Trailer Suspension Series Installation Instructions

44
9600-9700 Trailer Suspension Series Installation Instructions Advancing the Practical Application of Suspension Technology Springfield, MO n (800) 654-8824 n (417) 862-5012 Fax (417) 862-2317 n www.hutchensindustries.com Copyright © 2012 Hutchens Industries

Transcript of Trailer Suspension Series Installation Instructions

Page 1: Trailer Suspension Series Installation Instructions

9600-9700

Trailer Suspension Series

Installation Instructions

Advancing the Practical Application of Suspension Technology

Springfield, MO n (800) 654-8824 n (417) 862-5012 Fax (417) 862-2317 n www.hutchensindustries.com

Copyright © 2012 Hutchens Industries

Page 2: Trailer Suspension Series Installation Instructions
Page 3: Trailer Suspension Series Installation Instructions

Advancing the Practical Application of Suspension Technology

Springfield, MO n (800) 654-8824 n (417) 862-5012 Fax (417) 862-2317 n www.hutchensindustries.com

Page 4: Trailer Suspension Series Installation Instructions

This installation manual has been prepared to pass along to you our recommendations for attaching “Hutch” suspension components to trailer frames, subframes and axles. Unless otherwise noted, the same procedures apply whether you are installing fabricated or cast steel components.

The following illustrations are intended to show those proven welding and bolting practices which over the years have played an important part in achieving the high level of performance for which all “Hutch” suspensions are designed. These should be considered as minimum requirements. Anytime heavier than legal loads or abnormal service is anticipated, additional reinforcing must be provided. These recommendations also point to the need for adequate support and stabilization for each of the various types of hanger mountings. Since there are many variations in subframe design, this aspect of proper hanger installation must – in the final analysis – be assumed by the trailer or subframe manufacturer.

In regard to welding, we realize that specification of the electrode, as well as preparation and post-treatment of the weld area, is dependent in some instances upon the composition and thickness of the subframe and axle materials. Therefore, should there be any doubt as to the proper selection of the welding process to be used, subframe and axle manufacturers should be consulted. Should these manufacturers have higher requirements, then their instructions should be followed.

Many of the accompanying illustrations also include metric equivalents in (mm). Please read the “Assembly Instructions” which follow the accompanying illustrations. Should further information relating to installation procedures or component dimensions be required, please contact Hutchens’ Engineering Department for assistance.

1

Page 5: Trailer Suspension Series Installation Instructions

Table of Contents

Spring Hanger InstallationHanger Type Frame Type Page No.

Straddlemount (Str/mt) 4" Tube/G-Rail Pgs. 3, 4

Undermount (Un/mt) 4" I-Beam Pgs. 5, 6

Undermount (Un/mt) 6" I-Beam Pgs. 7, 8

Undermount (Un/mt) “C” Channel Pgs. 9, 10

Undermount I-Beam (Un/mt/I-beam) 4" I-Beam Pgs. 11, 12

Sidemount Type 1 (Si/mt) “C” Channel Pgs. 13, 14

Sidemount Type 2 (Si/mt) “C” Channel Pgs. 15, 16

Flangemount Weld-On (Fl/mt/wo) “C” Channel Pgs. 17, 18

Flangemount Bolt-On (Fl/mt/bo) “C” Channel Pgs. 19, 20

Intermediate Widespread Center Hanger (Str/mt, Un/mt) All Frame Types Pgs. 21, 22

Intermediate Widespread Center Hanger (Si/mt, Fl/mt) All Frame Types Pgs. 23, 24

Widespread Center Hanger and Beam Guides (Str/mt, Si/mt) All Frame Types Pgs. 25, 26

Widespread Center Hanger and Beam Guides (Un/mt) All Frame Types Pgs. 27, 28

Axle Clamp Group InstallationAxle Type

5" Round Pgs. 29, 30

5" x 5" Square Pgs. 31, 32

4" x 6" Rectangular Pgs. 33, 34

120 mm Square Pgs. 35, 36

Fastener InstallationFastener Identification and Torque Specifications Pgs. 37, 38

Suspension AlignmentAlignment Instructions Pg. 39

Important: Warning Decal NoteHutchens Suspension Torque Requirements Decal Pg. 40

2

Page 6: Trailer Suspension Series Installation Instructions

.12 (3.1)

.19 (4.8)

14.75 (374.7)

Straddlemount Hangers

3

.19 (4.8)

