Sukari Gold Project

1

Field Training

ISMAIL MOHAMED ISMAILAHMED MOHAMED ABDEEN

AHMED HUSSIEN EDREES MOHAMED EZZAT ABBAS

AHMED ABDALLAH MOHAMED

Geology Department

Page 2: Training sgm . aug 2015

Sukari Gold Project

2

Sukari Gold Mine

Sukari Gold Mine (SGM), owned and operated by Pharaoh Gold Mines (PGM) and Egyptian Minerals

Resources Authority (EMRA).

Introduction

Page 3: Training sgm . aug 2015

Sukari Gold Project

3

• Location• Regional Setting • License • History of mining• Zones

Page 4: Training sgm . aug 2015

Sukari Gold Project

4

Health Protection Safety Tools HSE (Health , Safety

and Environment)

Safety

Page 5: Training sgm . aug 2015

Sukari Gold Project

5

Geo tech Wall Stability

Crack measuringFailure warning

Movement of the walls Mapping Structure Lithology Modeling the pit Ground water level

measurement

Page 6: Training sgm . aug 2015

Sukari Gold Project

6

6

Page 7: Training sgm . aug 2015

Sukari Gold Project

7

Surpac Software

Page 8: Training sgm . aug 2015

Sukari Gold Project

8

P1 P6

DAN

Lithology

In Sukari we have different rock types as follow.

FSP

FWB

Page 9: Training sgm . aug 2015

Sukari Gold Project

9

Mining activity Mining activity

Page 10: Training sgm . aug 2015

Sukari Gold Project

10

Open Pit View

Looking West

Page 11: Training sgm . aug 2015

Sukari Gold Project

11

Blasting Pre-split.• Every 1.3 m.• Using Gel explosives to split the

wall from the Explosion area, so it won’t be affected.

Production shoot.• Center-lift.• Echelon. Trim.• Cut the edges to make it shorter. o Blasting enable us to convert

blocks to small fragmented materials which we can feed the crusher

Page 12: Training sgm . aug 2015

Sukari Gold Project

12

Ore marking:

After the blast , the blocks are marked by different colors for different grades .

• Green for low grade.• Orange for medium

grade .• Red for high grade.

Page 13: Training sgm . aug 2015

Sukari Gold Project

13

•Excavators (RH120) with 30T bucket.•Face shovel (RH170) with 45T bucket.

Load and Haul

Page 14: Training sgm . aug 2015

Sukari Gold Project

14

Page 15: Training sgm . aug 2015

Sukari Gold Project

15

AAS Reading

LAB

Cyanide Titration

Burn Carbon Into Ash

Sulpher Analysis

Fire Assay

Sample Preparation

Wet Table

Lab (Sample assay)

Page 16: Training sgm . aug 2015

Sukari Gold Project

16

Surveyor carry out the following Measuring the co-ordination of RC hole before &after

drilling . Detect the Location RC holes.. Correlation designs before & after the drilling to make

sure that each hole in situ. If there is any obstacle front of drilling hole it will be

changed its position .

Survey

Page 17: Training sgm . aug 2015

Sukari Gold Project

17

Gold Bars

Page 18: Training sgm . aug 2015

Sukari Gold Project

18

Questions

Page 19: Training sgm . aug 2015

Sukari Gold Project

THANKS FOR YOUR ATTENTION