Year
2008 2009 2010 2011
TOTAL
PE
Area study for roadway configuration, alignment of railroad crossings, sidewalk/sidepath installation, possible IU power plant and City fire station relocation, and misc. landscaping improvements.
RO
WC
ON
City of Bloomington Projects Funding Source
F EE
L N
LAW LN
FEE L N
FEE
L N
FESS AVE
I ND
I AN
LAW LN
17TH ST 17TH ST
15TH ST
AN AVE
UN
N ST
TH ST
STATE ROAD 45 46 BYPASS
17TH ST17TH STTH ST 17TH ST
JOR
DAN
A VE
17TH STFEE LN
TH ST
DU
NN
ST
15TH STLINGELBACH LN
LINGELBACH LN
14TH ST 14TH ST
DU
NN
ST
13TH ST 13TH ST13TH ST
UN
ION CT
IND
IANA
AVE12TH ST
DU
NN
ST11TH ST
JORDAN A
VE
UNION ST
GROVE AVE COTTAGE GROVE AVE
TH ST 10TH10TH ST 10TH ST10TH ST 10TH ST 10TH ST
DR
IVE TO
HI LLT O
P G
A
10TH STFESS
UN
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
13
Programmed Projects: City of Bloomington
Project: Atwater Avenue/High Street/3rd Street Local 10,000$
Location:
Description:
DES#: 0401309
Support: LRTP
Allied Projects: n/a 10,000$ -$ -$ -$
PE
Atwater Avenue/3rd Street one-way pair extension past Mitchell Street to High Street including the provision of context sensitive solutions. (~.31 miles long)
RO
WC
ON
Atwater Avenue/3rd Street corridor between Mitchell Street and High Street
City of Bloomington Projects Funding Source
TOTAL
Fiscal Year
2008 2009 2010 2011
ATWATER AVE
RO
SE AV E
RO
SE A
VE
SE AV E
AVE4TH ST
SO
N S
T
JEFF
ERSO
N S
T
3RD S
UN
ION S T
BRY
AN AV
E
D ST 3RD ST 3RD ST 3RD ST3RD ST
MITC
HELL S
T
HI G
H ST
ATWATER AVE
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
14
Programmed Projects: City of Bloomington
Project: Rogers StreetLocation: Rockport Road to Watson Street
Description: STP 408,000$ Local 120,000$
STP 500,000$
DES#: 0600496 Local 125,000$
Support: LRTP, GPP, BATGSP
Allied Projects: B-Line Trail -$ -$ 528,000$ 625,000$ TOTAL
PE
Safety improvements, including bituminous pavement, curb & gutter, drainage appurtenances and improvements, construction of sidewalk and a sidepath. (~.61 miles long)
RO
WC
ON
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
T
BRYAN
ST
RO
GER
S ST
R
RO
GER
S ST
EE DR
AVE
JED ST JEAN ST
COOLIDGE DR
GRAHAM DR
DR
WATSON ST
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
15
CO
LLE G
E A
10TH ST
9TH STM
OR
TON
ST
LEG
E AV
E
MO
RTO
N S
T
MAD
I SO
N S
T
8TH ST
SMITH A
KIRKWOOD AVE
JACKSO
N ST
RO
GER
S ST
4TH ST
RO
GER
S S
T
H ST
8TH ST
7TH STTH ST 7TH ST
6TH STTH ST 6TH
RO
GER
S ST
D AVE
H ST
3RD ST 3RD ST
2ND ST
RTO
N S
TR
OG
ERS
Programmed Projects: City of Bloomington
Project: B-Line TrailLocation:
Description:
TE 2,080,000$
DES#: 0401111, 0401112, 0300428 Local 520,000$
Support: LRTP, GPP, BATGSP, PMP
Allied Projects: Clear Creek Trail, Wykoff Way 2,600,000$ -$ -$ -$ TOTAL
PE
Site acquisition and construction of a downtown multi-use trail for non-motorized use, including site amenities, landscaping, and plaza space. (~.68 miles long)
RO
WC
ON
Former CSX line, from north of 2nd Street to Rogers Street
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
16
Programmed Projects: City of Bloomington
Project: Jackson Creek Trail (Phase I) Local 114,300$
Location:
Description:
TE 500,000$
DES#: 0200987 Local 14,050$
Support: LRTP, GPP, BATGSP, PMP
Allied Projects: Clear Creek Trail, Bloomington Rail Trail 628,350$ -$ -$ -$ TOTAL
PE
Site acquisition, design and construction of a multi-use trail for non-motorized use, including site amenities. R
OW
CO
N
Adjacent to Jackson Creek, Moores Pike to Sherwood Oaks Park
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
ROGERS RD RO
CH
EEKW
OO
D L
NMILL STONE CT OAK
LAW
N C
IR
Y
WINSLOW RD
SOUTHERN OAKS DR
CARAY CT
NSLO
CEDARWOOD DR
DURHAM DRY STBROWNING LNY DR
ER WAY W
E DR
FENW
AY P
L
SQ
CT
RA
WAY
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
17
Programmed Projects: City of Bloomington
Project: 17th Street & Fee LaneLocation: Intersection of 17th Street and Fee Lane
Description:
HES 499,500$
DES#: 0500960 Local 50,500$
Support: LRTP, BATGSP
Allied Projects: n/a 550,000$ -$ -$ -$
Fiscal Year
2008 2009 2010 2011
TOTAL
PE
Intersection modernization with new sidepath, signalization upgrade, turn lanes, and sight distance correction. R
OW
CO
N
City of Bloomington Projects Funding Source
FEE LN
17TH ST
17TH ST
FEE LN
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
18
Programmed Projects: City of Bloomington
Project: Tapp Road (Phase III)Location:
Description: TIF 225,000$
TIF 2,935,000$
DES#: N/A - LOCAL FUNDING ONLY Support: LRTP, GPP, BATGSP
Allied Projects: Tapp Road (Phase II) -$ -$ -$ 3,160,000$ TOTAL
PE
Road reconstruction, widen to 4 lanes with channelized intersections, wiring for future signalization, sidewalk/sidepath, possible bike lanes, landscaping, drainage facilities. (~.21 miles long)
RO
WC
ON
Existing 4-lane section of Tapp Road to 200 feet east of Weimer Road
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
SCHMALTZ BLVD
REX
GR
OS S
MA N
BL V
D
DEBORAH DRCOTA DR
TAPP RD TAPP RD
COTA DR
MC
INTY
RE
DR
WE
IME R
RD
TAPP RD
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
19
Programmed Projects: City of Bloomington
Project: Sare Road (Phase II)Location:
Description: Local 75,000$
DES#: N/A - LOCAL FUNDING ONLY
Support: LRTP, GPP, ATGSP
Allied Projects: n/a -$ -$ 75,000$ -$ TOTAL
PE
Road reconstruction, channelized intersections, drainage, sidewalks/sidepath, landscaping. (~.39 miles long) R
OW
CO
N
McCartney Lane to 400 feet south of Moores Pike
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
AN
DREW
CIR
BRICKLIN CT
MOORES PIKE
LD R
D
PINE LN
PINE LNSA
RE R
D
WINSTON ST
SARE R
D
MCCARTNEY LN
ROBIN
S R
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
20
Programmed Projects: City of Bloomington
Project: Weimer Road RealignmentLocation: Tapp Road to Wapehani Road
Description:
TIF 2,057,189$
DES#: N/A - LOCAL FUNDING ONLY
Support: LRTP
Allied Projects: Tapp Road (Phase III) -$ -$ -$ 2,057,189$ TOTAL
PE
Realignment of Weimer Road to the west of the existing intersection with Tapp Road. (~.50 miles long) R
OW
CO
N
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
E
IMER
RD
MALTZ BLVD
DEBORAH DR
TAPP RD
R
OAKDALE DR
CAN
LN
WAPEHANI RD
WEIM
ER R
D
TAPP RD
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
21
Programmed Projects: City of Bloomington
Project: Henderson Street ImprovementsLocation:
Description:
DES#: 0800014, 0800041 SRTS 250,000$
Support: ATGSP
Allied Projects: MCCSC Bike/Ped Education 250,000$ -$ -$ -$ TOTAL
PEHenderson St., between Hillside Dr. and
Allen St.
