13 August 2014 Transformer Bushing Monitoring Detect Bushing and Insulation Defects Before they Can Cause a Failure Peak Measure Transformer Seminar Wilsonville OR Tom Prevost

Transcript of Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a...

Page 1: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

13 August 2014

Transformer Bushing Monitoring

Detect Bushing and Insulation Defects Before they Can

Cause a Failure

Peak Measure Transformer Seminar

Wilsonville OR

Tom Prevost

Page 2: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Tap changer

26%

Other

1% Winding

45%

Lead exit

7%

Isolation

1%

Bushings

17%

Core and

magnetic

circuit

3%

Theory

Supplementary bushing monitoring is vital

> Bushing failures contribute significantly

to failure statistics of power transformers

> With dissolved gas analysis (DGA), only

by-products of insulation degradation

inside the tank can be detected – not at

the bushings

Page 2© OMICRON

Source: No. 261 – April 2012 ELECTRA

Cigre A2.37 Transformer

Failure StatisticsFailure Locations of Substation

Transformers >100 kV

Damaged transformer after a

bushing explosion

Page 3: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

CapacitancePartial

discharge

Transient

over-voltages

Dissipation/

power factor

Transformer monitoring focused on dielectric health

Monitors critical defect indicators

> Bushing monitoring: Capacitance and dissipation/power factor (DF/PF) > The classic bushing aging indicators

> Online measurement with lab accuracy

> Partial discharge (PD) in bushings and transformer> Early detection of defects

> Advanced PD noise suppression and UHF gating

> HV transients monitoring> Transients are detected directly at the

bushings where disturbances occur

Page 3© OMICRON

Page 4: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Theory

Bushing defects and their indicators

> Partial breakdowns> Capacitance

> Partial discharges

> Voids, cracks> Capacitance

> Partial discharges

> Aging by-products, moisture> Dissipation/power factor

Page 4© OMICRON

Bushing with capacitive layers and

tap electrode on flange

cen

ter

co

nd

ucto

r

Page 5: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Theory

Capacitance and dissipation/power factor

> Critical indicators of partial breakdowns,

cracks, aging and moisture in bushings

> With online monitoring, these indicators

are measured under real load conditions

> Continuous information about insulation

status allows early corrective action

> Reliable and accurate measurement

results enable comparison with

acknowledged standards

Page 5© OMICRON

Page 6: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Standards

Offline bushing tests

> Capacitance:> Cigre working group A2.34: Guide for transformer

maintenance presents capacity changes when

one control field layer is

short-circuited

> Dissipation/power factor:> Acceptance level depends on bushing design

Page 6© OMICRON

Acceptance level of dielectric losses for bushings of different design

Voltage

[kV]

No. of

layers

Capacitance

change in %

123 14 7.1

245 30 3.3

420 40 2.5

550 55 1.8

0.0

0.2

0.4

0.6

0.8

1.0

Dis

sip

atio

nFa

cto

r (%

)

typ. new

OIP

IEC 60137

RIP

0.0

0.2

0.4

0.6

0.8

1.0

Po

we

r F

acto

r (%

)

OIP

max: 0.85%

RIP

max: 0.5%

IEEE C57.19.01

max: 0.7%

typ. newtyp. new typ. new

Voltage class and change of capacitance

for condenser type bushings

[Source: Cigre working group A2.34]

Page 7: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Where Can I Get the Reference from?

• Off-line test: Reference from HQ capacitor

• On-line test: Reference?

u

UX(t)UR(t) Z1

Z2

CX, CR

0(t)

Reference Measurement path

I R I X

Im

j

d

Uo

IXIR

Page 8: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Relative C/DF Measurement

> Sum of the bushing currents

> Three phase vectors are added up

> Bushing-to-bushing comparison

> Vectors of bushings in same phase are

compared

L1

L2L3

Page 9: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Relative C, DF/PF measurement

> Changes in grid unbalance (phase shifts) can have a misleading impact on

online C, DF/PF measurements when the sum-of-current approach or a

bushing-to-bushing comparison is used to determine the values

Page 9© OMICRON

Example of changes of the sum vector of the 3 phases

of a transformer within 2 days

Relative measurement (bushing-to-bushing comparison)

Sum of voltages

Page 10: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

from 2011-02-13 to 2011-02-15

[P. Picher “Integration of New Transformer Monitoring Technologies ...”

