PRIVATE AND NOT FOR PUBLICATION NN tqa Britidh Rail EASTERN REGION TEMPORARY SPEEDRESTRICTIONS PERMANENTWAYOPERATIONS SIGNAL ALTERATIONS APPENDIXINSTRUCTIONS,ETC. SATURDAY16NOVEMBER TO FRIDAY 22 NOVEMBER1974 INCLUSIVE '1 , Trainmen must pay particular attention to works contained in this notice and keep a good look-out for hand signals, which will be exhibited at the various localities in accordance with the Rules and Regulations. Work at places other than those mentioned may be in progress, of which it may not have been possible to give previous notice, and drivers must be on the look-out and be prepared to stop or run at reduced speed when and where hand signals may be exhibited. B.R.31262 No.46 1

Transcript of tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa...

Page 1: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

PRIVATE AND NOT FOR PUBLICATION

NNtqa Britidh Rail

EASTERN REGION

TEMPORARY SPEED RESTRICTIONSPERMANENT WAY OPERATIONS

SIGNAL ALTERATIONSAPPENDIX INSTRUCTIONS, ETC.

SATURDAY 16 NOVEMBERTO

FRIDAY 22 NOVEMBER 1974INCLUSIVE

' 1,0St tr

Trainmen must pay particular attention to works contained in this notice and keep a goodlook-out for hand signals, which will be exhibited at the various localities in accordancewith the Rules and Regulations. Work at places other than those mentioned may be inprogress, of which it may not have been possible to give previous notice, and drivers mustbe on the look-out and be prepared to stop or run at reduced speed when and where handsignals may be exhibited.

B.R.31262

No.46 1

Page 2: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

SECTION A

*Pilmoor and Down — 19 00 21 50 30 Trackwork. 74/45Thirsk Slow*Thirsk and Down — 26 21 27 35 20 Trackwork. 74/41Northal I erton SlowtThirsk (Avenue) and Down — 28 66 28 70 20 Trackwork.Northallerton Slow 74/43tThirsk (Avenue) and Down — 28 66 28 74 20 Trackwork. 74/44Northa I I erton FastDurham Stationand Tursdale Jn.

— Up Main 65 33 64 49 20 Trackwork.74/43

Ouston „In. andLow Fell Stn. Jn.

DownFast

— 76 56 77 54 20 Trackwork. 74/45

Low Fell Station ..In.1and Ouston Jn.

.., Up Slow 76 37 75 45 20 Trackwork.74/25

936*tChaihill and — Up 42 40 40 40 20 Trackwork.Alnmouth

TEMPORARY SPEED RESTRICTIONS

(Until further notice unless otherwise stated)

Warning Boards and Indicators provided unless otherwise shown.

IS the case of items marked t The Warning Board(s) will be lit by propane gas.

In the case of items marked * the Warning Boards and Indicators will be moved as the work progressesand the restriction will not operate over more than 3A m i l e a t o n e t i m e .Where two speeds are shown for a restriction eg. 20 the Rule Book, Section T, Clause 21.2 applies.

Location of Workat or between

Down U p M . Chs. M. Chs m . p . h .YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE

66 *tChathill and — U p 4 2 40 4 0 40 4 0 Tra ckwo rk .Alnmouth

d The items shown are consecutive forming an overall moveable restriction between the mileages shown:The 40m.p.h. restriction will be South of the 20m.p.h. Warning boards and speed indicators will be shownin accordance with the Rule Book.

FERRYHILL (TURSDALE JN.)1TO PELAW VIA LEAMSIDEWhitwell andFencehouses

Fenceshouses andWhitwell

Down

Lines M i l e a g e S p e e daffected a t or between Restric tion Remarks

NN—e

40

6 30 6 56 2 0 Tra ckwo rk . 74/45

Up 6 56 6 30 2 0 Tra ckwo rk .74/44

Until 15 00Thursday 21November.

Page 3: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-3. :_•CTION A — TEMPORARY SPEED RESTRICTIONS continued

Whitwell and Down — 8 74 10 00 20 Trackwork.Fencehouses 74/34Whitweli andFencehouses

Down Up 10 60 11 20 20 Condition oftrack.