Construction of sidewalk along the west side of Henderson St.; construction of a bus pull-off lane in front of Templeton Elementary School; construction of a pedestrian refuge on Henderson St.
RO
WC
ON
City of Bloomington Projects Funding Source
Fiscal Year
2008 2009 2010 2011
Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
TEA-21 $ 1,646,767 $ - $ - $ - $ 1,646,767
STP $ 2,007,948 $ - $ 2,165,312 $ 1,847,000 $ 6,020,260
State $ 200,000 $ - $ - $ - $ 200,000
TE $ 2,580,000 $ - $ - $ - $ 2,580,000
HES $ 499,500 $ - $ - $ - $ 499,500
Bridge $ - $ - $ - $ - $ -
FTA 5307/09 $ - $ - $ - $ - $ -
FTA 5311 $ - $ - $ - $ - $ -
PMTF $ - $ - $ - $ - $ -
Farebox $ - $ - $ - $ - $ -
SRTS $ 250,000 $ - $ - $ - $ 250,000
Local $ 2,852,279 $ 1,570,600 $ 3,013,088 $ 8,395,277 $ 15,831,244
TOTAL $ 10,036,494 $ 1,570,600 $ 5,178,400 $ 10,242,277 $ 27,027,771
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
22
Programmed Projects: Monroe County
Project: Rogers Road & Smith RoadLocation:
Description:
HES 554,000$
DES#: 0600173
Support: LRTP
Allied Projects: n/a 554,000$ -$ -$ -$
Funding Source
Fiscal Year
2008 2009 2010 2011
Curve realignment and reconstruction.
RO
WC
ON
TOTAL
PEIntersection of Rogers Road and Smith Road
Monroe County Projects
SM
ITH R
D
SNO
DD
SADDLEBROOK CT
SMITH
RD
SADDLEBROOK LN
ROGERS RD
HIG
ST REM
Y CIR
ST REMY DR
OLCOTT BLVD
DANIEL ST
L ST
BRIDGEWATER CT
MULBERRY DR
KING
S CT
WIN
STO
WIN
STO BRIGS BND
BINS BOWGOSPORT CT
ES CT
TURN
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
23
Programmed Projects: Monroe County
Project: Vernal Pike (Phase II) Local 50,000$
Location: Curry Pike to Woodyard Road
Description: Local 350,000$
STP 3,461,140$
DES#: 9485590 Local 3,452,785$
Support: LRTP
Allied Projects: Vernal Pike (Phase I), Curry Pike 400,000$ 6,913,925$ -$ -$ TOTAL
PE
Road reconstruction & safety improvements, including bituminous pavement, curb & gutter, sidewalk and drainage appurtenances. (~1.03 miles long
RO
WC
ON
Monroe County Projects Funding Source
Fiscal Year
2008 2009 2010 2011
RO
AD 46
CURRY
WOODYARD RD
STATE R
VENTURE BLVD
VERNAL PIKEVERNAL PIKE
LANE
DR
VERNAL PIKE
CU
RR
Y PIKE
NS
ON
BUR
GR
D
CU
RR
Y PI
ME
R LE
LOG
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
24
3RE ROAD 48
PARK SQUAE ST
ONE
BLV
D
CH
ER
ZENITH DR
PRO
FI LE PKW
YH
ARTS
TRA I
T R
D
HAR
T STRAIT R
D
VER
NAL PI K
E
INNOVATION CT
PON
DER
O LL EN D
R
G
KNA
PP RD
O
L OE SC
H R
D
TENS
LEEP
RD
BEDR
OCK
RD
GIFFO
TER CURRY RD
KIRB
Y RD
K IRB
Y RD
E ROAD 45
END
WR
IGH
T R
D
WENDYS WAYHANKS XING
AIRPORT RD
KIRB
Y RD
KI RB
Y RD
GN
OLIA C
T
TERSTONE TRCE
QU
ARE D
R
GIFFORD RDGIFFORD RD
PAPER BIR
Programmed Projects: Monroe County
Project: Karst Farm Greenway (Phase I) Local 260,000$
Location:
Description: Local 240,000$
TE 1,000,000$
DES#: 0600370 Local 257,000$
Support: LRTP, MCATGSP, BATGSP, ERCP
Allied Projects: Ellettsville-Stinesville Trail, B-Line Trail 260,000$ 240,000$ 1,257,000$ -$
PESouth of Vernal Pike to Karst Farm Park
Preliminary engineering, Right-of-Way and construction of a multi-use trail for non-motorized use, including site amenities (~4.00 miles long)
RO
WC
ON
TOTAL
Monroe County Projects Funding Source
Fiscal Year
2008 2009 2010 2011
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
25
Programmed Projects: Monroe County
Project: Fullerton Pike/Gordon Pike/Rhorer Rd. Local 450,000$ 450,000$ 450,000$ 450,000$
Location:
Description: Local 490,000$ 490,000$
DES#: PENDING EARMARK
Support: GPP, LRTP
Allied Projects: SR 37/I-69, Sare Road 450,000$ 450,000$ 940,000$ 940,000$
PESR 37 to Sare Road
Road reconstruction and safety improvements, including bituminous pavement, curb, gutter, sidewalk, side path, bridges and drainage appurtnenances. (~3.21 miles long)
RO
WC
ON
Monroe County Projects Funding Source
TOTAL
Fiscal Year
2008 2009 2010 2011
GLASGOW CT
WICKENS ST
CRAMER CIR
MC
DO
UG
AL S
T
RBDOVE DR
RTON PIKE
KEN
NED
Y DR
WA
L NU
T ST
WA
LNU
T ST R
EET PIKE
NIM
IT D
R
ROCKPO
RT RD
W
WH
ITET
HO
RN
PL
NEL C
T
DR
RO
GER
S S
TDR
WE
EPIN
G W
ILLO
W TELL ST
GORDON PIKE
ESTATE DR
BURKS DRSHER
DER
BY
DR RHORER RD
MILL STO
NE C
T
THE
STAN
DS
ERBROOKE DR
ON DRBAINBRIDGE DR
Project: Bridge Inventory (Phases I & II) Local 13,200$ 24,000$
Location: Throughout Monroe County BR 52,800$ 96,000$
Description:
DES#: Project No. BR-NBIS
Support: LRTP
Allied Projects: n/a -$ 66,000$ -$ 120,000$
2008 2009 2010
Fiscal Year
2011Monroe County Projects Funding Source
TOTAL
PE
Reinspection of all 137 structures over 20 feet in span length in accordance with the National Bridge Inspection Standards established by the Federal Highway Administration.