TechCon Asia-Pacific 2011]

Systematic error

0.65 %

plus instrument

inaccuracy 0.5 %

Capacitance?

DF impossible!

0,0

0,2

0,4

0,6

0,8

1,0

DF

(%)

typ: 0,25

OIP

typ: 0,35

Systematic error

RIP

Page 11: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Page 12© OMICRON

Dual transformer

comparison

Absolute measurement

(VT reference)

Relative measurement

(bushing-to-bushing)

Highest

uncertainty

Lowest

uncertainty

1 2 3

Measurement configuration options

Page 12: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Reducing measurement uncertainty

> Grid unbalance impacts are minimized

with the use of a 2nd transformer for

comparison or a VT as reference

> Using a VT as reference, the smallest

uncertainty is achieved

Page 13© OMICRON

Bushing

aging

Bushing

aging

Reference

aging

Bushing

aging

Reference

aging

Relative

measurement

Dual transformer

comparison

Voltage transformer

reference

Highest

uncertainty

Lowest

uncertainty

1

2

3

Grid

unbalance

Page 13: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Benefits of highly accurate C, DF/PF measurement

> Enables the application of standards for offline

measurement via:> Excellent accuracy comparable to offline tests

> Implemented temperature compensation of

measured values

> Long-term stability of measurement

Page 14© OMICRON

0.0

0.2

0.4

0.6

0.8

DF

(%

)

OIPRIP

0.27 ± 0.05 %

measurement

0.7 % IEC warning

400

467 ± 2 pF

measurement

500

Ca

pa

cita

nce

(pF

) 478 pF warning

Temperature dependence

of the dissipation factor

[Source: Karl Frey, Micafil]

Capacitance and DF measurement over 1.75 years, and alarm levels

Temperature in ⁰C

tgδ in

%

Page 14: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Tap changer

26%

Other

1% Winding

45%

Lead exit

7%

Isolation

1%

Bushings

17%

Core and

magnetic

circuit

3%

Theory

Partial Discharge Analysis

> The majority of transformer failures are caused by

problems within the windings

> DGA can be used to identify fault types

> On-Line PD is used to verify the severity of the fault

as well as identify type of PD.

> Follow up with acoustic localization

Page 15© OMICRON

Source: No. 261 – April 2012 ELECTRA

Cigre A2.37 Transformer

Failure StatisticsFailure Locations of Substation

Transformers >100 kV

Electrical treeing on coil blocking

insulation – evidence of partial

discharge activity

Page 15: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Partial discharge (PD) detection

> PD detection is the early indicator of defects in dielectric insulation

> In typical field environments of transformers, electrical PD detection

suffers from a high noise level > Originated from outside the transformer, like corona

> Monitor PD at the bushing taps and inside the

transformer tank, using a UHF sensor> The sensor inside the tank is not affected by outside noise

> Synchronous multi-channel recording enables UHF gating> Using the UHF signals to distinguish between PD events inside and

outside the transformer at the bushing tap sensors

> Further advanced noise suppression technologies are available: > 3-Phase Amplitude Relation Diagram (3PARD)

Page 16© OMICRON

Page 16: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

PD Activity

over 4 Days

10

1

0.1

0.01

00:00:00 01:00:00 02:00:00 03:00:00 04:00:00 05:00:00

Q in n

C

t in dd:hh:min

L1L2L3

Page 17: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Fighting PD Noise: UHF Gating

Electr. PD

UHF PD

Internal

PD

Corona

EM Field

Page 18: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Combination of the Methods

