Traffic Impact Study Case: Al- Irsal Center Project in Al- Bireh City

50
Company LOGO Traffic Impact Study Case: Al-Irsal Center Project in Al-Bireh City Under the Supervision of : Pro.Sameer A. Abu-Eisheh Prepared by : Mohammad Tomeh Rand Malaysha Karem Ezat December 2010 An-Najah National University Engineering Collage Civil Engineering Department

description

An- Najah National University Engineering Collage Civil Engineering Department. Traffic Impact Study Case: Al- Irsal Center Project in Al- Bireh City. Under the Supervision of: Pro.Sameer A. Abu- Eisheh Prepared by: Mohammad Tomeh Rand Malaysha Karem Ezat. - PowerPoint PPT Presentation

Transcript of Traffic Impact Study Case: Al- Irsal Center Project in Al- Bireh City

Page 1: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Company

LOGO

Traffic Impact StudyCase: Al-Irsal Center Project in Al-Bireh City

Under the Supervision of:Pro.Sameer A. Abu-Eisheh

Prepared by:Mohammad Tomeh

Rand MalayshaKarem Ezat

December 2010

An-Najah National University Engineering CollageCivil Engineering Department

Page 2: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

What is Traffic Impact Study?

Page 3: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Project Description :• Al-Irsal Center is Arduna's first project in Ramallah

and Al-Bireh• The project will assist in enhancing the economic and

social life in Ramallah, Al-Bireh and most of the central region of the West Bank

Page 4: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Project Description :

• Al-Irsal Center is strategically located on Al-Irsal Hill-top, an elevated area on a major Al-Bireh-Ramallah route.

• Al-Irsal Center is located 2km to the North of the downtown of Ramallah-Al-Bireh occupying an area of 51,000 m2 with a total floor space of approximately 200,000 m2

Location:

Page 5: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Project Description :Location:

Page 6: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Project Description :Access to Al-Irsal

Center:

Page 7: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Project Description :

• Office and business facilities• Commercial activities• Residential• Hotel

Project Components:

Page 8: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Study Area:• The site lies close to the National Park, and near to

President Yasser Arafat’s tomb, Plaza Mall, and Ministry of Interior

Page 9: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Aim and Objectives• The aim of our study is to find the traffic impact of

this project on the system of roads around it

• Evaluate current traffic operations• Estimate the traffic to be developed by Al-Irsal Center

when it will be completely built• Examine how this project will affect the nearby roads• Solutions will be suggested to find the best alternative

solution, which can solve the problems

Objectives:

Page 10: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Intersection Counting

Page 11: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Field inventory studies

Page 12: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Volume studies:

– The peak hour volume (PHV)

– The expansion factors

• Traffic impact study (TIS)

– Trip generation

Page 13: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Level of service (LOS):

– A Free flow– B Reasonably free flow

A/B

Page 14: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Level of service (LOS):

– C Stable flow– D Approaching unstable flow

C/D

Page 15: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Level of service (LOS):

– E Unstable flow– F Forced or breakdown flow

E/F

Page 16: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology

Level of service Average control delay(sec/veh.)

A ≤10 sec

B 10-20 sec

C 20-35 sec

D 35-55 sec

E 55-80 sec

F ≥80 sec

• Level of service (LOS):– Level of service criteria for signalized & unsignalized

intersections

Page 17: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Methodology• Level of service (LOS):

– The range of level of service for roundabouts

Level of service (v/c)

Best level of service < 0.4

0.4- 0.55

0.55- 0.7

0.7- 0.85

0.85-1

Worse level of service >1

Page 18: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Data Collected and Analysis• The intersections in the study area

Intersection name Status

Al-Irsal with Al-Mubadeen Intersection(#2) Signalized

Al-Irsal with Hettean Intersection(#1) Unsignalized

Nablus with Hettean Intersection(#3) Roundabout

Nablus with Al-Mubadeen Intersection(#4) Signalized

Al-Irsal with Bait Nabala Intersection(#5) Unsignalized

Al-Irsal with -Bur Said Intersection(#6) Signalized

Nablus with Makah Intersection(#7) Roundabout

Al-Irsal with Sa'd Ban Abi Waqas Intersection(#12) Unsignalized

Page 19: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Data Collected and Analysis• Al-Irsal with Al-Mubadeen Intersection (#2):