74/39Until 10 00Tuesday 19November.

Fencehouses andWhitwell

— Up 11 20 10 60 20 Condition oftrack.

74/46Commencing10 00 Tuesday19 November.

Whitwell and Down — 11 40 12 00 20 Trackwork.Fencehouses 74/46

Commencing'- 10 00 Tuesday

19 November. iFencehouses andWashington South

Down Up 14 10 15 10 20 Trackwork,bridgework andsubsidence.

Location of Workit or between Lines M i l e a g e S p e e d

affected a t or between Re s tr ic tions Remarks

Down U p M . Chs. M . Chs. m . p . h .FERRYH ILL (TURSDALE JN.) TO PELAVY VIA LEAMSIDE — continued

73/28

CONSETT NORTH TO OUSTON JUNCTIONCarr House East and D o w n U p 9 60 8 55 1 5 Subsidence .Annfield 7 2 / 1Annfield and D o w n — 6 02 5 41 2 0 T ra ckwo rk .Beamish 74/30Beamish and D o w n — 3 27 3 01 2 0 Tra ckwo rk .South Pelaw 7 4 / 4 6

Commencing09 00 Friday22 November.

NEWCASTLE (MANORS JN.) TO TYNEMOUTH VIA BACKWORTH

Benton East Jn. and D o w n — 6 00 6 52 2 0 T ra c k wo rk .Backworth74/45

SOUTH GOSFORTH TO CALLERTON (ICI SIDINGS)South Gosforth West Jn. — U p 0 33 0 03 1 5 Tra ckwo rk .and South Gosforth Stn. Jn. 7 4 / 4 4

Page 4: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-4SECTION A — TEMPORARY SPEED RESTRICTIONS — continued

t*Picton and D o w n — 52 33 53 35 20 Trackwork.Eaglescliffe (South ..in.) 74/41Easington and D o w n Up 82 18 82 28 30 Subsidence.Dawdon 74/41Seaham and D o w n Up 85 15 85 58 20 Subsidence.Ryhope Grange 73/32Wearmouth and D o w nEast Boldon 91 29 92 12 20 Condition of

track. 74/26Wearmouth and D o w nEast Boldon Up 92 22 93 06 30 Subsidence.

72/1*Pelaw and —Bo'don Colliery

Up 97 40 96 50 20 Trackwork.74/45Gateshead and —

Pelaw UpPelaw

100 04 98 23 15 Trackwork.74/36Goods

DARLINGTON (SOUTH) TO SALTBURN*South Bank andWhitehouse,

Up 17 00 15 79 20 Trackwork.74/42

Until 16 00Monday 18November.

Bowesfield and D o w nThornaby East Jn.

Up 11 20 11 30 15 Condition oftrack.Commencing10 00 Monday 18November.

Location of Workat or between

RIVERSIDE BRANCHCaryl I le Down

NORTHALLERTON (BOROUGHBRIDGE ROAD) TO GATESHEAD (HIGH LEVEL BRIDGE) VIA HORDEN

TEES (THORNABY EAST AO TO GUISBOROUGHMiddlesbrough West D o w n —and Dock Hill G o o d s

Lines M i l e a g e S p e e daffected a t or between Restric tion Remarks

Down U p M . Chs. M. Chs. m . p . h .

4 19 4 58 2 0 Trackwork .74/44

14 70 1 5 10 10 Co n d i t i o n oftrack. (74/45)

NEWCASTLE TO CARLISLE (PETTERIL BRIDGE JR1.) EXCLUSIVE (REGIONAL BOUNDARY AT 58m. 60chs.)Blaydon and D o w n 3 78 4 41 2 0 Tra ckwo rk .Addison 74/44

Page 5: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-5sECTION A — TEMPORARY SPEED RESTRICTIONS — continuedLocation of Workat or between

Linesaffected

Mileageat or between

SpeedRestrittian Remarks

HALTWHISTLE TO ALSTONHaltwhistie andAlston

Down Up

Single

M.

