Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

36
TQM – PAPER 2 RASHMI.S

Transcript of Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

Page 1: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM – PAPER 2

RASHMI.S

Page 2: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

PART A – 1. DIMENSIONS OF QUALITY

There are 8 dimensions of quality;• Performance – product / service – perform as intended- bone of

contention – mkt position of brand.• Features – Product / service – all features specified / required for

its intended purpose – designing features – close relationship to end users.

• Reliability – product consistently perform within specifications – most important dimension among customers – linked with performance – influences corporate image.

• Conformance – conform to the specification – performance expected / stated – design features conformance.

• Durability – how long will the product last – linked to warranty- specified in product specifications / manuals / procurement contracts.

• Serviceability – Easy to maintain & repair –serviceability- product selection.

• Aesthetics – product looks to end users – defections / rejections – reduce aesthetic value – important for corporate image.

• Perceived quality- how is product perceived by customers – high quality product – not properly installed / maintained – customer – equates to product quality – reality – companies look after.

Page 3: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

2. GURUS OF TQM

• 5 main guru’s of TQM ;• 1. Deming - W Edwards Deming placed great importance

and responsibility on management, at both the individual and company level, believing management to be responsible for 94% of quality problems .14 principles – applied to all org.

• 2. Juran - Dr Joseph M Juran developed the quality trilogy – quality planning, quality control and quality improvement. Good quality management requires quality actions to be planned out, improved and controlled.

• The process achieves control at one level of quality performance, then plans are made to improve the performance on a project by project basis, using tools and techniques such as Pareto analysis.

• This activity eventually achieves breakthrough to an improved level, which is again controlled.

Page 4: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• 3. Crossby - Philip B Crosby is known for the concepts of “Quality is Free” and “Zero Defects”, and his quality improvement process is based on his four absolutes of quality:

• conformance to requirements, prevention , zero defect standard & The measurement of quality is the price of non-conformance.

• 4. Taguchi - he took the already established knowledge on experimental design and made it more usable and practical for quality professionals. His message was concerned with the routine optimization of product and process prior to manufacture rather than quality through inspection.

• • 5. Shigeo Shingo is strongly associated with Just-in-Time

manufacturing, and was the inventor of the single minute exchange of die (SMED) system, in which set up times are reduced from hours to minutes, and the Poka-Yoke (mistake proofing) system. In Poka yoke, defects are examined, the production system stopped and immediate feedback given so that the root causes of the problem may be identified and prevented from occurring again.

• Dr Kaoru Ishikawa made many contributions to quality, the most noteworthy being his total quality viewpoint, company wide quality control, his emphasis on the human side of quality, the Ishikawa diagram and the assembly and use of the “seven basic tools of quality

Page 5: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM Deming 1 Consistency of Purpose Top Management should follow vision, Mission and

objectives to be achieved

2 Learn a new Philosophy Learn new techniques-challenge the working

3. Do not depend on Mass Inspection Use sampling methods for inspection

Page 6: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM Deming

4 Reduce the number of vendors

5 Recognize two sources of namely a ) Management and production systems b) Production workers6 Improve on the job Training Training for best results

Page 7: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM Deming

7 Improve supervision for continuous improvement8 Drive out fear Self sustaining, proactive,9 Improve communication

10 Eliminate fear (Repeated)

Page 8: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM Deming

11 consider work standards carefully over designed-tolerance-12 Teach statistical Methods SPC-for process capability ,machine

capability, 13 Encourage new skills-Innovation continuous

improvement 14 Use statistical knowledge

Page 9: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM – JURAN

Juran”s Triology Quality Planning Quality control Quality Improvement

Page 10: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM - Juran

Quality Planning a ) Set up a Long term goal b) Define vision, mission statement c) SMART- Specific Measureable Achieveable Realistic Time Bound

Page 11: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM - Juran

d) Find customer Needse) Develop the product as per customer needsf) Develop process and system g) Develop process capability for

implementation.

Page 12: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM - Juran

Quality controlIt consists of two process a) Statistical process control b) Training on statistical tools continuous appraisal and measurement of the

process.

