Traffic Impact Study Case: Al- Irsal Center Project in Al- Bireh City
description
Transcript of Traffic Impact Study Case: Al- Irsal Center Project in Al- Bireh City
Company
LOGO
Traffic Impact StudyCase: Al-Irsal Center Project in Al-Bireh City
Under the Supervision of:Pro.Sameer A. Abu-Eisheh
Prepared by:Mohammad Tomeh
Rand MalayshaKarem Ezat
December 2010
An-Najah National University Engineering CollageCivil Engineering Department
What is Traffic Impact Study?
Project Description :• Al-Irsal Center is Arduna's first project in Ramallah
and Al-Bireh• The project will assist in enhancing the economic and
social life in Ramallah, Al-Bireh and most of the central region of the West Bank
Project Description :
• Al-Irsal Center is strategically located on Al-Irsal Hill-top, an elevated area on a major Al-Bireh-Ramallah route.
• Al-Irsal Center is located 2km to the North of the downtown of Ramallah-Al-Bireh occupying an area of 51,000 m2 with a total floor space of approximately 200,000 m2
Location:
Project Description :Location:
Project Description :Access to Al-Irsal
Center:
Project Description :
• Office and business facilities• Commercial activities• Residential• Hotel
Project Components:
Study Area:• The site lies close to the National Park, and near to
President Yasser Arafat’s tomb, Plaza Mall, and Ministry of Interior
Aim and Objectives• The aim of our study is to find the traffic impact of
this project on the system of roads around it
• Evaluate current traffic operations• Estimate the traffic to be developed by Al-Irsal Center
when it will be completely built• Examine how this project will affect the nearby roads• Solutions will be suggested to find the best alternative
solution, which can solve the problems
Objectives:
Methodology• Intersection Counting
Methodology• Field inventory studies
Methodology• Volume studies:
– The peak hour volume (PHV)
– The expansion factors
• Traffic impact study (TIS)
– Trip generation
Methodology• Level of service (LOS):
– A Free flow– B Reasonably free flow
A/B
Methodology• Level of service (LOS):
– C Stable flow– D Approaching unstable flow
C/D
Methodology• Level of service (LOS):
– E Unstable flow– F Forced or breakdown flow
E/F
Methodology
Level of service Average control delay(sec/veh.)
A ≤10 sec
B 10-20 sec
C 20-35 sec
D 35-55 sec
E 55-80 sec
F ≥80 sec
• Level of service (LOS):– Level of service criteria for signalized & unsignalized
intersections
Methodology• Level of service (LOS):
– The range of level of service for roundabouts
Level of service (v/c)
Best level of service < 0.4
0.4- 0.55
0.55- 0.7
0.7- 0.85
0.85-1
Worse level of service >1
Data Collected and Analysis• The intersections in the study area
Intersection name Status
Al-Irsal with Al-Mubadeen Intersection(#2) Signalized
Al-Irsal with Hettean Intersection(#1) Unsignalized
Nablus with Hettean Intersection(#3) Roundabout
Nablus with Al-Mubadeen Intersection(#4) Signalized
Al-Irsal with Bait Nabala Intersection(#5) Unsignalized
Al-Irsal with -Bur Said Intersection(#6) Signalized
Nablus with Makah Intersection(#7) Roundabout
Al-Irsal with Sa'd Ban Abi Waqas Intersection(#12) Unsignalized
Data Collected and Analysis• Al-Irsal with Al-Mubadeen Intersection (#2):
– Control Station:
Data Collected and Analysis• The relation between volume and time
– Peak hour: Am: from 7:30 to 8:30 Pm: from 1:30 to 2:30
7:30
-8:3
0
8:30
-9:3
0
9:30
-10:
30
10:3
0-11
:30
11:3
0-12
:30
12:3
0-1:
30
1:30
-2:3
0
2:30
-3:3
0
3:30
-4:3
0
0
500
1000
1500
2000
2500
3000
3500
Relation between volume and time
Time(h)
Volu
me(
v/h)
Data Collected and Analysis• Al-Irsal with -Bur Said Intersection (#6)
– Coverage Station:
Data Collected and Analysis• Al-Irsal with -Bur Said Intersection (#6)
TimeTotal
volume (vehicle)
Expansion factor
Volumes for 8 hours
Average volume
)vehicle(
Percentage of peak
hour volume
Volume at peak hour
)vehicle(
10:00-11:00 1865 10.65 1986218868 15% 2830
11:00-12:00 1727 10.35 17874
Traffic analysis• Analyses of the existing traffic
– Level of service for the intersections
Traffic analysisThe level of service for intersections-existing traffic.
