Engineering CM - Assistant Department Manager
Carl Faller
Engineering CM - Assistant Department Manager
Topics OverviewTopics Overview
• General Information
• Operations Module Content
• General Information
• Operations Module Content
© 2009 Institute of Nuclear Power Operations
• Engineering Module Content
• Needs / Open Items
• Engineering Module Content
• Needs / Open Items
General InformationGeneral Information• Objective:
– Develop a series of modules that utilities can use to assist in training plant personnel on gas accumulation in piping systems.
– Intended audience:
• Objective:– Develop a series of modules that
utilities can use to assist in training plant personnel on gas accumulation in piping systems.
– Intended audience:
Basic Overview of Gas Accumulation
Engineering
Specific Modules
Top-Tier Module
© 2009 Institute of Nuclear Power Operations
– Intended audience:
• Basic Module for Engineering, Operations, Maintenance, Chemistry, Management, and others who may need a background on the issue.
• Advanced Modules for Engineering, Operations, Maintenance, and others (TBD).
– Applicable to BWRs and PWRs
– Intended audience:
• Basic Module for Engineering, Operations, Maintenance, Chemistry, Management, and others who may need a background on the issue.
• Advanced Modules for Engineering, Operations, Maintenance, and others (TBD).
– Applicable to BWRs and PWRs
Operations
Engineering
Maintenance
TBD
General InformationGeneral Information• Basic Module (Issued September 09)
• Engineering Module (Pending)– comments being addressed
• Basic Module (Issued September 09)
• Engineering Module (Pending)– comments being addressed
© 2009 Institute of Nuclear Power Operations
• Operations Module (Pending)– comments being addressed– module being formatted and edited
• Maintenance Module (TBD)– intend to clone the operations module, add unique
maintenance perspective, add maintenance OE
• Operations Module (Pending)– comments being addressed– module being formatted and edited
• Maintenance Module (TBD)– intend to clone the operations module, add unique
maintenance perspective, add maintenance OE
General InformationGeneral InformationNotes about the training:• Not accredited; users are responsible to ensure it meets
their training program review requirements.
• Users are encouraged to add site specific materials and operating experience
Notes about the training:• Not accredited; users are responsible to ensure it meets
their training program review requirements.
• Users are encouraged to add site specific materials and operating experience
© 2009 Institute of Nuclear Power Operations
operating experience.
• Goal of training is to enhance performance:– improve discipline’s awareness of how their actions can
contribute to gas accumulation – share lessons learned / methods to reduce vulnerabilities– improve questioning attitude / sensitivity
• Goal of training IS NOT to make attendees experts
operating experience.
• Goal of training is to enhance performance:– improve discipline’s awareness of how their actions can
contribute to gas accumulation – share lessons learned / methods to reduce vulnerabilities– improve questioning attitude / sensitivity
• Goal of training IS NOT to make attendees experts
General InformationGeneral InformationSome concerns with the training:
• Not very dynamic
• Lacks visuals
Some concerns with the training:
• Not very dynamic
• Lacks visuals
© 2009 Institute of Nuclear Power Operations
Lacks visuals
• Availability to users (distribution / posting)
• Achieving the correct level of detail (too much vs too little)
Lacks visuals
• Availability to users (distribution / posting)
• Achieving the correct level of detail (too much vs too little)
Operations ModuleOperations Module• 11 Objectives
• High level review of content in basic module Focus is to carry forward basic information from the first module.– encourages review of basic material in more detail if time has
• 11 Objectives
• High level review of content in basic module Focus is to carry forward basic information from the first module.– encourages review of basic material in more detail if time has
© 2009 Institute of Nuclear Power Operations
encourages review of basic material in more detail if time has elapsed
– allows sites to combine basic training with discipline specific with minimal effort
• Systems in GL 2008-01 and SER 2-05 Rev 1Focus is to keep operations aware of scopes.– site specific information is encouraged ; absent that, module
cites systems that PWR & BWRs considered for SER 2-05 Rev 1
encourages review of basic material in more detail if time has elapsed
– allows sites to combine basic training with discipline specific with minimal effort
• Systems in GL 2008-01 and SER 2-05 Rev 1Focus is to keep operations aware of scopes.– site specific information is encouraged ; absent that, module
cites systems that PWR & BWRs considered for SER 2-05 Rev 1