.12 (3.1)

13.8 (351.3)

3

1.00 (25.4) Max No Weld

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.0)

.75 (19.5)

4

1.00 (25.4) Max No Weld

.12 (3.1)

.75 (19.1)

OA Pipe LG = S.C. + 4.75 Min (120.7)

4

3

Page 7: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Straddlemount suspension

hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

4

1.00 (25.4) Max No Weld

.19 (4.8)

13.8 (351.5)

Page 8: Trailer Suspension Series Installation Instructions

8

6

6

8

Undermount Hangers: 4" I-Beam Flange

5

.12 (3.1)

.19 (4.8)

6.00 (152.4)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.19 (4.8)

.12 (3.1)

.75 (19.1)

7

OA Pipe LG = S.C. + 5.75 Min (146.1)

.75 (19.1)

.19 (4.8)

.12 (3.1)

.12 (3.1)

.19 (4.8)

6.13 (155.6)

5

3

35

7

4

4

Page 9: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Undermount suspension

hangers to a 4" I-Beam Flange. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

6. Weld gusset to pipe, inside of front and center hangers, and to crossmember web.

7. Stiffeners may be required on both sides of web depending on flange width and thickness.

8. Gusset proportions shown are for reference only. The final size and orientation of the lateral hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

9. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

6

6.00 (152.4)

.19 (4.8)

4.00 Ref Typ

.19 (4.8)

7

5

Page 10: Trailer Suspension Series Installation Instructions

8

6

8

6

7

7

Undermount Hangers: 6" I-Beam Flange

7

6.00 (152.4)

.19 (4.8)

.12 (3.1)

.12 (3.1)

.19 (4.8)

6.13 (155.6)

OA Pipe LG = S.C. + 5.75 Min (146.1)

.19 (4.8)

.12 (3.1)

.75 (19.1)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.19 (4.8) .12

(3.1).75

(19.1)

5

3

3

4

4

5

Page 11: Trailer Suspension Series Installation Instructions

7

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Undermount suspension

hangers to a 6" I-Beam Flange. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

6. Weld gusset to pipe, inside of front and center hangers, and to crossmember web.

7. Stiffeners may be required on both sides of web depending on flange width and thickness.

8. Gusset proportions shown are for reference only. The final size and orientation of the lateral hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

9. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

8

.19 (4.8)

6.00 (152.4)

6.00 Ref Typ

.19 (4.8)

5

Page 12: Trailer Suspension Series Installation Instructions

56

9

6

9

9

10

9

10

Undermount Hangers: “C” Channel

9

.19 (4.8)

.19 (4.8)

19.60 (496.6)

.12 (3.1)

OA PiPe LG = S.C. + 5.75 Min (146.1)

.19 (4.8)

16.70 (424.2)

.12 (3.1)

.88 (22.4)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.19 (4.8) .12

(3.1).75

(19.1)

15.50 (393.7)

.19 (4.8)

.12 (3.1)

19.10 (484.1)

5

3

3

7

4

4

Page 13: Trailer Suspension Series Installation Instructions

10

9

Assembly InstructionsNotes 1. This recommendation is intended to provide a general guideline for the installation of the fabricated Undermount suspension

hangers to a “C” Channel Frame. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

6. Weld gusset to pipe, inside of front and center hangers, and to crossmember web.

7. Apply full length weld along hanger to siderail before attaching gusset. Typical of all hangers.

8. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

9. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the gussets should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

10. Lower end of gusset to be even with hanger sideplate.

10

6.00 (152.4)

Min Typ

.19 (4.8)

19.10 (485.1)

.19 (4.8)

15.50 (393.7)

5

Page 14: Trailer Suspension Series Installation Instructions

7

Undermount I-Beam Hangers

11

.19 (4.8)

6.5 (165.1)

.12 (3.1)

.19 (4.8)

6.5 (165.1)

4.00 (101.6)

Min Typ

.25 (6.4)

3.25 (82.6)

OA Pipe LG = S.C. + 4.75 Min (120.7)

3.25 (82.6)

.75 (19.1)

.12 (3.1)

.25 (6.4)

5

3

7

4

6

8

Page 15: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Undermount I-Beam

suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front hangers. Weld must penetrate hanger side plate and pipe brace.

5. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

6. Weld gusset to pipe, inside of front and center hangers, and to crossmember web.

7. Stiffeners may be required on both sides of web depending on flange width and thickness.

8. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the gussets should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential.

9. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

12

Page 16: Trailer Suspension Series Installation Instructions

Sidemount Hangers: “C” Channel (Type 1 Installation)

13

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.1)

.75 (19.1)

.19 (4.8)

2.00 (50.8)

.19 (4.8)

22.35 (567.6)

.12 (3.1)

.50 Omit Weld Typ

4.75 (120.7)

Min

.19 (4.8)

22.38 (568.5)

.12 (3.1)

3

5

6

6

6

4

3

Page 17: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Sidemount suspension

hangers to a “C” Channel Frame with a frame lap of 7.5". The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Consider clearance for 1.125" rocker bushing bolt.

6. Weld .25" thick x 2.50" tieplate to inside of center hanger and to frame rail.

7. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

14

SpringcL

.19 (4.8)

22.50 (571.5)

7.50 Typ (190.5)

Page 18: Trailer Suspension Series Installation Instructions

8

Sidemount Hangers: “C” Channel (Type 2 Installation)

15

.19 (4.8)

.19 (4.8)

.12 (3.1)

.50 Omit Weld Typ

15.50 (393.7)

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.1)

.75 (19.1)

.19 (4.8)

.12 (3.1)

15.00 (381.0)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.1)

.75 (19.1)

3

5

3

4

6

7

8

7

7

4

Page 19: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Sidemount suspension

hangers to a “C” Channel Frame with a minimum lap of 4". The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Apply full length weld along hanger to siderail before attaching gusset. Typical of all hangers.

6. Weld gusset to pipe, inside of center hangers, and to crossmember web.

7. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the lateral hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

8. Lower end of gusset to be even with hanger sideplate.

9. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

16

.19 (4.8)

15.00 (381.0)

4.00 Min (101.6)

7.50 Min Typ (190.5)

7

8

Page 20: Trailer Suspension Series Installation Instructions

Flangemount Weld-On Hangers

17

OA Pipe LG = S.C. + 4.75 Min (120.7)

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.1)

.75 (19.1)

.19 (4.8)

.12 (3.1)

.12 (3.1)

.75 (19.1)

.19 (4.8)

.12 (3.1)

8

3

5

4

6

6

5

4

8

3

Page 21: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Flangemount Weld-On

suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Weld gusset to pipe, inside of front and center hangers, and to crossmember web.

6. Gusset proportions shown are for reference only. The final size and orientation of the lateral hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

7. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

8. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

18

.19 (4.8)

8

Page 22: Trailer Suspension Series Installation Instructions

6

7

Flangemount Bolt-On Hangers

19

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.1)

.75 (19.1)

.12 (3.1)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.1)

.75 (19.1)

.12 (3.1)

4

6

5

3

3

5

4

Page 23: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Flangemount Bolt-On

suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown at the front and center hangers. Weld must penetrate hanger side plate and pipe brace.

5. Weld gusset to pipe, inside of front and center hangers, and to crossmember web.

6. Gusset proportions shown are for reference only. The final size and orientation of the lateral hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

7. Minimum .625" Grade 5 fasteners.

8. Refer to hanger detail drawings for bolthole pattern.

9. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

20

Page 24: Trailer Suspension Series Installation Instructions

9

10

6

Intermediate WS Center Hangers

21

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.0)

.75 (19.05)

.19 (4.8)

18.5 (470.0)

6.00 Min

.12 (3.7)

.19 (4.8)

21.50 (546.1)

1.00 (25.4)

Max No Weld

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.0)

.75 (19.05)

.19 (4.8)

17.10 (433.6)

.12 (3.0)

3

5

4

6

6

Straddlemount Hangers

Undermount Hangers: “C” Channel

5

4

8

3

Page 25: Trailer Suspension Series Installation Instructions

5

6

Assembly InstructionsNotes 1. This recommendation is intended to provide a general guideline for the installation of the cast Intermediate Widespread

Center suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown. Weld must penetrate hanger side plate and pipe brace.