RO
WC
ON
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
26
Programmed Projects: Monroe County
Project: Batchelor Middle School Infrastructure
Location:Batchelor Middle School property and adjacent roads (Rogers Street & Gordon Pike)
SRTS 10,000$
Description:
DES#: To be assigned SRTS 50,000$
Support: MCATGSP
Allied Projects: MCCSC Non-Infrastructure Project 60,000$ -$ -$ -$
PE
700 ft of sidewalk and improved crossings on Gordon Pike and Rogers Street
RO
WC
ON
Monroe County Projects (MCCSC) Funding Source
TOTAL
Fiscal Year
2008 2009 2010 2011
R
WHITETHORN WAY
ROCKCREST DRCRAM
ER C
IR
ANY CTE
RO
GER
S S
T
TULIP AVE
RO
GER
RO
GER
S S
T
REBECC
GORDON PIKE
CLEA
R VIE W
RO
GER
S S
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
27
Programmed Projects: Monroe County
Project: MCCSC Bike/Ped EducationLocation: Various MCCSC schools
Description:SRTS 53,500$
DES#: To be assigned
Support: MCATGSP
Allied Projects: MCCSC Batchelor Middle School Project 53,500$ -$ -$ -$
Biking and walking campaign at Batchelor Middle School; walking school bus for Summit Elementary; International Walk to School Day activities; & bicycle rodeos
Monroe County Projects (MCCSC) Funding Source
TOTAL
Fiscal Year
2008 2009 2010 2011
Project: MCCSC/RBBCSC Bike/Ped EducationLocation:
Description:SRTS 75,000$
DES#: 0800012
Support: MCATGSP; ATGSP
Allied Projects:RBBCSC sidewalk construction; Henderson Street improvements; Batchelor infrastructure
75,000$ -$ -$ -$ TOTAL
Various MCCSC and RBBCSC schools
Biking and walking campaign including various bicycle and pedestrian related education and encouragement programs for K-8 students
Monroe County Projects (MCCSC/RBBCSC) Funding Source
Fiscal Year
2008 2009 2010 2011
Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
TEA-21 $ - $ - $ - $ - $ -
STP $ - $ 3,461,140 $ - $ - $ 3,461,140
State $ - $ - $ - $ - $ -
TE $ - $ - $ 1,000,000 $ - $ 1,000,000
HES $ 554,000 $ - $ - $ - $ 554,000
Bridge $ - $ 52,800 $ - $ 96,000 $ 148,800
FTA 5307/09 $ - $ - $ - $ - $ -
FTA 5311 $ - $ - $ - $ - $ -
PMTF $ - $ - $ - $ - $ -
Farebox $ - $ - $ - $ - $ -
SRTS $ 188,500 $ - $ - $ - $ 188,500
Local $ 1,110,000 $ 4,155,985 $ 1,197,000 $ 964,000 $ 7,426,985
TOTAL $ 1,852,500 $ 7,669,925 $ 2,197,000 $ 1,060,000 $ 12,779,425
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
28
Programmed Projects: Town of Ellettsville
Project: Ellettsville TrailLocation:
Description:
TE 169,610$
DES#: 0301167 Local 42,403$
Support: n/a
Allied Projects: B-Line Trail, Ellettsville-Stinesville Trail 212,013$ -$ -$ -$
Site acquisition and construction of a multi-use trail for non-motorized use, including site amenities. R
OW
CO
N
Town of Ellettsville Projects Funding Source
TOTAL
PE
2008
Fiscal Year
2009 2010 2011
Project: RBBCSC Bike/Ped EducationLocation:
Description:SRTS 23,000$
DES#: To be assigned
Support: MCATGSP
Allied Projects: 23,000$ -$ -$ -$
Fiscal Year
2008 2009 2010 2011
Various RBBCSC schools
Town of Ellettsville (RBBCSC) Funding Source
Biking and walking campaign at Edgewood campus including bicycle rodeos and walking school bus program
TOTAL
Project: RBBCSC Sidewalk ConstructionLocation: SRTS 33,000$
Description:SRTS 32,619$
DES#: 0800021 SRTS 184,381$
Support: MCATGSP
Allied Projects: MCCSC/RBBCSC Bike/Ped Education 250,000$ -$ -$ -$ TOTAL
PEReeves Rd./Sale St., Edgewood Dr., Ridge
Springs Ln.Construction of sidewalks along Reeves Rd./Sale St., Edgewood Dr., and Ridge Springs Ln. to connect the Edgewood campus with surrounding neigborhoods
RO
WC
ON
Town of Ellettsville (RBBCSC) Funding Source
Fiscal Year
2008 2009 2010 2011
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
29
Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
TEA-21 $ - $ - $ - $ - $ -
STP $ - $ - $ - $ - $ -
State $ - $ - $ - $ - $ -
TE $ 169,610 $ - $ - $ - $ 169,610
HES $ - $ - $ - $ - $ -
Bridge $ - $ - $ - $ - $ -
FTA 5307/09 $ - $ - $ - $ - $ -
FTA 5311 $ - $ - $ - $ - $ -
PMTF $ - $ - $ - $ - $ -
Farebox $ - $ - $ - $ - $ -
SRTS $ 273,000 $ - $ - $ - $ 273,000
Local $ 42,403 $ - $ - $ - $ 42,403
TOTAL $ 485,013 $ - $ - $ - $ 485,013
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
30
Programmed Projects: State of Indiana
Project: State Road 45 STP 500,000$
Location: Pete Ellis Drive to Russell Road
Description: STP 750,000$
STP 3,994,482$
DES#: 9902910 State 998,620$
Support: Safety
Allied Projects: State Road 45/46 Bypass 500,000$ 750,000$ -$ 4,993,102$
2009 2010
Fiscal YearState of Indiana Projects Funding
Source
PE
2008
Road reconstruction, widening up to 3 lanes with intersection improvements, signals as warranted, sidewalk/sidepaths, concrete curb & gutter, drainage and landscaping. (~.88 miles long)
RO
WC
ON
TOTAL
2011
RU
SSELL R
D
RACHELS GLEN RD
RAN
GE R
DR
ANG
E RD
H ST
TAMARRON DR
TAMARRON DR
KEYSTO
NE C
T
BELL
TR
ACE
CT
10TH STBARRINGTON DR
BARRINGTON DR
RAC
E C
I R
CALLERY D
R1
WO
ODB
RID
GE
DR
KEYS
TONE
CT
10TH ST KERRY DR
PETE
ELL
IS D
R
HOLLYWOOD
TAA
TS D
R
SMITH
RD
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
31
Programmed Projects: State of Indiana
Project: State Road 45Location:
Description:
STP 1,711,327$
DES#: 8824615, 947897A State 427,832$
Support: Non-Interstate Preservation Program
Allied Projects: State Road 45/46 Bypass, State Road 45 -$ 2,139,159$ -$ -$
PE
TOTAL
Added travel lanes, traffic signals (~.30 miles long)
RO
WC
ON
0.1 miles east of SR 45/46 Bypass to 0.1 miles east of Pete Ellis Drive
State of Indiana Projects Funding Source
Fiscal Year
2008 2009 2010 2011
S T A T E R
RAN
GE R
D
10TH ST
ST A T E R OA D 4 5 4 6 B Y P A S S
10TH ST 10TH STPE
TE E
L LIS
DR
EASTGATE LN
JOHN HINKLE PL
AM
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
32
Programmed Projects: State of Indiana
Project: State Road 45/46 BypassLocation:
Description:
STP 18,601,574$
DES#: (see Description above) State 4,650,394$
Support: Expansion/Major Improvements
Allied Projects: State Road 45 projects -$ 23,251,968$ -$ -$
State of Indiana Projects Funding Source
Fiscal Year
2008 2009 2010 2011
Kinser Pike to Pete Ellis Dr.