12

Chs. M.

56 1 2

Chs.

67

m.p.h.

10 Contractors usingaccommodationcrossing.

73/15

BACKWORTH JUNCTION TO MORPETH VIA SEGH ILLHolywell and Down Up 8 38 8 58 20 Subsidence.Newsham South 74/41

*Newsham Southand Holywell

— Up 11 24 9 20 20 Trackwork.74/26

Holywell and Down — 11 20 12 00 20 Condition of trackNewsham South 72/11

Page 6: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

SECTION B

At or between

Darlington (South ..In.and North Jn.)Darlington

Parkgate Jn.

Parkgate „in. andFerryhill (South Jn.)Tursdale Jn. andDurham StationDurham Station andOuston Jn.

Newcastle

Newcastle

Heaton South Jn. andManors sin.Stannington andMorpethMorpeth andLonghirstAlrimouth

Christon Bank

Tweedmouth andGoswickTvieedmouth

Up Main

Engineer's SidingsPark Lane

Down

Down

Down and Up

East End Bay PlatformsBLOCKEDEast End BayPlatformsUp Tynemouth

Down and Up

Down and Up

Down Sidings

Down

Up Main

Sidings

NN-6

TEMPORARY ENGINEERING WORKS

(For Details of Signalling or Permanent Way Alterations See Section 'C')

Where any work involves fixing, removing or repairing of signals, or the protection of the runningline during renewals, repairs and obstructions, Handsignalmen will be provided by the Engineerto act in accordance with the Rules and Regulations.

Material may be lying about and disconnections may be made as required.

Unless otherwise shown, work will be carried out as traffic permits.

Lines affected R e m a r k s

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGEDAILY UNTIL FURTHER NOTICEYork Station A l l Modifications to signalling at North End of

Station.All Station Lines 0 8 00 to 17 00. Platform work.

08 00 to 16 00. Demolishing building. Crane andoff track machines in use. 7 4 / 4 6Commencing Monday 18 November.08 00 to 16 00. Demolishing building at 45m.32chs Cranes and ofi track machines in use.

74/46Commencing Monday 18 November.

07 00 to 17 00. Earthwork between 55m. 36chs. and55m. 55chs. Off track machines in use. 74/2507 30 to 16 30. Earthwork between 64m. 50chs.and 6 61A m . p. O ff t ra ck ma ch in es in use.

07 00 to 17 00. Earthwork at 67m. 61chs. Offtrack machines in use.

22 00 Sun to Fri to 06 00 Mon to Sat. Platformwork. Crane and Off track machines in use.08 00 to 16 30 Sun to Fri. Platform work. Craneand Off track machines in use.,08 00 to 17 00. Earthwork between lm. 4chs. and01/4m.p. Off track machines in use.

08 00 to 16 30. Work at Clifton level crossing.74/31

06 00 to 18 00. Earthwork at 17m. 64chs. Off trackmachines in use.08 00 to 17 00. Trackwork. Off track machines inuse. •08 00 to 17 00. Demolishing part of signal box.

74/3608 00 to 17 00. Earthwork between 611/4 and61m.p. Off track machines in use.08 00 to 16 00. TrackWork. Off t r a c k.m a c h i n e Sin use. 7 4 / 3 1

Page 7: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

raSECTION B - TEMPORARY ENGINEERING WORKS - continuedAt or between Lines affected R e m a l k s

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE-continuedSATURDAY 16 to MONDAY 18 NOVEMBERGateshead (K.E.B. Jn.) D o w n South 0 0 01 Sat to 04 00 Mon. Bridgework on King Edwardand Newcastle B L O C K E D B r i d g e . Trains to travel on East lines or High

between signals L e v e l Bridge.D79 and N256Up SouthBLOCKEDbetween signalsN254 and G146

SUNDAY 17 NOVEMBERThirsk (TK39 signal) U p Fast 0 3 30 to 12 30. Trackwork between 15Y2 and 153/4and Pilmoor B L O C K E D m . o . Trains to travel on Slow line.