Level of service*
Status IntersectionSouthbound Northbound Westbound Eastbound
Intersection R T L R T L R T L R T L
DN/A
T L R TN/A
LR Lane Group signalized Al-Irsal with Al-Mubadeen
Intersection (#2)A D A B F
B A F Approach
N/A N/A N/A C N/A N/A B N/A F B C F N/A Movement unsignalized Al-Irsal with Hettean Intersection (#1)
N/A 0.45 1.23 0.38 0.76 V/C Ratio roundabout Nablus with Hettean Intersection (#3
F
LTR LTR LTR LTR Lane Group signalized Nablus with Al-Mubadeen
Intersection (#4)F F E F
F F C D Approach
N/A N/A N/A B N/A N/A N/A N/A F N/A Movement unsignalized Al-Irsal with Bait Nabala Intersection (#5)
DTR L TR L LTR R LT Lane
Group signalized Al-Irsal with Bur Said Intersection (#6)C D F D F A F
C C F D Approach
N/A 0.03 0.55 0.09 0.24 V/C Ratio roundabout Nablus with Makah Intersection (#7)
N/A N/A N/A N/A N/A N/A D F N/A F Movement unsignalized Al-Irsal with Sa'd Ban Abi Waqas Intersection (#12)
*The complete LOS worksheets are provided in the Appendix B. N/A: not applicable since there is no movement in this specific direction or LOS for intersection or specific direction is not provided by software.
Traffic analysis• Trip generation rate
Trip Rate(Out)
Volume out
Trip Rate(In)
Volume In
Approximate Size
Study location Time
4.6trip/1000
m219
6.1 trip/1000
m225
4.128 thousand m2
Plaza Mall
7:00-8:00
18.7trip/1000
m2
7720.3
trip/1000 m2
84 10:00-11:00
17.9trip/1000
m2
7421.8
trip/1000 m2
90 11:00-12:00
21.6trip/1000
m2
8924
trip/1000 m2
99 2:00-3:00
0.17trip/1000
m21
11.6trip/1000
m268
5.880 thousand m2 Office
7:30-8:30
3.6trip/1000
m221
6.3trip/1000
m237 8:30-9:30
4.8trip/1000
m228
8.33 trip/1000
m2
49 1:30-2:30
0.21 trip/room
19 0.52 trip/room 47 90 Room
Grand Park Hotel
10:00-11:00
0.63trip/unit 20 .5
trip/unit 16
32UnitsIskan Al-Mohndse
en
7:00-8:00
1trip/unit
32 .72trip/unit 23 8:00-9:00
0.63trip/unit
20 .25trip/unit 8 9:00-10:00
0.38trip/unit
12 .56trip/ unit 18 10:00-11:00
0.66trip/unit
21 .66trip/unit 21 11:00-12:00
Traffic analysis• Trip generation rate for the components of Al-Irsal
Center projectGross Trips
Generated (Out)Trip Rate
(Out)Gross Trips
Generated (In)Trip Rate
(In) Size Land Use
2234.6
trip/1000 m2
2966.1
trip/1000 m2
48.513thousand
M2Commercial
230.17
trip/1000 m2
155511.6
trip/1000 m2
134.073thousand
M2Office
321
trip/unit23
0.72 trip/unit
32 Units Residential
50 0.21trip/room 125 0.52
trip/room 240 rooms Hotel
328 1999 Total
Traffic analysis• Analyses after 3 years
