TRANSMITTAL NO.1 SPECIFICATION NO. 2688 ANALYSIS OF BIDS

Transcript of TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ......

Page 1: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

TRANSMITTAL NO.1

SPECIFICATION NO. 2688

ANALYSIS OF BIDS

Page 2: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

~ SPECI.FICATION NO. 2688

BERTHS 302-305 TERMINAL LIGHTING UPGRADE

PROJ. CONST. MGR.: scorr GILMOUR

ENGINEERING EST.: $3,088.500.00 ADVERTISE DATE: JUNE 28,2007 BID DATE: AUGUST 9,2007

ITEM 1 ITEM 2 ITEM 3

LUMP SUM ASPHALT CONCRETE PAVING LIGHTING FIXTURES

CONTRACTOR'S NAME CONSTRUCTION

LUMP SUM Tons Aoorox. Otv = 200 Each Approx. Ot = 950

s ztoo s $Jea

ENGINEERING ESTIMATE $ 1,556,250.00 $ 150.00 $ 30,000.00 $ 1,275.00 $ 1,211,250.00

1) HELIX ELECTRIC, INC. $ 1,460,000.00 $ 175.00 $ 35,00000 $ 1,10000 $ 1,045,00000

2) DYNALECTRIC $ 1,382,213.00 $ 190.00 $ 38,00000 $ 1,200.00 $ 1,140,000.00

3) DOTY BROS. $ 788,291.00 $ 239.00 $ 47,80000 $ 1,850.00 $ 1,757,500.00

4) HIGHLIGHT ELECTRIC $ 1A 15,000.00 $ 285.00 $ 57,000.00 $ 1,560.00 $ 1,482,000.00

5} MORROW-MEADOWS CORP. $ 1,140,000.00 $ 150.00 $ 30,000.00 $ 1,98500 $ 1,885,750.00

6) CSI ELECTRICAL CONTR. $ 1,950,000.00 $ 200.00 $ 40,00000 $ 1,200.00 $ 1,140,00000

7) GOLDEN STATE UTILITY $ 2,632,304.00 $ 315.00 $ 63,000.00 $ 1,365.00 $ 1,296,750.00

8) COMET ELECTRIC, INC. $ 2,000,000.00 $ 506.00 $ 101,20000 $ 2,594.00 $ 2,464,300.00

+ $1,811,595.00 9) METRO BUILDERS & ENGRS. $ 2,802,928.71 $ 382.32 $ 76,464.00 $ 1,906.94 $ 1,811,593.00

') AVERAGE BID $ 1,730,OB1.B6 $ 271.37 $ 54,2737B $ 1,64010 $ 1,55B,099.22

2} STANDARD DEVIATION $ 672,18163 $ , 15.23 $ 23,04679 $ 488.02 $ 463,620.79

3} ENG. EST. - LOW BIDDER $ 96,25000 $ (2500) $ (5,00000) $ 175.00 $ 166,25000

• AS IN BID

Page 3: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

PAGE 2 OF 3 ~ SPECifiCATION NO. 2688 BERTHS 302-305 TERMINAL LIGHTING UPGRADE

ITEM 4 ITEM 5 ITEM 6 ITEM 7

EXCAVATE. REMO & DISP OF RECY CA HAZ WASTE SOIL, RESOURCE CONS & REC ACT (RCRAl HAZ WASTE SOIL, OR CONTI

NON-HAZ WASTE SOIL (ALLOWANCE ITEM)

$

FLAGPERSON (S)

(A LLOW A N C E IT EM)

21 ,000.00

PERFORM DEPT . OF BUILDING AND SAFETY CORRECTIONS

(A LLOWANC E ITE M)

MODIFICATIONS RESULTING FROM UNDGERGROUND UTILITIES AND

MODIFY UTILITIES (A LLOW A N C E ITEM)