5. Weld gusset to pipe, inside of center hangers, and to crossmember web.

6. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

7. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

8. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

9. Apply full length weld along hanger to siderail before attaching gusset.

10. Lower end of gusset to be even with hanger sideplate.

22

.12 (3.0)

8.00 (203.2)

.19 (4.8)

OA Pipe LG = S.C. + 4.75 Min (120.7)

5.00 (127.0)

.19 (4.8)

.12 (3.0)

.75 (19.05)

6.00 Ref

3

8

Undermount Hangers: I-Beam

4

Page 26: Trailer Suspension Series Installation Instructions

8

5

6

11

11

3

12

Intermediate WS Center Hangers

23

.19 (4.8)

.12 (3.1)

.75 (19.1)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.1)

.75 (19.1)

Flangemount Weld-On Hangers

23.35 (593.1)

.19 (4.8)

.12 (3.1)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.1)

.75 (19.1)

.19 (4.8)

2.00 (50.8)

Sidemount Hangers

4

4

3

11

Page 27: Trailer Suspension Series Installation Instructions

5

9

Assembly InstructionsNotes 1. This recommendation is intended to provide a general guideline for the installation of the cast Intermediate Widespread

Center suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld pipe brace all around the outside as shown. Weld must penetrate hanger side plate and pipe brace.

4. Weld pipe brace with two .75" welds on the horizontal centerline of the pipe as shown. Weld must penetrate hanger side plate and pipe brace.

5. Weld gusset to pipe, inside of center hangers, and to crossmember web.

6. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

7. For pipe brace, use 1.66 OD x .109 wall STD mechanical tubing to comply with ASTM A500 Grade B, or 1.25 SCH 40 pipe or better.

8. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

9. Minimum .625" Grade 8 fasteners.

10. Lower end of gusset to be even with hanger sideplate.

11. Weld .25" thick x 2.50" tieplate to inside of center hanger and to frame rail.

12. Consider clearance for 1.125" rocker bushing bolt.

24

.12 (3.1)

OA Pipe LG = S.C. + 4.75 Min (120.7)

.12 (3.1)

.75 (19.0)

Flangemount Bolt-On Hangers

3 4

6

Page 28: Trailer Suspension Series Installation Instructions

57

5

Widespread Center Hangers

25

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.0)

.75 (19.5)

.19 (4.8)

25.00 (635.0)

.12 (3.1)

Sidemount Hangers

4

3

.12 (3.0)

16.5 (420.4)

.19 (4.8)

1.00 (25.4)

Max No Weld

OA Pipe LG = S.C. + 5.75 Min (146.1)

.12 (3.0)

.75 (19.5)

Straddlemount Hangers

4

3

6

6

Page 29: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Widespread Center

suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld 2.00" SCH 40 pipe brace all around the outside as shown. Weld must penetrate hanger side plate and pipe brace.

4. Weld 2.00" SCH 40 pipe brace with two .75" welds on the horizontal centerline of the pipe as shown. Weld must penetrate hanger side plate and pipe brace.

5. Weld gusset to pipe, inside of center hangers, and to crossmember web.

6. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

7. Consider clearance for 1.125" rocker bushing bolt.

26

Page 30: Trailer Suspension Series Installation Instructions

5

6

6

5

6

Widespread Center Hangers

27

6.00 Min Typ

.12 (3.0)

.19 (4.8)

23.0 (585.2)

OA Pipe LG = S.C. + 5.75 Min (146.1)

.19 (4.8)

20.5 (520.7) .12

(3.0).75

(19.5)

.19 (4.8)

9.00 (228.6)

.12 (3.1) OA Pipe LG =

S.C. + 5.75 Min (146.1)

.12 (3.0)

.75 (19.5)

.19 (4.8)

5.00 (127.0)

6.00 Typ

Undermount Hangers: I-Beam

Undermount Hangers: “C” Channel

3

4

7

3

47

9

8

Page 31: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. This recommendation is intended to provide a general guideline for the installation of the fabricated Widespread Center

suspension hangers. The design and production of an adequate structure to support the suspension is the sole responsibility of the trailer manufacturer. This document is not intended to prescribe specific recommendations for the trailer design.

2. All welding should be performed using AWS E70xx welding materials and practices.

3. Weld 2.00" SCH 40 pipe brace all around the outside as shown. Weld must penetrate hanger side plate and pipe brace.

4. Weld 2.00" SCH 40 pipe brace with two .75" welds on the horizontal centerline of the pipe as shown. Weld must penetrate hanger side plate and pipe brace.

5. Weld gusset to pipe, inside of center hangers, and to crossmember web.

6. Except as noted, gusset proportions shown are for reference only. The final size and orientation of the hanger gusset should be designed for the specific main beam and crossmember configuration used on the trailer. Adequate lateral gusseting is essential. Consider clearance for 1.125" rocker bushing bolt.