Page 13: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM- Juran

Continuous Improvement Project oriented improvements All employees should be involved Steps to achieve the quality Improvements

Page 14: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM -Crosby

6C”s Comprehensions commitments competence corrections communications continuance.

Page 15: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

3. DEMING’S WHEEL• Also known as Deming’s cycle, Shewhart cycle or the Plan Do Act cycle. • It is an iterative 4 step solving process  typically used in 

business process improvement.• Popularized by W.Edward Deming in 1920- it was later modified by him to Plan

do study(PDSA) with recommendations. – used in 6 sigma. – DMAIC. • The concept of PDCA is based on the scientific method, as developed from the

work of Francis Bacon . The scientific method can be written as "hypothesis" - "experiment" - "evaluation" or plan, do, and check .

• PLAN - Establish the objectives and processes necessary to deliver results in accordance with the expected output. expected output – focus,the completeness and accuracy of the specification is also part of the improvement.

• DO- Implement the new processes. Often on a small scale if possible.• CHECK-  Measure the new processes and compare the results against the

expected results to ascertain any differences.• ACT- Analyze the differences to determine their cause. Determine where to

apply changes that will include improvement. refine the scope to which PDCA is applied until there is a plan that involves improvement.

• Rate of change, that is, rate of improvement, is a key competitive factor in today's world. PDSA allows for major 'jumps' in performance ('breakthroughs' often desired in a Western approach), as well as Kaizen.

Page 16: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...
Page 17: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

4. MALCOM BALRIDGE AWARD.

• The Malcolm Baldrige National Quality Award is an annual award that recognizes U.S. organizations for performance excellence. The Baldrige Award is the only formal recognition of the performance excellence of U.S. organizations given by the President of the United States.

• It is administered by the Baldrige National Quality Program, which is based at and managed by the National Institute of Standards and Technology, an agency of the U.S. Department of Commerce. The Baldrige National Quality Program and the associated Award were established by the Malcolm Baldrige National Quality Improvement Act of 1987 (Public Law 100–107),named for Malcolm Baldrige, who served as United States Secretary of Commerce during the Reagan administration.

• The Award promotes awareness of performance excellence as an increasingly important element in competitiveness and information sharing of successful performance strategies and the benefits derived from using these strategies

• To receive a Baldrige Award, an organization must have a role-model organizational management system that ensures continuous improvement in the delivery of products and/or services, demonstrates efficient and effective operations, and provides a way of engaging and responding to customers and other stakeholders. The Award is not given for specific products or services.

Page 18: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• Up to 18 Awards may be given annually across six eligibility categories—manufacturing, service, small business, education, health care, and nonprofit. As of 2009, 84 organizations had received the Award.

• The seven categories of the Criteria are1. Leadership2. Strategic Planning3. Customer Focus4. Measurement, Analysis, and Knowledge Management5. Workforce Focus6. Process Management7. Results.

• USES :• To help improve organizational performance practices,

capabilities, and results• To facilitate communication and sharing of information

on best practices among U.S. organizations of all types• To serve as a working tool for understanding and

managing performance and for guiding planning and opportunities for learning

Page 19: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

TQM- Malcolm Baldrige National Quality AwardBasic Customersand market

Focussed Strategy

LEADERSHIP1

StrategicPlanning

2

3Customer &

Market focussed

4INFORMATION

5Human resources

focus

6Process Management

7Business results

Page 20: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

5.BENEFITS OF ISO 9001:2008

• Qms -which provides a number of requirements which an organization needs to fulfill to achieve customer satisfaction through consistent products and services which meet customer expectations.

• The benefits identified for the ISO 9001:2008• Competitive advantage: Top-management led, ensures senior management take a

strategic approach to their management systems . business objectives constantly feed into processes and working practices to ensure maximization of assets.

• Improves business performance and manages business risk : Raise the organization’s performance above and beyond competitors who aren’t using management systems. Certification also makes it easier to measure performance and better manage business risk.

• Attracts investment, enhances brand reputation and removes barriers to trade : Certification to ISO 9001 boosts the organization’s brand reputation and can be a useful promotional tool. It sends a clear message to all interested parties that this is a company committed to high standards and continual improvement.