Added travel lanes, including 2 bridges, signs, signals, sidepaths, pedestrian underpass. DES. #'s: 9010075, 9611470, 991007A, 991007B, 991007C, 991007E, 991007F, 991007X (~2.80 miles long)
RO
WC
ON
TOTAL
PE
GR
ANT ST
FEE
LN
LAW LN
OLL
EGE
AVE
FEE LN
FEE
LN
STA
LIN
CO
LN S
T
FESS AVEW
ASH
ING
T ON
ST
WASH
ING
IND
I AN
LAW LN
17TH ST 17TH ST
WA
LNU
T ST
DU
NN
STN
N ST
O
15TH ST
MA
RTH
A DLEY R
D
TZ DR
MATLOCK RD
NC
LIFF LNFEE LN
FISHER
CT
JORDAN AVEDU
NN
ST
STATE ROAD 45 46 BYPASS
17TH ST 17TH ST 17TH ST17TH ST
FEE LN
16TH ST
WA
LNU
T S
T
LIN
CO
LN S
T
15TH STIN
DIAN
A AVE
LINGELBACH LN
CO
LLEG
E AV
E
14TH ST 14TH ST13TH ST 13TH ST
UN
ION CT12TH ST12TH ST
11TH ST 11TH ST
WA
LNU
T S
T
LINC
OLN
ST
DU
NN
ST
FESS AVE
10TH ST10TH ST
DR
IVE TO
HILLTO
P
10TH STWA P CW
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
33
Programmed Projects: State of Indiana
Project: State Road 37 STP 19,200$
Location: State 4,800$
Description:
STP 400,000$
DES#: 0400322, 0400324 State 100,000$
Support: Bridge Preservation
Allied Projects: n/a 24,000$ 500,000$ -$ -$ TOTAL
PE
Bridge rehabilitation
RO
WC
ON
NB/SB bridges over railroad, 3.65 mile south of SR 45
State of Indiana Projects Funding Source
Fiscal Year
2008 2009 2010 2011
GLEN
VIEW
DR
EATON CT7
DILLMAN RD
OLD CAPITOL PIKE
BIG SKY
LN
STATE ROAD 37
W
ROGER
S S
T
CHURC
VICTO
R PIKE
PHYLLIS
VICTOR HEIGHTS DR
OLD
STA
TE ROAD
37
JEREMY DRTHAT RD
LN
DILLMAN RD
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
34
Programmed Projects: State of Indiana
Project: State Road 46 STP 16,000$
Location: Intersection of SR 46 and Smith Road State 4,000$
Description: STP 40,000$
State 10,000$
STP 224,000$
DES#: 0100773 State 56,000$
Support: Safety Improvements
Allied Projects: n/a 70,000$ -$ 280,000$ -$
State of Indiana Projects Funding Source
Fiscal Year
2008 2009 2010 2011
Intersection improvements
TOTAL
PER
OW
CO
N
S BR
CH
RIST
FIELDC
RAV
EN
MO
HAGAN ST
SMITH
RD
PAR
K
SMITH
RD
CT
LONGVIEW AVE
HAMPTO
N CT
RD
MORNINGSIDE DR
PARK LN
3RD ST
HER
ITAGE R
D
3RD ST
RANDOLPH AVE
STON
EGA
TE D
R
ADOW
BROOK
DR
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
35
Programmed Projects: State of Indiana
Project: State Road 37Location:
Description:
STP 6,097,600$
DES#: 0300514 State 1,524,400$
Support: Non-Interstate Preservation
Allied Projects: n/a 7,622,000$ -$ -$ -$ TOTAL
PEFullerton Pike to Walnut Street SB (Old 37)
Pavement rehabilitation (~7.28 miles long)
RO
WC
ON
State of Indiana Projects Funding Source
Fiscal Year
2008 2009 2010 2011
STAT
E RO
MELBOTTO
M R
D
BOTTOM RD
STATE RO
AD 37 BU
SINES
SKI
NS
ER P
IKE
STAT
E RO
AD 3
7
BELL RD
KINS
ER P
ACUFF RD
PRO
W R
T E R
OA D
37
R D
S TA T
E R O AD
37
TE ROAD 37 CUTOFF
SUGARBER
WINTERSWEE
ASPEN CT
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
36
Programmed Projects: State of Indiana
Project: State Road 48Location:
Description:
STP 412,000$ DES#: 0600605 State 103,000$
Support: Non-Interstate Preservation
Allied Projects: n/a 515,000$ -$ -$ -$
PEState Road 37 to 2/4 lane transition west of
Curry PikePavement rehabilitation (~.60 miles long)
RO
WC
ON
TOTAL
State of Indiana Projects Funding Source
Fiscal Year
2008 2009 2010 2011
CU
RR
Y P I KC
UR
RY
PI
3RD ST
BELLE AVE
HIC
K OR
Y
V I L L A
A R K S Q U A R E D R
WAY AVE BROADWAY AVE
3RD ST 3RD ST
LIBE R
T
3RD ST
GA T
E S D
R
3RD ST3RD ST3RD ST
S T A T E R
S TA T
E R
OA D
37
R AM
PP
3RD ST
BELLE AVE
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
37
Programmed Projects: State of Indiana
Project: State Road 46Location: State Road 446 to College Mall Road
Description:
STP 320,000$ DES#: 0600603 State 80,000$
Support: Non-Interstate Preservation
Allied Projects: n/a 400,000$ -$ -$ -$
PE
Pavement rehabilitation (~1.40 miles long)
RO
WC
ON
State of Indiana Projects Funding Source
TOTAL
Fiscal Year
2008 2009 2010 2011
INDIANA BELL CTSTATE ROA
KING
S T ON
DR
RIVE TO EASTLAND PLAZA
LONGVIEW AVE
SM
T A T E R O A D 4 6
V E
WIL
MI N
GT O
N C
T
P AR
K RI D
GE
RD
MORNINGSIDE DR
WO
OD
AV E W
S MI T H R D
G LONGVIEW AVE
LD D
RMORNINGSIDE DR5TH ST
PARK LN
3RD ST 3RD ST 3RD ST 3RD ST3RD ST3RD ST
RANDOLPH AVE
CAMERON AVE
REIS
NE R
RD
S T ON
E GA
T E D
R2ND ST
STAT E RO
A D 4 4 6JANET DR
PLEA
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
38
Programmed Projects: State of Indiana
Project: State Road 45/46 STP 100,000$ Location:
Description:
STP 1,840,000$ DES#: 0600811 State 460,000$
Support: Non-Interstate Preservation
Allied Projects: State Road 45/46 projects 100,000$ 2,300,000$ -$ -$
PEMonroe Street to Kinser Pike
Pavement rehabilitation (~.48 miles long)
RO
WC
ON
State of Indiana Projects Funding Source
TOTAL
Fiscal Year
2008 2009 2010 2011
VE
S
RILEY DBR
OOKDALE D
R P
IKE
BITT
ERSW
EET
DR
THORNTR
EE D
R
HOOSIER COURT AVE
RAP
PEL
AVE
JACKSO
N
MAXI
N PIKE
KINSE
R P
IKE
GOURLEY PIKE
CASCADE AVE
0TH ST
WIL
LIS
DR
LONG
FELL
OW
DR
MERI
DIAN
DR
MO
NROE S
T
WIL
LIS
DR
LONG
FELLO
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
39
Programmed Projects: State of Indiana
Project: State Road 45 STP 96,800$ Location: State 24,200$
Description: STP 88,000$ State 22,000$
STP DES#: 0710011 State
Support: Non-Interstate Preservation
Allied Projects: n/a 121,000$ -$ 110,000$ -$
Fiscal Year
2008 2009 2010 2011
TOTAL
PE
Intersection improvement with added turn lanes
RO
WC
ON
Intersection of State Road 45 and Garrison Chapel Rd.
State of Indiana Projects Funding Source
HAR
MO
NY R
D
STATE ROAD 45
STATE ROAD 45
GAR
RISO
N C
HAPE
L RD
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
40
Programmed Projects: State of Indiana Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
NHS $ - $ - $ - $ -
STP $ 7,601,600 $ 23,302,901 $ 312,000 $ 3,994,482 $ 35,210,983
TE $ - $ - $ - $ - $ -
State $ 1,750,400 $ 5,638,226 $ 78,000 $ 998,620 $ 8,465,246
Local $ - $ - $ - $ - $ -
TOTAL $ 9,352,000 $ 28,941,127 $ 390,000 $ 4,993,102 $ 43,676,229
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
41
Programmed Projects: Bloomington Transit
Project: Operational Assistance FTA 5307 900,000$ 936,000$ 973,440$ 1,012,378$ Description: PMTF 1,675,000$ 1,708,500$ 1,742,670$ 1,777,523$
Local 1,675,000$ 1,742,000$ 1,811,680$ 1,884,147$
Fares 1,140,000$ 1,185,600$ 1,233,024$ 1,282,345$ DES#: n/a
Support: LRTP, GPP, TDP TOTAL 5,390,000$ 5,572,100$ 5,760,814$ 5,956,393$
Project: Passenger Shelters FTA 5307 20,000$ 21,600$
Description: Local 5,000$ 5,400$
DES#: n/a
Support: LRTP, GPP, TDP TOTAL 25,000$ -$ 27,000$ -$
Project: Security Cameras FTA 5309 40,000$
Description: Local 10,000$
DES#: n/a
Support: LRTP, TDP TOTAL 50,000$ -$ -$ -$
Project: 30 & 35 Foot Buses FTA 5307 1,088,000$ 2,265,600$ 295,000$ Description: Local 272,000$ 566,400$ 73,750$
DES#: n/a
Support: LRTP, TDP TOTAL 1,360,000$ 2,832,000$ 368,750$ -$
Project: Paratransit Scheduling System FTA 5307 60,000$
Description: Local 15,000$
DES#: n/a
Support: LRTP, TDP TOTAL 75,000$ -$ -$ -$
Project: Administrative Vehicles FTA 5307 32,000$ 56,000$
Description: Local 8,000$ 14,000$
DES#: n/a
Support: LRTP, TDP, GPP TOTAL 40,000$ -$ 70,000$ -$
Project: Maintenance FTA 5307 59,488$ 61,868$ 64,342$ 66,916$ Description: Local 14,300$ 14,872$ 15,467$ 16,086$
DES#: n/a
Support: LRTP, TDP TOTAL 73,788$ 76,740$ 79,809$ 83,001$
Fiscal YearBloomington Transit Projects
Federal, State and Local Assistance for the operation of BT's fixed route & Access Service.