Down FastBetween Trains

Thirsk (Avenue) and 0 3 15 to 18 15 0 3 15 to 18 15. Trackwork between 26m. 22chs.Northa I lerton D o w n Slow and a n d 27m. 25chs. and between 28m. 66chs. and

Down Longlands Loop 2 9 rn.p. 03 15 to 15 15. Up trains to travel on UpBLOCKED S l o w line. Down trains to travel on Up Fast line03 15 to 15 15 u n d e r Single line working conditions, where moreDown Fast t h a n one running line is available between ThirskBLOCKED S t a t i o n and Northallerton. 15 15 to 18 15. DownUp Fast t r a i n s to travel on Down Fast line. Cranes andBetween Trains o n track machines in use. (See Section 'C').18 15 to 20 00Down Longlands LoopBetween Trains15 15 to 20 00Down FastBetween Trains

Darlington and A l l 0 7 30 to 16 30. S & I work.Ferryh i I ITursdale sin. and U p Leamside 0 1 00 to 08 30. Trackwork between 57m. 25chs.Ferryhill (South Jn.) B L O C K E D a n d 56m. 18chs. Possession given up to pass

6K49, 02 40 Consett to Redcar and 07 00 and07 30 Hartlepool to Thrislington and Coxhoe

Tursdale Jn. 0 2 45 to 12 30 0 2 45 to 12 30. Trackwork between 58m. 76chs.Up Main a n d 59 m.o. All Through trains diverted viaBLOCKED L e a m s i d e . On track machines in use.04 15 to 07 30Down MainBLOCKED02 45 to 12 30Down LeamsideBetween Trains

Tursdale Jn. and 0 2 45 to 12 30 0 2 45 to 12 30. Trackwork between 64m. 56chs.Durham Station U p a n d 65m. 05chs. Bridgework on Roily Mill viaduct.

BLOCKED T h r o u g h trains diverted via Leamside. 07 30 to04 00 to 07 30 1 2 30. Single line working over Down for shuttleDown s e r v i c e between Darlington and Durham. ,CranesBLOCKED a n d on track machines in use.07 30 to 12 30DownBetween Trains

Durham Station and D o w n and Up 0 4 00 to 12 00. Trackwork between 69m. 70chs.Ouston Jn. B L O C K E D a n d 73m. 21chs. ,Trai ns diverted via Leamside.

Cranes in use. :

Page 8: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-8SECTION B - TEMPORARY ENGINEERING WORK - continuedAt or between

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE - continuedSUNDAY 17 NOVEMBER - continuedOuston Jn. and D o w n and Up FastTyne B L O C K E D

Tyne and Low Fell D o w n and Up FastStation „In. B L O C K E D

Morpeth and Longhirst D o w nBLOCKED

Widdrington North andWiddringt on StationAlnmouth (Southside)and ChevingtonAlnmouth andLittle Mill

Little Mill andChathi II

BelfordTweedmouth andAytonMONDAY 18 NOVEMBERPilmoor and Thirsk(Green Lane)MONDAY 18 to FRIDAY 22Newcastle andGateshead (KEB „in.)

TUESDAY 19 NOVEMBERPilmoor andTollertonOuston Jn. andTyne

Lines affected R e m a r k s

UpBLOCKEDUp MainBLOCKED00 01 to 11 00DownBLOCKED01 30 to 11 00UpBLOCKED00 01 t o l l 00DownBLOCKED01 30 to 15 30UpBLOCKED11 00 to 15 30DownBetween TrainsAllDownBLOCKED