$ 20,000.00 $ 100,000.00 $ 100,000.00

$ 100,000.00$ 20,000.00 $ 21 ,000.0 0 $ 100,000.00

$ 20,000.00 $ 21,000.00 $ 100,000.00 $ 100,000.00

$ 20,000.00 $ 21 ,000.00 $ 100,000.00 $ 100,000.00

$ 20,000 .00 $ 21 ,000.00 $ 10 0 ,0 0 0 .00 $ 100,000.00

$ 20,000.00 $ 2 1,000.0 0 $ 100,000.00 $ 100,0 00.00

$ 20,000.00 $ 21 ,000.00 $ 100,000.00 $ 100,000.00

$ 20,000.00 $ 21,000.00 $ 100,000.00 $ 100,000.00

$ 20,000.00 $ 21 ,000.00 $ 100,000.00 $ 100,000 .00

$ 100,000 .00$ 20,000.00 $ 2 1 ,0 0 0 .0 0 $ 10 0, 000. 0 0

s 20.000.00

S -S

S 2 1,00000 S 100,000.00

S S

S s

S 100 ,0 0 0 .0 0

S

s • AS IN BID

Page 4: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

• SPECifiCATION NO. 2688 PAGE30F3 BERTHS 302-305 TERMINAL LIGHTING UPGRADE

ITEM 8 GRAND TOTAL CONTRACTOR'S NAME EXISTING FIELD OFFICE ITEMS 1 - 8

(ALLOWANCE ITEM)

$ 50,000.00 $ 3,088,500.00 ENGINEERING ESTIMATE

$ 50,000.00 $ 2,831,000.00 1) HELIX ELECTRIC, INC.

$ 50,000.00 $ 2,851,213.00 2) DYNALECTRIC

$ 50,000.00 $ 2,884,591.00 3) DOTY BROS.

$ 50,000.00 $ 3,245,000.00 4) HIGHLIGHT ELECTRIC

$ 50,000.00 $ 3,346,750.00 5) MORROW-MEADOWS CORP.

$ 50,000.00 $ 3,421,000.00 6) CSI ELECTRICAL CONTR.

$ 50,000.00 $ 4,283,054.00 7) GOLDEN STATE UTILITY

$ 50,000.00 $ 4,856,500.00 8) COMET ELECTRIC, INC.

• $4,981,987.71 $ 50,000.00 $ 4,981,985.71 9) METRO BUILDERS & ENGRS.

50,000.00 3,633.454861') AVERAGE 810 853,757.95 2) STANDARD DEVIATION

257,50000

• AS IN BID

SHAUN SHAH REST ANI Chief Harbor Engineer Construction Division

Page 5: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

TRANSMITTAL NO.2

SPECIFICATION NO. 2688

CONTRACTOR &SUBCONTRACTOR LIST

Page 6: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

Project Title: Berth 302-305 lighting Terminal Upgrade Spec No.: 2688

Prime Contractor's Name & Address Type of Work SBE ( Yesl No)

Bid Grand Total: $2,831,000.00

$ Amount SBE% MBElWBEIOBE

Helix Electric, Inc. Prime Contractor 8260 Camino Santa Fe, Suite A San Diego, CA92121

No $1,581,000.00 0.00% aBE

Subcontractor's Name & Address Type of Work SBE (Yesl No) $ Amount SBE% MBElWBE/OBE

Vetsource Vendor 16701 Main Street #250 Fixtures Hesperia, CA 92345

Yes $850,000.00 30.02% aBE

Granitex Subcontractor Formed Concrete and

185 East Paularino, Suite D Paving Costa Mesa, CA 92626

No $400,000.00 0.00% aBE

Total Subcontractor $ Amount

subcontractor SBE Total Amount

Total Subcontractor Total $ Amount

Total SBE % SBE% Subcontractor %

$1,250,000.00 $850,000.00 30.02% 30.02% 44.2%

Page 1 of 1

Page 7: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

TRANSMITTAL NO.3

SPECIFICATION NO. 2688

SITE MAP

Page 8: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

SCAm "m AS-SHOWN IBERTHS 302-305 TERMINAL LIGHTING UPGRADE I

CHlU" or DESIGN

ISITE MAPI

L

Page 9: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

TRANSMITTAL NO.4

SPECIFICATION NO. 2688

LETTER FROM HOLOPHANE REGARDING LED TECHNOLOGY

Page 10: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

.~ .-.. ~.: . ;.-..-,­: :-".

LEADER IN LlGH11NGSOLUTIONS

An~cultvBrands Company

Mr. Vahik Haddadian, P.E. 9/21/07 Building Electrical Engineer Associate Port of Los Angeles 425 S. Palos Verdes Street San Pedro, CA 90731

Dear Mr. Haddadian:

I am writing in reference to your request for information regarding highmast lighting with LED technology. Certainly, LED's are progressing at a very fast pace and will someday reach the lumen packages needed for general illumination. While Holophane is actively researching this technology, it is not quite ready to replace traditional light sources, particularly in this application. At this point in time, three key elements hinder incorporating this elegant and progressive light source:

1. Required Lumen package/or highmast. Highmast requires high lumen density to achieve the recommended illumination levels. Typical IOOOW HPS lamps deliver approximately 150,000 lumens. Current commercially available LED's deliver approximately 50-701umens per watt (when properly thermally managed in a fixture). Thus a highmast fixture would require a minimum of2,000 or so 1W LED's to deliver the same lumen package. This is a very high part count to control from a quality and reliability standpoint.

