October 28, 2021 Mr. William J. Burke, Jr. Director The Philadelphia Art Commission 1515 Arch Street – 13th Floor Philadelphia PA 19102 RE: Submission to Art Commission for Permit Approval
8200 Enterprise Ave, Philadelphia, PA 19153 Philadelphia Water Department Southwest Water Pollution Control Plant – PTF Screening and Conveyance Improvements PWD Work No. 73084 Dear Mr. Burke: Information is being sent to you for the referenced project to secure the approval of the Philadelphia Art Commission as part of Permit applications from the Department of Licenses and Inspections (L&I). Our package for review consists of the following:
• The Project Narrative (included on next page) • The related scaled project design drawings including:
o Drawing G00.02 – Index of Sheets, General Notes, and Vicinity Map o Drawing C00.01 – Existing Features and Demolition Plan o Drawing C00.02 – Site Plan o Drawing C00.03 – Grading Plan o Drawing C00.06 – Construction Details o Drawing A00.01 – Legend, Abbreviations and Notes o Drawing A01.01 – Demolition Plans and Details o Drawing A01.02 – First Floor Plan o Drawing A01.03 – Roof Plan o Drawing A01.04 – Building Elevations o Drawing A01.05 – Building Elevation and Section o Drawing S01.03 – Preliminary Treatment Building – Façade Elevations o Drawing S01.04 – Preliminary Treatment Building – Façade Elevations o Drawing S01.08 – East Dumpster Bay – Building Sections
• One Set of Photographs Log with photo descriptions and Photo Key Plan • Land use classifications plan • Estimated project construction cost - $11,983,924 funded by PWD general funds • Prerequisite Approval Form for the future Building Permit Application
2 of 2
Project Narrative The Philadelphia Water Department (PWD) owns and operates the Southwest Pollution Control Plant located at 8200 Enterprise Avenue in Philadelphia. The project is intended to improve the Preliminary Treatment Facility with architectural, structural, mechanical, electrical, instrumentation, and civil site improvements. The project consists of the following:
Electrical, sanitary, and plant water utility relocations Demolishing curbing and sidewalk Erecting the East Dumpster Bay building addition to the Preliminary Treatment Facility Installing a reinforced concrete driveway, bollards, and curb features Regrading of the site Preliminary Treatment Building façade repair
If you have any questions or need anything else for the Commission’s review, please let us know. Thank you for your assistance. Sincerely, Andrew Chiang Trans-Pacific Engineering Corp. 2300 Computer Avenue, Suite L-65 Willow Grove, PA 19090 Tel: (215) 659-2490 Cell: (215) 260-7012 E-mail: [email protected] Cc: Kelly Lee – Philadelphia Art Commission Cc: Margot Berg – Office of Art – Percent for Art Program
BRO
AD
BELLS
GERMANTOWN
GRA
VERS
WISSAHICKON
RIDGE
AVE.
EVA
SHAWMONT
MIN
ERVA
UMBRIA
SCHO
OL
HOUS
E
AVE.
GERMANTOWN
HUNTING
PARK
BRO
AD
ALLEGHENY
GLENWOOD
ERIE
MASTER
LEHIGH
CADWALLADER
THOMPSON
WELSH
BUST
LETO
N
GRANT
ROAD
DIAMOND
25th
ST.
GLENW
OOD
22nd
ST
.
20th
ST.
33rd
ST.
27th
ST.
17th
ST.
9th
ST.
7th
ST.
SOUTH
ST.PINE
ST.
WALNUT ST.
MARKETST.
VINE ST.
GIRARD
AVE.
12th
ST.
NORRIS
ST.
DAUPHIN ST.
13th
ST.
ST.
CHESTNUT ST.
16th
ST.
LOCUST ST.
RACE ST.
ARCH ST.
21st
19th
ST.
34th
POWELTONAVE.
32nd
MANTUAAVE.
ZOOLO
GI CAL
ST.
AVE.
HAVERFORD
AVE.
CAR
DIN
GTO
N
BELMO
NT
PARKSID
E
FORD RD.
CHAMOUNIX
DR.
MO
NU
MEN
TR
D.
LANS
DOW
NE
SPRUCE
WYNNEFIELDAVE.
GEORGES
HILL
FOX
ST.
POPLAR
ST. NEW
MAR
KET
ST.
3rd
ST.
FRO
NT
ST.
4th
ST.
INDIANA AVE.
2nd
ST.
COBBSCR
EEK
PRKW
Y
60th
ST.
55th
ST.
36th
LANCASTER
AVE.
ROOSEVELT
BLVD.
MO
NTG
OM
ERY
COUNTY
BUCKS
COUNTY
AVE.
VERR
EE
RD.REDLION
RD.
ACAD
EMY
RD.
FRANKFORD
AVE.
SOUTHAMPTON
RD.
BYBERRY
RD.
BYBERR
Y
AVE.
RED
LION
RD.
COTTMAN
AVE.
WH
ITAK
ER
AVE.
GODFREY
AVE.
STENTON
AVE.
CHELTENHAM
AVE.
RHAWN
ST.
MT.
AIRY
AVE.
IVY
HILL
ROAD
WAS
HING
TON
LANE
AVE.
CHEL
TEN
HENRY
WIGARD
AVE.
ROYAL
AVE.
AVE.
WISSAHICKO
N
DR.
61st 51
st
ST.
BALTIMORE
AVE.
58th
ST.
56th
ST.
CO
BBS
CREEK
PARKWAY
WASHINGTON
25th
ST.
MOORE ST.
TASKER AVE.
SNYDER AVE.
WOODLA
ND
AVE.
28th
ST.GRAY'S
FERRY
AVE.
DICKINSON
5th
WOLF
3rd
MIFFLIN
2nd
PASCHALL
AVE.70th
ST.
LIND
BERG
H
BLVD
.
ESSI
NGTO
N
AVE.
PASSYUNK
AVE.
HARTRANFT
26th
ST.
PENROSE
AVE.
PATTISON AVE.
PACKERAVE.
OREGON AVE.
DEL
AWAR
EAV
E.
ISLAND
AVE.
84th
ST.
ST.
ST.
DEL
AWAR
E
RIVER
DEL
AWAR
E
CO
UN
TY
PHILMONT
AVE.
TREVOSE
AVE.
THORNTO
N
RD.
COMLY
RD.
DUNKSFERRY
RD.
DECAT
UR
RD.
KNIG
HTS
RD.
STATE
RD.
HOLME
AVE.
ST.
CONVENT
LANE
PENNYPACK
TORRESDALE
AVE.
OXFO
RD
AVE.
RIS
ING
SUN
AVE.
OG
ON
TZ
AVE.
EAST
ON
AVE.
BETH.PIKE
CAST
OR
AVE.
UNRUH
AVE.
LEVICK
ST.
ADAMS
AVE.
TABOR
AVE.
WIS
TER
ST.
AVE.
CHEW
AVE.
WALN
UT
LANE
WAYNEWISSAHICKON
AVE.
LUZERNE ST.
WYOMING AVE.
WINGOHOCKING AVE.
CAYUGA ST.
CAS
TOR
AVE.
LANE
ROBERTS
AVE.
AVE.
FRO
NT
RICHMOND
ST.
ARAMINGO
AVE.
RACE
AVE.
DOM
INO
LANE
OLNEY AVE.
RIVER
SCHUYLKILL
AVE.
ST.
COUN
TY
AVE.
PORT
MILL
RD.
NEILL
DR
.
KENSINGTON
AVE.
SUSQUEHANA AVE
AVE.
AVE.
ST.
AVE.
ST.
AVE.
SPRINGFIELD
AVE.
WARRINGTON
AVE.
FLORENCE
AVE.
WILLOWS
AVE.
HAR
BISO
NAV
E
MO
NTG
OM
ERY
SPRUCE
GIRARD
61st ST.
FAIRMOUNTPARK
POPLAR
23rd
ST.
30th
ST.
FAIRMOUNTST.
SPRING GARDEN
BLVD
.
ROOSEVELT
CITY AVE.
SOUTHWESTWATER POLLUTIONCONTROL PLANT8200 ENTERPRISE AVE.PHILADELPHIA, PA 19153
DRAWING NUMBER WHEREDETAIL, SECTION OR
ELEVATION IS DRAWN
DRAFTING SYMBOLOGY
X DEMOLITION NOTE
X REVISION NOTE
X SPECIFIC NOTE
BUILDING NORTH ARROW
TRUE NORTH ARROW
PLANT NORTH ARROW
ELEVATION OR WALL/BUILDINGSECTION SYMBOL
DETAIL REFERENCE SYMBOL
LETTER INDICATESSECTION, NUMBER
INDICATES ELEVATION
NUMBERINDICATESDETAIL
TITLE REFERENCE SYMBOL
PLAN DRAWINGS WHERE DETAIL, SECTION, ORELEVATION ARE TAKEN FROM.