Down SlowBLOCKED

NOVEMBERUp SouthBLOCKEDbetween signalsN254 and G146

Up FastBLOCKED03 00 to 07 00Up FastBLOCKED04 30 to 07 30Down FastBLOCKED

04 00 to 12 30. Trackwork at 74m. 61chs. Throughtrains diverted via Leamside. On track machinein use.04 00 to 16 00. Trackwork between 76m. 56chs.and 77m. 54chs. 0 4 00 to 12 30. Through trainsdiverted via Leamside. 12 30 to 16 00. Trains totravel on Slow Lines. On track machines in use.12 00 to 16 30. Trackwork between 17m. 30chs.and 18m. lOchs. Possession given up to pass 1S1710 00 King's Cross to Aberdeen and 5S11 14 45Newcastle to Craigentinny. On track machines inuse.01 45 to 1115. Trackwork between 241/2 a n d 2 4m.p. On track machines in use.01 45 to 1115. Trackwork between 30 and 26'Am.o. On track machines in use.00 01 to 11 00. Trackwork between 38 and 391Am.p. Crane in use.

00 01 to 15 30. Trackwork between 42m.p. and42m. 35chs. (Up) and between 41m. 18chs. and42m. 12chs. (Up). 11 00 to 15 30. Single lineworking over Down. Cranes and on track machinesin use.

08 00 to 17 00. S. & T. work.00 30 to 10 15. Trackwork. On track machinesin use.

08 00 to 14 00. Trackwork between 19m.p. and21m. 50chs. Trains to travel on Fast line.

04 00 Mon to 24 00 Fri. Bridgework on KingEdward Bridge. Trains to travel on East Lineor High Level Bridge.

13 30 to 15 00. Tipping ballast between 15% and101/4m.p. Trains to travel on Slow Line.03 00 to 07 30. Trackwork at 74m. 56chs. Trainsto travel on Slow Lines. On track machines in use,

Page 9: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-9SECTION B — TEMPORARY ENGINEERING WORKS — continued

Down FastBetween Trains04 30 to 10 00Down FastBLOCKED

THURSDAY 21 NOVEMBEROuston Jn. andTyne

03 00 to 07Up Fast

00 03 00 to 10 00. Trackwork between 75m. 57chs.and 753A r n .p . T ra in s to travel on Slow lines.

BLOCKED On track machines in use.03 00 to 04 30

At or between Lines affected

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEVIA KING EDWARDS BRIDGE OR HIGH LEVEL BRIDGETUESDAY 19 and WEDNESDAY 20 NOVEMBERPilmoor and Thirsk D o w n Slow(Green Lane) B L O C K E DManors Jr). andHeaton South Jn

INEDNESDAY 20Ouston Jn. andTyne

Down NorthBLOCKEDUp NorthBetween Trains

NOVEMBER03 00 to 07 00Up FastBLOCKED03 00 to 04 30

Down FastBetween Trains04 30 to 10 00Down FastBLOCKED

THURSDAY 21 and FRIDAY 22 NOVEMBERThirsk Avenue and D o w n SlowNortha I lerton B L O C K E DLonglands Jn.Manors Jn. and U p NorthHeaton South Jr). B L O C K E D

Down NorthBetween Trains

FRIDAY 22 NOVEMBERTyne and D o w n FastLow Fell Station Jn. B L O C K E D

Up SlowBetween Trains

YORK YARDS, HOLGATE M. AND YORK SKELTONTUESDAY 19 and WEDNESDAY 20 NOVEMBERYork N.C.L. Depot N o s . 2 and 3

Warehouse LinesBLOCKED

THURSDAY 21 NOVEMBERYork Yard South andYork Yard North Entrance to Up Yard,

Goods Warehouse andLeeman Rd. Store YardBLOCKED

Remarks

ADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)— continued

08 00 to 12 00 daily. Trackwork between 19m.p.and 21m. 50chs. Trains to travel on Fast Line.00 01 to 06 30 daily. Trackwork between Om. 50chsand 03A m .p . T ra in s to travel on Tynemouth lines.

03 00 to 10 00. Trackwork between 75m. 23chs.and 75m. 27chs. Tr ains to travel on Slow lines.On track machines in use.

05 00 to 12 00 daily. Trackwork between 261A a n d2 71/2m .p . Trains to travel on Fast line. On track

machines in use.

00 01 to 06 30 daily. Trackwork between Om. 50chs.and ON m.p. Trains to travel on Tynemouth lines.