• Saves money for the owners : the financial benefits for companies include operational efficiencies, increased sales, higher return on assets and greater profitability.

Page 21: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• Streamlines operations and reduces waste : The assessment focuses on operating processes. This encourages organizations to improve the quality of products and the service provided and helps to reduces waste and customer complaints.

• Encourages internal communication and raises morale : ensures that employees feel more involved through improved communication, invovement etc. Continued Assessment visits can highlight any skills shortages sooner and uncover any teamwork issues.

• Increases customer satisfactionThe ‘Plan, Do, Check, Act’ structure of ISO 9001 ensures that the needs of the customer – reliability, conformance, servicability, on time receival of products are met.

• Society will benefit from: ·         Fulfilment of legal and regulatory requirements

• ·         Improved health and safety• ·         Reduced environmental impact• ·         Increased security

Page 22: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

6. POKA YOKE• Also known as fool proofing system or mistake proofing

system or fail safing system.• POKA- means INADVERTENT ERRORS & YOKE- means TO

AVOID.• Developed by Dr. Shigeo Shingo.• It is a simple technique to avoid simple human error at work.• Part of “Zero Defect Quality Control”.• Identifying defects at the source lowers the cost.• Poka-Yoke respects the intelligence of the operator by

excluding repetitive actions that require a thinking process. By this method is the operator more free for creative and “value added “ activities.

• Poka-Yoke to detect faults at the base, ex the position of the filer neck into the down line.

• Poka-Yoke to detect faults after an operation, ex a sensor used to detect a metal part.

• Poka-Yoke to stop the machine if an error occurs.

Page 23: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

All the causes are related with the main factors ie,Man, Machine, Method, Material & Information. Implemented by PROBLEM LIST, ANALYSIS, IDENTIFICATION OF POKA-YOKE , ACTION & RESULT.

• 8 Principles of Poka-yoke for improvement• 1 Build quality in the Process• 2 Eliminate all in advertent errors and defects• 3 Stop doing it wrong and do it right 1st Time• 4 Don”t think up Excuses .Do it correctly• 5 A 60% success is good enough to implement your idea• 6 Working together for Zero defect is a must• 7 Ten Heads are better than one• 8 Find the True cause using 5W1H.

• 5 best POKA YOKES • 1. Guide pins of different sizes.• 2. Error detection & alarms.• 3. Limit switches• 4. Counters• 5. Checklists.

Page 24: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

PART B- 5S WITH EG

• The 5S Process, or simply "5S", is a structured program to systematically achieve total organization, cleanliness, and standardization in the workplace.

• A well-organized workplace results in a safer, more efficient, and more productive operation. 

• It boosts the morale of the workers, promoting a sense of pride in their work and ownership of their responsibilities.

• "5S" was invented in Japan, and stands for five (5) Japanese words that start with the letter 'S': Seiri, Seiton, Seiso, Seiketsn and Shitsuke.

• They stand for Organization, Neatness, Cleaning, Standardization & Discipline respectively.

• 5S can be applied in Production, Office, Scrapyard, Meeting, Design, Maintenance.

• Factors affecting 5S are: Team work, Top mgmt involvement. Carelessness, Ego, Accident & Laziness.

Page 25: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• SEIRI – organization: to put things in order ,to organize with rules , to distinguish between necessary and unnecessary , to make decisions, to find cause and to prevent it from future occurrence.

• usage priority to be known.• SEITON –Neatness- Eliminate searches, make arrangements to get it when we want,

Discard-unwanted items, Place for a contingency items, Far away for items not used frequently, Place for periodically & frequently used items. Retrival is very important . Impacts on Quality, Rusting, Denting, Deformation, Safety, Cleaning and Inspection .

• SEISO – Cleaning : One time usage concept instead of inspection.• Hiring people for cleaning, 3 step approach -Problems discovered in the cleaning

process, HARD TO CLEAN PLACES, CLEANING AND INSPECTION EDUCATION , THREE MINUTES EXERCISE & SELF EVALUATION SYSTEM.