Operations ModuleOperations Module• The affects of gas on operability / functionality
Focus is to make operators aware of topics to consider when faced with operability.– sites are encouraged to provide site specific information about
their own technical specification requirements
• The affects of gas on operability / functionality Focus is to make operators aware of topics to consider when faced with operability.– sites are encouraged to provide site specific information about
their own technical specification requirements
© 2009 Institute of Nuclear Power Operations
• Operations evolutions / tasks that could result in gas intrusion / accumulationFocus is to make operations aware of how they can contribute to gas accumulation.– filling & venting systems (post-outage or maintenance)– operational practices that change system response– off-normal lineups– startup of idle systems– in-service / operability testing– reduced inventory / mid-loop operations
• Operations evolutions / tasks that could result in gas intrusion / accumulationFocus is to make operations aware of how they can contribute to gas accumulation.– filling & venting systems (post-outage or maintenance)– operational practices that change system response– off-normal lineups– startup of idle systems– in-service / operability testing– reduced inventory / mid-loop operations
Operations ModuleOperations Module• Activities by other departments
Focus is to increase operator’s sensitivity to tasks / activities performed by others and how it could contribute to gas accumulation.– chemistry sampling or addition
instrument calibration testing or troubleshooting
• Activities by other departmentsFocus is to increase operator’s sensitivity to tasks / activities performed by others and how it could contribute to gas accumulation.– chemistry sampling or addition
instrument calibration testing or troubleshooting
© 2009 Institute of Nuclear Power Operations
– instrument calibration, testing, or troubleshooting– pressure testing of systems– testing system boundary components
• Potential for document changes to affect gas accumulationFocus is to increase operator’s sensitivity to how procedure & document changes can introduce vulnerabilities.
– instrument calibration, testing, or troubleshooting– pressure testing of systems– testing system boundary components
• Potential for document changes to affect gas accumulationFocus is to increase operator’s sensitivity to how procedure & document changes can introduce vulnerabilities.
Operations ModuleOperations Module
• Potential gas intrusion due to equipment degradation / failure
Focus is to make operations aware for how degraded equipment can contribute to gas accumulation.
• Potential gas intrusion due to equipment degradation / failure
Focus is to make operations aware for how degraded equipment can contribute to gas accumulation.
© 2009 Institute of Nuclear Power Operations
– PWR - Special consideration of potential impact of LOCA during decay heat removal modes of operation (Westinghouse NSAL 09-008)
– PWR - Special consideration of potential impact of LOCA during decay heat removal modes of operation (Westinghouse NSAL 09-008)
Operations ModuleOperations Module• Potential impact plant modifications
Focus is to alert operations to opportunities where they can significantly contribute to the design process.– review of associated operating procedure changes
– identify interim lineups that could result in gas accumulation
• Potential impact plant modifications
Focus is to alert operations to opportunities where they can significantly contribute to the design process.– review of associated operating procedure changes
– identify interim lineups that could result in gas accumulation
© 2009 Institute of Nuclear Power Operations
– post-modification testing
– identifying operational configurations and lineups that could result in gas accumulation
– sharing experience with system pressure / temperature variations
– post-modification testing
– identifying operational configurations and lineups that could result in gas accumulation
– sharing experience with system pressure / temperature variations
Operations ModuleOperations Module• Considerations for return to service
Focus is on operations being the final barrier and what they should ensure.– complete and effective post-maintenance fill and vent guidance
– when to question the use of UT over other methods
• Considerations for return to service
Focus is on operations being the final barrier and what they should ensure.– complete and effective post-maintenance fill and vent guidance
– when to question the use of UT over other methods
© 2009 Institute of Nuclear Power Operations
– sensitivity to changes in work schedule / sequencing
• Void removal and prevention techniques
Focus is on various methods that can be used to prevent gas from intruding and how to remove it from a system.