– Control Station:

Page 20: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Data Collected and Analysis• The relation between volume and time

– Peak hour: Am: from 7:30 to 8:30 Pm: from 1:30 to 2:30

7:30

-8:3

0

8:30

-9:3

0

9:30

-10:

30

10:3

0-11

:30

11:3

0-12

:30

12:3

0-1:

30

1:30

-2:3

0

2:30

-3:3

0

3:30

-4:3

0

0

500

1000

1500

2000

2500

3000

3500

Relation between volume and time

Time(h)

Volu

me(

v/h)

Page 21: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Data Collected and Analysis• Al-Irsal with -Bur Said Intersection (#6)

– Coverage Station:

Page 22: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Data Collected and Analysis• Al-Irsal with -Bur Said Intersection (#6)

TimeTotal

volume (vehicle)

Expansion factor

Volumes for 8 hours

Average volume

)vehicle(

Percentage of peak

hour volume

Volume at peak hour

)vehicle(

10:00-11:00 1865 10.65 1986218868 15% 2830

11:00-12:00 1727 10.35 17874

Page 23: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• Analyses of the existing traffic

– Level of service for the intersections

Page 24: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysisThe level of service for intersections-existing traffic.

Level of service*

Status IntersectionSouthbound Northbound Westbound Eastbound

Intersection R T L R T L R T L R T L

DN/A

T L R TN/A

LR Lane Group signalized Al-Irsal with Al-Mubadeen

Intersection (#2)A D A B F

B A F Approach

N/A N/A N/A C N/A N/A B N/A F B C F N/A Movement unsignalized Al-Irsal with Hettean Intersection (#1)

N/A 0.45 1.23 0.38 0.76 V/C Ratio roundabout Nablus with Hettean Intersection (#3

F

LTR LTR LTR LTR Lane Group signalized Nablus with Al-Mubadeen

Intersection (#4)F F E F

F F C D Approach

N/A N/A N/A B N/A N/A N/A N/A F N/A Movement unsignalized Al-Irsal with Bait Nabala Intersection (#5)

DTR L TR L LTR R LT Lane

Group signalized Al-Irsal with Bur Said Intersection (#6)C D F D F A F

C C F D Approach

N/A 0.03 0.55 0.09 0.24 V/C Ratio roundabout Nablus with Makah Intersection (#7)

N/A N/A N/A N/A N/A N/A D F N/A F Movement unsignalized Al-Irsal with Sa'd Ban Abi Waqas Intersection (#12)

*The complete LOS worksheets are provided in the Appendix B. N/A: not applicable since there is no movement in this specific direction or LOS for intersection or specific direction is not provided by software.

Page 25: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• Trip generation rate

Trip Rate(Out)

Volume out

Trip Rate(In)

Volume In

Approximate Size

Study location Time

4.6trip/1000

m219

6.1 trip/1000

m225

4.128 thousand m2

Plaza Mall

7:00-8:00

18.7trip/1000

m2

7720.3

trip/1000 m2

84 10:00-11:00

17.9trip/1000

m2

7421.8

trip/1000 m2

90 11:00-12:00

21.6trip/1000

m2

8924

trip/1000 m2

99 2:00-3:00

0.17trip/1000

m21

11.6trip/1000

m268

5.880 thousand m2 Office

7:30-8:30

3.6trip/1000

m221

6.3trip/1000

m237 8:30-9:30

4.8trip/1000

m228

8.33 trip/1000

m2

49 1:30-2:30

0.21 trip/room

19 0.52 trip/room 47 90 Room

Grand Park Hotel

10:00-11:00

0.63trip/unit 20 .5

trip/unit 16

32UnitsIskan Al-Mohndse

en

7:00-8:00

1trip/unit

32 .72trip/unit 23 8:00-9:00

0.63trip/unit

20 .25trip/unit 8 9:00-10:00

0.38trip/unit

12 .56trip/ unit 18 10:00-11:00

0.66trip/unit

21 .66trip/unit 21 11:00-12:00

Page 26: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• Trip generation rate for the components of Al-Irsal

