Open house to focus on transmission line routes, substation sites Transmission Line PROJECT Stegall-Scottsbluff 115,000 Volt August 2014 W ith a focus on preferred and alternative line routes and substation sites for its Stegall to Scottsbluff transmission line project, Nebraska Public Power District will hold an open house on Wednesday, Aug. 20 at the Gering Civic Center, 1050 M Street in Gering, from 2 to 8 p.m. Attendees should allow 30-60 minutes to walk through the displays and interact with NPPD representatives. This will be the third open house on the project by NPPD since January 2014. Since then the project team has been reviewing public comments and meeting with various agencies while working to narrow down the initial study area to corridors, and now to preferred and alternative routes. Project Manager Jedd Fischer noted, “Although we have a preferred and alternative routes for this project, no final route has been determined. We will continue to gather additional comments from landowners and various agencies before making a final determination.” The Stegall to Scottsbluff project consists of routing and siting a new 115,000-volt electric transmission line from the existing Scottsbluff substation, to a new substation to be built approximately five miles south of Stegall, near an existing substation operated by Basin Electric Power Cooperative. The line length is estimated to be 23 miles and is expected to be in service by mid-2017. The open houses are held to allow landowners the opportunity to learn more about the project, including the need and benefit for the project, structure types, right-of- way acquisition, and routing criteria, as well as provide NPPD staff with information about each landowner’s property. “The Stegall to Scottsbluff transmission line will strengthen electric reliability in the Panhandle region of Nebraska and we encourage landowners who have been identified to attend and provide us with comments on the preferred and alternative routes,” NPPD Vice President and Chief Operating Officer Tom Kent explained. “We have had good turnouts at our first two open houses,” Fischer added. “We do encourage all landowners along the routes to attend and make comments related to their specific property. Even if a landowner has been to a previous open house, new, more detailed information is available regarding the project.” Fischer also noted that there has been a misconception that NPPD plans to use lattice-style, steel towers as the structures to support the line. “NPPD plans to use a At the GIS station, an NPPD representative confirms the comments given by a landowner regarding his property during the April open house.

Transcript of Transmission Line PROJECT - Nebraska Public Power … · Open house to focus on transmission line...

Open house to focus on transmission line routes, substation sites

Transmission Line

PROJECTStegall-Scottsbluff 115,000 Volt

A u g u s t 2 0 1 4

With a focus on preferred and alternative line routes and substation sites for its Stegall to Scottsbluff

transmission line project, Nebraska Public Power District will hold an open house on Wednesday, Aug. 20 at the Gering Civic Center, 1050 M Street in Gering, from 2 to 8 p.m. Attendees should allow 30-60 minutes to walk through the displays and interact with NPPD representatives.

This will be the third open house on the project by NPPD since January 2014. Since then the project team has been reviewing public comments and meeting with various agencies while working to narrow down the initial study area to corridors, and now to preferred and alternative routes. Project Manager Jedd Fischer noted, “Although we have a preferred and alternative routes for this project, no final route has been determined. We will continue to gather additional comments from landowners and various agencies before making a final determination.”

The Stegall to Scottsbluff project consists of routing and siting a new 115,000-volt electric transmission line from the existing Scottsbluff substation, to a new substation to be built approximately five miles south of Stegall, near an existing substation operated by Basin Electric Power Cooperative. The line length is estimated to be 23 miles and is expected to be in service by mid-2017.

The open houses are held to allow landowners the opportunity to learn more about the project, including the need and benefit for the project, structure types, right-of-way acquisition, and routing criteria, as well as provide NPPD staff with information about each landowner’s property.

“The Stegall to Scottsbluff transmission line will strengthen electric reliability in the Panhandle region of Nebraska and we encourage landowners who have been identified to attend and provide us with comments on the preferred and alternative routes,” NPPD Vice President and Chief Operating Officer Tom Kent explained.

“We have had good turnouts at our first two open houses,” Fischer added. “We do encourage all landowners along the routes to attend and make comments related to their specific property. Even if a landowner has been to a previous open house, new, more detailed information is available regarding the project.”

Fischer also noted that there has been a misconception that NPPD plans to use lattice-style, steel towers as the structures to support the line. “NPPD plans to use a

At the GIS station, an NPPD representative confirms the comments given by a landowner regarding his property during the April open house.

")

")

")")

")

PreferredNPPD Stegall

Substation

ExistingScottsbluffSubstation

Ij

Ij

?ä?î

UV79D

UV79C

S c o t t s B l u f fS c o t t s B l u f fC o u n t yC o u n t y

Mitchell

Lyman

Morrill

Study Area Boundary

Study Area Boundary

CORRIDOR (WHITE AREAS)

CORRIDOR (WHITE AREAS)