– Growth rate traffic forecasts– Trip generation from the project– Opening the old Nablus-Al-Bireh road
Traffic analysis• The analysis of trip generation for offices
Number of trips
For % entrance
Entrances name
(%in)from north
Number of trips
For % entrance
Entrances name
(%in)from south
Trip rate (In)
Land use
234 50 1
30%↔
467 trip
490 45 1
70%↔
1089 trip11.6
Offices with approximate size134.073thousand M2
46 10 2 0 0 2
187 40 3 545 50 3
0 0 4 54 5 4
Number of trips
For % entrance
Entrances name
(%out)to north
Number of trips
For % entrance
Entrances name
(%out)to south
Trip rate
(Out)
2 50 1
20%↔
5 trip
9 50 1
80%↔
18 trip.17
1 10 2 0 0 2
2 40 3 8 45 3
0 0 4 1 5 4
Traffic analysis• The analysis of trip generation for commercial areas
Number of trips
For % entrance
Entrances name
(%in)from north
Number of trips
For % entrance
Entrances name
(%in)from south
Trip rate (In)
Land use
45 50 1
30%↔
89 trip
93 45 1
70%↔
207 trip6.1
Commercial areas with
approximate size48.513
thousand M2
8 10 2 0 0 2
36 40 3 104 50 3
0 0 4 10 5 4
Number of trips
For % entrance
Entrances name
(%out)to north
Number of trips
For % entrance
Entrances name
(%out)to south
Trip rate
(Out)
23 50 1
20%↔
45 trip
89 50 1
80%↔
178 trip4.6
4 10 2 0 0 2
18 40 3 80 45 3
0 0 4 9 5 4
Traffic analysis• The analysis of trip generation for residential areas
Number of trips
For % entrance
Entrances name
(%in)from north
Number of trips
For % entrance
Entrances name
(%in)from south
Trip rate (In)
Land use
3 50 1
30%↔
7 trip
8 50 1
70%↔
16 trip.72
Residential areas with
approximate size 32 Units
1 10 2 0 0 2
3 40 3 7 45 3
0 0 4 1 5 4
Number of trips
For % entrance
Entrances name
(%out)to northNumber of
tripsFor %
entranceEntrances
name(%out)to
south
Trip rate (Out)
3 50 1
20%↔
6 trip
13 50 1
80%↔
26 trip1
2 30 2 0 0 2
1 20 3 12 45 3
0 0 4 1 5 4
Traffic analysis• The analysis of trip generation for hotel
Number of trips
For % entrance
Entrances name
(%in)from north
Number of trips
For % entrance
Entrances name
(%in)from south
Trip rate (In)
Land use
19 50 1
30%↔
38 trip
44 50 1
70%↔
88 trip.52
hotel with approximate
size240rooms
4 10 2 0 0 2
15 40 3 40 45 3
0 0 4 4 5 4
Number of trips
For % entrance
Entrances name
(%out)to north
Number of trips
For % entrance
Entrances name
(%out)to south
Trip rate
(Out)
5 50 1
20%↔
10 trip
20 50 1
80%↔
40 trip.21
3 30 2 0 0 2
2 20 3 18 45 3
0 0 4 2 5 4
Traffic analysisThe level of service for intersections- after 3 years with project..