Center projectGross Trips

Generated (Out)Trip Rate

(Out)Gross Trips

Generated (In)Trip Rate

(In) Size Land Use

2234.6

trip/1000 m2

2966.1

trip/1000 m2

48.513thousand

M2Commercial

230.17

trip/1000 m2

155511.6

trip/1000 m2

134.073thousand

M2Office

321

trip/unit23

0.72 trip/unit

32 Units Residential

50 0.21trip/room 125 0.52

trip/room 240 rooms Hotel

328 1999 Total

Page 27: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• Analyses after 3 years

– Growth rate traffic forecasts– Trip generation from the project– Opening the old Nablus-Al-Bireh road

Page 28: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• The analysis of trip generation for offices

Number of trips

For % entrance

Entrances name

(%in)from north

Number of trips

For % entrance

Entrances name

(%in)from south

Trip rate (In)

Land use

234 50 1

30%↔

467 trip

490 45 1

70%↔

1089 trip11.6

Offices with approximate size134.073thousand M2

46 10 2 0 0 2

187 40 3 545 50 3

0 0 4 54 5 4

Number of trips

For % entrance

Entrances name

(%out)to north

Number of trips

For % entrance

Entrances name

(%out)to south

Trip rate

(Out)

2 50 1

20%↔

5 trip

9 50 1

80%↔

18 trip.17

1 10 2 0 0 2

2 40 3 8 45 3

0 0 4 1 5 4

Page 29: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• The analysis of trip generation for commercial areas

Number of trips

For % entrance

Entrances name

(%in)from north

Number of trips

For % entrance

Entrances name

(%in)from south

Trip rate (In)

Land use

45 50 1

30%↔

89 trip

93 45 1

70%↔

207 trip6.1

Commercial areas with

approximate size48.513

thousand M2

8 10 2 0 0 2

36 40 3 104 50 3

0 0 4 10 5 4

Number of trips

For % entrance

Entrances name

(%out)to north

Number of trips

For % entrance

Entrances name

(%out)to south

Trip rate

(Out)

23 50 1

20%↔

45 trip

89 50 1

80%↔

178 trip4.6

4 10 2 0 0 2

18 40 3 80 45 3

0 0 4 9 5 4

Page 30: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• The analysis of trip generation for residential areas

Number of trips

For % entrance

Entrances name

(%in)from north

Number of trips

For % entrance

Entrances name

(%in)from south

Trip rate (In)

Land use

3 50 1

30%↔

7 trip

8 50 1

70%↔

16 trip.72

Residential areas with

approximate size 32 Units

1 10 2 0 0 2

3 40 3 7 45 3

0 0 4 1 5 4

Number of trips

For % entrance

Entrances name

(%out)to northNumber of

tripsFor %

entranceEntrances

name(%out)to

south

Trip rate (Out)

3 50 1

20%↔

6 trip

13 50 1

80%↔

26 trip1

2 30 2 0 0 2

1 20 3 12 45 3

0 0 4 1 5 4

Page 31: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysis• The analysis of trip generation for hotel

Number of trips

For % entrance

Entrances name

(%in)from north

Number of trips

For % entrance

Entrances name

(%in)from south

Trip rate (In)

Land use

19 50 1

30%↔

38 trip

44 50 1

70%↔

88 trip.52

hotel with approximate

size240rooms

4 10 2 0 0 2

15 40 3 40 45 3

0 0 4 4 5 4

Number of trips

For % entrance

Entrances name

(%out)to north

Number of trips

For % entrance

Entrances name

(%out)to south

Trip rate

(Out)

5 50 1

20%↔

10 trip

20 50 1

80%↔

40 trip.21

3 30 2 0 0 2

2 20 3 18 45 3

0 0 4 2 5 4

Page 32: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysisThe level of service for intersections- after 3 years with project..