DRAWING NUMBER WHERE DETAIL,SECTION OR ELEVATION IS DRAWN
ABBREVIATIONS
ADA AMERICANS WITH DISABILITIES ACTARVR AIR RELEASE VACUUM RELIEFCW CITY WATERD DRAINDWG DRAWINGEX EXISTINGHB HORIZONTAL BENDA.A. NORMALLY CLOSEDOC ODOR CONTROLPOB POINT OF BEGINNINGPOE POINT OF ENDPW PLANT WATERRS RAW SEWAGES SANITARY DRAIN OR SEWERSPD SUMP PUMP DISCHARGEST STORMWATERTD TANK DRAINVB VERTICAL BEND
INDEX OF SHEETS, GENERAL NOTES, AND VICINITY MAP
G00.02
SCALE: NOT TO SCALEPHILADELPHIA VICINITY MAP
G00.021
REF: GXX.XXSCALE: NONETITLE
GXX.XXX
INDEX OF SHEETS
1 G00.01 COVER SHEET2 G00.02 INDEX OF SHEETS, GENERAL NOTES, AND VICINITY MAP
GENERAL (WORK NO. 73084, 73101)
SHEET NO. TITLE
3 C00.01 EXISTING FEATURES AND DEMOLITION PLAN4 C00.02 SITE PLAN5 C00.03 GRADING PLAN6 C00.04 EROSION AND SEDIMENT CONTROL PLAN7 C00.05 EROSION AND SEDIMENT CONTROLS NOTES8 C00.06 CONSTRUCTION DETAILS
CIVIL (WORK NO. 73084)
SHEET NO. TITLE
33 M00.01 MECHANICAL GENERAL NOTES, ABBREVIATIONS AND LEGEND34 M00.02 SCREENING AND COLLECTION PROCESS FLOW DIAGRAM35 M00.03 SCREENING AND COLLECTION HYDRAULIC PROFILE36 M00.04 DETAILS & SCHEMATICS37 M00.05 DETAILS38 M01.01 PRELIMINARY TREATMENT BUILDING DEMOLITION UPPER PLAN39 M01.02 PRELIMINARY TREATMENT BUILDING DEMOLITION LOWER PLANS40 M01.03 PRELIMINARY TREATMENT BUILDING SCREEN ROOM FIRST FLOOR PLAN41 M01.04 PRELIMINARY TREATMENT BUILDING EAST DUMPSTER BAY PLANS42 M01.05 PRELIMINARY TREATMENT BUILDING SECTIONS
MECHANICAL (WORK NO. 73084)
SHEET NO. TITLE
43 E00.01 LEGEND, ABBREVIATIONS, AND GENERAL NOTES44 E00.02 ELECTRICAL SITE PLAN45 E01.01 PRELIMINARY TREATMENT BUILDING EXISTING AND DEMOLITION PLAN46 E01.02 PRELIMINARY TREATMENT BUILDING EXISTING AND NEW PLAN47 E01.03 PRELIMINARY TREATMENT BUILDING PARTIAL PLANS48 E01.04 PRELIMINARY TREATMENT BUILDING PARTIAL PLANS49 E01.05 EAST DUMPSTER BAY LIGHTING PLAN50 E01.06 MOTOR CONTROL CENTER PTB-MCC-13 & PTB-MCC-14 - ONE LINE DIAGRAM EXISTING AND DEMOLITION WORK51 E01.07 MOTOR CONTROL CENTER MCC-PT1 & MCC-PT2 - ONE LINE DIAGRAM EXISTING AND DEMOLITION WORK52 E01.08 MOTOR CONTROL CENTER PTB-MCC-13, PTB-MCC-14, MCC-PT1 & MCC-PT2 - ELEVATIONS DEMOLITION WORK53 E01.09 SWITCHBOARD PTB-SWBD-13 & PTB-SWBD-14 ONE LINE DIAGRAM EXISTING AND NEW WORK54 E01.10 PANELBOARD PTB-PT-100 AND PTB-PT-101 SCHEDULE NEW WORK55 E01.11 MISCELLANEOUS DETAILS56 E01.12 CABLE AND CONDUIT SCHEDULE57 E01.13 CABLE AND CONDUIT SCHEDULE
ELECTRICAL (WORK NO. 73101)
TITLE
9 A00.01 LEGEND, ABBREVIATIONS AND NOTES10 A01.01 DEMOLITION PLAN AND DETAILS11 A01.02 FIRST FLOOR PLAN12 A01.03 ROOF PLAN13 A01.04 BUILDING ELEVATIONS14 A01.05 BUILDING ELEVATION AND SECTIONS15 A01.06 BUILDING AND WALL SECTIONS16 A01.07 SCHEDULES AND DETAILS17 A01.08 DETAILS18 A01.09 CONTROL ROOM PLANS19 A01.10 ELECTRICAL ROOM PLANS
ARCHITECTURAL (WORK NO. 73084)
SHEET NO. TITLE
58 I00.01 INSTRUMENTATION GENERAL NOTES, LEGEND AND ABBREVIATIONS59 I00.02 PCS NETWORK ARCHITECTURE60 I01.01 PRELIMINARY TREATMENT BUILDING BAR SCREEN P&ID61 I01.02 PRELIMINARY TREATMENT BUILDING CONVEYANCE P&ID62 I01.03 PRELIMINARY TREATMENT BUILDING CONTROL ROOM PCS PANEL63 I01.04 PRELIMINARY TREATMENT BUILDING CONTROL ROOM EXISTING PLAN64 I01.05 PRELIMINARY TREATMENT BUILDING CONTROL ROOM NEW WORK PLAN65 I01.06 PRELIMINARY TREATMENT BUILDING ELECTRICAL ROOM EXISTING AND NEW PLAN66 I01.07 PRELIMINARY TREATMENT BUILDING SCREENING BUILDING PLAN67 I01.08 EAST DUMPSTER BAY PLAN68 I01.09 PRELIMINARY TREATMENT BUILDING GRIT WASHERS MCC MODIFICATIONS69 I01.10 PRELIMINARY TREATMENT BUILDING GRIT WASHERS RELAY PANEL RP-PT5 MODIFICATIONS70 I01.11 PRELIMINARY TREATMENT BUILDING GRIT WASHER BUILDING PLAN71 I01.12 GRIT COLLECTION SYSTEM PCS PANEL72 I01.13 GRIT COLLECTION SYSTEM MCC MODIFICATIONS73 I01.14 EAST GRIT AREA PLAN74 I01.15 WEST GRIT AREA PLAN75 I01.16 GRIT AREA RELAY PANEL SCHEDULE76 I01.17 PRIMARY SEDIMENTATION TANK MCC ECD MODIFICATIONS77 I01.18 PRIMARY SEDIMENTATION TANK MCC PANEL MODIFICATIONS78 I01.19 CCTV DETAILS SHEET79 I01.20 DETAILS SHEET
INSTRUMENTATION (WORK NO. 73101)
SHEET NO. TITLE
SHEET NO.
MH MH
NOT TO SCALE
2
MDO
20 S00.01 GENERAL NOTES21 S00.02 TYPICAL DETAILS22 S00.03 TYPICAL DETAILS23 S01.01 PRELIMINARY TREATMENT BUILDING FIRST FLOOR PLAN24 S01.02 PRELIMINARY TREATMENT BUILDING PARTIAL FLOOR PLANS25 S01.03 PRELIMINARY TREATMENT BUILDING FACADE ELEVATIONS26 S01.04 PRELIMINARY TREATMENT BUILDING FACADE ELEVATIONS27 S01.05 PRELIMINARY TREATMENT BUILDING SECTIONS AND DETAILS28 S01.06 EAST DUMPSTER BAY FOUNDATION AND SLAB PLAN29 S01.07 EAST DUMPSTER BAY ROOF PLAN30 S01.08 EAST DUMPSTER BAY BUILDING SECTIONS31 S01.09 EAST DUMPSTER BAY FOUNDATION DETAILS32 S01.10 EAST DUMPSTER BAY FRAMING DETAILS
STRUCTURAL (WORK NO. 73084)
SHEET NO. TITLE
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of 79
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTSWORK NO. 73084WORK NO. 73101
CITY OF PHILADELPHIAWATER DEPARTMENT
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
SOUTHWESTWATER POLLUTIONCONTROL PLANT
CLIENT INFORMATION
JANUARY 2021
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
1"=20'
AC AC JP
3
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of 79
SIGNATURE
GRAPHIC SCALES
KEY PLAN
CLIENT INFORMATION
JANUARY 2021
PLOT
DAT
E: 1/
21/20
21 2:
13:53
PM
PAGE
SET
UP: -
--- P
LOT
STYL
E: W
RA_2
006.C
TB P
APER
SIZ
E:AR
CH F
ULL B
LEED
E1 (
30.00
X 42
.00 IN
CHES
)
FILE
NAME
: C:\U
SERS
\NMC
GO\T
PEC
ENGI
NEER
ING
DROP
BOX\
IN P
ROGR
ESS
(X)\P
ROJE
CT 20
18\18
.014 -
SW
WPC
P - P
TB- S
CREE
NING
& C
ONVE
YANC
E IM
PROV
EMEN
TS\10
0% D
ESIG
N\CA
D RE
LATE
D\CI
VIL_
1439
0009
3-10
0.DW
G
REMOVE SECTIONOF SIDEWALKPRELIMINARY
TREATMENTBUILDING
ELECTRICALCONTRACTOR SHALLREMOVE AND SALVAGEEX. LIGHT POLE
CAP EX. 3" PWOWNER TO ISOLATECOORDINATE WITHOWNER ON CAP LOCATION
REMOVE EX. 3" PWUNDER EAST DUMPSTERBAY BUILDING ADDITION
LEGEND
DEMOLITION
REMOVE SECTIONOF CURB TONEAREST JOINT
PLANTNORTH
FLEETMANAGEMENTPROPERTY
1/26/2021
1"=20'
AC AC JP
4
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of 79
SIGNATURE
GRAPHIC SCALES
KEY PLAN
CLIENT INFORMATION
JANUARY 2021
PLOT
DAT
E: 1/
21/20
21 2:
14:09
PM
PAGE
SET
UP: -
--- P
LOT
STYL
E: W
RA_2
006.C
TB P
APER
SIZ
E:AR
CH F
ULL B
LEED
E1 (
30.00
X 42
.00 IN
CHES
)
FILE
NAME
: C:\U
SERS
\NMC
GO\T
PEC
ENGI
NEER
ING
DROP
BOX\
IN P
ROGR
ESS
(X)\P
ROJE
CT 20
18\18
.014 -
SW
WPC
P - P
TB- S
CREE
NING
& C
ONVE
YANC
E IM
PROV
EMEN
TS\10
0% D
ESIG
N\CA
D RE
LATE
D\CI
VIL_
1439
0009
3-10
0.DW
G
R30'
R30'
77'
8" BOLLARD 1'-6" OFFSETFROM BUILDING (TYP OF 3)(SEE C00.06 DETAIL 1)
4' SIDEWALK(SEE C00.06 DETAIL 2)
10'-8"
DEPRESSED CURB(SEE C00.06 DETAIL 6)
REINSTALL SALVAGEDLIGHT POLESEE DWG E01.11
30.0'
EAST DUMPSTER BAYBUILDING ADDITION
REINFORCED CONCRETEDRIVEWAY(SEE C00.06 DETAIL 5)
PRELIMINARYTREATMENT BUILDING
PROPOSED CONCRETE CURB
PROPOSED SIDEWALK
8" BOLLARD 1'-6" OFFSETCENTER OF POST FROMEX. WALL & 6' CENTERSPACING UNLESS LABELEDOTHERWISE (TYP OF 12)(SEE C00.06 DETAIL 1)
10 FT ROLL-UP DOOR
CONTAINMENT CURB(SEE S01.09 DETAIL 11)
FFE 108.20
CONC. CURB (TYP)(SEE C00.06 DETAIL 3)
7'
22.0'
5'
7' 7'MATCH EXISTINGCURB
MATCH EXISTINGCURB
LEGEND
PROPOSED REINFORCEDCONCRETE DRIVEWAY
PROPOSED BOLLARD
RELOCATED LIGHT POLE
CONTRACTORACCESS
FLEETMANAGEMENTPROPERTY
CONTRACTORACCESS
PROPOSED DEPRESSED CONC. CURB
MANDOOR
PLANTNORTH
1/26/2021
107
108
108
1"=20'
AC AC JP
5
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of 79
SIGNATURE
GRAPHIC SCALES
KEY PLAN
CLIENT INFORMATION
JANUARY 2021
PLOT
DAT
E: 1/
21/20
21 2:
14:26
PM
PAGE
SET
UP: -
--- P
LOT
STYL
E: W
RA_2
006.C
TB P
APER
SIZ
E:AR
CH F
ULL B
LEED
E1 (
30.00
X 42
.00 IN
CHES
)
FILE
NAME
: C:\U
SERS
\NMC
GO\T
PEC
ENGI
NEER
ING
DROP
BOX\
IN P
ROGR
ESS
(X)\P
ROJE
CT 20
18\18
.014 -
SW
WPC
P - P
TB- S
CREE
NING
& C
ONVE
YANC
E IM
PROV
EMEN
TS\10
0% D
ESIG
N\CA
D RE
LATE
D\CI
VIL_
1439
0009
3-10
0.DW
G
74'-0"
PRELIMINARYTREATMENT BUILDING
LEGEND
TC 108.11BC 107.61
TC 108.60BC 108.10
TC 108.70BC 108.20
TC 108.30BC 107.80
TC 108.40BC 107.90
108.15
108.00
108.20
FFE 108.20
DEPRESSED CURB(SEE C00.06 DETAIL 6)
RELOCATED LIGHT POLESEE DWG E01.11
EAST DUMPSTERBAY BUILDINGADDITION
REINFORCEDCONCRETE DRIVEWAY(SEE C00.06 DETAIL 5)
INV ELEV 104.00
CORE INTOEX. MH & INSTALLA-LOK GASKETINV EL 103.75
CONCRETE CURB(SEE C00.06 DETAIL 3)
XX
TC 109.40BC 108.40
XX
108.40
108.00
108.15
XX
TC 109.40BC 108.40
X
XX
XX
X
X
CONC.CURB
108.35108.25
CONC.SIDEWALK
PROPOSED CONTOUR108
108
TC 107.21BC 106.71
CLEAN OUT8" CIPSAN. DRAIN
REMOVE & REPLACECONCRETE AS REQ'DFOR NEW BUILDING
CONTAINMENT CURB(SEE S01.09 DETAIL 11)
PLANTNORTH
FLEETMANAGEMENTPROPERTY
1/26/2021
NOT TO SCALE
AC AC JP
8
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of 79
SIGNATURE
GRAPHIC SCALES
KEY PLAN
CLIENT INFORMATION
JANUARY 2021
PLOT
DAT
E: 1/
20/20
21 9:
30:57
AM
PAGE
SET
UP: -
--- P
LOT
STYL
E: W
RA_2
006.C
TB P
APER
SIZ
E:AR
CH F
ULL B
LEED
E1 (
30.00
X 42
.00 IN
CHES
)
FILE
NAME
: C:\U
SERS
\NMC
GO\T
PEC
ENGI
NEER
ING
DROP
BOX\
IN P
ROGR
ESS
(X)\P
ROJE
CT 20
18\18
.014 -
SW
WPC
P - P
TB- S
CREE
NING
& C
ONVE
YANC
E IM
PROV
EMEN
TS\10
0% D
ESIG
N\CA
D RE
LATE
D\CI
VIL_
1439
0009
3-10
0.DW
G
COMPACTEDSUBGRADE
AASHTO NO. 57 (3/4")CRUSHED STONE BASE
3000 PSI CLASS ACEMENT CONCRETE
GRADEEL. VARIES
NOTES
1) CONTRACTION JOINTS AT INTERVALS NOT GREATER THAN 5FEET.