7. Terminate weld .50" from flange free edge unless otherwise prescribed by the trailer manufacturer.

8. Apply full length weld along hanger to siderail before attaching gusset.

9. Lower end of gusset to be even with hanger sideplate.

28

Page 32: Trailer Suspension Series Installation Instructions

1

5" RD Standard, Underslung & No-Hop

29

No Welds In This Area

3.00

10.0° 6

Optional Inverted U-Bolt Configuration

1.00 Ref

No Welds In This Area

3.00

Weld Around End – 2 PLCS .25

Min

Weld Around End – 2 PLCS .25

Min

Optional No-Hop Configuration 9700

1

1

No Welds In This Area

4.00

.25 Min

Weld Around End – 2 PLCS

1.00 Ref

Optional Underslung Configuration

1

No Welds In This Area

3.00

.25 Min

.25 Min

Weld Around End – 2 PLCS

3 Welds 2 PLCS

1.00 Ref

Standard Overslung Axle Seat and Bottom Plate

1

6 10.0°

Page 33: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. Check axle manufacturer for electrode specification, weld size, pre-heat and post-heat requirements, etc.

2. Be certain axle seats fit axle properly before welding.

3. Welds are not permitted more than 2" above or 1.5" below the horizontal centerline of the axle beam.

4. All of Hutchens’ components are weldable using E70xx welding materials and practices.

5. All spring seats and bottom plates must be parallel within .032" to ensure proper installation of the U-bolts, as well as proper positioning of springs and axles.

6. For “cams forward” applications, position the camshaft 10 degrees below axle centerline when using spring seats shorter than 1.75".

30

5" RD Standard, Underslung & No-Hop

No Welds In This Area

3.00.25 Min

.25 Min

5.31

Weld Around End – 2 PLCS1

2 PLCS

Optional Cast Bottom Plate and No-Hop Configuration 9600

Optional No-Hop Configuration 9700

1

Page 34: Trailer Suspension Series Installation Instructions

5" x 5" Standard, Underslung & No-Hop

31

Weld Around End – 2 PLCS .25

Min

1.00 Ref

Optional Underslung Configuration

1

No Welds In This Area

3.00

.25 Min

Weld Around End – 2 PLCS

Standard Overslung Axle Seat and Bottom Plate

1

4

Page 35: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. Check axle manufacturer for electrode specification, weld size, pre-heat and post-heat requirements, etc.

2. Be certain axle seats fit axle properly before welding.

3. All of Hutchens’ components are weldable using E70xx welding materials and practices.

4. For “cams forward” applications, a spring seat of 1.75" minimum must be used.

5. All spring seats and bottom plates must be parallel within .032" to ensure proper installation of the U-bolts, as well as proper positioning of springs and axles.

6. Cast 9600 No-Hop bottom plate attaches in the same manner.

32

No Welds In This Area

3.00

.25 Min

.25 Min

Weld Around End – 2 PLCS

3 Welds 2 PLCS

1

Optional No-Hop Configuration

1.00 Ref

1 & 6

Page 36: Trailer Suspension Series Installation Instructions

4" x 6" Standard, Underslung & No-Hop

33

Weld Across End – 2 PLCS .25

Min

Optional Underslung Configuration

1

No Welds In This Area

2.00

Weld Around End – 2 PLCS .25

Min

Standard Overslung Configuration

1

4

Page 37: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. Check axle manufacturer for electrode specification, weld size, pre-heat and post-heat requirements, etc.

2. Be certain axle seats fit axle properly before welding.

3. All of Hutchens’ components are weldable using E70xx welding materials and practices.

4. For “cams forward” applications, a spring seat of 1.75" minimum must be used.

5. All spring seats and bottom plates must be parallel within .032" to ensure proper installation of the U-bolts, as well as proper positioning of springs and axles.

34

No Welds In This Area

2.00

.25 Min

.25 Min

1.00 Ref

Weld Around End – 2 PLCS

Weld Around End – 2 PLCS

Optional No-Hop Configuration

1

1

Page 38: Trailer Suspension Series Installation Instructions

120 mm Square Axle

35

No Welds In This Area

2.78

Standard Overslung Axle Seat

Page 39: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. Check axle manufacturer for electrode specification, weld size, pre-heat and post-heat requirements, etc.