2. Thermal and ElectricalManagement. Magnetic ballast technology is a very mature technology and extremely robust to both temperature fluctuations and electrical variation. LED's and the electronic drivers that power them must be thermally managed and electrically protected from surges. There is a scarcity of robust technologies commercially available to handle these challenging issues. While this hurdle is achievable from an engineering perspective, it creates a significant cost disparity and adds component complexity for an outdoor fixture.

3. Costo/assembkd Iumineire with LED's. While both the sheer number of LED's and the technology required to handle them are certainly barriers, the key hurdle remains the extremely high cost. For example, there are commercially available LED luminaires for roadway application that target to replace cobrahead type fixture. They cost $800·$1000 each vs. $80-$100 for the cobrahead... a significant price disparity driven by the high costs of LED's and the sophisticated technology required to electrically drive, thermally protect, and electrically isolate the components.

While we are very excited about this new technology and are actively working on applications to bring this technology to its full commercial potential, the reality is that it is not currently feasible to replace a very high lumen package like HighMast with an LED alternative.

Please don't hesitate to call or e-mail me ifyou would like any further clarification.

smcerelJ1Jd-J tbdelSamedt~ee;~r of Technology - Holophane 214 Oakwood Ave Newark, OH 43055 (740) 349-4230 e-mail: [email protected]

Page 11: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

TRANSMITTAL NO.5

SPECIFICATION NO. 2688

ISEW ALLEGATIONS, STAFF RESPONSE, AND REFERENCE LETTERS

Page 12: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

Berths 302-305 Terminal Lighting - Specs No. 2688

IBEW Local 11 Allegations

IBEW Local 11 has furnished the POLA a binder titled "HELIX ELECTRIC FACT SHEET AND SUBSTANTIATING DOCUMENTS". Staff has reviewed this information and the following comments are provided.

1. IBEW provided information regarding a public agency's responsibilities regarding award of contract.

POLA Response: The POLA always performs a bid analyses after receipt of each bid. Bid proposals are reviewed for conformance with contract bidding requirements, verification of contractor's license and reference checks. The City Attorney is consulted in case it is determined that a bid/bids might be non-responsive and/or other questionable items are found in the bid proposals.

2. IBEW has provided many reference projects in the binder regarding lawsuits, safety violations and noncompliance.

POLA Response: Law suits: Most of the projects with the exception a few in 2003, and two in 2004, were between 1990 and 2002. In all Helix lawsuits, the charges were settled before going to trial. Safety. The Experience Modification Factor (EMF) for Helix is 0.66, which is considered low. This. EMF is calculated based on the number of accidents a company has had, and is used for Worker's compensation rate purposes. Helix has a low EMR of 0.66 and therefore is considered a safe contractor. In addition, the POLA Berths 302-305 Terminal Lighting project includes the "Electrical Safety Policy" which requires trained workers to work on this project. Non­compliance: The non-compliance notices were issued on the Westwood Replacement Hospital project. The non-compliance form was used as a means of communication between the owner and the contractor. Staff has checked Helix's recent projects. In all reference checks the clients were happy with the quality of work performed by Helix (see attached transmittal). Helix has received numerous project awards from many agencies including "Excellence in Construction - LAX Gateway Enhancement Project - 2002" and "Education Contractor of the Year - 2005".

Helix worked on the City of Los Angeles City Hall Retrofit project between 1998 and 2003 and successfully completed the project with no contract compliance issues. Helix is currently working on a major expansion project for the Los Angeles Department of Airports and has encountered no contract compliance issues thus far.

Page 13: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

I

'/

,~

COUNTY SANITATION DISTRICTS [IF ORANGE COUNTY, CALIFORNIA

August 28, 2007

., ',' .~. .

phone: '['Z14J 962-2411

mailing address: OJ, JW:8ox 8127

Fountain Valley, CA • ,,)32728-8127

jS;~~taddress: 1tie44 ElliS Avenue Foui'itairi Valley, CA

"'9270EP018

... ~ ..'.