2) EXPANSION JOINTS AT INTERVALS NOT GREATER THAN 15 FEET.3) INSTALL PREMOLDED JOINT MATERIAL WHERE SIDEWALK
ADJOINS CURBS, SIDEWALKS, OR OTHER STRUCTURES.4) ALL CONSTRUCTION AND JOINT MATERIAL SHALL MEET CITY OF
PHILADELPHIA STANDARDS. PROVIDE CROSS SLOPE FORDRAINANGE TO MEET CITY OF PHILADELPHIA STANDARDS.
5) CONCRETE SHALL BE AIR ENTRAINED TO 4% ± 1%
5'-0" MIN. (OR AS SHOWN ON PLAN)
4"X X X X X X X X X X X X X X X X X X X X X
6X6 - W2.9 x W2.9
6"
NOT TO SCALE
4'-0
"4'
-8"
2'-8" DIA. OR SQUARECONCRETE PIER WITH (8)-#5VERTICAL AND #4@12 TIES
PROVIDE 12" X 1"DEEP SEALANT
AROUND PIPE
PROVIDE SLOPEDCROWN AROUNDPIPE
8"Ø (GALVANIZED) SCH. 40STEEL PILE, GRIND SMOOTH,CONCRETE FILLED & CROWN.
14" IDEAL SHIELD BOLLARD
COVER IN OSHA ORANGE
3" CL.3" CL.
8" CONCRETE SLAB8" COMPACTED AGGREGATE BASE COURSE
1"Ø SMOOTH DOWEL14" LONG @12" O.C.W/ ONE SIDE LUBRICATED
RUBBERIZED JOINT SEALING MATERIAL
1/8 x 1/8
TAPE BOND BREAKER
1/8" INITIAL SAWCUT
SAWCUT JOINT @ 20' SPACING MAX. INEACH DIRECTION FOR ALL CONTROL ANDCONSTRUCTION JOINTS (CONTRACTOR TOSUBMIT JOINT LAYOUT PLAN FOR APPROVAL).
12"
(TYP.)
3" CL 6 x 6 - W5.5 x W5.5 W.W.F.(WHERE REQ'D., LAP 24" MIN.)
NOTES:1. ANY EXCAVATION BELOW DESIRED GRADE DUE TO OVER EXCAVATION
OR WET SOIL CONDITIONS SHALL BE BACKFILLED WITH 3/4" CLEANCRUSHED STONE. ALL SUBGRADES SHALL BE APPROVED BY THEENGINEER PRIOR TO POURING.
2. TRANSVERSE EXPANSION JOINTS 1/2" WIDE SHALL BE INSTALLED IN THECURB 20'-0" APART AND SHALL BE FILLED WITH PREFORMED,BITUMINOUS-IMPREGNATED FIBER JOINT FILLER, COMPLYING WITH THEREQUIREMENTS OF AASHTO M-213, RECESSED 1/4" FROM THE FRONTFACE AND TOP OF THE CURB.
3. DUMMY JOINTS (FORMED) SHALL BE INSTALLED MIDWAY BETWEENEXPANSION JOINTS.
4. WIDTH OF JOINT FILLER STRIP EQUAL TO THE THICKNESS OF THEPAVEMENT LESS 1/2".
5. THESE SPECIFICATIONS ALSO MEET RSIS DESIGN STANDARDS.6. THE 6" CURB REVEAL IS TYPICAL. CONTRACTOR TO REVIEW GRADING
PLAN FOR AREAS WHERE REVEAL IS TO BE MODIFIED.
6"
18"
1"
8"
1/2" R
FINISHED GRADE
1 1/4" R
CONCRETE OR PAVEMENTSURFACE (SEE DETAIL)
APPROVEDSUBGRADEUNEXCAVATEDVIRGIN MATERIAL(SEE NOTE 1)
USE ONLY WHENCURB IS ADJACENTTO NON BITUMINOUSPAVEMENT BASECOURSE: HOTPOURED RUBBERASPHALT JOINTSEALER AND 1/2"PREFORMEDEXPANSION JOINTFILLER, BITUMINOUSTYPE, CONFORMINGTO AASHTOSPECIFICATIONS M-33,TO BE INSTALLEDBETWEEN CURB ANDPAVEMENT.
CONC. CLASS 'B' WITH AIRENTRAINMENT
1/2"
6" (TYP.)(SEE NOTE)
4"
8"
1 1/2" PREFORMED EXPANSION JOINT FILLER
PROPOSED CURB
AASHTO NO. 57 (3 4'') STONEON STABLE SUBBASE
CONCRETE CRADLE 4" WIDE
4500 PSI CONC @ 28 DAYS WITH AIR ENTRAINMENT
REINFORCED CONCRETE DRIVEWAY
18"
112'' REVEAL
1/26/2021
DETAIL, SECTION ORELEVATION DESIGNATOR
DOOR NUMBER SYMBOL
LOUVER NUMBERSYMBOLWINDOW NUMBERSYMBOL
ROOM NUMBER SYMBOL
WALL SECTION SYMBOL
TITLE AND DETAILREFERENCESYMBOL
PARTITION TYPE DESIGNATOR
REVISION
NORTH ARROW(CONSTRUCTION NORTH)
DRAWING NUMBER WHEREDETAIL, SECTION OR
ELEVATION IS DRAWN
TITLE AND SECTION /DETAIL REFERENCE SYMBOL
LETTER INDICATES SECTION,NUMBER INDICATES DETAIL ORELEVATION
DETAIL,SECTION ORELEVATION DESIGNATOR
LETTER INDICATES SECTION,NUMBER INDICATES DETAIL OR
ELEVATION
BUILDINGSECTION / DETAIL
SYMBOL
DRAWING NUMBER WHEREDETAIL, SECTION ORELEVATION IS DRAWN
TITLESYMBOL
101
1
ROOM NAME101
BUILDING SECTION SYMBOL
SHEET KEYNOTE - DEMOLITION
SHEET KEYNOTE - NEW CONSTRUCTION
RATING OF WALLNUMBER DESIGNATES HOUR
PARTITION TYPE
PARTITION TYPE VARIANT
1 View NameSCALE:1/8" = 1'-0"A101
1i
View NameSCALE:1/8" = 1'-0"
A
A
0X.1
1A101
SIM 1A101
SIM
1A101
SIM
1i
BRICK
CONCRETE MASONRYUNITS
STRUCTURAL CLAYUNITSGYPSUM BOARDPARTITIONSWOOD-FINISHGRADEWOOD BLOCKING
RIGID WALL/ PERIMETERINSULATIONRIGID ROOFINSULATION
BATT INSULATION
CONCRETE
POROUS FILL
EARTH
METAL PATTERN
EXISTING CONSTRUCTIONTO REMAIN
EXISTING CONSTRUCTION TO BEREMOVED AND DISPOSED OF
NEW CONSTRUCTION
CENTERLINE
BULKHEAD OR BEYOND
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2020 79
1/27/2
021 7
:55:25
AM A00.01
RK KB RS
CITY OF PHILADELPHIAWATER DEPARTMENT
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTS WORKNO. 73084
LEGEND, ABBREVIATIONS ANDNOTES
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
9
SOUTHWESTWATER POLLUTION
CONTROL PLANT
ARCHITECTURAL ABBREVIATIONS MATERIALS LEGEND GENERAL NOTES
SYMBOLS LEGEND
GENERAL DEMOLITION NOTES
THESE NOTES APPLY TO THE ENTIRE SCOPE OF DEMOLITION WORK ON THIS PROJECT ANDENCOMPASS WORK OF ALL TRADES AND DISCIPLINES.
DEMOLITION AND ALTERATION NOTES SHOULD NOT BE CONSIDERED TO BE ALL INCLUSIVE. IT ISTHE CONTRACTOR’S RESPONSIBILITY TO INSPECT AND ASSESS EACH SPACE, AND TO FULFILL THEINTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY ALL CONDITIONS AND
DIMENSIONS WITHIN THE CONTRACT LIMITS. DEVIATIONS FROM THE CONTRACT DOCUMENTSNECESSITATED BY FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THEOWNER'S REPRESENTATIVE.
WHERE EXISTING CONSTRUCTION IS MODIFIED OR REMOVED, PATCH AND REPAIR DISTURBEDSURFACES TO MATCH ADJACENT SURFACES OR PROVIDE NEW SCHEDULED FINISHES.
REMOVE PROJECTIONS, HANGERS, BOLTS, NAILS, ETC., FROM EXISTING COLUMNS ANDUNDERSIDE OF ROOF DECK. PATCH ALL HOLES TO MATCH ADJACENT SURFACES OR PROVIDENEW SCHEDULED FINISHES.
PIPE, DUCT AND CONDUIT PENETRATIONS, EITHER EXISTING IN THE FLOOR, WALLS, OR CEILINGRESULTING FROM THE WORK REQUIREMENTS, SHALL BE FILLED IN TO MATCH ADJACENTCONDITIONS.
EXISTING DUCTS, PIPES AND ELECTRICAL CONDUIT EXPOSED IN FINISH SPACES SHALL BEFURRED IN AS INDICATED ON THE DRAWINGS. NEW DUCTS, PIPES, CONDUITS SHALL BE “CHASED”INTO WALLS AND FINISHED TO MATCH ADJACENT SURFACES, UNLESS OTHERWISE NOTED.
1.
2.
3.
4.
5.
6.
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. NOTES ON A SINGLE SHEET APPLY TO THEENTIRE SHEET. SHEET KEYNOTES APPLY TO THE APPLICABLE SPECIFIC INSTANCE.
WHILE WORK IS GENERALLY CONFINED TO AREAS SHOWN ON DRAWINGS, THE ENTIRE BUILDINGIS CONSIDERED THE PROJECT AREA, AND CONTRACTOR SHALL NOT ASSUME THAT WORK ISCONFINED IN ANY WAY.
FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO STARTING WORK. ANYDISCREPANCIES WILL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVEBEFORE PROCEEDING WITH THE WORK.
DO NOT SCALE DRAWINGS. REFER TO DIMENSIONS INDICATED.
PROTECT EXISTING CONSTRUCTION TO REMAIN.
PROVIDE A DUST BARRIER TO CONTROL DUST DURING DEMOLITION AND NEW CONSTRUCTIONWHEN CONSTRUCTION OCCURS ADJACENT TO OCCUPIED AREAS.
MATERIAL IDENTIFIED TO BE SALVAGED AND REINSTALLED SHALL BE CAREFULLY REMOVED ANDSTORED TO MINIMIZE DAMAGE OR LOSS PRIOR TO REINSTALLATION.
MATERIALS AND / OR FINISHES DAMAGED, DESTROYED OR MISSING AS A RESULT OF DEMOLITIONOR NEW CONSTRUCTION SHALL BE REPAIRED TO MATCH ADJOINING MATERIALS AND FINISHESAT NO COST TO THE OWNER.
OPENINGS IN FULL HEIGHT PARTITIONS OR EXPOSED PARTITIONS BELOW CEILINGS, LEFT BYREMOVAL OF WORK SHALL BE INFILLED WITH CONSTRUCTION TO MATCH EXISTING.
EXISTING OPENINGS IN FULL HEIGHT PARTITIONS ABOVE CEILINGS SHALL BE BROUGHT TO THEATTENTION OF THE OWNER'S REPRESENTATIVE PRIOR TO DEMOLITION
OPENINGS IN EXTERIOR WALLS AND / OR ROOF WILL BE PROTECTED TO BE WEATHERTIGHT ATALL TIMES. NEW ROOF OPENINGS AND / OR PENETRATIONS WILL BE FLASHED INTO THEEXISTING ROOF CONSTRUCTION TO MAINTAIN A WEATHERTIGHT INSTALLATION.
COORDINATE WORK OF ALL TRADES.
ALL NEW WORK TO BE PAINTED TO MATCH ADJOINING FINISHES UNLESS OTHERWISE NOTED.
COORDINATE DEMOLITION WORK WITH EXISTING CONDITIONS AND NEW WORK. MODIFYEXISTING OPENINGS AS REQUIRED TO ACCOMMODATE NEW WORK.
ALL REQUIRED UTILITY OUTAGES SHALL BE COORDINATED WITH THE OWNER.
WITHIN THE PROJECT AREA, OWNER RESERVES THE RIGHT TO SELF-PERFORM OR DIRECT WORKOF OTHER CONTRACTORS OR VENDORS CONCURRENTLY WITH HIS PROJECT.
NEW ELECTRICAL PANELS SHALL BE RECESSED IN NEW AND/OR EXISTING WALLS. PROVIDEOPENINGS. PATCH TO MATCH ADJACENT SURFACES OR PROVIDE NEW SCHEDULED FINISHES.
UNLESS OTHERWISE NOTED ON DOCUMENTS, ALL PAINTING SHALL BE FROM A BREAK IN PLANETO A BREAK IN PLANE REGARDLESS OF AREA ACTUALLY REPAIRED OR DISTURBED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
TEMPORARY BARRIER NOTES
1. CONSTRUCT TEMPORARY BARRIERS FROM FLOOR SLAB UP TO UNDERSIDE OF DECK TO CONTAIN DUST ANDDEBRIS DURING CONSTRUCTION. TEMPORARY BARRIERS OVER EXISTING RACKS, EQUIPMENT ANDWORKSTATIONS SHALL BE STRUCTURALLY SOUND TO PROTECT AGAINST DAMAGE BY FALLING MATERIALS OREQUIPMENT.
2. TEMPORARY BARRIERS ARE TO BE SET UP AND BROKEN DOWN EACH SHIFT WHEN REQUIRED IN OCCUPIEDSPACES. CONTRACTOR SHALL SUBMIT FOR APPROVAL A PROTECTION PLAN FOR THIS PROJECT.
3. ACCEPTABLE BARRIERS SHALL BE:A. METAL STUDS AT 24" ON CENTER, OF SUFFICIENT STRENGTH TO MEET SPANS, WITH EITHER GYPSUM
BOARD OR FIRE - RETARDANT PLYWOOD ONE SIDE.B. "ZIPWALL" OR EQUIVALENT SYSTEM, WITH HEAVY-MIL OPAQUE PLASTIC SHEATHING, TAPED CONTINUOUSLY
AT SEAMS AND TOP AND BOTTOM.
4. FLOOR PROTECTION SHALL BE:A. RAM BOARD, OR EQUIVALENT.
ARCHITECTURAL - ABBREVIATIONSPTD PAPER TOWEL DISPENSERPTN PARTITIONPVC POLYVINYL CHLORIDEQT QUARRY TILEQTY QUANTITYR RISER OR RADIUSRB RESILIENT WALL BASE AND ACCESSORIES (VINYL
BASE RUBBER BASE TREADS NOSINGS EDGINGS)RCP REINFORCED CONCRETE PIPERD ROOF DRAIN OR ROUNDREBAR REINFORCING BARREF REFERENCESREINF REINFORCED OR REINFORCINGREQ REQUIREDREQ'D REQUIREDRESF RESINOUS FLOORINGRET RETURNREV REVISIONRF RESILIENT FLOORING (VINYL RUBBER VINYL
COMPOSITION SHEET FLOORING)RH ROBE HOOKRM ROOMRO ROUGH OPENINGRV ROOF VENTRWR RECESSED WASTE RECEPTACLERX REMOVE EXISTINGS SILL, SOUTH OR SINGLESC SPECIAL COATING (OTHER THAN PAINT SYSTEMS)SCH SCHEDULE OR SCHEDULEDSCR SHOWER CURTAIN RODSD SOAP DISPENSER OR STORM DRAINSECT SECTIONSF SQUARE FOOTSFT STRUCTURAL FACING TILESH SHOWERSHT SHEETSIM SIMILARSJ STEEL JOISTSND SANITARY NAPKIN DISPOSALSOD SECTIONAL OVERHEAD DOOR (STEEL ALUMINUM:
PLASTIC PANEL)SP STAND PIPESPEC SPECIFICATIONSQ SQUARESS STAINLESS STEEL OR SERVICE SINKSSM SOLID SURFACING MATERIALSTAT STATIONARYSTL STEELSTRUCT STRUCTURAL OR STRUCTURESUSP SUSPENDEDSWR SURFACE-MOUNTED WASTE RECEPTACLESYS SYSTEMT TILET&B TOP & BOTTOMT&G TONGUE & GROOVETBD TO BE DETERMINEDTC TOP OF CURBTCD TOILET SEAT COVER DISPENSERTEL TELEPHONETER TERRAZZOTH THICKTO TOP OFTOB TOWEL BARTOS TOP OF STEELTOW TOP OF WALLTP TOILET PARTITION (WATER CLOSET URINAL
SHOWER: SCREEN)TPD TOILET PAPER DISPENSERTR TREADTYP TYPICALU UNITUNO UNLESS NOTED OTHERWISEUR URINALV VENTVB VERTICAL BLINDVDB VISUAL DISPLAY BOARD (HINGED CONFERENCE
UNIT)VERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVP VAPOR BARRIERVS VERTICAL STANDPIPEW WOMEN, WIDTH, WEST OR WOVENW/ WITHWC WATER CLOSET OR WALL COVERING (VINYL OR
TEXTILE WALL COVERING WALL PAPER)WD WOODWH WEEP HOLEWHT WHITEWO WINDOW OPENINGWP WATERPROOF OR WORKING POINTWR WATER RESISTANT OR WASTE RECEPTACLEWT WEIGHTWWF WOVEN WIRE FABRICYD YARDYR YEAR
ARCHITECTURAL - ABBREVIATIONSFG FIBERGLASSFH FLAT HEADFIN FINISH OR FINISHEDFIRE T FIRE TREATEDFIX FIXTUREFL FLASHINGFLM FULL LENGTH MIRRORFLR FLOORFR FIRE RATEDFRC FIBER-REINFORCED COATINGFS FOLDING SHELFFSS FOLDING SHOWER SEATFT FOOT OR FEETFTG FOOTINGFWP FABRIC-WRAPPED PANEL (FABRICATED TACKABLE
ACOUSTICAL PANEL)GA GAUGEGALV GALVANIZEDGB GRAB BARGEN GENERALGL GLASSGLM GLASS UNIT MASONRY (GLASS BLOCK)GMU GLAZED MASONRY UNITGP GYPSUM PLASTERGRD GROUNDGRT GROUTGVP GYPSUM VENEER PLASTERGYPB GYPSUM BOARD (WALL OR CEILING)GYPBS GYPSUM BOARD SHAFT-WALL ASSEMBLYH HEADHB HORIZONTAL BLINDHDW HARDWAREHM HOLLOW METALHOR HORIZONTALHP HIGH POINTHR HOURHT HEIGHTHTR HEATERHVAC HEATING, VENTILATING AND AIR CONDITIONINGHW HOT WATERID INSIDE DIAMETERIN INCHINSUL INSULATIONINT INTERIORINV INVERTJ JAMBJC JANITOR'S CLOSETJT JOINTKIT KITCHENL LINTELLAB LABORATORYLAV LAVATORYLG LONGLIN LINOLEUM FLOOR COVERINGLLV LONG LEG VERTICALLOC LOCATIONLOCK LOCKERLP LOW POINTLT LIGHTLTG LIGHTINGLV LOUVERM MIRROR OR MENMACH MACHINEMAS MASONRYMATL MATERIALMAX MAXIMUMMC MEDICINE CABINETMDF MEDIUM DENSITY FIBERBOARDMECH MECHANICALMET METALMFB MINERAL FIBER BLANKETMFR MANUFACTURERMH MANHOLEMIN MINIMUMMISC MISCELLANEOUSMK MARKMO MASONRY OPENINGMP METAL PANELMR MOP RACKMTD MOUNTEDMTL METALN NORTHNA NOT APPLICABLEND SANITARY NAPKIN DISPENSERNIC NOT IN CONTRACTNO NUMBERNOM NOMINALNTS NOT TO SCALEOA OVERALLOC ON CENTEROD OUTSIDE DIAMETEROFF OFFICEOHD OVERHEAD COILING DOOROHG OVERHEAD COILING GRILLEOP OPERABLE PANEL PARTITION (HUNG FROM
OVERHEAD TRACK)OPNG OPENINGOPP OPPOSITEOZ OUNCEPAV PAVER TILEPC PIECEPF PLASTIC FABRICATIONPL PLATEPLAM PLASTIC LAMINATEPLAS PLASTERPREFAB PREFABRICATEDPREST PRESSURE TREATEDPT PAINT
ARCHITECTURAL - ABBREVIATIONSABV ABOVEAC AIR CONDITIONING (CONDITIONER)AD ACCESS DOOR (OR PANEL)ADA AAMERICAN WITH DISABILITIES ACTADD ADDENDUMADJ ADJACENTAES ABOVE EXISTING SLABAF ACCESS FLOORAFF ABOVE FINISHED FLOORAHU AIR HANDLING UNITALT ALTERNATEALUM ALUMINUMAPC ACOUSTICAL PANEL CEILING (LAY-IN)APPROX APPROXIMATEARCH ARCHITECTURALASB ASBESTOSASP ASPHALTATC ACOUSTICAL TILE CEILING (CONCEALED
SUSPENSION)AWP ACOUSTICAL WALL PANELBB BULLETIN BOARD (GLASS COVERD)BC BOTTOM OF CURBBD BOARDBEN BENCHBETW BETWEENBLDG BUILDINGBLKG BLOCKINGBM BEAMBOT BOTTOMBR BRICKBR/S BACKER ROD AND SEALANTC CONDUITC/C CENTER TO CENTERCAB CABINETCARP CARPETCARPT CARPET TILECB CHALK BOARDCEM CEMENTCER CERAMICCG CORNER GUARDCH CEILING HEIGHTCI CAST IRONCJ CONTROL JOINTCL CENTERLINECLG CEILINGCLOS CLOSETCLR CLEARCMP CORRUGATED METAL PIPECMU CONCRETE MASONRY UNITCO CLEAR OPENINGCOL COLUMNCOMP COMPACTEDCONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOUSCONV CONVECTORCR COLD ROLLEDCSK COUNTERSUNKCSPE CHLOROSULFONATED POLYETHYLENE ELASTOMERCT CERAMIC TILECTR COUNTERCW COLD WATERCX CONNECT TO EXISTINGD DOUBLEDEG DEGREEDEMO DEMOLITIONDET DETAILDF DRINKING FOUNTAINDIA DIAMETERDIR DIRECTORYDN DOWNDO DOOR OPENINGDR DOORDS DOWNSPOUTDWG DRAWINGE EASTEA EACHEF EACH FACEEFS EXTERIOR FINISH SYSTEMEIFS EXTERIOR INSULATION AND FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELEC ELECTRIC OR ELECTRICALELEV ELEVATOREM ENTRY MATEP ETHYLENE PROPYLENE-BASED (SINGLE PLY
ROOFING)EPB ELECTRIC PANEL BOXEPDM ETHYLENE-PROPYLENE-DIENE MEMBRANEEPS EXPANDED POLYSTYRENEEPX EPOXYEQ EQUALEQUIP EQUIPMENTEST ESTIMATEEUH ELECTRIC UNIT HEATEREW EACH WAYEWC ELECTRIC WATER COOLEREWCA ELECTRIC WATER COOLER - ACCESSIBLEEXIST EXISTINGEXP EXPANSION OR EXPOSEDEXT EXTERIORF FILLERFC FAN COIL UNITFD FLOOR DRAIN OR FIRE DAMPERFDR FOLDING DOOR (WOOD OR FABRIC)FE FIRE EXTINGUISHER ON BRACKETFEC FIRE EXTINGUISHER CABINET
212019181716
GRINDER ROOMSCREEN ROOM
OPEN
ING
EXIS
TING
2
1
3
3
2
36' -
6 3/4"
+/-
5' - 4
"
5' - 4
"
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2020 79
1/4" = 1'-0"
1/27/2
021 7
:55:26
AM A01.01
RK AM DK
CITY OF PHILADELPHIAWATER DEPARTMENT
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTS WORKNO. 73084
DEMOLITION PLAN AND DETAILS
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
10
SOUTHWESTWATER POLLUTION
CONTROL PLANT
SCALE: 1/4" = 1'-0"A01.011 DEMOLITION FLOOR PLAN
DEMOLITION SHEET NOTESREMOVE EXISTING DOOR AND FRAME AND PREPAREOPENING FOR NEW DOOR AND FRAME.
