Tracking Utility Performance Using Interconnection Reporting

11
Tracking Utility Performance Using Interconnection Reporting Gerry Bingham DOER

description

Tracking Utility Performance Using Interconnection Reporting. Gerry Bingham DOER. National Grid. National Grid. This gap suggests a discrepancy in the reporting: Authorizations preceding Sent ISA’s. NSTAR. NSTAR. What explains the drop in ISA’s? The 12-Point - PowerPoint PPT Presentation

Transcript of Tracking Utility Performance Using Interconnection Reporting

Page 1: Tracking Utility Performance Using Interconnection Reporting

Tracking Utility Performance Using Interconnection Reporting

Gerry BinghamDOER

Page 2: Tracking Utility Performance Using Interconnection Reporting

National Grid

Page 3: Tracking Utility Performance Using Interconnection Reporting

National Grid

This gap suggests a discrepancy in the reporting: Authorizations preceding Sent ISA’s.

Page 4: Tracking Utility Performance Using Interconnection Reporting

NSTAR

Page 5: Tracking Utility Performance Using Interconnection Reporting

NSTAR

What explains the drop in ISA’s? The 12-Point Verification email announced clock stopped until customer affirms requirements.

Page 6: Tracking Utility Performance Using Interconnection Reporting

WMECo

Page 7: Tracking Utility Performance Using Interconnection Reporting

Unitil

Page 8: Tracking Utility Performance Using Interconnection Reporting

National Grid

Not all projects are reported:Numerous Authorized Projects have blanks in the “ISA Sent” field.

Page 9: Tracking Utility Performance Using Interconnection Reporting

NSTAR

Page 10: Tracking Utility Performance Using Interconnection Reporting

WMECo

Page 11: Tracking Utility Performance Using Interconnection Reporting

Unitil