:Member ,', Agencies

• Cities

,>'~,;;;;';:,;,;ta~~: '~;?, ',''?,lJa 'park,',', Cypress3f.,o!.Jl ,pain Valley.{",,?,:,.; Fullerton

~it~?fE1"'[J,Beach

",/p,cange 'entia

nB h

Mr. HamidKalantar ProjectManager Helix Electric, Inc. 8260 Camino Santa Fe San Diego CA 92121

Subject: Orange County Sanitation District SP-81 Project Plant 2 Electrical Equipment Refurbishment & Protection Project Letter ofRecommendation

Dear Mr. Kalantar,

Helix Electric, Inc. (HEI) as the prime contractor on the subject project successfully completed this job per contract plans and specifications on time and on budget. HErs unique ability to work closely with the owner and identify design changes and modifications as needed added value to the overall performance and delivery of the contract specified work. As a result, HEI was able to meet and exceed budgeting and milestone requirements that were instrumental to the overall success of this project.

HEI conunitted highly professional and experienced field personnel to operate and perform its work. HEI's Superintendent and Foremen effectively coordinated all work between engineering, owner, and Operations and Maintenance groups while maintaining the required productivity levels demanded on this project. As a direct result of strong HEI project management skills, the team was able to reach consensus in a timely fashion in order to effectively recognize and resolve conflicts. The overall change order rate was below 5% which achieved the owner's expectations. Upon the final job walk, Operations and Maintenance staff praised the quality of the work and final product. The project goals associated with Quality, Cost, Schedule, and Scope were all met as a result of HEI's diligent efforts coupled with the Orange County Sanitation Districts support.

It has been a pleasure working with such dedicated and professional group of people on this job. Please feel free to share your success story on this project with others and contact me should further recommendation be desired.

Sincerely,

Chuck Hodge Resident Engineer, PE

A Public Wastewater and Environmental Management Agency Committed to Protecting the Envtronment: Since 1954

Page 14: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

SMARf']CORNER August 27, 2007

Mr. Gary Shekhter, CEO Helix Electric, Inc. 8260 Camino-Santa Fe, Suite A San Diego, Ca 92121

Re: Smart Corner

Dear Gary,

I am writing this letter to express our appreciation of Helix Electric's outstanding performance as Design-Build Electrical Subcontractor for our Smart Comer project.

Following your selection as our Design-Build electrical subcontractor In 2004, Helix Electric successfully completed the project's electrical design while employing fast-track construction techniques to accomplish the construction of our mixed-use Smart Corner project In approximately 30 months. This is a noteworthy achievement considering the unusual challenges the project imposed on its constructors.

In addition to the obvious challenges associated with a congested downtown site, our project included a requirement to achieve a Sliver LEED Certification for the Office Building component while simultaneously completing the electrical design and Installation of the necessary conduits, pull boxes and grounding system for the San Diego Troltey's Light Rail Station whose trackway and passenger platforms form the podium between the two Smart Comer buildings. Your team's willingness to work with SANDAG', their consulting engineers, our Architect and our Architect's consultants In properly coordinating your electrical design was exemplary.

While we appreciate everyone's contribution to the success of our project, we wish to particularly recognize your Senior Project Manager, Naum Gore and your Superintendent, Gary Workman for their outstanding efforts. We look forward to working with this Helix Electric team as we develop future projects.

Very truly yours,

CJUF Smart Corner LLC b~~._Sm~!'t~omer, LLC.. i'~ t

/ / ' .,'LJ l--.----- ­nager

'\ AIV M':'T

655 WEST BROADWAY, SUITE 1450 • SAN DIEGO, CA 92101 • 619-702-5655 • 619-702-1655 FAX

Page 15: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

Hensel PhelpsConstruction Co.

. ,:....'

sOUTHeRN CALIFOANIA DrSTRlet 18850 Von Karman Avenue, Sulle100 Irvine, Calilornla 92612 Lie. 519252 (949) 852·0111 (949) 852·0218 FAX

August21, 2007

Helix Electric, Inc. 8260Camino Santa Fe, Suite A San Diego, Cn 92121

Attention: Gary Shekhter

Reference: SMART CORNER

Subject: Letter of Recognition

DearGary,

This letter is provided to Helix Electric in rec;qgnitionofyourb.u~tl!,nalflgp:eifQnnanq~.Q~ Design-Build Electrical Subcontractor for the SffiartComerptdJeet.