CUT NEW DOOR OPENING THROUGH EXISTING CONCRETE /BRICK WALL. FINISHED OPENING SIZE SHALL BE 3' - 4 1/2"WIDE BY 7' - 4 1/2" TALL
PROVIDE NEW OPENING FOR HORIZONTAL BELT CONVEYORTHROUGH EXISTING CONCRETE / BRICK WALL. FINISHEDOPENING SIZE SHALL BE APPROXIMATELY 3' - 4" WIDE BY 6' -0" HIGH. VERIFY DIMENSIONS OF BELT CONVEYOR BEINGPROVIDED BEFORE CUTTING OPENING. SEE STRUCTURALDRAWINGS FOR LINTEL - DETAIL 8/S01.10
1
2
3
0 8'4'2'
1/4" = 1'-0"SCALE:
UP
UP
212019181716
A01.051
A01.042
A01.041
101B
101C
101D
1
2
3 TYP OF (4)
45
EASTDUMPSTER
BAY
101E
4' - 0
"3'
- 4"
4' - 0
"5'
- 4"
2' - 8
"4'
- 8"
2' - 8
"5'
- 4"
4' - 0
"4'
- 0"
6' - 8
"
6' - 4" 10' - 8" 5' - 8"
ALIGN
101
GRINDER ROOMSCREEN ROOM
2' - 0" 3' - 4"
2' - 8" 4' - 0"
1
101A
1' - 7"
22' - 8"
46' -
8"
1' - 7
"1'
- 7"
6
7
8
3' - 0
"5'
- 4"
100AD.O.
3' - 0
"2'
- 11"
2A01.05
2A01.05
1A01.06
1A01.06
9
LV-1
LV-2
10
11 TYP
1' - 1
0"
OPEN
ING
EXIS
TING
9
9
W-1
W-2
W-1
12
12
12
5A01.08
8
A01.053
4' - 8
"
13
14
14
1A01.08
4A01.08
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2020 79
1/4" = 1'-0"
1/27/2
021 7
:55:28
AM A01.02
RK AM RS
CITY OF PHILADELPHIAWATER DEPARTMENT
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTS WORKNO. 73084
FIRST FLOOR PLAN
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
11
SOUTHWESTWATER POLLUTION
CONTROL PLANT
0 8'4'2'
1/4" = 1'-0"SCALE:
CONSTRUCTION SHEET NOTES
LOUVER. SEE ELEVATION FOR HEIGHT ABOVE FINISHEDFLOOR.
HOOD FOR OVERHEAD COILING DOOR ABOVE.
CAST IN PLACE CONCRETE COLUMN. SEE STRUCTURALDRAWINGS.
REVERSIBLE BELT CONVEYOR. SEE MECHANICAL DRAWINGS.
DUMPSTER. SEE MECHANICAL DRAWINGS.
INFILL OPENING ABOVE WITH CONSTRUCTION TO MATCHEXISTING WALL.
BOLLARD. SEE CIVIL DRAWINGS.
OPENING IN EXISTING WALL TO ACCOMMODATE EXTENSIONOF BELT CONVEYOR. SEE MECHANICAL DRAWINGS.
METAL STAIR. SEE SHEET A01.08
CONTINUOUS 1" ISOLATION JOINT WHERE SLAB MEETS THEEXISTING BUILDING.
TRENCH DRAIN. SEE SHEET M01.04
WINDOW. SEE ELEVATION FOR HEIGHT ABOVE FINISHEDFLOOR
PREFABRICATED CANOPY (ABOVE)
FIRE EXTINGUISHER
SCALE: 1/4" = 1'-0"A01.021 EAST DUMPSTER BAY FLOOR PLAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
21
A01.051
A01.042
A01.041
1 TYP
1/4" / 12"
1/4" / 12"
ADDITION
EXISTING
2A01.05
2A01.05
1A01.06
1A01.06
2
2
3
4
1/4"
/ 12
"1/
4" /
12"
5
1/4"
/ 12
"1/
4" /
12"
2' - 0
"
2' - 0"
INSULATION
SUBSTRATE
INSULATION
SUBSTRATE
ROUN
D PE
NETR
ATIO
NPRIMER
MODIFIEDBITUMINOUSMEMBRANE
BONDING ADHESIVE(ADHERED SYSTEM ONLY)
CONTINUOUS BEAD OF LAPSEALANT
STAINLESS STEEL CLAMPINGRING (SEE NOTES)
CONTINUOUS BEAD HIGHGRADE SEALANT
FIELD FABRICATED METAL HOOD
PRE-MOLDED PIPE FLASHING
JOINT COVER OR FLASHING WITHSEAM EDGE TREATMENT
PLAN VIEW: PIPEFLASHING OVER FIELDSEAM
3"
FACTORY OR FIELD SEAM
PIPE MUST BE ANCHORED TO ENSURESTABILITY.
PRE-MOULDED PIPE FLASHING MAY BE CUTTO HEIGHT, BUT NO LOWER THANREINFORCING RING (NO WRINKLES OR FOLDSUNDER CLAMPING RING).
APPLY LAP SEALANT BETWEENPENETRATION AND PRE-MOLDED PIPEFLASHING PRIOR TO INSTALLATION OFCLAMPING RING.
PRE-MOLDED PIPE FLASHING FITS 1" - 6"PENETRATIONS SIZES.
NOTES:
1.
2.
3.
4.
INSULATION
SUBSTRATE SUBSTRATE
NEW WOOD NAILER
CLAMPING RINGSTAINLESS STEEL STUDS, WASHERS AND NUTS
CAST IRON DOME
FASTENER
CAST IRON FLANGE (18" DIAMETER)
DRAIN BOWL
MODIFIED BITUMINOUS MEMBRANE
CONTINUOUS BEAD OF WATERBLOCK (SEENOTES)
1/2" MIN.
NOTES:HOLE IN MEMBRANE SHOULD EXTEND A MINIMUMOF 1/2" BEYOND CLAMPING RING AND SHOULD NOTBE SMALLER THAN THE DIAMETER OF THE LEADERPIPE.
INSULATION ADJACENT TO DRAIN TO BEAPPROPRIATE INSULATION WITH APPROPRIATEBONDING SURFACE.
WATERBLOCK MIN OF 1/2 OF 10 OZ. TUBE PER 4"DRAIN. USE ADDITIONAL WATERBLOCK FORLARGER DRAINS.
1.
2.
3.
INSULATION
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2020 79
As indicated
1/27/2
021 7
:55:29
AM A01.03
RK AM RS
CITY OF PHILADELPHIAWATER DEPARTMENT
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTS WORKNO. 73084
ROOF PLAN
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
12
SOUTHWESTWATER POLLUTION
CONTROL PLANT
ROOF DRAIN. SEE MECHANICAL DRAWINGS.
OVERFLOW SCUPPER WITH STAINLESS STEEL LINER.
EXPANSION JOINT. SEE DETAIL 3/A1.06
PRECAST COPING. SEE DETAIL 2/A1.06
MEMBRANE ROOFING OVER TAPERED INSULATION ANDCOVER BOARD. SEE DETAIL 2/A1.06
0 8'4'2'
1/4" = 1'-0"SCALE:
SCALE: 1/4" = 1'-0"A01.031 EAST DUMPSTER BAY ROOF PLAN
1
2
3
4
5
CONSTRUCTION SHEET NOTES
SCALE: 6" = 1'-0"A01.033 ROOF PIPE PENETRATION DETAIL
SCALE: 6" = 1'-0"A01.034 ROOF DRAIN DETAIL
0 2" 4"
6" = 1'-0"
1"
SCALE:
ParapetEL. 150.50
Main LevelEL. 111.50
22 21 20 1918 17
T.O. E. DUMPSTERBAY FLOOR SLAB
EL. 108.20
12' -
0"
TOP OF PRECASTCONCRETE PANELEL. 128.20
1 2
3
ADDITION
20' -
6"
1
54
10' - 8"
T.O. BRICKEL. 121.53
TYP3' - 4" 2' - 8"
EQ.
