Training sgm . aug 2015
-
Upload
faculty-of-science-benha-university -
Category
Science
-
view
236 -
download
4
Transcript of Training sgm . aug 2015
Sukari Gold Project
1
Field Training
ISMAIL MOHAMED ISMAILAHMED MOHAMED ABDEEN
AHMED HUSSIEN EDREES MOHAMED EZZAT ABBAS
AHMED ABDALLAH MOHAMED
Geology Department
Sukari Gold Project
2
Sukari Gold Mine
Sukari Gold Mine (SGM), owned and operated by Pharaoh Gold Mines (PGM) and Egyptian Minerals
Resources Authority (EMRA).
Introduction
Sukari Gold Project
3
• Location• Regional Setting • License • History of mining• Zones
Sukari Gold Project
4
Health Protection Safety Tools HSE (Health , Safety
and Environment)
Safety
Sukari Gold Project
5
Geo tech Wall Stability
Crack measuringFailure warning
Movement of the walls Mapping Structure Lithology Modeling the pit Ground water level
measurement
Sukari Gold Project
6
6
Sukari Gold Project
7
Surpac Software
Sukari Gold Project
8
P1 P6
DAN
Lithology
In Sukari we have different rock types as follow.
FSP
FWB
Sukari Gold Project
9
Mining activity Mining activity
Sukari Gold Project
10
Open Pit View
Looking West
Sukari Gold Project
11
Blasting Pre-split.• Every 1.3 m.• Using Gel explosives to split the
wall from the Explosion area, so it won’t be affected.
Production shoot.• Center-lift.• Echelon. Trim.• Cut the edges to make it shorter. o Blasting enable us to convert
blocks to small fragmented materials which we can feed the crusher
Sukari Gold Project
12
Ore marking:
After the blast , the blocks are marked by different colors for different grades .
• Green for low grade.• Orange for medium
grade .• Red for high grade.
Sukari Gold Project
13
•Excavators (RH120) with 30T bucket.•Face shovel (RH170) with 45T bucket.
Load and Haul
Sukari Gold Project
14
Sukari Gold Project
15
AAS Reading
LAB
Cyanide Titration
Burn Carbon Into Ash
Sulpher Analysis
Fire Assay
Sample Preparation
Wet Table
Lab (Sample assay)
Sukari Gold Project
16
Surveyor carry out the following Measuring the co-ordination of RC hole before &after
drilling . Detect the Location RC holes.. Correlation designs before & after the drilling to make
sure that each hole in situ. If there is any obstacle front of drilling hole it will be
changed its position .
Survey
Sukari Gold Project
17
Gold Bars
Sukari Gold Project
18
Questions
Sukari Gold Project
THANKS FOR YOUR ATTENTION
Geology Department