Purchase of passenger shelter for BT stops.
Security camera systems for Facilities.
Purchase of new 30-foot and 35-foot buses.
Purchase of new Paratransit Scheduling System
2011
Capitalize the purchase of engine/transmission rebuilds & tires.
2008 2009 2010
Purchase supervisory vehicle and handicapped accessible van.
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
42
Programmed Projects: Bloomington Transit
Project: BT Access Vehicles FTA 5307 64,896$ 67,492$ 70,192$ 72,999$ Description: Local 16,224$ 16,873$ 17,548$ 18,250$
DES#: n/a
Support: LRTP, TDP TOTAL 81,120$ 84,365$ 87,739$ 91,249$
Project: Downtown Transfer Facility FTA 5309 2,926,198$ 2,400,000$ Description: Local 731,550$ 600,000$
DES#: n/a
Support: LRTP, GPP, TDP TOTAL 3,657,748$ 3,000,000$ -$ -$
Project: Fare Collection Equipment FTA 5307 280,000$ Description: Local 70,000$
DES#: n/a Support: LRTP, TDP TOTAL 350,000$ -$ -$ -$
Project: 25 Foot Buses FTA 5307 60,000$ 62,400$ Description: Local 15,000$ 15,600$
DES#: n/a
Support: LRTP, TDP TOTAL -$ -$ 75,000$ 78,000$
Project: Cleaning Equipment FTA 5307 320,000$ Description: Local 80,000$
DES#: n/a
Support: LRTP, TDP TOTAL 400,000$ -$ -$ -$
Project: Operational Assistance JARC 200,000$ 208,000$ 216,320$ 224,973$ Description: New Freedo 25,000$ 26,000$ 27,040$ 28,122$
Local/State 225,000$ 234,000$ 243,360$ 253,094$
DES#: n/a Support: Coordinated Plan, LRTP TOTAL 450,000$ 468,000$ 486,720$ 506,189$
Bloomington Transit ProjectsFiscal Year
2008 2009 2010 2011
Upgrade and/or replace fare collection equipment.
Capitalize BT Access vehicles for use in Paratransit service.
Environmental assessment, land acquisition, architectural design & engineering, and construction of Downtown Transfer Facility.
Late night downtown fixed route bus service to 11:30 p.m. and BT Access service to serve the entire City to 11:30 p.m
Replace Bus Cleaning Equipment & Upgrade Wash Bay Heat, Heat Retention, Drainage, & Lighting
Purchase of new 25-foot buses.
Note: The figure in bold represents a total of three earmarks from 2006, 2007, 2008.
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
43
Programmed Projects: Bloomington Transit Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
TEA-21 $ - $ - $ - $ - $ -
STP $ - $ - $ - $ - $ -
State $ - $ - $ - $ - $ -
TE $ - $ - $ - $ - $ -
HES $ - $ - $ - $ - $ -
Bridge $ - $ - $ - $ - $ -
FTA 5307/5309 $ 5,790,582 $ 5,730,960 $ 1,540,574 $ 1,214,693 $ 14,276,809
FTA 5311 $ - $ - $ - $ -
JARC/NewFreedom $ 225,000 $ 234,000 $ 243,360 $ 253,094 $ 955,454
PMTF $ 1,675,000 $ 1,708,500 $ 1,742,670 $ 1,777,523 $ 6,903,693
Farebox $ 1,140,000 $ 1,185,600 $ 1,233,024 $ 1,282,345 $ 4,840,969
Local $ 3,122,074 $ 3,174,145 $ 2,196,205 $ 2,187,177 $ 10,679,601
TOTAL $ 11,952,656 $ 12,033,205 $ 6,955,833 $ 6,714,833 $ 37,656,527
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
44
Programmed Projects: Indiana University Transit
Project: Park & Ride Improvements FTA 5309 594,000$ 1,500,000$ Description: Local 148,500$ 300,000$
DES#: n/a
Support: n/a TOTAL 742,500$ 1,800,000$ -$ -$
2011
Physical improvements to the IU Park & Ride station at the IU Football Stadium parking lot.
Indiana University Transit Projects 2008 2009 2010
Fiscal Year
Note: A Congressional earmark is being sought for the remaining funding highlighted in bold on this chart.
GR
ANT ST
FEE L
17TH ST
DU
NN
STU
NN
ST
WO
ODLAW
FOR
RES
RITZ D
R
MATLOCK RD MATLOCK RD
MIL
O B
SAM
P
MATLOC
JOR
DU
NN
ST
20TH ST
TH ST
DU
NN
ST
17TH ST17TH STTH ST
DU
NN
ST
17TH ST
FEE LN
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
45
Programmed Projects: Indiana University Transit Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
TEA-21 $ - $ - $ - $ - $ -
STP $ - $ - $ - $ - $ -
State $ - $ - $ - $ - $ -
TE $ - $ - $ - $ - $ -
HES $ - $ - $ - $ - $ -
Bridge $ - $ - $ - $ - $ -
FTA 5307/09 $ 594,000 $ 1,500,000 $ - $ - $ 2,094,000
FTA 5311 $ - $ - $ - $ - $ -
PMTF $ - $ - $ - $ - $ -
Farebox $ - $ - $ - $ - $ -
Local $ 148,500 $ 300,000 $ - $ - $ 448,500
TOTAL $ 742,500 $ 1,800,000 $ - $ - $ 2,542,500
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
46
Programmed Projects: Rural Transit
Project: Operating Budget FTA 5311 450,000$ 450,000$ 450,000$ 450,000$
Description: PMTF 273,000$ 273,000$ 273,000$ 273,000$ Local 300,000$ 332,000$ 352,000$ 377,000$
DES#: n/a
Support: n/a TOTAL 1,023,000$ 1,055,000$ 1,075,000$ 1,100,000$
Project: Capital Budget FTA 5311 110,000$ 144,000$ 144,000$ 144,000$
Description: PMTF 10,000$ 10,000$ 10,000$ 10,000$ Local 18,000$ 18,800$ 18,800$ 18,800$
DES#: n/a
Support: n/a TOTAL 138,000$ 172,800$ 172,800$ 172,800$
2011
Fiscal Year
2008 2009 2010
Operating budget assistance.