• SEIKETSU – Standardization : Visualization by colour, shape, cover;Making ABNORMALITIES obvious with visual control. Avoids operator”s making mistake -

Signals for Alert and Danger, Instructions for operating Standards on RIGHT AND WRONG.SHITSUKE – Discipline : Discipline as a way of changing Habits, Doing Right things as a

matter of COURSE, habit formation, Clear communication , Reconformation, Practice until you can do it without problems, Personal responsibility & RULE OBSERVENCE

CAMPAIGNS

Page 26: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• 5S advantage to VVD - Quality Improvement by eliminating mixup of oils in storage, stirrer,kettle , No leakages in pipes.

• Elimination of foreign bodies in oil due to unwanted material, machine dust, man

• Elimination of search time for Tools, containers, samples labels. To get high yield of scrap by segregating the scrape by Tins, plastics, other materials & Elimination of DENT in the container.

• Elimination of Suppliers material lying in the factory.• Reasons : No decision making, lots of unwanted machine /

materials, experimental & suppliers material, Breakdown of machinery, territory occupation between the employees, no statutory regulation & internal/ external inspection.

• Problems also due to nature of material, leakage, no proper facilities, waiting for unit weight, seasonal products, canteen material supplies…

• Identified factors such as top mgmt, carelessness, ego & laziness for the various accident occuring ….

• Benefits :Quality improvement • Systematic approach – space utilization• Eliminating unnecessary items , Reduction in search time• Full utilisation of RESOURCES – scrap realization , less accidents,

no fires…

Page 27: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

3. SIX SIGMA PROCESS• Six Sigma is a business management strategy originally

developed by Motorola, USA in 1981. As of 2009, it enjoys widespread application in many sectors of industry.

• Six Sigma seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) and Minimizing variability in manufacturing and business processes. – STRIVES FOR NEAR PERFECTION.

• Six sigma focuses on Defect Prevention, Cycle time reduction, Cost savings & Eliminating Non-value added activities.

• It tells you about the defects per unit. The sigma level indicates how often the defects will occur.

• Used for continuous improvement, To attack poor cost of quality ie, Internal failure cost , Appraisal cost & Prevention cost & For value addition.

• Data driven system approach to problem solving -focus on customer, through statistical process and Analysis

Page 28: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• 6 Sigma Process: The PDCA cycle has been modified into the DMAIC approach in 6 sigma & it consists of 5 steps;

Define, Measure

AnalyzeImproveControl

• Define : What is the current status ?, What wrong with the things now ?, How big is the problem ?, What is to be accomplished ?, What is the impact of the problem on the business ? Ans using Process Mapping, Trend Analysis, Pareto, Brainstorming, Product defect concentration chart & Cause and Effect Diagram

• Measure : To identify the project ( the characteristic of the product/ Key Process Input , variables (KPIV) & Key Process Output Variables(KPOV) & map the variable process & To make sure measurement system is valid & make necessary measurements in the current process for future comparison and record .

• Using : Paired comparison methods.

Page 29: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• Analyze: To screen the potential causes, establish the capability of the process, determine the vital factors that impact the process & make recommendation for the improve phase through Product/Process research, component research, Modified component research, Multi-vari Analysis, Product defect concentration chart, Test of means, Gauge R &R study etc..

• Improve: To develop a strategy for improvement, find the solution to the problem, discover variable relationship using design of experiment & establish the new operating Tolerances.

• Using: B Vs C, ANNOVA, Scatter plot & Evaluating solution tool.

• Control : To define control metrics, develop metrics collection tools, implement the improved process & monitor the process regularly using the defined control metrics .

• Using : Variation Analysis, X bar and Range chart, Pre-control chart, Process control Analysis and control Planning & Mistake proofing.

Page 30: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

BENEFITS FROM SIX SIGMA

1 Huge profit through product and process characterization

2 Improved customer satisfaction

3 Reduced COPQ through Defect reduction/Elimination , yield improvement

4 Break through Management

5 Improved process.

Page 31: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

4. ROLE OF CUSTOMER SATISFACTION IN MGMT

• Customer Satisfaction has Organization survives because of customer & It is customer who pays salary .