Level of service*

Status IntersectionSouthbound Northbound Westbound Eastbound

Intersection R T L R T L R T L R T L

E

T L R T N/A

LRLane Group

signalized Al-Irsal with Al-Mubadeen Intersection (#2)

A D A F F

B E F Approach

N/A N/A N/A B N/A N/A B N/A F N/

A C F N/A Movement unsignalized Al-Irsal with Hettean

Intersection (#1)

N/A 2.13 3.01 1.59 1.37 V/C Ratio roundabout Nablus with Hettean Intersection (#3

F

LTR LTR LTR LTRLane Group

signalized Nablus with Al-Mubadeen Intersection (#4)

F F E F

F F D E Approach

N/A N/A N/A B N/A N/A

N/A N/A F N/

A Movemen unsignalized Al-Irsal with Bait Nabala Intersection (#5)

ETR L TR L LTR R LT

Lane Groupsignalized Al-Irsal with Bur Said

Intersection (#6)C D F D F A FC D F D Approach

N/A 0.59 0.95 0.16 0.46 V/C Ratio roundabout Nablus with Makah Intersection (#7)

N/A N/A N/A N/A N/A N/A F F N/A F Movement unsignalized Al-Irsal with Sa'd Ban Abi

Waqas Intersection (#12)

The complete LOS worksheets are provided in the Appendix B. N/A: Not applicable since there is no movement in this specific direction or LOS for intersection or specific direction is not provided by software.

Page 33: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Traffic analysisThe LOS for intersections- after 5 years from opening the project.

Level of service*

Status IntersectionSouthbound Northbound Westbound Eastbound

Intersection R T L R T L R T L R T L

F

T L R T N/A

LRLane Group

signalized Al-Irsal with Al-Mubadeen Intersection (#2)

A D A F F

B F F Approach

N/A N/A N/A D N/A N/A C N/A F N/

A D F N/A Movement unsignalized Al-Irsal with Hettean

Intersection (#1)

N/A 3.12 4.14 2.89 1.90 V/C Ratio roundabout Nablus with Hettean Intersection (#3

F

LTR LTR LTR LTRLane Group

signalized Nablus with Al-Mubadeen Intersection (#4)

F F E F

F F E F Approach

N/A N/A N/A B N/A N/A

N/A N/A F N/

A Movemen unsignalized Al-Irsal with Bait Nabala Intersection (#5)

F

TR L TR L LTR R LTLane Group

signalized Al-Irsal with Bur Said Intersection (#6)C D F D F A F

C F F F Approach

N/A 0.73 1.20 0.22 0.63 V/C Ratio roundabout Nablus with Makah Intersection (#7)

N/A N/A N/A N/A N/A N/A F F N/A F Movement unsignalized Al-Irsal with Sa'd Ban Abi

Waqas Intersection (#12)

The complete LOS worksheets are provided in the Appendix B. N/A: Not applicable since there is no movement in this specific direction orLOS for intersection or specific direction is not provided by software.

Page 34: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• Improvement of Al-Irsal with Hettean Intersection (#1)

Page 35: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• LOS of Al-Irsal with Hettean Intersection (#1)

Page 36: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• Intersection #1 after improvement(#1)

Page 37: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• LOS of Al-Irsal with Hettean Intersection (#1) After improvement

Page 38: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• Nablus with Al-Mubadeen Intersection (#4)

Page 39: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• LOS of Nablus with Al-Mubadeen Intersection (#4)

Page 40: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• Intersection #4 after improvement

Page 41: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• LOS of Nablus with Al-Mubadeen Intersection (#4) After improvement

Page 42: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• Improvement of Al-Irsal with -Bur Said Intersection (#6)

Page 43: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• LOS of Al-Irsal with -Bur Said Intersection (#6)

Page 44: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• Intersection #6 after improvement

Page 45: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

• LOS of Al-Irsal with -Bur Said Intersection (#6) after improvement

Page 46: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

The improved LOS for intersections after 3 years with project.