Capital budget assistance.Replace 2 diesel buses each yearEmergency equipmentRadio equipment
Rural Transit Projects
Programmed Projects: Rural Transit Summary of Programmed Expenditures:
2008 2009 2010 2011 TOTAL
TEA-21 $ - $ - $ - $ - $ -
STP $ - $ - $ - $ - $ -
State $ - $ - $ - $ - $ -
TE $ - $ - $ - $ - $ -
HES $ - $ - $ - $ - $ -
Bridge $ - $ - $ - $ - $ -
FTA 5307/09 $ - $ - $ - $ - $ -
FTA 5311 $ 560,000 $ 594,000 $ 594,000 $ 594,000 $ 2,342,000
PMTF $ 283,000 $ 283,000 $ 283,000 $ 283,000 $ 1,132,000
Farebox $ - $ - $ - $ - $ -
Local $ 318,000 $ 350,800 $ 370,800 $ 395,800 $ 1,435,400
TOTAL $ 1,161,000 $ 1,227,800 $ 1,247,800 $ 1,272,800 $ 4,909,400
Funding SourceFiscal Year
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
47
Annual Listing of Projects SAFETEA-LU requires Metropolitan Planning Organizations to prepare an annual listing of projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have been obligated in the preceding year. The listing shall be published or otherwise made available by the cooperative effort of the State, transit operators, and the Metropolitan Planning Organization for public review. The listing shall be consistent with the funding categories identified in each Transportation Improvement Program (TIP). This requirement has been revised by the SAFETEA-LU, 23 U.S.C. 134(j)(7)(B), 23 U.S.C. 135(g)(4)(B), 49 U.S.C. 5303(j)(7)(B), and 49 U.S.C. 5304(g)(4)(B). An obligation could be defined as the federal government’s legal commitment to pay the federal share of a project’s cost. An obligated project is one that has been authorized by a federal agency, such as the Federal Highway Administration (FHWA) or the Federal Transit Administration (FTA). Obligated projects are not necessarily initiated or completed in the programmed year and the amount of the obligation may not necessarily equal the total cost of the project. For FTA projects, obligation occurs when the FTA grant is awarded. For FHWA projects, obligation occurs when a project agreement is executed and the state/grantee requests that the funds be obligated. The following tables provide information on transportation projects in the Bloomington/Monroe County Metropolitan Planning Organization’s Urbanized Area that have been obligated for spending using federal funds. The information provided below is consistent with project listings of the FY 2007-2009 TIP. The list provides information on the amount of funds programmed in the TIP, the amount of funds obligated during the past fiscal year(s) and the amount of funds remaining and available for use in subsequent years. Additionally, all local projects programmed in the FY 2008-2011 TIP and their funding sources are provided so as to clearly illustrate a yearly breakdown of projects.
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
48
2007 Projects Brief Description Phase Federal Program
Programmed Federal Funding
Authorized Federal Fuding Remaining Funds
BL Basswood Dr. Traffic Signal
Intersection improvements and signalization at Bloomfield Road CON HES $ 112,500 112,500$ -$
BL Rogers Street Sidepath
Intersection, stormwater, & sidewalk/sidepath improvements from Rockport Rd. to Watson St. PE STP $ 154,000 133,409$ 20,591$
BL F& 2005 Flex to PL Planning funds to develop LRTP PL STP $ 66,400 6,843$ 59,557$
MC Bridge Inventory Inventory of condition of all bidges in County over 20 ft. long PE BR $ 96,000 96,000$ -$
MC Bridge #78 Rogers Street Bridge Replacement at Clear Creek CON STP $ 1,040,496 695,305$ 345,191$
MC Vernal Pike (Phase I) Road reconstruction, curb, gutter, drainage, bridge widening, and sidewalks from Hartstrait Rd. to Curry Pike CON STP $ 6,565,120 4,172,712$ 2,392,408$
MC Bridge #902 Walnut St bridge reconstruction at 1st St. CON TEA21/STP $ 3,220,000 3,220,000$ -$
IN State Road 45 Road reconstruction, intersection improvements, and sidewalks/sidepaths from Pete Ellis to Russell Rd. PE NHS $ 48,000 48,000$ -$
IN State Road 46 Landscaping from 2.5 miles W of Ellettsville to .5 miles E of SR 37 CON NHS $ 800,000 800,000$ -$
IN State Road 48 Added travel lanes, traffic signs and signals from 2.5 miles W of SR37 to .6 miiles W of SR37 CON STP $ 6,758,000 6,758,000$ -$
IN State Road 45 Road reconstruction between SR 445 and Curry Pike PE STP $ 672,000 672,000$ -$
IN State Road 45 Signal modernization at 10th St. & the SR 45/46 bypass CON STP $ 45,000 45,000$ -$
BT Operational Assistance Funding for BT's fixed route and Access Service n/a FTA 5307 $ 728,000 728,000$ -$
BT Security Cameras Security camera systems for buses and facilities n/a FTA 5309 $ 160,000 160,000$ -$
BT 30 & 35 Ft. Buses Purchase of new 30 ft and 35 ft buses n/a FTA 5309 $ 975,000 975,000$ -$
BT Administrative Vehicles
Purchase of supervisory vehicle and handicapped accessible van n/a FTA 5307 $ 22,400 22,400$ -$
BT Maintenance Capitalize the purchase of engine/transmission rebuilds & tires n/a FTA 5307 $ 57,200 57,200$ -$
BT BT Acess Vehicles Capitalize BT Access vehicles for use in Paratransit service n/a FTA 5307 $ 62,400 62,400$ -$
BT Maintenance Jack stands as safety backup for vehicle hoists n/a FTA 5307 $ 7,600 7,600$ -$
RT Operating Budget Operating budget assistance n/a FTA 5311 $ 385,500 385,500$ -$