EQ
2' - 8
"10
' - 8"
6' - 8
"
7
8TYP
T.O. CONCRETE KNEEWALL
EL. 110.87Grinder Room Slab 1
EL. 109.00
TOP OF PARAPETEL. 128.70
BOT. OF WINDOWLOUVER
EL. 115.53
99 9
11
ParapetEL. 150.50
Main LevelEL. 111.50
222120191817
T.O. E. DUMPSTERBAY FLOOR SLAB
EL. 108.20
TOP OF PRECASTCONCRETE PANEL
EL. 128.20
6 2
3
ADDITION
20' -
0"
6' - 8
"10
' - 8"
2' - 8
"
4
T.O. BRICKEL. 121.53
EQEQ
.
TYP3' - 4"2' - 8"
4' - 0
"A.
F.F.
7' - 4
"
8TYP
Grinder Room Slab 1EL. 109.00
TOP OF PARAPETEL. 128.70
BOT. OF WINDOWLOUVER
EL. 115.53
7
6' - 0"
10
11
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2020 79
1/4" = 1'-0"
1/27/2
021 7
:56:00
AM A01.04
RK AM RS
CITY OF PHILADELPHIAWATER DEPARTMENT
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTS WORKNO. 73084
BUILDING ELEVATIONS
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
13
SOUTHWESTWATER POLLUTION
CONTROL PLANT
REF:SCALE: 1/4" = 1'-0"A01.04
A01.02
1 NORTH ELEVATION
SCHEDULED DOOR AND FRAME.
PRECAST CONCRETE PANELS.
CAST IN PLACE CONCRETE. KNEE WALL SANDBLASTEDFINISH. SEE STRUCTURAL.
BRICK VENEER.
METAL PANEL.
SCHEDULED LOUVER.
CONTINUOUS ISOLATION JOINT WHERE WALL MEETS THEEXISTING BUILDING.
SEALANT JOINT BETWEEN CONCRETE PANELS.
8" BOLLARD. SEE CIVIL.
MASA ARCHITECTURAL CANOPIES - EXTRUDECK.
PRECAST CONCRETE COPING.
1
0 8'4'2'
1/4" = 1'-0"SCALE:
REF:SCALE: 1/4" = 1'-0"A01.04
A01.02
2 SOUTH ELEVATION
2
3
4
5
6
GENERAL SHEET NOTES1. SEE A01.07 FOR SCHEDULES.
7
8
9
10
CONSTRUCTION SHEET NOTES
11
ParapetEL. 150.50
T.O. E. DUMPSTERBAY FLOOR SLAB
EL. 108.20
TOP OF PRECASTCONCRETE PANEL
EL. 128.20
1
2
3
46
5
T.O. BRICKEL. 121.53
2' - 8
"10
' - 8"
6' - 8
"
20' -
0"
TYP3' - 4"
4' - 0
"A.
F.F.
7' - 4
"
T.O. CONCRETE KNEEWALL
EL. 110.874'
- 8"
A.F.F
.7'
- 4"
13' -
4"
TOP OF PARAPETEL. 128.70
BOT. OF WINDOWLOUVER
EL. 115.53
3' - 1
0"
777
88
6' - 0"
9
10
1A01.08
4A01.08
11
12
13
13
1414
1515
16
17
18
19
20
21
EXISTING EAST WASTE WATERCONDUIT TO EAST GRIT AREA
23
23
24 TYP
25
26 TYP
10"
27
5A01.08
A01.062
Sim
28
BEYOND
19
3' - 0
"
4A01.08
1A01.06
1A01.06
4' - 0
"
5' - 4"
14 13
26 TYP
27
28
5A01.08
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2020 79
1/4" = 1'-0"
1/27/2
021 7
:56:42
AM A01.05
RK AM RS
CITY OF PHILADELPHIAWATER DEPARTMENT
SCREENING COLLECTIONAND CONVEYANCE
IMPROVEMENTS WORKNO. 73084
BUILDING ELEVATION AND SECTION
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
14
SOUTHWESTWATER POLLUTION
CONTROL PLANT
REF:SCALE: 1/4" = 1'-0"A01.05
A01.02
1 EAST ELEVATION
SCHEDULED LOUVER.
SCHEDULED DOOR AND FRAME.
PRECAST CONCRETE PANELS.
CAST IN PLACE CONCRETE. KNEE WALL SANDBLASTEDFINISH. SEE STRUCTURAL.
METAL PANEL.
BRICK VENEER.
SCHEDULED WINDOW.
OVERFLOW SCUPPER (TYP.)
MASA ARCHITECTURAL CANOPIES - EXTRUDECK.
PRECAST CONCRETE COPING.
0 8'4'2'
1/4" = 1'-0"SCALE:
1
2
3
4
5
6
REF:SCALE: 1/4" = 1'-0"A01.05
A01.02
2 BUILDING SECTION
MEMBRANE ROOF WITH TAPERED INSULATION.
PRECAST HOLLOW CORE CONCRETE ROOF STRUCTURE,SEE STRUCTURAL.
CAST IN PLACE CONCRETE COLUMN, SEE STRUCTURAL.
HOLLOW METAL DOOR AND FRAME.
MASONRY WALL. SEE 2/A01.06.
OVERHEAD COILING DOOR.
8" BOLLARD, SEE CIVIL.
REVERSIBLE BELT CONVEYOR, SEE MECHANICAL.
DUMPSTER, SEE MECHANICAL.
DUMPSTER CONVEYOR, SEE MECHANICAL.
DUMPSTER CONVEYOR CONTROL PANEL, SEE MECHANICAL.
CONCRETE DRIVEWAY, SEE CIVIL.
CONCRETE SLAB ON GRADE, SEE STRUCTURAL.
CONCRETE GRADE BEAM, SEE STRUCTURAL.
EXISTING PRELIMINARY TREATMENT BUILDING.
TRENCH DRAIN, SEE MECHANICAL.
CONVEYOR WALL OPENING. REMOVE STRUCTURAL GLAZEDTILE, COMMON BRICK, AND FACE BRICK AS REQUIRED TOPROVIDE OPENING FOR BELT CONVEYOR.
REMOVE STRUCTURAL GLAZED TILE, COMMON BRICK, ANDFACE BRICK AS REQUIRED TO INSTALL NEW STEEL ANGLELINTELS. RESTORE WALL WITH SALVAGED MASONRYMATERIAL TO MATCH EXISTING CONSTRUCTION. SEE DETAIL3/A01.08
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
7
8
REF:SCALE: 1/4" = 1'-0"A01.05
A01.02
3 CONVEYOR WALL OPENING ELEVATION
27
28
9
CONSTRUCTION NOTES
10
FIRST FLOORPLAN
111' - 6"
SCREEN ROOMPARAPET
150' - 6"
CRANE GIRDER132' - 8 1/2"
TOP OF STEEL146' - 9 1/2"
CB
C
B
B C CB
FINISHED GRADE VARIES(VIF)
(VIF
)E
XS
T C
ON
C P
AR
AP
ET
(BR
ICK
MA
SO
NR
Y R
EP
AIR
S N
OT
IN
SC
OP
E)
EX
ST
BR
ICK
MA
SO
NR
Y V
EN
EE
R (
VIF
)
EXST CONCRETE ARCH (TYP)
BA
SE
WA
LL
(V
IF)
EX
ST
CO
NC
EXST BRICK MASONRY CONTROL JOINT (VIF)
EXST BRICK MASONRY CONTROL JOINT (VIF)
EXST BRICK MASONRY EXPANSION JOINT (VIF)
EXST BRICK MASONRY EXPANSION JOINT (VIF)
B
C
C
C
C C
B
C C
A
B
B
C
C
C
FIRST FLOORPLAN
111' - 6"
SCREEN ROOMPARAPET
150' - 6"
CRANE GIRDER132' - 8 1/2"
TOP OF STEEL146' - 9 1/2"
NOT IN CONTRACT
(VIF
)E
XS
T C
ON
C P
AR
AP
ET
(BR
ICK
MA
SO
NR
Y R
EP
AIR
S N
OT
IN
SC
OP
E)
EX
ST
BR
ICK
MA
SO
NR
Y V
EN
EE
R (
VIF
)
A
EXST ELONGATED DOOR WAY (VIF)
B
BBB
B
FIRST FLOORPLAN
111' - 6"
SCREEN ROOMPARAPET
150' - 6"
CRANE GIRDER132' - 8 1/2"
TOP OF STEEL146' - 9 1/2"
NOT IN CONTRACT
B
(VIF
)E
XS
T C
ON
C P
AR
AP
ET
(BR
ICK
MA
SO
NR
Y R
EP
AIR
S N
OT
IN
SC
OP
E)
EX
ST
BR
ICK
MA
SO
NR
Y V
EN
EE
R (
VIF
)
A
EXST ELONGATED DOOR WAY (VIF)
B B
B
REF:SCALE: 3/16" = 1'-0"S01.03
S01.01
1 NORTH REPAIR ELEVATION
REF:SCALE: 3/16" = 1'-0"S01.03
S01.01
2 SOUTH REPAIR ELEVATION - WEST END
REF:SCALE: 3/16" = 1'-0"S01.03
S01.01
3 SOUTH REPAIR ELEVATION - EAST END
0
3/16" = 1'-0"
10'6'2' 4'
SCALE:
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2021 79
SCREENING COLLECTION AND CONVEYANCE
IMPROVEMENTS WORK NO. 73084
As indicated
1/22/2
021 1
:42:08
PM S01.03
RMP MAW MP
CITY OF PHILADELPHIAWATER DEPARTMENT
PRELIMINARY TREATMENT BUILDING- FACADE ELEVATIONS
SOUTHWESTWATER POLLUTION
CONTROL PLANT
PRELIMINARY TREATMENT BUILDING FACADE REPAIR SCOPE OF WORK KEY NOTES:
ALL SCOPE ITEMS LABELED AS X ON THE DRAWINGS REFER TO THESE SCOPE OF WORK SUMMARIES.
SEE SPECIFICATIONS, PLANS AND DETAILS FOR ADDITIONAL REQUIREMENTS FOR EACH SCOPE OF WORK.
A. SOUND ALL EXPOSED EXTERIOR SURFACES OF THE CONCRETE PARAPET WALL AND CONCRETE BEAM ABOVE ROLL-UP DOORSCOPE INCLUDES:• VISUALLY OBSERVE AND PERFORM SOUNDINGS ON ALL EXPOSED, EXTERIOR SURFACES OF THE CONCRETE ELEMENTS. • IDENTIFY AND MARK ALL DISCOVERED AREAS OF SPALLING, DELAMINATED, HOLLOW-SOUNDING AND/OR DETERIORATED
CONCRETE. • REVIEW OBSERVED AND MARKED CONDITIONS WITH THE ENGINEER AND OWNER PRIOR TO PROCEEDING WITH THE
REPAIRS.REFERENCE:• ALL AREAS OF REPAIR IDENTIFIED ON THE DRAWINGS WITH THIS SCOPE OF WORK LETTER. BASE BID QUANTITY:• ALL EXPOSED, EXTERIOR CONCRETE PARAPET AND CONCRETE BEAM SURFACE AREAS SHOWN ON ELEVATIONS AND
DENOTED WITH THE SCOPE OF WORK.
