UNIDO Presentation on TPT’s SD Plans
26th of July 2012
2
Contents
SD : Proposal vs Final plan
SD : Background and Objectives
Tender gateways : SD and BBBEE
TPT Equipment acquisitions
A lack of investment in infrastructure has impacted the capacity and capability of the local industry to do business in South Africa and subsequently economic growth
3
Historical Background
There has been a significant decline in SA local industry over the past years largely due to a lack of consistent investment in infrastructure
Ratio of Gross Fixed Capital Formation to GDP (1970-2009)
Source: SARB Quarterly Bulletin
Furthermore, due to significant historical political and social imbalances a large portion of the SA population were unable to participate meaningfully in the economy thereby creating a gap in wealth distribution
0
5
10
15
20
25
30
2006
1982
1974
1998
1990
Impact on industry
The overall impact both from the lack of investment in infrastructure and the suppression of a large percentage of the population from partaking in the economy had a significant impact on local industry:
Loss of key skills and key capabilities
Decrease in manufacturing capabilities and thereby export potential
Lack of job creation opportunities Increase in the costs of doing
business due to higher transportation costs and longer lead times
The key difference between CSDP and NIPP is that CSDP allows for the investment to take place in a related industry
NIPP CSDP
Transaction target
Focus
Reporting & Tracking
Part of Negotiation
• Prior to February 2008 • February 2008 Onwards
• Non Related Industry • Related Industry
• DTI • SOE DPE
• Not Part of Evaluation Criteria
• Not part of SOE responsibility – Done by DTI and the Supplier
• Part of Evaluation Criteria
Spend is channeled into relevant industry development which Transnet can influence 4
Effective Date
• 30 % > R100 million • 30 % > R100 million
Tier 1Systems –
Subsystems
Tier 2
Tier 3
Other
Components
Assemblies
Supplier BaseSphere of Control
Tran
sn
et’
s
CS
DP
Focu
s
Su
pp
liers
’ C
SD
P
Focu
s
Tran
sn
et’
s E
D
an
d P
P F
ocu
s
Su
pp
liers
’ Focu
s
Supplier Development
Category
**ED – Enterprise Development / PP – Preferential Procurement
s
Transnet’s CSDP phase one Strategic Approach will be to focus on Tier 1 suppliers to assist them in engaging local Tier 2 suppliers
Transnet will use its sphere of control to contract with OEM’s as tier-1 suppliers
Sphere of Influence
CSDP Development:
Port Equipment
BBBEE Focus
ED Development
5
Transnet will apply their influence and current resources to actively align their existing SD activities with the objectives of NGP as reflected below
SHEQHuman Resources
Regulatory
Funding
Volumegrowth
Increase productivity & efficiency
Capital investment
Financial sustainability
Improvingcustomerservice
Quantum Leap Focus• Increase productivity
and efficiency
• Volume growth
• Capital investment
• Financial stability
• Funding
• Human capital
• SHEQ
• Regulatory
• Improve customer
service
• Increase employment intensity of the economy
• Reduce the cost to improve infrastructure and address competiveness
• Balanced spatial development of rural areas and poorer provinces’
• Reduce the carbon intensity of the economy
• Create opportunities in changing regional and global environments
• Increase black ownership and entrepreneurship
New growth path
Source: Transnet Corporate Plan 2011/12
iSCM/Supply Chain
6
A shared aspiration for SD was created by merging Governments and Transnet’s objectives
SD Principles
• Increase the percentage of the population
involved in quality formal employment
opportunities
• Address wealth distribution disparities in
the country by ensuring the
participation of previously
disadvantaged groups in the economy
• Maintain a healthy balance of payments
position by reducing the reliance of
South African industries on imports
• Increase the participation of public
enterprises in increasing levels of real
fixed capital formation
• Develop key skills and capabilities
required for specific industries where these
do not exist
• Volume and Revenue Growth
• Creating Capacity
• Operational Efficiency
• Financial Strength
• SHEQ
• Promote the
1) Empowerment of previously
disadvantaged groups
2) Increase in local content
3) Improvement of skills and create
opportunities for sustainable jobs
• Security of Supply
• Reduction in Costs
• Reduction in Working Capital
• Enhanced Preferential Procurement
and Enterprise Development
Government’s Objectives Transnet’s Objectives
Internal Analysis
External Analysis
Corp
ora
te
Ob
jectiv
es
SD
O
bje
ctiv
es
Su
pp
ly C
hain
Gu
idin
g
Prin
cip
les
Source: Transnet Corporate Plan, NGP, B-BBEE, CSDP
Vision
Values
Supplier Development (SD)
8
• Supplier development refers to the improvement in the socio-economic environment by creating competitive local suppliers via Competitive Supplier Development and other initiatives. This results in a local supply base that can eventually be competitive to market its goods on the international market leading to increased exports
• Transnet’s SD strategy aims to holistically satisfy all of Government’s legislation and requirements in respect of identifying and undertaking opportunities through specific initiatives
Tender Process:
• All contracts sent to the market equal or exceeds R70million* will include a CSDP obligation as part of the tender,• A CSDP Proposal must be submitted as part of the tender •A CSDP Plan must be signed submitted within 30 days to Transnet after signing the Letter of Intent (LOI) and be agreed and signed within 15 days thereafter by both parties
CSDP opportunities are generally triggered for transactions equal or exceeding USD10 million for all tenders after February 2008
• SOE influences OEM/multinational for CSDP transactions .
