Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth...

26
Transport and Installation Project Management Offshore Construction Blue Parrot is committed to an incident and injury free workplace, and cares about its Employees and its Clients, everyday, everywhere.

Transcript of Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth...

Page 1: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Transport and Installation Project Management

Offshore Construction

Blue Parrot is committed to an incident and injury free

workplace, and cares about its Employees and its Clients,

everyday, everywhere.

Page 2: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Who We Are

Privately owned Company, established in

2014 in Spain.

Core Business: Transport and Installation

Project Management Contractor.

Combined competence of the Management

Team in the offshore construction industry is

70 years.

Page 3: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

QHSE Commitment

Safety: primary focus area for our

Management Team

Minimisation of the impact of our activities

on the environment

Open communication with Stakeholders to

continue improving the quality of our

services

Page 4: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Company Overview

Page 5: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Market Assessment

Moray Firth – 1.1GW

Moray Firth Renewables Ltd

Dogger Bank – 7.2 GW

Forewind Consortium

Hornsea – 4 GW

Smartwind Consortium

East Anglia – 7.2 GW

East Anglia Offshore Wind Ltd

Rampion – 0.4 GW

E.ON

Seagreen – 3.5GW

Seagreen Wind Energy Ltd

Navitus Bay – 0.8GW

Eneco

Outlook for the next 10 years

In UK 3000 foundations

(8MW WTGs)

Page 6: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Market AssessmentUK DE

Offshore Wind

Farm Name Operator

Potential N.

of WTGs

Offshore Wind

Farm Name Operator

Potential N.

of WTGs

Beatrice

Repsol-

Copenhagen

Infrastructure-SSE 140 Arkona Becken Eon 80

East Anglia Iberdrola-Vattenfall 900 Borkum Riffgrund Dong Energy 142

Dogger Bank

Statoil-Statkraft-

SSE-RWE 900 Delta Nordsee Eon 67

Hornsea

Mainstream-

Siemens-Dong

Energy 500 He Dreiht Enbw 80

Moray Firth EDP-Repsol 135 Hohe See Enbw 80

Rampion Eon 116 Gode Wind Dong Energy 154

Navitus Bay Eneco-EDF 100 Innogy Nordsee RWE 174

Galloper RWE 68 Albatros Enbw 79

Inch Cape EDP-Repsol 110 Veja Mate

Laidlaw Capital

Group 72

Burbo Bank

Extension Dong Energy 32 Horizont Mainstream 190

Triton Knoll RWE 100 DK

Race Bank Dong Energy 91 Krigers Flak under tender 75

Seagreen SEE-Fluor 400 Horns Rev 3 under tender 50

Walney

Extension Dong Energy 110 Mejlflak Havvind Arhus 20

OtherCompetitors

Blue ParrotOffshore

10%-15%

Market Share

Page 7: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Company Organisation ChartStakeholders/Sharehol

ders

CEO

CFO and HR Officer HSE Officer

COO

Construction

Manager

Transport and

Installation ManagerEngineering Manager

Management

Team

QA/QC Officer

Page 8: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

T&I Project Task Force

COO

T&I Manager

Technical

Project

Manager

Planning

and

Logistics

Doc/Cost

Controller

Naval

Architect

Structural

EngineerCAD

Installation

Engineer

Project

Engineer

QHSE

Page 9: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Why Blue Parrot Offshore

Delivering what you need,

when you need, at a competitive price.

QHSE Focussed

Cost Competitive

Technically Competent

Transparent and Flexible

Page 10: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium
Page 11: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Current Development

• EPCI

• Fabrication and Manufacturing

• Transport and Installation Offshore

Benefits of integration

Reduced number of contracts

Reduced interfaces and risks

Reduced impact on scope changes

Increased investors appetite for well

defined project budgets

Page 12: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Fabrication Yard

Cádiz

Page 13: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Fabrication Yard

• 15000sqm, 2500 smq

indoor, 20t/sqm

loading capacity

• Direct access to

quayside for load out

operations (200m

long, 14m deep)

• Complex welded structures (jackets) capability

• Future upgrade: 150mm thickness x 10m diameter

rolling machine (XL Monopiles)

Page 14: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Strengths of the Logistics Platform

Strategic location

Communication and Transports (Ports,

Jerez Airport and City Transport in Jerez)

Climate

Storage / capacities, processing and distribution

to national and international markets

Value added services related

to Transportation, Research and Training

Freeport

How does Blue Parrot integrate these?

Page 15: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Blue Parrot Business Model

Design/Engineering

Procurement Fabrication Transportation Offshore Installation

IDEA

Engineering

Blue Parrot

Procurement

Blue Parrot

FabricationAltius

Blue Parrot

Offshore

Project Management

QA/QCHSSE

Cost Competitiveness

Page 16: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Blue Parrot: Strategic Targets

Establish EPCI company integrating engineering,

fabrication and offshore construction in the Cadiz

logistic hub

Potential Clients

Iberdrola

Repsol

Cepsa

NATO

Navantia

Onshore, civil fabrication & services

Offshore Services (ROVs, subsea, etc.)

Annual turnover 50-100m EUR

Page 17: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Fabrication Yard

Page 18: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Fabrication Yard

Page 19: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Fabrication Yard

Page 20: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Current Status

Fabrication Yard in Cadiz

up and running

Iberdrola Wikinger Wind

Farm, Offshore Substation

Topsides

Fabrication and

installation 3.400 ton

grillage for Mariner project

(24.000 ton jacket)

Page 21: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Logistics Platform in Southern Europe

Cadiz, Gateway to America and Africa in Europe

Page 22: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

Logistics Platform in Southern Europe

Strategic location

Communication and Transportation (Ports, Free

Zones, Jerez Airport and City Transport in Jerez).

Storage capacities, processing and distribution

to national and international markets.

Value added services related

to Transportation, Research and Training.

Strongholds

Page 23: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

VOLGOGRAD DEEP CONVERSION COMPLEX PROJECT

Page 24: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

TUPRAS Izmit, RESID UPGRADING Project

Page 25: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

ANHOLT OFFSHORE WIND PROJECT

DETALLES DEL PROYECTO

Año: 2011

Sector: Offshore

Puertos de carga: Aviles

Puerto de descarga: Grenaa (Dinamarca)

Carga: Jacket

Peso 550 ton

Alcance: Transporte desde zona de fabricación en

Avilés hasta zona de instalación en Grenaa

Page 26: Transport and Installation Project Management Offshore ... · Moray Firth –1.1GW Moray Firth Renewables Ltd Dogger Bank –7.2 GW Forewind Consortium Hornsea –4 GW Smartwind Consortium

TOTAL Raffinage Marketing –

RN DGO5 ISBL Project

DETALLES DEL PROYECTO

Año: 2013

Sector: Modular

Puerto de carga: Tarragona

Puerto de descarga: Le Havre (Francia)

Carga:18x módulos pre-ensamblados

Max. dimensiones: 33 x 16 x 12 m;

Max. peso: 321 ton

Alcance: Transporte desde taller del fabricante en

Tarragona hasta

la refinería en Normandía