04 30 to 10 00. Trackwork between 76m. 54chs.and 76m. 59chs. Trains to travel on Slow line. Ontrack machines in use.

08 00 to 16 30 daily. Trackwork. Possessiongiven up to pass trains as necessary. Crane in use,(See Section '0 ' ).

07 30 to 16 30. Trackwork between ,A a n d 1 m . p .

Cranes in use.

Page 10: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN— iuSECTION B—TEMPORARY ENGINEERING WORKS—continued

At or between L i n e s affected

NORTHALLERTON (CASTLE HILLS M. ) TO REDIVIRESUNDAY 17 NOVEMBERBedale Down and Up

and SingleBLOCKED

DARLINGTON NORTH JN. TO BISHOP AUCKLAND EASTDAILY UNTIL FURTHER NOTICEDarlington (Parkgate Jn.) Do wn and Upand Hopetown Jn. B i s h o p Auckland and

Down and Up GoodsHeighington and D o w nShildonHeighington andShildonSATURDAY 16 to MONDAYShildon

All

SUNDAY 17 NOVEMBERShildon and S i n g l eBishop Auckland East B L O C K E D

18 NOVEMBER14 00 to 23 00 SatSidingsBLOCKED23 00 Sat to 05 00 MonAllBLOCKED

FERRYHILL (SOUTH M. ) TO NORTON ON TEES SOUTHDAILY UNTIL FURTHER NOTICEBishop Middieham D o w n and Upand Still inotonSUNDAY 17 NOVEMBERFerryhill (South Jn.) D o w n and Upand Norton on Tees B L O C K E DSouth

FERRYHILL ITURSDALE AU TO PELAW VIA LEAMSIDEDAILY UNTIL FURTHER NOTICEWhitwell and D o w n and UpFencehousesWhitwell and D o w n and UpFencehousesFencehouses and D o w n and UpPenshaw NorthWashington and D o w n and UpWardlevSUNDAY 17 NOVEMBERWhitwel I and D o w n and UpFencehouses B L O C K E DTUESDAY 19 and THURSDAY 21 NOVEMBERWh itwel I and D o w nFencehouses B L O C K E D

UpBetween Trains

Remarks

06 00 to 18 00. Renewing Bedale level crossing.

06 00 to 20 00. Platform work at North Road.74/23

07 30 to 16 30. Trackvvork between 63/4 a n d 7 m . p .Off track machines in use. 7 4 / 3 907 30 to 19 00. Bridgework No.5. Crane and off-track machine in use. 7 4 / 3 4

14 00 Sat to 05 00 Mon. Bridgework No. 5.Possession given up to pass spoil trains asnecessary.

07 30 to 16 30. Earthwork between WA m.p. and9m. 45chs. Off track machines in use.

08 00 to 18 00. Earthwork at 6m. 23chs. Off-trackmachines in use.

08 30 to 17 00. Earthwork between 11/2 a n d 01/ 2 m . p .

(Up). Trackwork between 10 and 01/ 2 m . p .Possession given up to pass return trips of 07 00Hartlepool to Thrislington and 07 30 Hartlepoolto Coxhoe WH.

08 00 to 16 00. Trackwork between 6m. 30chs.and 6m. 56chs. Off track machines in use.07 30 to 16 30. Earthwork between 9m. l0chs.and 91/2 m .p . Of f t rack machines in use.

07 30 to 19 00. Bridgework No.52A. Offtrack machines in use.07 00 to 17 00. Bridgework No.64A. Offtrack machines in use..

13 00 to 21 00. Trackwork between 6m 30chs and6m 56chs. On and off track machines in use.

09 45 to 15 45 daily. Trackwork between 6m 30chsand 12 m.p. 6K56 12 00 Redcar to Consett divertedvia ECML and Tyne Yard. On track machines in use.