B. CONCRETE SPALL REPAIR SCOPE INCLUDES:• AT IDENTIFIED AREAS OF CONCRETE SCHEDULED FOR REPAIR, SELECTIVELY DEMOLISH CONCRETE DOWN TO SOUND
SUBSTRATE. • REMOVE ADDITIONAL CONCRETE AS REQUIRED TO PROVIDE A SQUARE REPAIR REGION WITH A MINIMUM THICKNESS AS
REQUIRED BY THE REPAIR MATERIAL. • PREPARE THE CONCRETE SUBSTRATE PER THE REPAIR MATERIAL MANUFACTURER REQUIREMENTS AND COAT WITH AN
EPOXY MODIFIED BONDING AGENT. • PATCH CONCRETE WITH POLYMER-MODIFIED, CEMENTITIOUS PATCHING MORTAR PER MANUFACTURER'S
RECOMMENDATIONS. PATCHING MORTAR TO MATCH EXISTING CONCRETE IN COLOR AND TEXTURE. REFERENCE:• ALL AREAS OF REPAIR IDENTIFIED ON THE DRAWINGS AS AND WITH THIS SCOPE OF WORK LETTER
AND AS IDENTIFIED AND APPROVED FOR REPAIR BY THE ENGINEER AND OWNER DURING COMPLETION OF SCOPE OF WORK A.
BASE BID QUANTITY:• PROVIDE UNIT PRICE FOR THIS SCOPE OF WORK• ASSUME 150 SF (4" DEPTH OF CONCRETE SPALL)
C. CONCRETE CRACK REPAIR: EPOXY INJECTION METHODSCOPE INCLUDES:• CLEAN AND PREPARE SUBSTRATES FOR APPLICATION OF EPOXY INJECTION REPAIRS PER THE MANUFACTURER'S
WRITTEN INSTRUCTIONS. • INSTALL INJECTION PORTS AND SEAL CRACKS WITH A HIGH STRENGTH STRUCTURAL EPOXY PRIOR TO BEING INJECTED
PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS. • INJECT CRACKS WITH A MOISTURE TOLERANT STRUCTURAL EPOXY ADHESIVE. BASE BID QUANTITY:• PROVIDE UNIT PRICE FOR THIS SCOPE OF WORK ITEM.• SEE PLAN AND ELEVATIONS FOR AREAS GRAPHICALLY SHOWN AS AND DENOTED WITH THIS SCOPE OF
WORK SUMMARY NUMBER. • ASSUME 200 LF OF CONCRETE SLAB CRACK REPAIR. ASSUME THE CRACKS TO BE 1/4" THICK WITH AN ASSUMED DEPTH OF
12".
GENERAL REMEDIATION NOTES:
1. THE PROJECT SCOPE FOR THE FACADE REPAIRS IS LIMITED TO THE EXPOSED SURFACES OF THE CONCRETE PARAPET WALLS. 2. THE REPAIR AREAS INDICATED ON THE DRAWINGS ARE GENERALIZED GRAPHICAL DEPICTIONS OF THE DEFICIENCIES NOTED AT
THE TIME OF VISUAL OBSERVATIONS. THESE REPAIR AREAS SHOULD BE VERFIED IN THE FIELD. 3. THE BASE BID SCOPE OF WORK INCLUDES ALL WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT
LIMITED TO ALL ITEMS GRAPHICALLY DEPICTED ON THE DRAWINGS, ALL ITEMS DESCRIBED IN THE SCOPE OF WORK KEY NOTES AND THE FULL AMOUNTS OF ALL BASE BID QUANTITIES INDICATED.
4. THE BASE BID SCOPE OF WORK DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF IDENTIFYING SIMILAR UNMARKED CONDITIONS AND PERFORMING APPROVED REPAIRS IN EXCESS OF THE AMOUNTS INDICATED. THE "SCOPE OF WORK KEY NOTES" DESCRIPTIONS ARE PROVIDED TO AID THE CONTRACTOR IN IDENTIFYING SIMILAR CONDITIONS. ANY SIMILAR CONDITIONS DISCOVERED BY THE CONTRACTOR SHALL BE IMMEDIATELY IDENTIFIED TO THE ENGINEER FOR APPROPRIATE CONSULTATIONS WITH THE OWNER PRIOR TO THE START OF ADDITIONAL WORK. PRIOR TO PROCEEDING WITH WORK NOT GRAPHICALLY SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER FOR AUTHORIZATION TO PROCEED.
5. THE CONTRACTOR SHALL PROVIDE UNIT PRICES ON THE BID FORM CORRESPONDING TO EACH SCOPE OF WORK ITEM THAT INDICATES TO PROVIDE A UNIT PRICE. THE UNIT PRICES SHALL BE ALL INCLUSIVE OF GENERAL CONDITIONS, PREPARATION OF SUBSTRATES, SCAFFOLDING, CONSTRUCTION AND TESTING COSTS REQUIRED TO COMPLETE THE WORK DESCRIBED.
6. THE CONTRACTOR SHALL MAINTAIN DAILY WRITTEN QUANTITIY RECORDS CORRESPONDING TO EACH BASE BID QUANTITY INDICATED FOR EACH SCOPE OF WORK KEY. RECORDS SHALL BE REPORTED TO THE OWNER AND ENGINEER WEEKLY FOR THE PURPOSES OF PROGRESS MONITORING AND APPROVAL OF SIMILAR CONDITIONS DISCOVERED BY THE CONTRACTOR IN THE FIELD.
7. ENGAGE A REPRESENTATIVE FROM THE MANUFACTURER FOR EACH PRODUCT TO BE UTILIZED PRIOR TO THE START OF WORK TO EVALUATE FIELD CONDITIONS AND MAKE PROJECT SPECIFIC RECOMMENDATIONS. POWERWASH AND PROVIDE CLEAN AND SOUND SURFACE FREE OF DIRT, DUST, OIL, GREASE, EFFLORESCENCE OR EXISTING COATINGS FROM CONCRETE BY STEAM CLEANING, WATERBLASTING OR SLIGHTLY SANDBLASTING. FOLLOW MANUFACTURE'S WRITTEN INSTRUCTIONS WHERE REQUIRED.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR TO ANY SIDEWALKS, LAWN, TREES, PAVING, AND OTHER IMPROVEMENTS DISTURBED OR DAMAGED BY CONSTRUCTION OR DEMOLITION ACTIVITIES PROPOSED HEREIN.
9. FOR THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE OVERHEAD PROTECTION AS REQUIRED TO PROVIDE SAFE EGRESS FROM EXTERIOR DOORS AND ROLL-UP DOORS AS REQUIRED.
25
1/8/2021
FIRST FLOORPLAN
111' - 6"
UNLOADINGROOM
107' - 2"
SCREEN ROOMPARAPET
150' - 6"
CRANE GIRDER132' - 8 1/2"
TOP OF STEEL146' - 9 1/2"B
C
A
A
EXST BRICK MASONRY CONTROL JOINT (VIF)
EXST BRICK MASONRY CONTROL JOINT (VIF)
EXST CONCRETE BEAM ABOVE ROLL-UP DOOR (VIF)
(VIF
)E
XS
T C
ON
C P
AR
AP
ET
(BR
ICK
MA
SO
NR
Y R
EP
AIR
S N
OT
IN
SC
OP
E)
EX
ST
BR
ICK
MA
SO
NR
Y V
EN
EE
R (
VIF
)
EXST ELONGATED DOOR WAY (VIF)
FINISHED GRADE VARIES (VIF)
B
C
B
CB B
B
B
C
B
FIRST FLOORPLAN
111' - 6"
SCREEN ROOMPARAPET
150' - 6"
CRANE GIRDER132' - 8 1/2"
TOP OF STEEL146' - 9 1/2"
EXTENTS OF NEW DUMPSTER BAY ADDITION
B
B
C
A
(VIF
)E
XS
T C
ON
C P
AR
AP
ET
(BR
ICK
MA
SO
NR
Y V
EN
EE
R N
OT
IN
SC
OP
E)
EX
ST
BR
ICK
MA
SO
NR
Y V
EN
EE
R (
VIF
)
B
B
FINISHED GRADE VARIES (VIF)
EXST BRICK MASONRY CONTROL JOINT (VIF)
EXST BRICK MASONRY CONTROL JOINT (VIF)
B
EXISTING CONDITION SHOWING CONCRETE SPALL AND CRACK, DEMO & PREP
SP
AL
L (
VIF
)
EX
ST
CO
NC
RE
TE
EXST REINFORCING (TYP)
REMOVE ADDITIONAL CONCRETE MATERIAL AS REQ'D TO PROVIDE SQUARED-OFF REPAIR AREA
EMBEDDED REBAREXPOSE 1" MIN BEHIND
PREPARE AND COAT EXPOSED REBAR AND CONCRETE WITH BONDING AGENT
EXST ROOF SLAB
REMOVE LOOSE AND SPALLING CONCRETE TO SOUND MATERIAL
ROUT-OUT CONCRETE CRACK TO A DEPTH AND WIDTH REQ'D BY THE REPAIR MATERIAL MANUFACTURER
EX
TE
NT
S O
F E
XP
OS
ED
CO
NC
RE
TE
PA
RA
PE
T S
UR
FA
CE
EXST CONCRETE CRACK (VIF)
REPAIRED CONDITION SHOWING PATCHING MORTAR AND COATING
SP
AL
L (
VIF
)
EX
ST
CO
NC
RE
TE
EXST REINFORCING (TYP)
REMOVE ADDITIONAL CONCRETE MATERIAL AS REQ'D TO PROVIDE SQUARED-OFF REPAIR AREA
APPLY CORROSION INHIBITING IMPREGNATION COATING AND HIGH PERFORMANCE, ANTI-CARBONATION COATING PER MANUFACTURER WRITTEN RECOMMENDATION. EXTEND COATING 6" BEYOND PATCHING MORTAR EXTENTS ON ALL SIDES.EXST ROOF SLAB
PATCH CONCRETE AREA WITH POLYMER MODIFIED CEMENTITIOUS PATCHING MORTAR
APPLY CEMENTITIOUS PATCHING MORTAR PER MANUFACTURERS WRITTEN RECOMMENDATIONS
EXST CONCRETE CRACK (VIF)
6"
(TY
P)
EXTENTS OF CONCRETE SOUNDING PER SCOPE OF WORK A
EXTENTS OF CONCRETE SOUNDING PER SCOPE OF WORK A
EXST CONCRETE BEAM ABOVE ROLL-UP DOOR (VIF)
EXST CONCRETE PARAPET WALL (VIF)
REF:SCALE: 3/16" = 1'-0"S01.04
S01.01
1 WEST REPAIR ELEVATION
REF:SCALE: 3/16" = 1'-0"S01.04
S01.01
2 EAST REPAIR ELEVATION
26
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2021 79
SCREENING COLLECTION AND CONVEYANCE
IMPROVEMENTS WORK NO. 73084
As indicated
1/22/2
021 1
:42:08
PM S01.04
RMP MAW MP
CITY OF PHILADELPHIAWATER DEPARTMENT
PRELIMINARY TREATMENT BUILDING- FACADE ELEVATIONS
SOUTHWESTWATER POLLUTION
CONTROL PLANT
SCALE: 3/4" = 1'-0"S01.044 TYPICAL CONCRETE SPALL REPAIR DETAIL
SCALE: 3/4" = 1'-0"S01.045 TYPICAL SECTION SHOWING CONCRETE SOUNDING EXTENTS
PRELIMINARY TREATMENT BUILDING FACADE REPAIR SCOPE OF WORK KEY NOTES:
ALL SCOPE ITEMS LABELED AS # ON THE DRAWINGS REFER TO THESE SCOPE OF WORK SUMMARIES.
SEE SPECIFICATIONS, PLANS AND DETAILS FOR ADDITIONAL REQUIREMENTS FOR EACH SCOPE OF WORK.