Level of service*
Status IntersectionSouthbound Northbound Westbound Eastbound
Intersection R T L R T L R T L R T L
E
T L R T N/A
LRLane Group
signalized Al-Irsal with Al-Mubadeen Intersection (#2)
A D A F F
B E F Approach
N/A N/A N/A B N/A N/A B N/A F N/
A C F N/A Movement unsignalized Al-Irsal with Hettean
Intersection (#1)
N/A 2.13 3.01 1.59 1.37 V/C Ratio roundabout Nablus with Hettean Intersection (#3
F
LTR LTR LTR LTRLane Group
signalized Nablus with Al-Mubadeen Intersection (#4)
F F E F
F F D E Approach
N/A N/A N/A B N/A N/A
N/A N/A F N/
A Movemen unsignalized Al-Irsal with Bait Nabala Intersection (#5)
ETR L TR L LTR R LT
Lane Groupsignalized Al-Irsal with Bur Said
Intersection (#6)C D F D F A FC D F D Approach
N/A 0.59 0.95 0.16 0.46 V/C Ratio roundabout Nablus with Makah Intersection (#7)
N/A N/A N/A N/A N/A N/A F F N/A F Movement unsignalized Al-Irsal with Sa'd Ban Abi
Waqas Intersection (#12)
The complete LOS worksheets are provided in the Appendix B. N/A: Not applicable since there is no movement in this specific direction or LOS for intersection or specific direction is not provided by software.
Traffic analysisThe LOS for intersections- after 5 years from opening the project.
Level of service*
Status IntersectionSouthbound Northbound Westbound Eastbound
Intersection R T L R T L R T L R T L
F
T L R T N/A
LRLane Group
signalized Al-Irsal with Al-Mubadeen Intersection (#2)
A D A F F
B F F Approach
N/A N/A N/A D N/A N/A C N/A F N/
A D F N/A Movement unsignalized Al-Irsal with Hettean
Intersection (#1)
N/A 3.12 4.14 2.89 1.90 V/C Ratio roundabout Nablus with Hettean Intersection (#3
F
LTR LTR LTR LTRLane Group
signalized Nablus with Al-Mubadeen Intersection (#4)
F F E F
F F E F Approach
N/A N/A N/A B N/A N/A
N/A N/A F N/
A Movemen unsignalized Al-Irsal with Bait Nabala Intersection (#5)
F
TR L TR L LTR R LTLane Group
signalized Al-Irsal with Bur Said Intersection (#6)C D F D F A F
C F F F Approach
N/A 0.73 1.20 0.22 0.63 V/C Ratio roundabout Nablus with Makah Intersection (#7)
N/A N/A N/A N/A N/A N/A F F N/A F Movement unsignalized Al-Irsal with Sa'd Ban Abi
Waqas Intersection (#12)
The complete LOS worksheets are provided in the Appendix B. N/A: Not applicable since there is no movement in this specific direction orLOS for intersection or specific direction is not provided by software.
The problems and suggested solutions
• Improvement of Al-Irsal with Hettean Intersection (#1)
The problems and suggested solutions
• LOS of Al-Irsal with Hettean Intersection (#1)
The problems and suggested solutions
• Intersection #1 after improvement(#1)
The problems and suggested solutions
• LOS of Al-Irsal with Hettean Intersection (#1) After improvement
The problems and suggested solutions
• Nablus with Al-Mubadeen Intersection (#4)
The problems and suggested solutions
• LOS of Nablus with Al-Mubadeen Intersection (#4)
The problems and suggested solutions
• Intersection #4 after improvement
The problems and suggested solutions
• LOS of Nablus with Al-Mubadeen Intersection (#4) After improvement
The problems and suggested solutions
• Improvement of Al-Irsal with -Bur Said Intersection (#6)
The problems and suggested solutions
• LOS of Al-Irsal with -Bur Said Intersection (#6)
The problems and suggested solutions
• Intersection #6 after improvement
The problems and suggested solutions
• LOS of Al-Irsal with -Bur Said Intersection (#6) after improvement
The problems and suggested solutions
The improved LOS for intersections after 3 years with project.