• The following will trigger a CSDP transaction which involves the purchase of services and goods:
- Single New Contract with an imported content portion that is equal to or exceeds USD 10 million*;
- Contract with a renewable option clause, should the option be exercised, the total value of the imported content would be equal to or exceed USD 10 million*
Criteria to be considered to initiate a CSDP transaction:
• To avoid capital leakage;• When an opportunity to develop a local industry within Transnet’s supply chain; and / or• When a limited local supply base exists but the potential to develop existing suppliers is evident; and / or• Where there is a strong opportunity for IP and skills transfer to local suppliers and / or Transnet for which the capacity does not presently reside in South Africa
* Total Value planned to spend with a Supplier - (USD 10 million ~ R70 million. ** All CSDP Capability and capacity building in SA efforts initiated by the Supplier since the award of the contract to date must be included
into the plan.
Trigger for a CSDP transaction:
- No CSDP obligations (after Feb 2008) may be claimed for a NIPP – Double CountingAll CSDP obligations will be considered as standalone -obligations for each specific tender;- Where a CSDP obligation has not been mutually agreed between Transnet and the Supplier after February 2008 a CSDP Reconciliation Plan (to date) must be submitted by the Supplier to Transnet and agreed and signed off by both parties.
9
The IC3 Matrix is used as the basic framework to plot the SD opportunities identified in its appropriate SD initiative bucket
Value leverage
Hig
hLow
HighLow
Focused
Small
Enterprise
Development
Programmatic1
Strategic
Ind
ustr
ial le
vera
ge
1 This could be further refined in the future through the DPE Programmatic Policy2Adapted from the DPE Supplier Classification Matrix focused on Increased Competitiveness, Capability and Capacity.
IC3 Supplier Development Classification Matrix2
Stra
teg
ic Im
porta
nce to
Tra
nsn
et
Industrialisation
Capability and capacity building in SA and Supplier Development
SkillsDevelopment
Value Leverage refers to transactions where the financial scale of the transaction allows the buyer the opportunity to negotiate supplier development. Industrial Leverage refers to transactions whereby the nature of the procurement is such that the scale and the industrial complexity of the item being purchased allows for local supply chain development around a particular industry.Strategic Importance to Transnet refers to the extent to which the product to be procured has a impact on Transnet’s core business.
The IC3 supplier development classification matrix assists in categorising opportunities according to their industrial leverage, value leverage and strategic importance to Transnet
Once opportunities are identified it will be possible to identify the tools that should be implemented to maximise the full supplier development potential from the opportunities
Not currently a focus area
10
Strategic objectives within each quadrant have been identified
Strategic ObjectiveIC3 quadrant Key Outcomes
Programmatic
• Assist Government achieve their industrialisation objectives through development of local supplier base to increase the cost efficiency of fleet procurement, support and maintenance
• Industrialisation• Technology transfer• Job creation/preservation • Skills Development• Downstream Supplier
Development • Increased exports • Reduction in capital leakage
Strategic
• Influence multinational organisations toward initiatives that lead to the development of local downstream suppliers through large-scale SOE procurement in order to develop a competitive local supplier base focusing on Rolling stock, Port Equipment and Infrastructure
• Capability and capacity building in SA
• Increased Technology transfer• Job creation/preservation• Skills development
Focused
• Assist local suppliers to improve their performance, enhance their existing production & skills capabilities by placing increased emphasis on benefiting previously disadvantaged individuals and rural development
• Provide a platform through which local suppliers can test their local innovations for export promotion
• Job Creation/preservation• Empowerment• Skills Development• Rural Development
Small Enterprise
Development
• Assist local suppliers to improve their skills by placing increased emphasis on benefiting previously disadvantaged individuals and rural development in line with the BBBEE strategy
• Empowerment• Rural Development• Skills Development• Job Creation/preservation
Transnet has to develop an internal policy to support product development and funding as the current innovation policy drafted by the DPE only allows for testing local products in the Transnet operating environmentSource: Team analysis
11
12
Small Enterprise Development
Focused
Strategic
Programmatic
Strategic Focused Small ED
*Points allocated in further recognition of certain components of BBBEE in line with Transnet and government objectives
Programmatic
• Localisation
• Technology transfer/ sustainability
• Skills development
• J ob creation / preservation
• Small business promotion
• Further recognition*
• Rural development and regional integration
• Industrialisation
• Technology transfer/ sustainability
• Skills development
• J ob creation/ preservation
• Small business promotion
• Further recognition*
• Rural development and regional integration
• localisation
• . J ob creation/ preservation
• Skills development
• Further recognition*
• Rural development and regional integration
• Small business promotion
• Further recognition*
• J ob preservation
Decreasing emphasis on evaluation criteria categories
Sphere of influence
** Indicative and varies on business and Macro Economic need
Figure 2: Transnet value capture through supplier influence
Category Description
Capability and capacity building in SA
• Developing local capability and efficiency through : investment in plant, increasing the number of products bought locally and qualifying suppliers to meet international standards.