2. Be certain axle seats fit axle properly before welding.

3. All of Hutchens’ components are weldable using E70xx welding materials and practices.

4. For “cams forward” applications, make sure adequate clearance is available.

5. All spring seats and bottom plates must be parallel within .032" to ensure proper installation of the U-bolts, as well as proper positioning of springs and axles.

36

Weld Around End – 2 PLCS .25

Min

1

4

Standard Overslung Bottom Plate

Page 40: Trailer Suspension Series Installation Instructions

Torque Specifications Item No. Fastener Oiled Dry

1 1 1/8-7 (9600/9700 Rocker Bolt) 590 Lb-Ft 790 Lb-Ft

2 1-14 (9700 Radius Rod Bolt) 540 Lb-Ft 720 Lb-Ft

3 7/8-14 (Axle U-Bolt & 9600 Radius Rod Bolt) 350 Lb-Ft 470 Lb-Ft

4 3/4-16 (Axle U-Bolt) 310 Lb-Ft 420 Lb-Ft

5 5/8-18 (Radius Rod Clamp Bolt) 130 Lb-Ft 170 Lb-Ft

6 5/8-18 (Spring Retainer Bolt) 35 Lb-Ft 50 Lb-Ft

Fastener ID and Torque Specifications

37

23

34

5

1

66

3

Tandem Axle Overslung

Underslung Option – All Axles

23

34

5

6

Inverted U-Bolt Option – All Axles

23

34

5

6

Page 41: Trailer Suspension Series Installation Instructions

Assembly InstructionsNotes1. To achieve the most consistent clamp loads, lubricate the threads and torque fasteners to the “oiled” specifications.

2. Tighten U-bolt nuts in an alternating pattern.

3. Not required if rocker and hanger are assembled at Hutchens.

4. Install decal #16086-01 in clear view on the road side of the trailer immediately above the suspension.

5. On standard model suspensions having one adjustable and one non-adjustable torque arm on each axle, install the non-adjustable torque arm on the curb side and the adjustable torque arm on the road side. On suspension models utilizing the “no-hop” feature, two adjustable torque arms are provided for the rear axle.

38

Fastener ID and Torque Specifications

No-Hop Option – Rear Axle Only (Remaining Axles Are Overslung)

23

34

5

6

Page 42: Trailer Suspension Series Installation Instructions

Suspension Alignment

39

To properly align the suspension, make sure the trailer is unloaded. Free the suspension of any “binds” by first pushing the trailer backwards and then pulling forward. While pulling the trailer forward on a level floor, apply the brakes and release. This will assure than an adjustable undercarriage is in its rearmost locked position. The trailer must be level from side to side, as well as from front to rear. Neither service nor parking brakes shall be applied during the measurement procedure.

The axle position may be determined using any established mechanical or optical (laser) measurement equipment.

Measure distances A and B from the kingpin to the front axle. These dimensions must be equal within 1/8 (.125) of an inch. If adjustment is needed, loosen the radius rod clamp bolts and turn the adjustment screw as required. When the front axle is positioned correctly, align any succeeding axles with the front axle by measuring distances C and D. These dimensions must be equal to within 1/16 (.062) of an inch.

After alignment has been completed on all axles, check to make certain that the radius rod clamp bolts and all other fasteners are tightened to the recommended torque requirement.

Check dimension E. The lateral displacement of the trailer body to the axles should not exceed 1/4 (.25) of an inch.

Refer to TTMA RP No. 71-10 for more detail.

A = B ± .125"C = D ± .062"E = ± .25"

A

B

C

D

E

Page 43: Trailer Suspension Series Installation Instructions

Important: Warning Decal NoteWhen the installation of your “Hutch” suspension is complete and the trailer and/or subframe has been painted, a torque requirement decal (Part No. 16086-01) must be installed in plain view on the road side of the trailer immediately above the suspension. It is essential that the correct decal is in plain view on each trailer. Decals are shipped with the suspension. If decals are not received, or if for any reason additional decals are wanted, contact our Customer Service Department at (800) 654-8824 or fax (417) 862-2317 and decals will be shipped promptly at no charge.

40

Page 44: Trailer Suspension Series Installation Instructions

October 2012–HZ

Advancing the Practical Application of Suspension Technology

Springfield, MO n (800) 654-8824 n (417) 862-5012 Fax (417) 862-2317 n www.hutchensindustries.com