A. SOUND ALL EXPOSED EXTERIOR SURFACES OF THE CONCRETE PARAPET WALL AND CONCRETE BEAM ABOVE ROLL-UP DOORSCOPE INCLUDES:• VISUALLY OBSERVE AND PERFORM SOUNDINGS ON ALL EXPOSED, EXTERIOR SURFACES OF THE CONCRETE ELEMENTS. • IDENTIFY AND MARK ALL DISCOVERED AREAS OF SPALLING, DELAMINATED, HOLLOW-SOUNDING AND/OR DETERIORATED
CONCRETE. • REVIEW OBSERVED AND MARKED CONDITIONS WITH THE ENGINEER AND OWNER PRIOR TO PROCEEDING WITH THE
REPAIRS.REFERENCE:• ALL AREAS OF REPAIR IDENTIFIED ON THE DRAWINGS WITH THIS SCOPE OF WORK LETTER. BASE BID QUANTITY:• ALL EXPOSED, EXTERIOR CONCRETE PARAPET AND CONCRETE BEAM SURFACE AREAS SHOWN ON ELEVATIONS AND
DENOTED WITH THE SCOPE OF WORK.
B. CONCRETE SPALL REPAIR SCOPE INCLUDES:• AT IDENTIFIED AREAS OF CONCRETE SCHEDULED FOR REPAIR, SELECTIVELY DEMOLISH CONCRETE DOWN TO SOUND
SUBSTRATE. • REMOVE ADDITIONAL CONCRETE AS REQUIRED TO PROVIDE A SQUARE REPAIR REGION WITH A MINIMUM THICKNESS AS
REQUIRED BY THE REPAIR MATERIAL. • PREPARE THE CONCRETE SUBSTRATE PER THE REPAIR MATERIAL MANUFACTURER REQUIREMENTS AND COAT WITH AN
EPOXY MODIFIED BONDING AGENT. • PATCH CONCRETE WITH POLYMER-MODIFIED, CEMENTITIOUS PATCHING MORTAR PER MANUFACTURER'S
RECOMMENDATIONS. PATCHING MORTAR TO MATCH EXISTING CONCRETE IN COLOR AND TEXTURE. REFERENCE:• ALL AREAS OF REPAIR IDENTIFIED ON THE DRAWINGS AS AND WITH THIS SCOPE OF WORK LETTER
AND AS IDENTIFIED AND APPROVED FOR REPAIR BY THE ENGINEER AND OWNER DURING COMPLETION OF SCOPE OF WORK A.
BASE BID QUANTITY:• PROVIDE UNIT PRICE FOR THIS SCOPE OF WORK• ASSUME 150 SF (4" DEPTH OF CONCRETE SPALL)
C. CONCRETE CRACK REPAIR: EPOXY INJECTION METHODSCOPE INCLUDES:• CLEAN AND PREPARE SUBSTRATES FOR APPLICATION OF EPOXY INJECTION REPAIRS PER THE MANUFACTURER'S
WRITTEN INSTRUCTIONS. • INSTALL INJECTION PORTS AND SEAL CRACKS WITH A HIGH STRENGTH STRUCTURAL EPOXY PRIOR TO BEING INJECTED
PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS. • INJECT CRACKS WITH A MOISTURE TOLERANT STRUCTURAL EPOXY ADHESIVE. BASE BID QUANTITY:• PROVIDE UNIT PRICE FOR THIS SCOPE OF WORK ITEM.• SEE PLAN AND ELEVATIONS FOR AREAS GRAPHICALLY SHOWN AS AND DENOTED WITH THIS SCOPE OF
WORK SUMMARY NUMBER. • ASSUME 200 LF OF CONCRETE SLAB CRACK REPAIR. ASSUME THE CRACKS TO BE 1/4" THICK WITH AN ASSUMED DEPTH OF
12".
0
3/16" = 1'-0"
10'6'2' 4'
SCALE:
0
3/4" = 1'-0"
1' 3'2'
SCALE:
1/8/2021
MICROPILE (TYP)(SEE PLAN)
CONCRETE GRADE BEAM (TYP)(SEE PLAN)
CONCRETE COLUMN (TYP)(SEE PLAN)CONCRETE BEAM (TYP)
(SEE PLAN)
CONCRETE HOLLOW CORE PLANK (TYP)(SEE PLAN)
DUMPSTER CONVEYOR RAIL (SEE MECH)
DUMPSTER CONVEYOR IDLER STATION (SEE MECH)
DUMPSTER (SEE MECH)
DUMPSTER CONVEYOR DRIVE STATION(SEE MECH)
REVERSIBLE BELT CONVEYOR (SEE MECH)
TRENCH DRAIN (TYP)
CONCRETE GRADE BEAM BEYOND (SEE PLAN)
CONCRETE SLAB (SEE PLAN)
CONCRETE KNEE WALL (TYP)(SEE PLAN)
CMU WALL (SEE PLAN)
8" CMU PARAPET WALL (TYP)
10" CMU WALL (TYP)
STEEL FRAME WALKWAY PLATFORM AND RAILING(SEE PLAN)
NEW OPENING FOR CONVEYOR BELT. (SEE DETAIL 8/S01.10)
NEW OPENING FOR DOORWAY
CONCRETE CURB (SEE PLAN)
CONCRETE BEAM BEYOND (SEE PLAN) (TYP)
MICROPILE (TYP)(SEE PLAN)
CONCRETE GRADE BEAM (TYP)(SEE PLAN)
CONCRETE GRADE BEAM BEYOND (SEE PLAN)
EXST CONCRETE WALL (VIF)
EXST CONCRETE MAT FOUNDATION (VIF)
CONCRETE COLUMN BEYOND(SEE PLAN)
CONCRETE BEAM(SEE PLAN)
DUMPSTER CONVEYOR RAIL (SEE MECH) TYP
CONCRETE SLAB (SEE PLAN)
CONCRETE HOLLOW CORE PLANK (TYP)(SEE PLAN)
DUMPSTER (SEE MECH)
REVERSIBLE BELT CONVEYOR (SEE MECH)
CONCRETE KNEE WALL (SEE PLAN)
CMU WALL (SEE PLAN)
FACE OF EXST MULTI WYTHE MASONRY WALL (VIF)
STEEL FRAME WALKWAY PLATFORM AND RAILING
PRECAST PANEL (SEE ARCH)
BRICK VENEER (SEE ARCH)
REF:SCALE: 3/8" = 1'-0"S01.08
S01.06
1 SECTION
REF:SCALE: 3/8" = 1'-0"S01.08
S01.06
2 SECTION
30
0
3/8" = 1'-0"
1' 2' 3' 5'
SCALE:
Drawing No.
Scale:
Date:
Des: Drawn: Check:
Sheet of
SIGNATURE
GRAPHIC SCALES
KEY PLAN
REVISIONS
CLIENT INFORMATION
Whitman, Requardt & Associates, LLP1500 Market Street, Suite W2750, Philadelphia, Pennsylvania 19102
JANUARY 2021 79
SCREENING COLLECTION AND CONVEYANCE
IMPROVEMENTS WORK NO. 73084
3/8" = 1'-0"
1/22/2
021 1
:42:09
PM S01.08
RMP MAW MP
CITY OF PHILADELPHIAWATER DEPARTMENT
EAST DUMPSTER BAY - BUILDINGSECTIONS
SOUTHWESTWATER POLLUTION
CONTROL PLANT
1/8/2021
Drawing No.
Scale:Date:Des: Drawn: Check:
Sheet of 2
SUBMITTAL
GRAPHIC SCALES
KEY PLAN
REVISIONS
SCREENING COLLECTIONAND CONVEYANCEIMPROVEMENTS
WORK NO. 73084
CITY OF PHILADELPHIAWATER DEPARTMENT
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
SOUTHWESTWATER POLLUTIONCONTROL PLANT
CLIENT INFORMATION
OCTOBER 2021
Whitman, Requardt & Associates, LLP1500 Market Street, 12th Floor, East Tower, Philadelphia, Pennsylvania 19102
TPECTRANS-PACIFICENGINEERING CORP.2300 Computer Avenue, Suite L-65,Willow Grove, PA 19090
Tel: 215-659-2490Fax: 215-659-2702www.tpeceng.com
12
34
5678 9
10
11 12 131415
17
1618
2019
2122 23 2425
26
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
1. Southwest view of the SWWPCP PTB near the North Plant gate access, along South Road.
2. Southwest view facing the Influent Pumping Station Building.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
3. View of the North Plant Access Gate, facing South Road.
4. Western view of the Influent Pumping Station Building.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
5. Northwestern view of the Influent Pumping Station Building and elevated steal beam lift
system.
6. Southwestern view of the Preliminary Treatment Facility Building.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
7. Southwestern view of the Preliminary Treatment Facility Building (left), Fleet
Management Property (center), and the Influent Pumping Station Building (right).
8. Southwestern view of the Preliminary Treatment Facility Building (left), Fleet
Management Property (center), and the Influent Pumping Station Building (right)
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
9. Southeastern view of the Preliminary Treatment Facility.
10. Northeastern view of the vegetation screening between SR 291 and South Road.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
11. Southeastern view of the vegetation screening along South Road facing the South West
Water Pollution Control Plant.
12. Northeastern view of South Road facing the South West Water Pollution Control Plant
showing vegetation screening in front of the Preliminary Treatment Building.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
13. Southeastern view of equipment owned by Philadelphia Gas Works (PGW) along South
Road.
14. Southeastern view of equipment owned by Philadelphia Gas Works (PGW) along South
Road.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
15. Eastern view of the South West Water Pollution Control Plant along South Road.
16. Eastern view of the Preliminary Treatment Building along South Road.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
17. Eastern view of the Preliminary Treatment Building along South Road.
18. Eastern view of the Preliminary Treatment Building along South Road.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
19. Eastern view of the Preliminary Treatment Building along South Road.
20. Eastern view of the Preliminary Treatment Building along South Road. North Plant Access
is shown on the right side of the road.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
21. Screening immediately across from the North Plant Access Gate on South Road.
22. Southeastern view of the Grit Transfer Facility (left), Influent Pumping Station Building
middle), and Preliminary Treatment Building (right) from South Road.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
23. Northeastern view along South Road showing vegetative screening to the left.
24. Southwestern view along South road showing vegetative screening to the right.
8200 Enterprise Ave, Photos taken on 10/4/2021 and 10/21/2021 Philadelphia, Pennsylvania Philadelphia Art Commission
25. Southwestern view of the Preliminary Treatment Building and Influent Pumping Station.
26. Eastern view towards the intersection of South Rd and Bartram Ave.
Drawing No.
Scale:Date:Des: Drawn: Check:
Sheet of 2
SUBMITTAL
GRAPHIC SCALES
KEY PLAN
REVISIONS
SCREENING COLLECTIONAND CONVEYANCEIMPROVEMENTS
WORK NO. 73084
CITY OF PHILADELPHIAWATER DEPARTMENT
1101 MARKET STREET, 2ND FLOORPHILADELPHIA, PA 19107
SOUTHWESTWATER POLLUTIONCONTROL PLANT
CLIENT INFORMATION
OCTOBER 2021
Whitman, Requardt & Associates, LLP1500 Market Street, 12th Floor, East Tower, Philadelphia, Pennsylvania 19102
TPECTRANS-PACIFICENGINEERING CORP.2300 Computer Avenue, Suite L-65,Willow Grove, PA 19090
Tel: 215-659-2490Fax: 215-659-2702www.tpeceng.com
LEGEND:
COMMUNITY MIXED USE
INDUSTRIAL USE
AIRPORT / INDUSTRIAL
SOUTHWEST WATER POLLUTION CONTROL PLANT
PROJECT SITE