Transportation Access Exterior...

4
Registration # GH-8340562797 Board 1 of 4 Site Analysis Exterior Rendering Historical Urban Fabric Transportation Access SISU and VAPAUS CITYSCAPE- directly referencing the western grid of the city, and maintaining water views from Etelainen Makasiinikatu, Bernhardinkatu, and Tah- titornin vuori Park, the form of the building recalls the moraines left behind by the continental glaciers - only the given site constraints, the landscape design is to connect the site to the Covered Market to the large outdoor café terrace captures views of the city to the north and the harbour, and is adjacent to a connects Tahtitornin vuori Park to the site as well as a new 100 square meter port terminal is provided ARCHITECTURE- the architecture evolves out of the site, the context, the views, the great Nor- - tempt is made to fuse the interior and the exterior, and visually to extend Tahtitornin vuori Park to the north end of the site with both north and south entries and is paved in 315 stones representing the space is provided for queuing and as an extension views of Tahtitornin vuori Park and gives access to each of three long gallery axes with framed views to The three principal LYHTY, or lanterns, are to roofed galleries and providing diffused/ controlled glass, concrete, and stone), as a structural member An abstraction of Finnish lap jointing is used at key USABILITY- the interior functions are to be read- able from the exterior, with key spaces articulated Multi-Purpose Zone, the Event Space, the Café, and the Formal Dining Room are each able to function independently of the galleries allowing for secure The galleries can be combined or divided into dis- All employees would have direct access to natural light and views of the water or the city from ei- lunchroom would have an open terrace facing the All port access constraints have been accommodat- LEED-Gold would be achieved through material selection, HVAC systems, structure, waste and wa- Guggenheim - Helsinki, Finland 1 2 3 4 5 6 7 Le Corbusier - Buenos Aires

Transcript of Transportation Access Exterior...

Page 1: Transportation Access Exterior Renderingdesignguggenheimhelsinki.org/stageonegallery/pdfs/GH-834056279… · Accessibility Diagram Spacial Program Lobby - Interior Rendering Gallery

Registration # GH-8340562797Board 1 of 4

Site Analysis

Exterior Rendering

Historical Urban Fabric

Transportation Access

SISU and VAPAUS

CITYSCAPE- directly referencing the western grid of the city, and maintaining water views from Etelainen Makasiinikatu, Bernhardinkatu, and Tah-titornin vuori Park, the form of the building recalls the moraines left behind by the continental glaciers ��������������� ������ �����������������������-������������������ ����� ������ ������������������������ ���������������� ����������������������������� �only the given site constraints, the landscape design is to connect the site to the Covered Market to the ���������������������������������������� ���������large outdoor café terrace captures views of the city to the north and the harbour, and is adjacent to a ����������� �������������������������� �������������connects Tahtitornin vuori Park to the site as well as a new 100 square meter port terminal is provided ������� ����������! ����� ����

ARCHITECTURE- the architecture evolves out of the site, the context, the views, the great Nor-��������������"���� ���������������������������������-tempt is made to fuse the interior and the exterior, and visually to extend Tahtitornin vuori Park to the ���������������������������� �������$����������������� !���� �! � �� �������� ���������� �� � � ���� �! � ����north end of the site with both north and south entries and is paved in 315 stones representing the %&'�� ���� ������������ ��(�� �������)������ ����*��space is provided for queuing and as an extension �! �����������!�������� �

$��� ���������� �����+����� ������������ ����� �!!��� �views of Tahtitornin vuori Park and gives access to each of three long gallery axes with framed views to .���� ������/:�����(������;�

The three principal LYHTY, or lanterns, are to ��� ������ ���� ��������� ��� ����� ���� ���������+roofed galleries and providing diffused/ controlled ������������� ���� ���������$���!������������������ �����������������"��=�����>��!�������� �����

����� � � � ��� � � �� ��������� ��������� /������ �����glass, concrete, and stone), as a structural member �������!��������! �����@���������������� ���������������������D������������ ��� ��+� ������������������An abstraction of Finnish lap jointing is used at key �=������������� �

USABILITY- the interior functions are to be read-able from the exterior, with key spaces articulated !��������!����������������������������������������$���Multi-Purpose Zone, the Event Space, the Café, and the Formal Dining Room are each able to function independently of the galleries allowing for secure �!���+��������� ���������� �� � �

The galleries can be combined or divided into dis-������ ������� ���� ��������� ����������K������������� ���� ��! ��������� ��������������������������������

All employees would have direct access to natural light and views of the water or the city from ei-��������������!�� ������������� ������ ���$��� ��!! �lunchroom would have an open terrace facing the :�����(�������

All port access constraints have been accommodat-��������� ���� ������������ �����+���� �����

LEED-Gold would be achieved through material selection, HVAC systems, structure, waste and wa-�������������������� ������������������� ��������

Guggenheim - Helsinki, Finland

1

2

3

4

5

6

7

Le Corbusier - Buenos Aires

Page 2: Transportation Access Exterior Renderingdesignguggenheimhelsinki.org/stageonegallery/pdfs/GH-834056279… · Accessibility Diagram Spacial Program Lobby - Interior Rendering Gallery

1 1

2 2

3

3 Registration # GH-8340562797Board 2 of 4

Guggenheim - Helsinki, Finland

Page 3: Transportation Access Exterior Renderingdesignguggenheimhelsinki.org/stageonegallery/pdfs/GH-834056279… · Accessibility Diagram Spacial Program Lobby - Interior Rendering Gallery

Section 1-1

Section 2-2

Section 3-3

)�������O�����������Q������ Accessibility Diagram Spacial Program Lobby - Interior Rendering

Gallery - Interior Rendering

1 2

3 4

Registration # GH-8340562797Board 3 of 4

Guggenheim - Helsinki, Finland

PRELIMINARY�AREA�SCHEDULE

ASSIGNED�AREASCompetition Design

Space Program�(Sq.M.) Program�(Sq.M.) Notes/�AdjacenciesExhibition 3,920 3920 Ground�&�First�FloorExhibition�Galleries 3,920 3920 Flexible�SpacePrograms�and�Events 565 602 Third�Floor�off�of�lobbyFlexible�Performance�Conference�Hall 500 332 275�movable�seatsGreen�Room incl. 30 Access�to�stageControl�Room/�Projection�Booth incl. 9Simultaneous�Translation�Booth incl. 9Movable�Stage�Platform incl. incl.Seating,�Stage,�and�Equipment�Storage incl. 76Technician�Office incl. 9Dressing�Rooms incl. 72Multifunction�Classroom/�Laboratory 65 65 First�floor�off�of�lobbyMulti�purpose�Zone 300 317 Off�of�lobby/�ground�floorProject�Space�and/�or�Atrium 300 317 Flexible�Space/�A/V�RoomVisitor�Services 190 193 LobbyVisitor�Screening/�Bag�Check 100 103 Queuing�areaCoat�Check/�Lockers 60 60 Queuing�areaTicketing�and�Information�Desk 20 20 LobbyStorage 10 10 LobbyRetail 300 300 Off�of�lobby/�ground�floorMuseum�and�Design�Store 250 250 Additional�retail�at�gallery�Stock�Room�and�Offices 50 50 levelDining 700 700 Café�at�ground�levelCafé/�Bar 200 200 120�seats�+�outdoor�diningFormal�Restaurant 130 130 55�seats/�2nd�fl.�+�outdoorKitchen 370 370 Serves�café�&�restaurantCatering�Prep/�Staging�Area incl. incl.� Serves�café�&�restaurantReceiving incl. incl. Adjacent�to�loadingOffices incl. incl. View�to�HarbourTrash�Room incl. incl. RefrigeratedStorage incl. incl. Adj.�to�kitchenOffices 500 464 Second�FloorAdministrative�Offices 130 176 10�off./�View�to�water/�cityCuratorial,�Exhib.�Design,�Publ.,�Archivist 110 72 12�Work�stations;�6m/stationEducation�Offices 30 36 6�Work�stations;�6m/�stationMarketing�and�Development�Offices 100 48 8�Work�stations;�6m/�stationConference�Rooms 75 55 20�seats�+�10�seatsWork�Room/�Copy/�File�Storage/�Pantry 55 77 Central�+�PantryCollections�Storage�&�Management 350 350 Ground�FloorArt�Storage 100 100 Short�term�storageShipping/�Receiving 50 50 Centrally�locatedCrate�Storage 50 50 Adjacent�to�shipping/�receiv.Uncrating/�Staging 50 50 Adjacent�to�shipping/�receiv.Shared�Art�Prep/�Conserv.�Studio/�Equip. 70 70 7�staff;�harbour�viewRegistrar,�Conservation,�Exhib.�&�Tech.�Off. 30 30 5�staff�offices;�harbour�viewMaintenance�and�Operations 230 245 Ground�FloorSecurity�office/�Control�Room 20 20 At�control�point�for�BOHCustodial�Office 20 20IT�Server,�Workroom,�&�Staff�Offices 35 35 View�to�HarbourSupply,�Equipment,�&�Seasonal�Furn.�Stor. 40 40 w/�access�to�exteriorLandscape�&�Grounds�Maint.�Equipment 25 25 w/�access�to�exteriorStaff�Lunch�Room/�Lounge 65 65 Terrace�with�harbour�viewLocker�Rooms 25 40 2�rooms;�25�lockers�eachTotal�Assigned�Area 7,055������������������� 7,091������������������

UNASSIGNED�AREASCompetition Design

Space Program�(Sq.M.) Program�(Sq.M.) Notes/�AdjacenciesTotal 5,045 5068Lobbies incl. 1557 Ground�FloorCirculation incl. 901 Main�circl.�w/�view�to�parkRestrooms incl. 196 Ground,�1st,�2nd,�&�3rd�Flrs.Art�Loading�Dock incl. incl. Centrally�locatedGeneral�Loading�Dock incl. incl. Centrally�locatedMechanical/�Electrical/�Plumbing incl. 225Partitions,�Structure,�Shafts,�Stairs,�Elev. incl. 2189

TOTAL�BUILDING�AREA 12,100 12,159gross�sq.m. gross�sq.m.

PORT�TERMINAL 1,000 1,000 At�south�end�of�site;�gross�sq.m gross�sq.m sculpture�gallery�@�roof

Page 4: Transportation Access Exterior Renderingdesignguggenheimhelsinki.org/stageonegallery/pdfs/GH-834056279… · Accessibility Diagram Spacial Program Lobby - Interior Rendering Gallery

Climate Diagram

Road Access/ Port Operations Diagram

Site /Orientation Plan

View From Tahtitorninvuoren Park

MATERIALS-

�����������=������ �����������! ��������� �� ����be developed, our proposal includes the fol-lowing suggestions, which take into account lifecycle costs, sustainability, and Finnish ar-������������������������������������ ����������-cally sourced, are readily available, and have a history of durability in Finnish climactic ��������� ���$�� ���������X1. Wood- we propose the use of the four

principal Finnish woods- Aspen, Scots >����� :������ ���� [������ � $��� ����������=����������������� ��������������+ �������cladding and sun screening elements would ���:��������K�������� ��!��� ���������������in Aspen with benches and millwork in [�������)�������\��� ���������������/!������� ��� �����������;�

2. Steel- the spans outlined in the proposed layout suggest using a steel frame as the ���������� ���������� � ������$�� ������������� ���������&]�'������������� �����! �����galleries and the 17 meter clear span of the ^����+>���� ��_���D�.�����:������ � �$��the degree possible, all steel would have �� ����� ����������� �! � ��������� �����������Milled steel would be used as rails, base-����� ������������������ �

3. Concrete+� ����� \�+� �� �������� ������������������� ���!���!�����������\���� ��� ��retaining walls, and key structural elements

4. Stone- Finnish granite would be the prin-������ ����� � ��� � � �� ����+ ������� ����-ding and for lobby and main circulation \�������� � K�� ���������� "���� �� ��� �����would be used as stair treads, millwork, �����������������������������������

5. Glass+� ���� ���� � ������ ��� �����+�����with a high degree of sun shading con-���������������������������@��+K����)�� �would serve as a principal sustainability el-ement in capturing and distributing heat ������������������������ �����

Registration # GH-8340562797Board 4 of 4

Guggenheim - Helsinki, Finland

TIME- while the exact project schedule is not known, our proposed design is intended to be buildable �����������������! �/�����;����!� ������:���������� ������������ ������������������� ������ ���������*������������!��� �� �������������� �������������� �!��� ����������!������������� ���������

BUDGET- the proposed design hews very closely to the proposed programmatic spreadsheet pro-��������������������! ������=��������']� `���������� �/ ���[�����z%;���[� ��������!�������������������regarding construction costs in Helsinki, the proposed budget of 100million Euros (8,224 Euros per `����������;� ������������`������������������������� ����� ������

Yes ? No

9 4 Sustainable Sites 14 Points

Y Prereq 1 Construction Activity Pollution Prevention Required1 Credit 1 Site Selection 11 Credit 2 Development Density & Community Connectivity 1