-Helix Electric joined the project team as a Design-Builderin 2()04. This team then successfully completed the design and, employing fast-trackmethodology. constt~ct~dthe

signature mixed-use Smart Corner project in l1pptoxtmately 3'0 months. ThisiS":a:rell1arkable achievement, especiallywhen considering the many unique challengestlieSll'ntrt Comer project team experienced.

In addition to the more obvious challenges associated with compleUI1gii complexmixec;l:"'use projecton a congested downtown site, Helix Electric Was faced With theIl4iJ~;~'haH~ri~<\f helpingattain a Silver LEED Certification for the Smart: Cumet Office.)3uildmg,'whHe completingtenant improvement work for a sophisticated PublicTennant. Inatl,l:itlon:HeHx took on the challengecompleting the electrical design and instaJ.ling the reqtl'tred conduit fbt the San Diego Trolley's City College Station which sits atoptheparK1ngga~gebehveenthe

two Smart Corner buildings.

We appreciate everyone's contrihution to the suecesset'this project. In particu[ar,how~ver,

we want to recognizeyour Senior Project Manager,Naum Gorthllldyour St~j)etirtteI14eht, Gary Workman for their outstanding efforts.

We look forward to working with this Helix Electric teamonmany I11preJ;ltQjiJl.cts.

Sincerely, HENSEL PHELPS CONSTRUCTION CO.

~~~ B.II1. Welch Project Manager

Page 16: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

August 1, 2007

Mr. Mike Thompson Helix Electric, Inc. 8260 Camino Santa Fe San Diego, CA 92121

Re: Infrastructure Upgrade Project Gavilan Joint Community College District Gilroy, CA

Dear Mr. Thompson,

I would like to take this opportunity to express on behalf of Kitchell, BFGC Architects, and the District the great job Helix Electric did in completing the Infrastructure Upgrade project at Gavilan College on time and within budget. As you know this was a complex project with several different phases in order to keep the college operational throughout the school year. Mike Nolan, as project superintendent, did a great job maintaining the project schedule and addressing any issues as they arose. Mike was also very professional, courteous, and a valuable team member.

It certainly has been a pleasure working with Helix Electric, Inc. on this project. If desired, I would be willing to provide future references.

C,:y, ly~{L Casey M~~lis Project ~i~~r

\J cc: Joe Keeler, GJCCD

Art Kerr, GJCCD Rich Faber, Kitchell Dave Cartnal, BFGC File: 3269C2 - 3.08

Kitchell CEM

5055 Santa Teresa Blvd. I Gilroy, California 95020 I Phone 408.846.4986 I Fax 408.846.4988 I www.kitchell.com

I

Page 17: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

LEDCOR BUILDERS INC.

U.I. READ OffICE

9466 Black Mountain Rd.Suite 250

San Diego,CA

92126

July 26th , 2007

To whom it may concern:

Re: Helix Electric, Inc. Sub]: Letter of Recommendation

Helix Electric is currently a subcontractor on my Oceanside Terraces Project, completingan electrical package totaling close to $1.2 million. They have also successfully worked on several other Ledcor projects.

With regard to my personal working experience with Helix Electric, I can say that I have enjoyed having them onboard my project. Their workmanship exceeds industry standards. Their office support has been fair with pricing of scope changes. They have the ability to staff the job to meet demanding schedule requirements.

I would strongly recommend Helix Electric for any contractor looking for a fair and qualified electrical subcontractor.

Sincerely,

\A\ \1,\}~-V

Biglid,ne ject anage

(Al.GAR)' CHiCAGO D.o\I..l.AS EDMONTON HONOLULU

ORLANDi.) OTTAWA SAN DIEGO SEATilE TORONTO V,t;,NCOUVER

Page 18: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

February 8, 2007 •SUNDT Mr. Gary Shekhter - CEO CONSTRUCTION, INC.

Helix Electric, Inc. 8260 Camino Santa Fe, Suite A San Diego, CA 92121

Re: UCDHS Education Building

Subject: Letter of Recommendation

Dear Gary:

I would like to thank you and your entire staff, Elmer Ganac, John Mari, Brian Johnson and Eric Chien for a job well done.

The UCDHS Education Building project is nearly complete and I wanted to let you know how much I appreciated the efforts of your project team.

I know that Helix has a large resume of projects of similar size and complexity to the UCDHS project. However, these projects are never easy. I am thankful we were able to have Helix Electric on this project.

I myself have been around this industry for more than 30 years and I've watched Helix Electric grow into a formidable company over the years. You must be very proud. In fact Eric and I have worked on projects together as far back as 20 years ago and I look forward to many more projects together.