– sensitivity to changes in work schedule / sequencing
• Void removal and prevention techniques
Focus is on various methods that can be used to prevent gas from intruding and how to remove it from a system.
Engineering ModuleEngineering Module• 8 Objectives
• Basics Review (similar to the operations module)
• Design vulnerabilities
• 8 Objectives
• Basics Review (similar to the operations module)
• Design vulnerabilities
© 2009 Institute of Nuclear Power Operations
gFocus is to make engineers aware of common design vulnerabilities (based on operating experience).– component configurations– accumulator (affects of gas on fluid)– construction tolerances– operational configurations and lineups – system pressure / temperature variations– boundary components with manage temperature / pressure
differentials
gFocus is to make engineers aware of common design vulnerabilities (based on operating experience).– component configurations– accumulator (affects of gas on fluid)– construction tolerances– operational configurations and lineups – system pressure / temperature variations– boundary components with manage temperature / pressure
differentials
Engineering ModuleEngineering Module
• How to reduce vulnerabilities during design
Focus is to provide designers with items to consider to help reduce vulnerabilities with the design.– preventing unvented high points
• How to reduce vulnerabilities during design
Focus is to provide designers with items to consider to help reduce vulnerabilities with the design.– preventing unvented high points
© 2009 Institute of Nuclear Power Operations
– potential new sources of gas
– susceptibility of components
– unique designs
– construction vulnerabilities
– affects of changes to operating instructions and documents
– potential new sources of gas
– susceptibility of components
– unique designs
– construction vulnerabilities
– affects of changes to operating instructions and documents
Engineering ModuleEngineering Module• System Operability
Focus is to provide engineers items to consider for input to operability / functionality determinations. – sites are encouraged to provide site specific information about
their own technical specification requirements– high level review of effects to consider
• System Operability Focus is to provide engineers items to consider for input to operability / functionality determinations. – sites are encouraged to provide site specific information about
their own technical specification requirements– high level review of effects to consider
© 2009 Institute of Nuclear Power Operations
high level review of effects to consider – documents and information that will most likely be required
• Engineering department role in support of station gas accumulation management effortsFocus is a recap of engineering’s role. – typical responsibilities written very “generically”– gas accumulation management program coordination – support of operations and maintenance
high level review of effects to consider – documents and information that will most likely be required
• Engineering department role in support of station gas accumulation management effortsFocus is a recap of engineering’s role. – typical responsibilities written very “generically”– gas accumulation management program coordination – support of operations and maintenance
Needs / Open ItemsNeeds / Open Items
• Input for maintenance module material
• Comments on draft operations and engineering modules before release
• Input for maintenance module material
• Comments on draft operations and engineering modules before release
© 2009 Institute of Nuclear Power Operations
• Ensure no conflicts between other documents and modules (e.g. operability guidance, program documents)
• Need for any other modules (e.g. chemistry).
• Ensure no conflicts between other documents and modules (e.g. operability guidance, program documents)
• Need for any other modules (e.g. chemistry).
ThanksThanks
Thanks to following primary participants:Carl Faller – Team Lead (INPO) John Duffy (PSEG Nuclear)
Bill Jensen (FPL) Steve Unikewicz (Alion)
Phil Rush (MPR Associates) Greg Guliani (Alion)
Thanks to following primary participants:Carl Faller – Team Lead (INPO) John Duffy (PSEG Nuclear)
Bill Jensen (FPL) Steve Unikewicz (Alion)
Phil Rush (MPR Associates) Greg Guliani (Alion)
© 2009 Institute of Nuclear Power Operations
Questions ?Questions ?
© 2009 Institute of Nuclear Power Operations
Questions ?Questions ?