IEC PD Measurement

Corrected IEC PD Measurement

& UHF PD Measurement

IEC

UHF

Page 19: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

3PARD: PD Discrimination by Amplitude

MPD1

Internal

PD

Corona

EM Field

MPD2 MPD3

1

23

Page 20: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

3PARD and Back Transformation

Page 21: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

20100 t in ms

10

1

0.1

0.01

QIE

Cin

nC

Ph. U Ph. W

Ph. V

Ph. U Ph. W

Ph. V

On-Line Application of 3PARD

10

1

0.1

QIE

Cin

nC

100

20100 t in ms

Page 22: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Page 25© OMICRON

PD diagrams of 3 phases

without separation

Measurements related to each

other in a 3PARD diagram

Separated PD activity:

located in phase C

PD denoising and source separation

Phase A

Phase B

Phase C

Phase A

Phase B

Phase C

Channel 2

3-band filter

Channel 3

3-band filter

Channel 1

3-band filter

Page 23: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Methods

Recording of transient over-voltages

> Detection directly at bushings> Where the dielectric stress occurs

> Recording of full signal shape at all 3 phases

> Supports IEEE compliant export format (COMTRADE C37.111-1999)

Page 26© OMICRON

Different examples of transients recorded at bushings of a power transformer

Voltage in

kV

t in ms

1.5e+005

1.0e+005

5.0e+005

0.0e+005

-5.0e+005

-1.0e+005

-1.5e+005

0.095 0.100 0.105 0.1100.115

Voltage in

kV

t in ms

2.0e+005

1.5e+005

1.0e+005

5.0e+005

0.0e+005

-5.0e+005

-1.0e+005

-1.5e+005

0.085 0.090 0.095 0.100 0.105 0.110 0.115 0.1200.125

Page 24: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Benefits

Condition monitoring to extend

transformer life

> Continuous assessment of insulation state> Early detection prevents failures

> Absolute C, DF/PF monitoring ensures

lab accuracy in the field

> Advanced noise suppression for reliable

PD source detection

> Complete HV transient waveform recording

for effective impact assessment

Page 27© OMICRON

MONTRANO system components for continuous

monitoring of transformer dielectric health

Page 25: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Benefits

Actionable data to plan corrective

action early

> Web-based data access > Fast and easy system status overview

> Detailed trend data

> Easily adaptable charts and diagrams

> Configurable warnings and alerts

> Detailed trend data for modern transformer

health management

Page 28© OMICRON

Page 26: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

System configuration

Customized and extendable system

> One or more transformers can be monitored

> Optional communication with SCADA system

> Fiber-optic communication from acquisition

units to central computer> Undisturbed communication

> Galvanic isolation

> Up to 4 km (2.48 miles) distance

Page 29© OMICRON

Page 27: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

System configuration

Relative C, DF/PF measurement

Page 30© OMICRON

Coupling units with bushing

tap adapters

MCU (FO controller), central computer

& monitoring software

OMS 843 acquisition unit

1

UVS 610 drain valve sensor & UHF converter

Page 28: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

System configuration

Dual transformer comparison

Page 31© OMICRON

OMS 843 acquisition unit

2

MCU (FO controller), central computer

& monitoring software

Coupling units with bushing

tap adapters

OMS 843 acquisition unit UVS 610 drain valve sensor & UHF converter

Page 29: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

System configuration

Absolute measurement with VT reference

Page 32© OMICRON

Coupling units with bushing

tap adapters

MCU (FO controller), central computer

& monitoring software

OMS 843 VT acquisition unit

OMS 843 acquisition unit

3

UVS 610 drain valve sensor & UHF converter

Page 30: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Hardware components

Page 33© OMICRON

Bushing tap adapters

3

1

2

4

5

1

2

3

UHF sensors

OMS 843 acquisition unit

Reference acquisition unit4

5

6

Fibre optic communication

Central computer and software

1

1

6

Page 31: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Hardware components

Bushing tap adapters and coupling units

> Synchronously captures signals for > Capacitance, dissipation/power factor

> Transient over-voltages

> Partial discharge (PD)