As both Helix and Sundt concentrate on similar project types, it makes good sense to me that we should make a concerted effort to pursue projects together in the future.

Please keep Sundt in mind, I will contact you or Eric whenever I run across a project that makes sense for us to pursue.

Sincerely, Sundt Construction, Inc.a/M'k S' ~~ ~

1 e ala Project Director

cc: Eric Chien

We Make Projects Work.sID 2860 GATEWAY OAKS DRIVE . Sum 300 . SACRAMENTO. CA (95833) . (916) 830-8000 . FAX (916) 830-8015 . WWW.SUNDT.COM

DALLAS • NOVATO • PHOENIX • SACRAMENTO • SAN DIEGO • TUCSON

CONT'''CTOR ARIZONA ROC06BOI2'A ROC068014'L,09 ROC07B799-L'37 ROC076101'L'!! CALIFORNIA 453175-A-8 ! "JI'\IO(' Q(\rn"Anl1:.It_(ll onrn"?Q(HI:O_I.f"l,.l "",r"",(c~1-1 '''''1 nr.,..,"' ... ' ..... "

Page 19: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

·'

A. R Street Headquarters Expansion Project P. O. Box 942702 Sacramento, CA 94229-2702 Telecommunications Device for the Deaf- (916) 795-3240CalPERS (916) 795-2050. FAX (916) 795-2383

November 1. 2006

Gary Shekhter Helix Electric 8260 Camino Santa Fe San Diego. CA 92121

Dear Gary,

I want to thank you personally for your contribution to this extraordinary project. Each team member, and there are over 2,500 of you, has much to be proud of in what you have accomplished individually and together.

There is a great story in this project. It is a story about how people came together from many diverse perspectives and made a meaningful contribution. You know about the hard work that you and others around you put into it each day. For some of you it was for many months. for others it was a couple years, and for some of you it has been a daily commitment for six or seven years. And you stayed with it. You worked for the good of the whole, for the vision ofwhat the team committed to do.

The CalPERS Board put their trust in the team to create the design and construct the bUilding to accomplish a great vision. You honored CalPERS values and their trust through the magnificent building that stands' here today, and wiJl be here for generations to come.

You have succeeded by communicating and collaborating daily; and through mutual respect, your commitment to excellence (our team motto) and integrity. And you have shown an undying willingness to persevere to solve problems at all levels and of all types. As the project is ending, some of you are still here. helping solve remaining issues in the same way you have participated throughout the life of this project. And for all of this I thank you.

I know 'from talking with many of you over the past seven years that you take great pride ;n the work you have done to make this a reality. You have told your family, friends, and neighbors about your work and how special it is. You brought them to see this building, sharing your sense of its special qualities. I too share this sense of pride and accomplishment in what we have done together as a team.

At each step ln the project planning, design, and construction phases, the vision and core values have been present in your approach to the work at hand. When presented with difficult issues and challenging options you asked yourselves what is the right

California Public 15m"'" Retirement System ,.~ .. ~......~ ,.--."

Page 20: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

THE CITY OF SAN DIEGO

April 14,2005

To Whom It May Concern:

Subject: Helix Electric - Work on Alvarado and Miramar Water Treatment Plant Projects

Helix Electric has been our subcontractor on two large City of San Diego Water Treatment Plant Upgrade and Expansion projects.

Alvarado Phase I was a $52 million complex and a difficult project. When the owner initiated an $11 million change order and bankruptcy of the prime contractor, it was essential for the City and all subcontractors to work harder and more diligently to finish this project. One highlight of this project was that Helix staffworked cooperatively with the designer and the construction manager's team to overcome difficulties and challenges, while maintaining the existing plant in operation at all time. This project was substantially completed in June of2003. Helix's staff has been back several times to answer and address City concerns without asking for any additional compensation.