Page 11: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-11SECTION B — TEMPORARY ENGINEERING WORK — continuedAt or between L i n e s affected

CONSETT NORTH TO OUSTON JUNCTIONSUNDAY 17 NOVEMBERCarr House East and D o w n and UpAnntield B L O C K E D

RIVERSIDE BRANCHDAILY UNTIL FURTHER NOTICE

• Riverside Jn. and D o w n and UpSt. PetersSATURDAY 16 to MONDAYRiverside Jn. andSt. PetersSUNDAY 17 NOVEMBERSt. Peters andPercy Main Station

NEWCASTLE (MANORS JNSUNDAY 17 NOVEMBERBenton East Jo. andBackworth Station Jo.

18 NOVEMBERDown and UpBLOCKED

Down and UpBLOCKED

TUESDAY 19 and WEDNESDAY 20 NOVEMBERSt. Peters and D o w n and UpPercy Main Station

Backworth Station Jri. and Down and UpMonkseatonWEDNESDAY 20 NOVEMBERBenton East Jn. and D o w nBackworth Station Jn. B L O C K E D

.) TO TYNEMOUTH VIA BACKWORTH

00 01 to 17 00DownBLOCKED03 15 to 06 15UpBetween Trains06 15 to 14 00UpBLOCKED14 00 to 17 00UpBetween Trains

HEATON SOUTH JN. TO TYNEMOUTH VIA WALLSENDTUESDAY 19 NOVEMBERTynemouth South and U pPercy Main Station B L O C K E D

SOUTH GOSFORTH TO CALLERTON (ICI SIDINGS)THURSDAY 21 NOVEMBERSouth Gosforth West Jn. U pand South Gosforth StationJn.

Remarks

08 00 to 16 00. Trackwork between 91/2 a n d 91/ 4 m . p .

On track machines in use.

07 00 to 18 00. Work on bridge No.8. Crane andOff track machines in use. ( 7 4 / 2 6 )

16 00 Sat to 08 00 Mon. Bridgework No.8 Off trackmachines in use.

06 00 to 18 00. Trackwork between 4m 19chs and4m 58chs (Down). On track machines in use.

08 00 to 16 00 daily. Trackwork between 4m 22chsand 4m 57chs. On track machines in use.

00 01 to 17 00. Trackwork between 6m.p. and 6m50c (Down) 14 00 to 17 00 Single line workingover Up between Backworth Station and BentonStation. Cranes and on track machines in use.

07 30 to 16 30. Bridgework No.65.

00 01 to 04 45. Trackwork between 6m.p. and 6m50c. On track machines in use.

00 15 to 05 00. Trackwork between 6m Olc and 5m28c. On track machines in use.

08 00 to 16 00. Trackwork between Om 30c andOm 03c. On track machines in use.

Page 12: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-12SECTION B-TEMPORARY ENGINEERING WORKS-continued

At or between L i n e s affected

NORTHALLERION (BOROUGHBRIDGE ROAD) TO GATESHEAD (HIGH LEVEL BRIDGE) VIA HORDENDAILY UNTIL FURTHER NOTICELong Lane and D o w n and Up MainPictonCliff House D o w n

Ryhope Grange andHall DeneSeaham

Ryhope Grange

Up

Down and Up

Up

SATURDAY 16 to SUNDAY 17 NOVEMBERGreatham and U pBillingham B L O C K E D

DownBetween Trains00 01 to 16 30 SunUpBLOCKED

23 15 Sat to 06 00 SunDownBLOCKED06 00 to 16 30 SunDownBetween Trains

Bo'don Collieryand Pelaw

SUNDAY 17 NOVEMBERNorthallerton East Jn.

Picton andEaglescliffe (South „in.)

Easington andDawdon

Ryhope GrangeEast Boldonand Wearmouth

Pelaw andGateshead

Gateshesd

Gateshead

Down and Up

05 30 to 14 45UpBLOCKED07 30 to 19 30DownBLOCKED14 45 to 19 30UpBetween TrainsDown and UpBLOCKED

All

UpBLOCKED

Down and UpPelaw GoodsBLOCKED00 01 to 06 00Up Pelaw MainBLOCKED06 00 to 09 00Up Pelaw MainBetween TrainsAll

Remarks

07 30 to 14 30. Trackwork between 52 and 5 21/ 2 m . p .Off track machines in use. 7 4 / 2 408 00 to 16 00. Trackwork. Off track machines in

• use.08 00 to 17 00. Earthwork between 8 63/ 4 m . p . a n d86m. 30chs.Off track machines in use,

07 30 to 16 30. Platform work (See Section 'D').74/32

07 00 to 17 00. Trackwork between 88m.p. and87m. 54chs. Off track machines in use.