• All quality gurus insist that customer satisfaction is achieved only when the stated & implied needs of customers are achieved.

• Stated need means physical description and technical specification• Implied needs means –what the product suppose to do or

performance • If both are satisfied –customer satisfaction and repeated customer.• Customer satisfaction depends on • -The need to satisfy the customers• - Accurate demand measurement• - Market research• - Customer Relationship Management (CRM) • - Technology Management• - Environment scanning• - Value Analysis • - Supply chain Management• - Excellent customer response (ECR).

Page 32: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• This involves looking at the concepts of ;• The concept of Right quality -Customer's perceptions and

functional requirement.• The concept of Right quantity - Correct quantity ordered

by the customer.- JIT concept.• The concept of Right time. The time when needed- • Eg. Food when needed in a Hotel.• The concept of Right place – Eg Component in a right place

in the assembly. • It requires management to think about• a) customer needs• b ) Ability of the organization to meet the customer needs• c ) Prevention rather than detection • d) Quality Improvement• e ) customer satisfaction• f ) Review QMS for progress. • Changing the Culture• 1. Behaviors based on people interactions• 2 Norms resulting from working groups• 3 Values adopted by the organization• 4 Rules of the game for “Getting On”• 5. The climate.

Page 33: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• 5 important components that should be established by mgmt for customer satisfaction.

• 1. A Mission Statement- Clear documented corporate beliefs

• 2. To achieve the Mission- clear & Effective strategies

• 3. Identify and implement- critical success factors and critical process

• 4. Review the management structure• 5. Empowerment- employee

participation

Page 34: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

2. 7 OLD QC TOOLS• The 7 basic QC tools are a part of the Kaizen

process. • These 7 basic tools are statistical tools.• These tools are;• Flow Charts, • Cause and Effect Diagrams,• Check Sheets,• Histograms,• Pareto Charts,• Scatter Diagram and• Control Charts• These 7 basic tools have been recently updated

by 7 new tools such as arrow dig, tree dig , relationship dig for better understanding & solving of process.

Page 35: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• These 7 tools for various stages in the Kaizen process such as identifying the symptoms of the Problem, Finding Facts, Identifying problems, Generating ideas, Evaluating the potential solutions , making decisions & Implementing the solution.

• Flow Charts : the actual sequence of work processes in the org. It can be used to describe the current work flow, whether simple or complex. Finds the symptoms of the problems.

• It is also used to find out the benefits of a process, persons responsible .It Identifies the potential solutions by Listing the main activities & Chart activities in sequence.

• Cause & Effect Diagram : Ishikawa or Fishbone diagram• It is used for generating ideas.• Relates causes to effects• Start with effect and work back to the possible causes.• Benefit : even the smallest of causes are not ignored – better

control.• Check sheets : Useful in finding facts.• It is used to systematically record and compile data from

historical sources, or observations as they happen, so that patterns and trends can be clearly detected and shown.

• Since, Quality management has to be based on facts• • Information such as What, where, how, who and when?• • Maps Data versus frequency…

Page 36: Tqm CONCEPTS 2 - 6 SIGMA, 7QC TOOLS...

• Histograms: Used to summarize data from a process that has been collected over a period of time, and graphically present its frequency distribution in bar form.

• Pictures of data• • Use Check Sheet• • Data versus frequency• • See patterns and variations.• Used in identifying problems.• Pareto Charts: Used in identifying problems• Most effects occur from few causes- 80/20 rule• Use data from Check Sheets & Histograms are ordered from most

frequent to least frequent.• Scatter diagrams: Used for finding the potential solutions to the

problems. • These diagrams are used to study and identify the possible

relationship between the changes observed in two different sets of variables.

• Use Run Charts.• Control Charts: Control charts are used to monitor, control and

improve process performances over time by studying variations and its source.

• They provide common language for discussing process performance.• Same as Run Chart but control limits are added• • Control limits - Two horizontal lines• • Upper control limit (UCL)• • Lower control limit (LCL)