> Robust, modular design for different types

of bushings> Standardized coupling unit

> Customizable tap adapter

> Multiple redundant high-voltage protections

> Built-in temperature sensor> For temperature compensation of

measured values

> IP65, -40°C...+90°C (-40°F...+194°F)

ambient temperature

Page 34© OMICRON

CPL 843 coupling unit

with bushing tap adapter

Page 32: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Hardware components

UHF sensor

> UHF sensor detects PD signals inside

the transformer tank

> Consists of sensor (antenna) and

signal converter

> Mounting at drain valve or hatch> Customizable flange adapters optional

Page 35© OMICRON

UVS 610 drain valve sensor & UHF converter

Page 33: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Hardware components

OMS 843 – Transformer acquisition unit

> 4-channel, simultaneous acquisition of data from

the bushing tap adapters and UHF sensor

> Advanced signal processing for capacitance,

DF/PF, transient over-voltages and PD

calculation

> 10 analog inputs for additional measurements> Humidity

> Ambient temperature

> Optional measurements, e.g. oil pressure

> Fiber-optic communication to central computer

> IP65 enclosure, -30°C...+55°C (-27.4°F...+131°F)

ambient temperature

Page 36© OMICRON

OMS 843 acquisition unit

Page 34: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Hardware components

OMS 843 VT – Reference acquisition unit

> Acquisition unit for the reference signal for

capacitance, DF/PF measurement from a set of

voltage transformers (1...3 phases)

> Provides reference signal for absolute

capacitance and DF/PF measurement

> Fiber-optic communication > Undistorted signal transmission ensures

high-precision measurement

> Galvanic insulation

> System accuracy (at 50/60 Hz, including VT)> Capacitance: ± 2pF + dyn. VT error

> DF/PF: 0.05% + dyn. VT error

Page 37© OMICRON

OMS 843 VT acquisition unit

Page 35: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Hardware components

MCU monitoring control unit

> Fiber optic bus controller

> Transmitter between acquisition units

and central computer

> 3-channel fiber-optic communication

> USB connection to computer

> Integrated in enclosure of central computer or

in separate housing for outdoor mounting

Page 38© OMICRON

MCU monitoring

control unit

Page 36: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Software

Central computer and monitoring software

> State-of-the art database system for long-

term data storage and retrieval

> Web-based data access & visualization

> Different user roles/logins:> Operators:

> Overview of full system setup

> View all data with free configurable charts

and diagrams

> Confirm warnings and alarms

> Administrator: As operator, plus> Configuration of all monitoring parameters

> Set and change warning and alarm rules

Page 39© OMICRON

Page 37: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Software

Warnings and alarms

> Defined threshold settings for alarm

notifications

> Real-time display of current

alarm level

> View of events that triggered

an alarm

> Alarm confirmation by operators> Confirmed alarms change color or

> Are taken out of viewing window

(optional settings)

> All alarm data saved

Page 40© OMICRON

Page 38: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

Software

Data visualization

> Configurable trend charts show data for each monitored parameter

> Tooltip pop-up for easy accessible detailed information of each data point

> All data records and corresponding charts can be exported

Page 41© OMICRON

Page 39: Transformer Bushing Monitoring - Peak · PDF fileTransformer Bushing Monitoring ... Cause a Failure Peak Measure Transformer Seminar ... > Multiple redundant high-voltage protections

MONTRANO – Transformer Monitoring System

> Continuous assessment of insulation state

> Absolute C, DF/PF monitoring ensures

lab accuracy in the field

> Advanced noise suppression for reliable

PD source detection

> Complete HV transient waveform

recording for effective impact assessment

> Web-based data access for fast and easy

data & system status overview

> Detailed trend data for modern transformer

health management

Thank you for your attention.