Level of service*Status IntersectionSouthbound Northbound Westbound Eastbound
Intersection R T L R T L R T L R T L
CS
T LS
T N/A S N/A
L Lane Group signalized Al-Irsal with Al-Mubadeen
Intersection (#2)A D D EA C D Approach
DS
T L TR LS
LT LTR Lane Group signalized Al-Irsal with Hettean
Intersection (#1)D E E D F FD D E E Approach
FT L LTR L LTR TR L Lane
Group signalized Nablus with Hettean Intersection (#3)F D D F E F
E D F F Approach
FTR L TR L LTR LTR Lane
Group signalized Nablus with Al-Mubadeen Intersection (#4)D E F E F F
C E F F Approach
BN/A
T L TR N/A
LR Lane Group signalized Al-Irsal with Bait Nabala
Intersection (#5)A B C CA B C Approach
DT L TR L LTR
SLT Lane
Group signalized Al-Irsal with Bur Said Intersection (#6)E D E C F E
C D E D Approach
CR LT R LT R LT R LT Lane
Group signalized Nablus with Makah Intersection (#7)A C B C B C B D
C B C C Approach
BS
TN/A N/A
T LS N/A
L Lane Group signalized Al-Irsal with Sa'd Ban Abi
Waqas Intersection (#12)C A D CC B C Approach
BN/A
T LS
T N/A S
T L Lane Group signalized Al-Irsal with Project
Intersection (new)A D C N/A CB B C Approach
The problems and suggested solutions
The improved LOS for intersections after 3 years with project.
Level of service*Status IntersectionSouthbound Northbound Westbound Eastbound
Intersection R T L R T L R T L R T L
CS
T LS
T N/A S N/A
L Lane Group signalized Al-Irsal with Al-Mubadeen
Intersection (#2)A D D EA C D Approach
DS
T L TR LS
LT LTR Lane Group signalized Al-Irsal with Hettean
Intersection (#1)D E E D F FD D E E Approach
FT L LTR L LTR TR L Lane
Group signalized Nablus with Hettean Intersection (#3)F D D F E F
E D F F Approach
FTR L TR L LTR LTR Lane
Group signalized Nablus with Al-Mubadeen Intersection (#4)D E F E F F
C E F F Approach
BN/A
T L TR N/A
LR Lane Group signalized Al-Irsal with Bait Nabala
Intersection (#5)A B C CA B C Approach
DT L TR L LTR
SLT Lane
Group signalized Al-Irsal with Bur Said Intersection (#6)E D E C F E
C D E D Approach
CR LT R LT R LT R LT Lane
Group signalized Nablus with Makah Intersection (#7)A C B C B C B D
C B C C Approach
BS
TN/A N/A
T LS N/A
L Lane Group signalized Al-Irsal with Sa'd Ban Abi
Waqas Intersection (#12)C A D CC B C Approach
BN/A
T LS
T N/A S
T L Lane Group signalized Al-Irsal with Project
Intersection (new)A D C N/A CB B C Approach
The problems and suggested solutions
The improved LOS for intersections after 5 years from opening.
Level of service*Status IntersectionSouthbound Northbound Westbound Eastbound
Intersection R T L R T L R T L R T L
DS
T LS
TN/A S N/A
LLane Group
signalized Al-Irsal with Al-Mubadeen Intersection (#2)
A D D E
B D E Approach
ES
T L TR LS
LT LTRLane Group
signalized Al-Irsal with Hettean Intersection (#1)D E E D F F
E E F F Approach
FT L LTR L LTR TR L
Lane Groupsignalized Nablus with Hettean
Intersection (#3)F D D F E FF F F F Approach
FTR L TR L LTR LTR
Lane Groupsignalized Nablus with Al-Mubadeen
Intersection (#4)D E F E F FD F F F Approach
BN/A
T L TRN/A
LRLane Group
signalized Al-Irsal with Bait Nabala Intersection (#5)A B C C
A C C Approach
FT L TR L LTR
SLT
Lane Groupsignalized Al-Irsal with Bur Said
Intersection (#6)E D E C F EE E F E Approach
CR LT R LT R LT R LT
Lane Groupsignalized Nablus with Makah
Intersection (#7)A C B C B C B DC B C D Approach
BS
TN/A N/A
T LS N/A
LLane Group
signalized Al-Irsal with Sa'd Ban Abi Waqas Intersection (#12)C A D C
C B C Approach
CN/A
T LS
TN/A S
T LLane Group
signalized Al-Irsal with Project Intersection (new)A D C N/A C
B C C Approach
Conclusion & Recommendations
Any Questions?