Miramar Water Treatment Plant Upgrade and Expansion - Contract A is an $82 million project that started mid 2003 and will be completed summer 0[2007. Helix is a major subcontractor for this project. Helix has been instrumental in working with the designer to incorporate a major change to the security plan which was a new scope to the project.

Overall, City of San Diego staff and our consultants have an excellent working relationship with Helix Electric which has resulted in successful completion of several difficult projects. Weare glad to provide this letter of recommendation to Helix Electric to be used for other agencies or private work.

Please feel free to call me at (619) 533-5105 if you have any question regarding this letter.

Sincerely,

~arzwU'e·h'\...rU'11 JI/

Senior Civil Engineer

• Capital Improvements Prosram • Water Department 600 BStreet, Suite 700, MS 907 • Son Diego, fA 92101·4518

DIVERSITY I!IN;;~IJS.:J:I~ Tel (619) 533·4242 Fox (619) 533·5278

Page 21: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

, 05/06/2007 17:43 FAX 7026995743 HELILELECTRIC ... GARY SHEKHTER I4J 002/002

FLAGSHIP CONSTRUCTION CO., LLC

(~~ Con8truet1on Management. General Contracting 4052 South DeanMartin Drive. Las Vegas. Nevada 89103

(702) 739·1122 Voice • (702) ~1724 Fax:, ... - .­ Nevada License # 52358

January18, 2007

Mr. Vietor Fuchs Hetix Electric 3078 E. Sunnt Road. Suite8 lea Vega, NV 89120

Reference: McCarren 2000 - Phase five In-llne Baggage Saeenlog ~ Terminal 1. Nodes 3 & 4 Contract No.22OS.2

SUbJect: Jeti' Reider

Dear Mr. FlICtts,

The purpose of this letter is to thankHelix Electricfor placlngJeff Relderon the contractfor the above refereneecl project. Jeff i.s atways very proactive In Identlfyitlgproblems and possiblesolution, to these iSsues beforethey detrimental to the project

Jeff'scusm-.er service skill. regarding thecompletion of this project are second to none. Jeff is always Ir. constant GOntact withFSCCregarding our wants and needs from Helix concerning this project. Hehas goneout of his way to makethisproject as successful as possible.

It Is In myopinion that anyfutureprojects lhat 'am Incharge of andwhereHelIxhoklsa contract that I Will ImmedlQtely requestJeff Reider to be my pointof contact. I·ti$ presence on this projecthas been a great aid tome Inthe goals that I amatt.."pting to ~pflSh.

HeIs always on aehedule andkeepsme posted whenproblemsarise.

Should you have any questions, please feel free to contact me at 702-491·8745

Slncerely)'DLIl'$. Flagship ConstructionCompany, L.LC

~~

A NAnONAL CONSTRUCTION ENTERPRISES COMPANY AN IQUAL OPPOR1'UNITY IMPLOYER

Page 22: TRANSMITTAL NO - Port of Los Angeles · Magnetic ballast technology is a very mature technology ... Please don't hesitate to call or e-mail me ifyou would like any further clarification.

State of California • State and Consumer Services Agency • Gray Davis, Governor

D E fAR 1 M [ N T 0 F G ENE R A L S E R V ICE·S Real Estate Services Division. Project Management Branch The Ziggurat. 707 Third Street, Third Floor. Wesl Sacramento, CA 95605· (916) 376·1700

March 7, 2003

Mr. Dimitri Gelfer Helix Electric 8260 Camino Santa Fe San Diego, Ca. 92121

Subject: Richmond Laboratory Phase II

To Whom It May Concern,

Since 1996 the State of California has been involved with the design and construction of the Department of Health Services, Richmond Laboratory. The Richmond Laboratory is a 322,000 square foot Bio-Safety Level III (BSL-III) Laboratory that houses nine laboratories including a Genetic Disease Laboratory, Infectious Disease Laboratory, Food and Drug Laboratory, and an Environmental Health Laboratory. Phase II included the construction of three - 3 story laboratories, two- 3 story office buildings, an auditorium and a warehouse. During the construction phase of the project I had the pleasure of working with Helix Electric.

Helix Electric was responsible for providing all labor, materials and supervision associated with work pertaining to the electrical scope of the project. The electrical scope included power, communications, control, lighting, public address, fire alarm, etc. My experiences with Helix are that they were, on a consistent basis, cooperative in nature, provided a positive attitude in achieving the State's goal to complete the project and, in general, a pleasure to deal with.

The State of California is fortunate to have had the opportunity to work with Helix Electric on the Richmond Laboratory project. Please consider this letter my personal commendation to the Helix organization for providing superior services on the Richmond Lab project. . .

.,?

Sincerely,

Joseph Flores, Project Director Project Management Branch 916-376-1726