Level of service*Status IntersectionSouthbound Northbound Westbound Eastbound

Intersection R T L R T L R T L R T L

CS

T LS

T N/A S N/A

L Lane Group signalized Al-Irsal with Al-Mubadeen

Intersection (#2)A D D EA C D Approach

DS

T L TR LS

LT LTR Lane Group signalized Al-Irsal with Hettean

Intersection (#1)D E E D F FD D E E Approach

FT L LTR L LTR TR L Lane

Group signalized Nablus with Hettean Intersection (#3)F D D F E F

E D F F Approach

FTR L TR L LTR LTR Lane

Group signalized Nablus with Al-Mubadeen Intersection (#4)D E F E F F

C E F F Approach

BN/A

T L TR N/A

LR Lane Group signalized Al-Irsal with Bait Nabala

Intersection (#5)A B C CA B C Approach

DT L TR L LTR

SLT Lane

Group signalized Al-Irsal with Bur Said Intersection (#6)E D E C F E

C D E D Approach

CR LT R LT R LT R LT Lane

Group signalized Nablus with Makah Intersection (#7)A C B C B C B D

C B C C Approach

BS

TN/A N/A

T LS N/A

L Lane Group signalized Al-Irsal with Sa'd Ban Abi

Waqas Intersection (#12)C A D CC B C Approach

BN/A

T LS

T N/A S

T L Lane Group signalized Al-Irsal with Project

Intersection (new)A D C N/A CB B C Approach

Page 47: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

The improved LOS for intersections after 3 years with project.

Level of service*Status IntersectionSouthbound Northbound Westbound Eastbound

Intersection R T L R T L R T L R T L

CS

T LS

T N/A S N/A

L Lane Group signalized Al-Irsal with Al-Mubadeen

Intersection (#2)A D D EA C D Approach

DS

T L TR LS

LT LTR Lane Group signalized Al-Irsal with Hettean

Intersection (#1)D E E D F FD D E E Approach

FT L LTR L LTR TR L Lane

Group signalized Nablus with Hettean Intersection (#3)F D D F E F

E D F F Approach

FTR L TR L LTR LTR Lane

Group signalized Nablus with Al-Mubadeen Intersection (#4)D E F E F F

C E F F Approach

BN/A

T L TR N/A

LR Lane Group signalized Al-Irsal with Bait Nabala

Intersection (#5)A B C CA B C Approach

DT L TR L LTR

SLT Lane

Group signalized Al-Irsal with Bur Said Intersection (#6)E D E C F E

C D E D Approach

CR LT R LT R LT R LT Lane

Group signalized Nablus with Makah Intersection (#7)A C B C B C B D

C B C C Approach

BS

TN/A N/A

T LS N/A

L Lane Group signalized Al-Irsal with Sa'd Ban Abi

Waqas Intersection (#12)C A D CC B C Approach

BN/A

T LS

T N/A S

T L Lane Group signalized Al-Irsal with Project

Intersection (new)A D C N/A CB B C Approach

Page 48: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

The problems and suggested solutions

The improved LOS for intersections after 5 years from opening.

Level of service*Status IntersectionSouthbound Northbound Westbound Eastbound

Intersection R T L R T L R T L R T L

DS

T LS

TN/A S N/A

LLane Group

signalized Al-Irsal with Al-Mubadeen Intersection (#2)

A D D E

B D E Approach

ES

T L TR LS

LT LTRLane Group

signalized Al-Irsal with Hettean Intersection (#1)D E E D F F

E E F F Approach

FT L LTR L LTR TR L

Lane Groupsignalized Nablus with Hettean

Intersection (#3)F D D F E FF F F F Approach

FTR L TR L LTR LTR

Lane Groupsignalized Nablus with Al-Mubadeen

Intersection (#4)D E F E F FD F F F Approach

BN/A

T L TRN/A

LRLane Group

signalized Al-Irsal with Bait Nabala Intersection (#5)A B C C

A C C Approach

FT L TR L LTR

SLT

Lane Groupsignalized Al-Irsal with Bur Said

Intersection (#6)E D E C F EE E F E Approach

CR LT R LT R LT R LT

Lane Groupsignalized Nablus with Makah

Intersection (#7)A C B C B C B DC B C D Approach

BS

TN/A N/A

T LS N/A

LLane Group

signalized Al-Irsal with Sa'd Ban Abi Waqas Intersection (#12)C A D C

C B C Approach

CN/A

T LS

TN/A S

T LLane Group

signalized Al-Irsal with Project Intersection (new)A D C N/A C

B C C Approach

Page 49: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Conclusion & Recommendations

Page 50: Traffic Impact Study Case: Al- Irsal  Center Project in Al- Bireh  City

Any Questions?