RT Capital Budget Capital budget assistance n/a FTA 5311 $ 100,000 100,000$ -$
$ 22,075,616 19,257,869$ 2,817,747$
Fiscal Year 2007 Listing of Obligated Projects
TOTAL
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
49
2008
Loc
al P
roje
cts
Phas
eTE
A-21
STP
Stat
eTE
SRTS
HES
Brid
geFT
A 53
07/0
9FT
A 53
11JA
RC
/NF
PMTF
Fare
box
Loca
lTO
TAL
BLS
are
Roa
d (P
hase
I)R
OW
80,0
00$
80
,000
$
BL
Rog
ers
Stre
et &
Cou
ntry
Clu
b R
oad
RO
W25
0,00
0$
250,
000
$
BLS
R 4
5/46
Ped
estri
an O
verp
ass
RO
W20
0,00
0$
200,
000
$
BLW
est 3
rd S
treet
PE
150,
000
$
15
0,00
0$
BL
Wes
t 3rd
Stre
etR
OW
1,58
6,76
7$
1,
232,
705
$
2,81
9,47
2$
BLR
oger
s S
treet
& C
ount
ry C
lub
Roa
dC
ON
2,00
7,94
8$
41
5,72
4$
2,42
3,67
2$
BLA
twat
er S
treet
/Hig
h S
treet
/3rd
Stre
etP
E10
,000
$
10,0
00$
BLB
-Lin
e Tr
ail
CO
N2,
080,
000
$
520,
000
$
2,
600,
000
$
BL
Nor
th C
ampu
s Ar
ea S
tudy
PE
60,0
00$
15
,000
$
75,0
00$
BLJa
ckso
n C
reek
Tra
il (P
hase
I)P
E11
4,30
0$
114,
300
$
BLJa
ckso
n C
reek
Tra
il (P
hase
I)C
ON
500,
000
$
14
,050
$
514,
050
$
BLH
ende
rson
Stre
et Im
prov
emen
tsC
ON
250,
000
$
-
$
25
0,00
0$
BL
17th
Stre
et &
Fee
Lan
eC
ON
499,
500
$
50
,500
$
550,
000
$
MC
Rog
ers
Roa
d &
Sm
ith R
oad
CO
N55
4,00
0$
554,
000
$
MC
Ver
nal P
ike
(Pha
se II
)P
E50
,000
$
50,0
00$
MC
Ver
nal P
ike
(Pha
se II
)R
OW
350,
000
$
35
0,00
0$
M
CFu
llerto
n Pi
ke/G
ordo
n P
ike/
Rho
rer R
d.P
E45
0,00
0$
450,
000
$
MC
Kar
st F
arm
Gre
enw
ay (P
hase
I)R
OW
260,
000
$
26
0,00
0$
M
CC
SC
Bat
chel
or M
iddl
e Sc
hool
PE
/CO
N60
,000
$
-$
60,0
00$
MC
CS
CM
CC
SC B
ike/
Ped
Edu
catio
nn/
a53
,500
$
-$
53,5
00$
MC
CS
CM
CC
SC/R
BB
CS
C B
ike/
Ped
Edu
catio
nn/
a75
,000
$
-$
75,0
00$
RBB
CSC
RB
BCS
C S
idew
alk
Con
stru
ctio
nP
E33
,000
$
33,0
00$
RBB
CSC
RB
BCS
C S
idew
alk
Con
stru
ctio
nR
OW
32,6
19$
32
,619
$
R
BBC
SCR
BBC
SC
Sid
ewal
k C
onst
ruct
ion
CO
N18
4,38
1$
184,
381
$
RBB
CSC
RB
BCS
C B
ike/
Ped
Edu
catio
nn/
a23
,000
$
-$
23,0
00$
EVE
lletts
ville
Tra
ilC
ON
169,
610
$
42
,403
$
212,
013
$
BTO
pera
tiona
l Ass
ista
nce
n/a
900,
000
$
1,
675,
000
$
1,14
0,00
0$
1,
675,
000
$
5,39
0,00
0$
BTS
ecur
ity C
amer
asn/
a40
,000
$
10,0
00$
50
,000
$
BT
Pas
seng
er S
helte
rsn/
a20
,000
$
5,00
0$
25,0
00$
BT30
& 3
5 Fo
ot B
uses
n/a
1,08
8,00
0$
27
2,00
0$
1,36
0,00
0$
BTP
arat
rans
it Sc
hedu
ling
Syst
emn/
a60
,000
$
15,0
00$
75
,000
$
BT
Adm
inis
trativ
e Ve
hicl
esn/
a32
,000
$
8,00
0$
40,0
00$
BTM
aint
enan
cen/
a59
,488
$
14,3
00$
73
,788
$
BT
BT
Acce
ss V
ehic
les
n/a
64,8
96$
16
,224
$
81,1
20$
BTD
ownt
own
Tran
sfer
Fac
ility
n/a
2,92
6,19
8$
73
1,55
0$
3,65
7,74
8$
BTFa
re C
olle
ctio
n Eq
uipm
ent
n/a
280,
000
$
70
,000
$
350,
000
$
BTC
lean
ing
Equ
ipm
ent
n/a
320,
000
$
80
,000
$
400,
000
$
BTO
pera
tiona
l Ass
ista
nce
n/a
225,
000
$
22
5,00
0$
450,
000
$
IUC
apita
l Rep
lace
men
tn/
a59
4,00
0$
148,
500
$
74
2,50
0$
R
TO
pera
ting
Bud
get
n/a
450,
000
$
27
3,00
0$
300,
000
$
1,
023,
000
$
R
TC
apita
l Bud
get
n/a
110,
000
$
10
,000
$
18,0
00$
13
8,00
0$
M
PO
5% C
hang
e O
rder
Res
erv
n/a
113,
911
$
11
3,91
1$
TOTA
L1,
646,
767
$
2,12
1,85
9$
20
0,00
0$
2,74
9,61
0$
71
1,50
0$
1,
053,
500
$
-$
6,
384,
582
$
560,
000
$
225,
000
$
1,
958,
000
$
1,14
0,00
0$
7,59
3,25
6$
26
,344
,074
$
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
50
2011
Loc
al P
roje
cts
Phas
eTE
A-21
STP
Stat
eTE
SRTS
HES
Brid
geFT
A 53
07/0
9FT
A 5
311
JAR
C/N
FPM
TFFa
rebo
xLo
cal
TOTA
L
BLW
est 3
rd S
t.C
ON
407,
000
$
2,
818,
088
$
3,
225,
088
$
BL
Rog
ers
Stre
et S
idep
ath
CO
N50
0,00
0$
125,
000
$
625,
000
$
BLS
are
Roa
d (P
hase
I)C
ON
640,
000
$
16
0,00
0$
80
0,00
0$
BL
SR
45/
46 P
edes
trian
Ove
rpas
sC
ON
300,
000
$
75
,000
$
375,
000
$
BLTa
pp R
oad
(Pha
se II
I)R
OW
225,
000
$
225,
000
$
BLTa
pp R
oad
(Pha
se II
I)C
ON
2,93
5,00
0$
2,93
5,00
0$
BLW
eim
er R
oad
Rea
lignm
ent
CO
N2,
057,
189
$
2,
057,
189
$
M
CB
ridge
Inve
ntor
yPE
96,0
00$
24
,000
$
120,
000
$
MC
Fulle
rton
Pik
e/G
ordo
n Pi
ke/R
hore
r Rd.
PE45
0,00
0$
45
0,00
0$
M
CFu
llerto
n P
ike/
Gor
don
Pike
/Rho
rer R
d.R
OW
490,
000
$
490,
000
$
BTO
pera
tiona
l Ass
ista
nce
n/a
1,01
2,37
8$
1,
777,
523
$
1,28
2,34
5$
1,
884,
147
$
5,
956,
393
$
BT
Mai
nten
ance
n/a
66,9
16$
16
,086
$
83,0
02$
BTB
T A
cces
s V
ehic
les
n/a
72,9
99$
18
,250
$
91,2
49$
BT25
Foo
t Bus
esn/
a62
,400
$
15,6
00$
78
,000
$
BT
Ope
ratio
nal A
ssis
tanc
en/
a25
3,09
4$
253,
094
$
506,
189
$
RT
Ope
ratin
g Bu
dget
n/a
450,
000
$
27
3,00
0$
377,
000
$
1,10
0,00
0$
RT
Cap
ital B
udge
tn/
a14
4,00
0$
10,0
00$
18
,800
$
172,
800
$
MPO
5% C
hang
e O
rder
Res
erve
n/a
113,
911
$
11
3,91
1$
TO
TAL
-$
1,
960,
911
$
-$
-
$
-$
96
,000
$
1,
214,
693
$
594,
000
$
25
3,09
4$
2,06
0,52
3$
1,
282,
345
$
11,9
42,2
54$
19,4
03,8
21$
2010
Loc
al P
roje
cts
Phas
eTE
A-21
STP
Stat
eTE
SRTS
HES
Brid
geFT
A 53
07/0
9FT
A 53
11JA
RC
/NF
PMTF
Fare
box
Loca
lTO
TAL
BL
Wes
t 3rd
St.
CO
N1,
757,
312
$
2,81
8,08
8$
4,
575,
400
$
B
LR
oger
s S
treet
RO
W40
8,00
0$
120,
000
$
52
8,00
0$
B
LS
are
Roa
d (P
hase
II)
RO
W75
,000
$
75,0
00$
MC
Kar
st F
arm
Gre
enw
ay (P
hase
I)C
ON
1,00
0,00
0$
25
7,00
0$
1,25
7,00
0$
MC
Fulle
rton
Pike
/Gor
don
Pike
/Rho
rer R
d.PE
450,
000
$
45
0,00
0$
M
CFu
llerto
n Pi
ke/G
ordo
n Pi
ke/R
hore
r Rd.