1 Credit 3 Brownfield Redevelopment 11 Credit 4.1 Alternative Transportation, Public Transportation Access 11 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1

1 Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 11 Credit 4.4 Alternative Transportation, Parking Capacity 11 Credit 5.1 Site Development, Protect or Restore Habitat 1

1 Credit 5.2 Site Development, Maximize Open Space 11 Credit 6.1 Stormwater Design, Quantity Control 11 Credit 6.2 Stormwater Design, Quality Control 11 Credit 7.1 Heat Island Effect, Non-Roof 1

Credit 7.2 Heat Island Effect, Roof 11 Credit 8 Light Pollution Reduction 1

Yes ? No

5 Water Efficiency 5 Points

1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 11 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 11 Credit 2 Innovative Wastewater Technologies 11 Credit 3.1 Water Use Reduction, 20% Reduction 11 Credit 3.2 Water Use Reduction, 30% Reduction 1

9 Energy & Atmosphere 17 Points

Y Prereq 1 Fundamental Commissioning of the Building Energy Systems RequiredY Prereq 2 Minimum Energy Performance RequiredY Prereq 3 Fundamental Refrigerant Management Required

5 Credit 1 Optimize Energy Performance 1 to 1010.5% New Buildings or 3.5% Existing Building Renovations 114% New Buildings or 7% Existing Building Renovations 217.5% New Buildings or 10.5% Existing Building Renovations 321% New Buildings or 14% Existing Building Renovations 4

5 24.5% New Buildings or 17.5% Existing Building Renovations 528% New Buildings or 21% Existing Building Renovations 631.5% New Buildings or 24.5% Existing Building Renovations 735% New Buildings or 28% Existing Building Renovations 838.5% New Buildings or 31.5% Existing Building Renovations 942% New Buildings or 35% Existing Building Renovations 10

Credit 2 On-Site Renewable Energy 1 to 32.5% Renewable Energy 17.5% Renewable Energy 212.5% Renewable Energy 3

1 Credit 3 Enhanced Commissioning 11 Credit 4 Enhanced Refrigerant Management 11 Credit 5 Measurement & Verification 11 Credit 6 Green Power 1

continued…Yes ? No

10 3 Materials & Resources 13 Points

Y Prereq 1 Storage & Collection of Recyclables Required1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 11 Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof 11 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1

1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 11 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 11 Credit 3.1 Materials Reuse, 5% 11 Credit 3.2 Materials Reuse,10% 11 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 11 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 11 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionall 11 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionall 11 Credit 6 Rapidly Renewable Materials 11 Credit 7 Certified Wood 1

Yes ? No

15 Indoor Environmental Quality 15 Points

Y Prereq 1 Minimum IAQ Performance RequiredY Prereq 2 Environmental Tobacco Smoke (ETS) Control Required1 Credit 1 Outdoor Air Delivery Monitoring 11 Credit 2 Increased Ventilation 11 Credit 3.1 Construction IAQ Management Plan, During Construction 11 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 11 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 11 Credit 4.2 Low-Emitting Materials, Paints & Coatings 11 Credit 4.3 Low-Emitting Materials, Carpet Systems 11 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 11 Credit 5 Indoor Chemical & Pollutant Source Control 11 Credit 6.1 Controllability of Systems, Lighting 11 Credit 6.2 Controllability of Systems, Thermal Comfort 11 Credit 7.1 Thermal Comfort, Design 11 Credit 7.2 Thermal Comfort, Verification 11 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 11 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1

Yes ? No

4 Innovation & Design Process 5 Points

1 Credit 1.1 Innovation in Design: Provide Specific Title 1

1 Credit 1.2 Innovation in Design: Provide Specific Title 11 Credit 1.3 Innovation in Design: Provide Specific Title 1

Credit 1.4 Innovation in Design: Provide Specific Title 1

1 Credit 2 LEED® Accredited Professional 1Yes ? No

52 7 Project Totals (pre-certification estimates) 69 PointsCertified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points

*Note for EAc1: All LEED for New Construction projects registered after June 26 th, 2007 are required to achieve at least two (2) points under EAc1.

Project Name: Solomon Guggenheim- HelsinkiProject Address: Etelasatama

LEED for New Construction v2.2 Registered Project Checklist

Green Roof Construction

)����������|��������

Lobby - Heat Recovery