T22R58

T21R58

Scottsbluff

Terrytown

Gering

T22R54

T22R56

T22R57

T21R54

T21R55

T21R56

T21R57

T22R55

01 05 0104 0603 05 03 02 0106 05

12 0708 09

1007

0912

12 08 0911 07

14 13 1716 14 18

16

13 17

14

21

15 13 16

14

24 19

0602 04

13

22

18 17

20 2419

2223 20

2124

19

23 20 22

10 11

21

30 29

24 1923 19

20

30 30

22

28 26

2321 22 23

27 26 2525

21 19 20

15 1817

08

1924

15

28 3025

20

18 16

17

15

3333 31

31

35 36 31 3536

21

25

36 31 32 3436 32 35 32

2829 27

24

01 06 0504

03

20

29 27 26

06 05 03 02 06 05 03 02

32 34

06 0501

02 01

0712 0908 10 11 07

0811 12 07 09

11

04 04

08101217

16 1316

01

151815 13

08 1012

09 0714

18 1718

N o r t hP l a t t e

R i v e r

Preferred Route

Route Alternative

WAPA Emigrant

WAPAStegall

Existing BasinElectric Substation

S T E G A LL - SC O TT SB LU FF P R E FE R R EDA N D A LT ER N ATI VE L I N E R O U T ES

NPPD's 115 kV Transmiss ion L ine Project

Typical corridor extends500 feet beyond section orhalf section line.

3231

06

0807

All landowners are encouraged to follow developments of the project through completion of the siting process. New informationmay require adjustments to the routes shown on this map. See website: http://www.nppd.com/stegall-scottsbluff/

City Limits

Township

Section

Existing Substation")

River

ExistingTransmission Line

L E G E N D

Preferred Route

Route AlternativeI

Corridors (white)

Preferred Substation Site

Alternate Substation Site

")

ExistingScottsbluffSubstation

Ij

C o R d R ( R o b i d o u x R d )

Co

Rd

2 3 (

Su

g ar

F ac t

o ry

Rd )

Co

Rd

2 4

O v e r l a n d D r

2 7 t h S t C o R d K

10th

St

F iv e

Ro

c ks

Rd

D S t

7th

St

K i mb a l l

A v e

B e l t l i n e H w y

7th

St

L oc k

wo o

d R

d

U S t

2 0 t h S t

Ave

I

Scottsbluff

Terrytown

Gering

T22R54

T21R54

T21R55

T22R55

1614

13 18

21

28

3025

15

313635

2726

03 0206

11

04

10 12

01

0907

N o r t h P l a t t e R i v e r

Route Alternative

Route Alternative

Preferred Route

Preferred Route

L E G E N D

S T E G A L L S U B S TAT I O N / G E R I N GA N D S C O T T S B L U F F A R E A D E TA I L

NPPD's 115 kV Transmiss ion L ine Project

")

")")

C o R d P

Co

Rd

7( S

t eg a

l l R

d )

R o b i d o u x R d

C o R d S

C o R d N

Co

Rd

6

T21R57

Route Alternative

Preferred Route

PreferredNPPDStegall

SubstationSite

C o R d R

AlternateNPPD Stegall

Substation Site

AlternateNPPD Stegall

Substation Site

ExistingBasin

ElectricSubstation

WAPAStegall

Stegall East

2019

06 0504 03

07

09

17

16

18

15

08

10

All landowners are encouraged to follow developments of the project through completion of the siting process. New information may require adjustments to the routesshown on this map. See website: http://www.nppd.com/stegall-scottsbluff/

Preferred Route

Route Alternative

Corridors(white)

TownshipExistingTransmission Line

Section

Existing Substation")

0 1 2

Miles

0 0.5 1

Miles

")

Ij

Ij ?ä

")

Scottsbluff

GeringTerrytown

Scottsbluff

S c o t t sS c o t t sB l u f fB l u f f

S t e g a l l A r e a I n s e t

S c o t t s b l u f f A r e a I n s e t

Alternate Substation Site

Preferred Substation Site I

%

%

See StegallArea Inset

See ScottsbluffArea Inset

The Stegall-Scottsbluff 115 kV Transmission Line Newsletter is published by NPPD’s transmission project team. It is intended to provide a project overview and communicate project developments.

Contributors: Project Manager Jedd Fischer.Project Team: Al Beiermann, Brenda Blatchford, Ross DeBower, Larry Linder, Tom Pillen, Rocky Plettner, Dennis Schroeder, Ron Starzec and Terry Warth.

Printing and artwork:Bill Haack, Dan Zastera and Scott Margheim.

Editor: Jill Novicki

Contact us:[email protected]

Mailing address: Stegall-Scottsbluff 115 kV Transmission Line Project, NPPD, P.O. Box 499 Columbus, NE 68602-0499Attention Jill NovickiPhone (toll-free): 888-677-3412

G14

1653

.ZIP

Stay connected.Follow us online.

P.O. Box 499 Columbus, NE 68602-0499

Address Service Requested

PRSRT STD US POSTAGE

PAID COLUMBUS NE PERMIT NO. 3

Open house to focus on line routes, substation sites

combination of single pole and H-frame structures made of steel. There are no plans to use the large lattice-style, steel structures,” he explained.

The Stegall to Scottsbluff project was identified by the Southwest Power Pool (of which NPPD is a member) as a project that will enhance transmission system reliability in the western Nebraska Panhandle region, and meet the North American Electric Reliability Corporation’s Reliability Standards.

For those who are unable to attend the open house in person, an online open house meeting will be available at www.nppd.com/stegall-scottsbluff beginning Aug. 20. Abbreviated information, maps and drawings from the open house will be available, and landowners will have the opportunity to provide comments. Landowners can also share their feedback by emailing [email protected] or by calling the project hotline at 1-888-677-3412. All feedback will be taken into consideration before a final line route is chosen.

Steel single pole structure Steel H-frame structure