RO
W49
0,00
0$
490,
000
$
BT
Ope
ratio
nal A
ssis
tanc
en/
a97
3,44
0$
1,74
2,67
0$
1,
233,
024
$
1,81
1,68
0$
5,
760,
814
$
B
T30
& 3
5 Fo
ot B
uses
n/a
295,
000
$
73
,750
$
368,
750
$
BT
Pas
seng
er S
helte
rsn/
a21
,600
$
5,40
0$
27,0
00$
BT
Adm
inis
istra
tive
Veh
icle
sn/
a56
,000
$
14,0
00$
70
,000
$
B
TM
aint
enan
cen/
a64
,342
$
15,4
67$
79
,809
$
B
TB
T A
cces
s V
ehic
les
n/a
70,1
92$
17
,548
$
87,7
40$
BT
25 F
oot B
uses
n/a
60,0
00$
15
,000
$
75,0
00$
BT
Ope
ratio
nal A
ssis
tanc
en/
a24
3,36
0$
243,
360
$
48
6,72
0$
R
TO
pera
ting
Bud
get
n/a
450,
000
$
27
3,00
0$
352,
000
$
1,
075,
000
$
R
TC
apita
l Bud
get
n/a
144,
000
$
10
,000
$
18,8
00$
17
2,80
0$
M
PO
5% C
hang
e O
rder
Res
erve
n/a
113,
911
$
11
3,91
1$
TOTA
L-
$
2,27
9,22
3$
-
$
1,00
0,00
0$
-
$
-$
1,
540,
574
$
594,
000
$
24
3,36
0$
2,02
5,67
0$
1,
233,
024
$
6,77
7,09
3$
15
,692
,944
$
2009
Loc
al P
roje
cts
Phas
eTE
A-21
STP
Stat
eTE
SRTS
HES
Brid
geFT
A 53
07/0
9FT
A 53
11JA
RC
/NF
PMTF
Fare
box
Loca
lTO
TAL
BLC
urry
Pik
eR
OW
250,
000
$
25
0,00
0$
BL
Wes
t 3rd
Stre
etC
ON
1,24
5,60
0$
1,
245,
600
$
BL
Sar
e R
oad
(Pha
se I)
RO
W75
,000
$
75,0
00$
MC
Ver
nal P
ike
(Pha
se II
)C
ON
3,46
1,14
0$
3,
452,
785
$
6,91
3,92
5$
MC
Brid
ge In
vent
ory
(Pha
se I
& II)
PE52
,800
$
13,2
00$
66
,000
$
M
CFu
llerto
n P
ike/
Gor
don
Pike
/Rho
rer R
d.PE
450,
000
$
45
0,00
0$
M
CK
arst
Far
m G
reen
way
(Pha
se I)
RO
W24
0,00
0$
240,
000
$
BTO
pera
tiona
l Ass
ista
nce
n/a
936,
000
$
1,70
8,50
0$
1,
185,
600
$
1,74
2,00
0$
5,
572,
100
$
BT
30 &
35
Foot
Bus
esn/
a2,
265,
600
$
56
6,40
0$
2,83
2,00
0$
BTM
aint
enan
cen/
a61
,868
$
14
,872
$
76,7
40$
BTB
T Ac
cess
Veh
icle
sn/
a67
,492
$
16
,873
$
84,3
65$
BTD
ownt
own
Tran
sfer
Fac
ility
n/a
2,40
0,00
0$
600,
000
$
3,
000,
000
$
BT
Ope
ratio
nal A
ssis
tanc
en/
a23
4,00
0$
234,
000
$
46
8,00
0$
IU
Par
k an
d R
ide
Impr
ovem
ents
n/a
1,50
0,00
0$
300,
000
$
1,
800,
000
$
R
TO
pera
ting
Budg
etn/
a45
0,00
0$
273,
000
$
33
2,00
0$
1,05
5,00
0$
RT
Cap
ital B
udge
tn/
a14
4,00
0$
10,0
00$
18
,800
$
172,
800
$
MPO
5% C
hang
e O
rder
Res
erve
n/a
113,
911
$
11
3,91
1$
TOTA
L-
$
3,57
5,05
1$
-
$
-$
-
$
52,8
00$
7,23
0,96
0$
59
4,00
0$
234,
000
$
1,
991,
500
$
1,18
5,60
0$
9,
551,
530
$ 24
,415
,441
$
Amended June 13, 2008
FY 2008 – 2011 Transportation Improvement Program Bloomington/Monroe County Metropolitan Planning Organization
51
Abbreviations and Acronyms List 3C Continuing, Comprehensive, and Cooperative Planning Process ADA Americans with Disabilities Act BATGSP Bloomington Alternative Transportation & Greenways System Plan BL City of Bloomington CAC Citizens Advisory Committee BOND Municipal Bond BR Bridge Replacement and Rehabilitation BT Bloomington Transit CDBG Community Development Block Grant CMAQ Congestion Mitigation and Air Quality CON Construction EJ Environmental Justice ERCP Ellettsville Rural Community Plan EV Town of Ellettsville FHWA Federal Highway Administration FTA Federal Transit Administration FY Fiscal Year (for the TIP: July 1 through June 30) GPP Growth Policies Plan HES Hazard Elimination Safety Program HPMS Highway Performance Monitoring System IM Interstate Maintenance IN State of Indiana INDOT Indiana Department of Transportation INSTIP Indiana State Transportation Improvement Program IU Indiana University LRTP Long Range Transportation Plan MC Monroe County MCATGSP Monroe County Alternative Transportation and Greenways System Plan MCCSC Monroe County Community School Corporation MPA Metropolitan Planning Area MPO Metropolitan Planning Organization MTP Master Thoroughfare Plan NHS National Highway System PC Policy Committee PE Preliminary Engineering PMP Parks Master Plan PMTF Public Mass Transportation Fund RABA Revenue Aligned Budget Authority RBBCSC Richland-Bean Blossom Community School Corporation ROW Right-of-Way RT Rural Transit SAFETEA-LU Safe, Affordable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SRTS Safe Routes to School STP Surface Transportation Program TAC Technical Advisory Committee TDF Travel Demand Forecast TDM Travel Demand Model TEA-21 Transportation Equity Act for the 21st Century TE Transportation Enhancements TIF Tax Increment Financing District TIP Transportation Improvement Program TIS Traffic Impact Study TOD Transit Oriented Development UAB Urbanized Area Boundary UMTA Urban Mass Transit Administration UPWP Unified Planning Work Program
54
55
56
m o Bloomington/Monroe County Metropolitan Planning Organization
ADOPTION RESOLUTION FY 2008-09
RESOLUTION ADOPTING AN AMENDMENT TO THE TRANSPORTATION IMPROVEMENTPROGRAM FY 2008-2011 TO REFLECT CHANGES TO THE STATE ROAD 45/46 PROJECT
FROM MONROE STREET TO KINSER PIKE (DES# 0600811) as presented to the Policy Committeeof the Bloomington/Monroe County Metropolitan Planning Organization (MPO) on March 7, 2008.
WHEREAS, the Bloomington/Monroe County Metropolitan Planning Organization (MPO) is theorganization designated by the Governor of Indiana as the Metropolitan Planning Organizationresponsible for carrying out, with the State of Indiana, the provisions of 23 U.S.C. 134, andcapable of meeting the requirements thereof for the Bloomington, Indiana urbanized area; and
WHEREAS, the Indiana Department of Transportation has indicated that the engineering phase for theState Road 45/46 Project from Monroe Street to Kinser Pike needs to be reflected in theTransportation Improvement Program FY 2008-2011; and
WHEREAS, the Technical Advisory Committee recommended approval of this amendment at theirmeeting on February 22, 2008 and the Citizens Advisory Committee recommended approval ofthis amendment at their meeting on February 27, 2008.
NOW, THEREFORE, BE IT RESOLVED:
(1) That the Bloomington/Monroe County Metropolitan Planning Organization herebyamends the Transportation Improvement Program FY 2008-2011 to make thefollowing changes to the State Road 45/46 Project from Monroe Street to Kinser Pike(DES # 0600811):• Add Engineering phase to 2008 for $100,000
(2) That the adopted document shall be forwarded to all relevant public officials andgovernment agencies, and shall be available for public inspection during regularbusiness hours at the City of Bloomington Planning Department, located in theShowers Center City Hall at 401 North Morton Street, Bloomington, Indiana.
PASSED AND ADOPTED by the Policy Committee by a vote of 9 -0 ,upon this 7th day of March,2008.
Kent McDaniel
Chair, Policy CommitteeBloomington/Monroe County MPO
57
58
59