• This criterion refers specifically to industrial capability building that focuses on value-add activities of the local industry through manufacturing or service-related functions.
Source: Team Analysis
Technology transfer/Sustainability
• Refers to process, know-how and Intellectual Property associated with developing a competitive local supplier post the current transaction
The recommended SD categories are based on the alignment with government objectives
13
Skills development
Job creation/ preservation
Small business promotion
• Refers to skills transfer with an emphasis on the accumulation of knowledge and experience
• Generally targeted toward sector specific skills development with a focus on artisan and technical skills
• Refers to an increase or preserve in the number of jobs due to the award of business from Transnet
• Favouring more labour intensive methods for job creation• Jobs include both skilled and unskilled
• Encourage the growth and expansion of small businesses and start ups through procurement and support mechanisms
14
SD and BBBEE Requirements
Contents
SD : Proposal vs Final plan
SD : Background and Objectives
Tender gateways : SD and BBBEE
TPT Equipment acquisitions
Summary: SD Process
Compile proposal as part of SD plan
Transnet evaluates supplier SD proposal
Successful tenderer to compile SD plan
SD plan to be agreed upon by Transnet and supplier
Responsible Supplier Transnet Supplier &
TransnetSupplier& Transnet
• The supplier is expected to formulate a SD proposal to identify the opportunities that the supplier will pursue
• The SD Proposal should address the main areas
Capability and capacity building in SA;
technology transfer/sustainability;
skills development; small business
promotion job
creation/preservation
• SD (Proposals) responses will be evaluated on their ability to leverage Transnet’s long term procurement in order to promote Capability and capacity building in SA in order to increase the capability and capacity, responsiveness and competitiveness of South African supplier industries
• The SD Programme’s ability to promote skills transfer, Capability and capacity building in SA and the sustainability of the venture will all be taken into account during evaluation
• Once the SD plan has been finalised with Transnet, the supplier will initiate the plan
• The supplier will be required to report quarterly on the progress being made against the plan, the attainment of milestones and the reasons (if any) that goals are not being met
• Transnet will supply guidelines to the reporting format required for the quarterly reports
• Only a successful bidder will be required to complete a detailed SD Plan and deliver it to Transnet in 30 days after signing the LOI
• Both the Supplier ad Transnet must agree and sign the final SD plan 30 days thereafter
• The SD Plan will have to outline the:
– Type of Capability and capacity building in SA effort that will be pursued,
– Anticipated investment,
– Description of products to be produced,
– Skills transfer ,as well as
– Processes, systems, technologies and equipment required
NOTE: • Both a SD Proposal and SD Plan must be completed . 1
5
SD Plan: Capability and capacity building in SA Summary – Supplier (x/x)
Description Sub-initiative
Total Summary • 1.0 xxx• 2.0 xxx • 3.0 xxx
• Total Capability and capacity building in SA Value
1.0 xxxx • xxxx • Rx.xm
Key KPICategory
Capability and capacity building in SA
A • R xxx.xm• R xxx.xm• R xx.xm
• R xxx.xm
Transnet Authorised Signatory Date
Name / Title
Supplier Authorised Signatory Date
Name / Title
2.0 xxxx • xxxx
3.0 xxxx • xxxx
• Rx.xm
• Rx.xm
Example
16
SD Plan: SD Capability and capacity building in SA Initiative (x/x)
Transnet Authorised Signatory Date
Name / Title
Supplier Authorised Signatory Date
Name / Title
Initiative Description: Target KPI
Detailed Description R x.x* ZAR
Transnet Lead:TPT Lead:
x # of reports completed
Supplier Lead:Supplier Lead:
TBD at selection meeting
# of components selected
Start Date:
End Date:
Reporting Frequency:(one month prior to DPE report)
Quarterly (xx May CY, xx, xx August CY, xx November CY and February (following Year) xx)
17
Transnet Authorised Signatory Date
Name / Title
Supplier Authorised Signatory Date
Name / Title
412 9871110 498764321
20132012
8765 9321 10 11
2011
5 12 1 62 3 5 121110
Year
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
xxx
Activity
SD Plan: SD Capability and capacity building in SA Initiative (x/x)
18
19
SD and BBBEE Requirements
Contents
SD : Proposal vs Final plan
SD : Background and Objectives
Tender gateways : SD and BBBEE
TPT Equipment acquisitions
20
A three step evaluation strategy will be used in the evaluation of the equipment proposals
> Threshold
MinimumSD/BBBEE
criteria
SD / BBBEE PriceSD BBBEE
Award tender to successful supplier
Evaluate for
>Threshold
MinimumEligibility criteria
1 2 2
Evaluate for Evaluate per weighting
Equipment SD / BBBEE threshold
Eligibility threshold
Technical threshold
Evaluation weighting (%)
Main offer and main offer plus options
Price SD BBBEE (Scorecard and Further recognition criteria)
RTG Cranes (Proposal A), STS Cranes (Proposal B) and RTG Cranes and STS Cranes (Proposal C)
40% 100% 80% 60 20 20
1 2
3
>Threshold
MinimumTechnical criteria
Evaluate for
Eligibility
3
2
Note: The tender indicates that the SD commitment is aimed at achieving at least 30% of the supplier’s tender value as part of the tender bidIf no tender passes the 2nd stage technical evaluation, the threshold will be reduced from 80% to 70%
Technical
21
SD and BBBEE Requirements
Contents
SD : Proposal vs Final plan
SD : Background and Objectives
Tender gateways : SD and BBBEE
TPT Equipment acquisitions
7 Year Capital expenditure plans
22
• Transnet’s capital investment over the next 7 years (2012/13 to 2018/19) totals R300billion
• Transnet Port Terminals will be undertaking R33billion (11%) of these projects over the next 7 years
• TPT’s 7 year investment plan will comprise mainly of the following acquisitions:o Ship to Shore Craneso Rubber-Tyred Gantry Craneso Straddle Carrierso Ship Loaderso Ship Unloaderso Mobile Harbour Craneso Haulerso Trailerso Reach Stackerso Empty Container Handlers
Equipment acquisitions : currently in procurement cycle phase
23
Item Project
1 4 x STS Cranes – Ngqura
2 18 x RTG Cranes – Ngqura
3 DGPS (Digital Global Positioning System) - Durban
4 Supply and installation of a monitoring system for refrigerated containers (Reefers) at Cape Town (CTCT & CTMPT), Port Elizabeth (PECT), Ngqura (NCT) and Durban Container terminals (Pier1 and Pier2).
5 Manufacture, supply, delivery and commissioning of 74 Fifth wheel haulers for RBY
6 Manufacture, supply, delivery and commissioning of forklifts – RBY (3x42T;6x32T;10x18T;11x8T); EL (4x7T) and NGQURA (2x2T)
7 Manufacture, supply, delivery and commissioning of 6 Reachstackers – 2 RBY;2 NCT;1 Pier 1 and 1 CTNMPT
Equipment acquisitions : SD plans being finalised
24
Item Project
1 1 x Mobile harbour crane for CTN
2 Design review services
3 Manufacture, supply, delivery and commissioning of 14 haulers – 4 Saldanha;10 Pier 1
4 Manufacture, supply, delivery and commissioning of 9 empty container handlers – 2 CTN;2 NCT; 5 DCT
5 Manufacture, supply, delivery and commissioning of 48 haulers for Ngqura
Equipment acquisitions : SD plans committed
25
Item Project SD value committed (R’m)
SD committed %age of Contract value
1 1 x Ship unloader 15.52 12%
2 28 x Straddle Carriers 23.00 10%
3 7 x Tandem lift STS Cranes 47.00 6%
4 6 x Mobile Harbour Cranes 58.29 23%
5 33 x Haulers 4.07 9%
6 8 x Reachstackers 18.12 16%
Equipment acquisitions planned for the remainder of this year (to Mar 2013)
26
Item Project
1 Ship unloaders for Bulk terminals
2 Rail Mounted Gantry Cranes for Container Terminals
3 Wharf Cranes