23 30 Sat to 07 00 Sun. Loading rails between64,4 and 641/4m.p. Cranes in use.

23 15 Sat to 16 30 Sun. Trackvvork between 97m.30chs. and 973A r n . p . E a r t hw o r k a t 9 7m . 9 ch s. and

between 97 rri.p. and 97m. 5chs. 06 00 to 16 30.Single line working over Down. On and off trackmachines in use.

15 00 to 23 00. Trackwork at 43 m.p. On trackmachines in use.

05 30 to 19 30. Trackwork between 52m. 33chs.and 53m. 35chs. 07 30 to 16 30. Bridgework No.132. Crane in use.

00 01 to 08 00. Trackwork between 801/4 and8014 m.p. Possession given up to pass 1N96,03 50 York to Newcastle and 1N01, 00 30 KingsCross to Newcastle on Down. Cranes in use.07 30 to 17 00. Overhauling connections.00 15 to 08 00. Trackwork at 91m. 27chs.Possession given up to pass 3N75, 06 00Newcastle to Sunderland.07 30 to 16 30. Bridgework No.305. Trains totravel on Pelaw Main lines. Ladders in use.

00 01 to 09 00. Trackwork between 101m. 36chs.and 101m. 30chs. 00 01 to 06 00. Trains to travelon Pelaw Goods.

07 30 to 17 00. Renewing air main and cables.

Page 13: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

p.

NN-13SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between L i n e s affected

NORTHALLERTON (BOROUGHBRIDGE ROAD) TO GATESHEAD (HIGH LEVEL BRIDGE) VIA HORDEN —continuedTUESDAY 19 NOVEMBERNorton-on-Tees South andNorton-on-Tees East

00 01 to 02 30Up MainBLOCKED02 30 to 05 00Down MainBLOCKED

WEDNESDAY 20 to FRIDAY 22 NOVEMBERHartburn Jn. and A l lNorth ShoreFRIDAY 22 NOVEMBERBishopton Lane Jn. andNorth Shore

00 01 to 01 00Down MainBLOCKED01 00 to 02 00Up MainBLOCKED

Norton-on-Tees South U pand North Shore B L O C K E D

Gateshead and U p Pelaw GoodsPelaw B L O C K E D

NORTHALLERTON STATION TO NORTHALLERTON EAST JN.SUNDAY 17 NOVEMBERNorthallerton East Jn. D o w n and Up

Northallerton Loop

BILLINGHAM BECK BRANCHDAILY UNTIL FURTHER NOTICENorth Shore and 0 8 00 to 16 00Haverton Hill South S i n g l e

BLOCKED16 00 to 22 00SingleBetween Trains

North Shore and S i n g l eHaverton Hill South

Remarks

BILLINGHAM-ON-TEES TO PORT CLARENCE (PHILLIPS SIDINGS G.F.)DAILY UNTIL FURTHER NOTICEBelasis Lane and A l lHaverton Hill StationSUNDAY 17 NOVEMBERBillingham and D o w n MainBelasis Lane

00 01 to 05 00. Trackwork between 61m. 72chs.and 62m. 16chs. 00 01 to 02 30. Single lineworking over Down Main. 02 30 to 05 00. Singleline working over Up Main. On track machines inuse.

00 01 to 06 00 daily. Trackwork between 5 93A m . p .and 59m. 75chs. On track machine in use.

00 01 to 02 00. Trackwork between 611A a n d6 01/2m .p . Trains to travel on Goods lines. On

track machines in use.

02 00 to 05 00. Trackwork between 61% and60'Am.p. Single line working over Down. Ontrack machines in use.00 30 to 04 30. Trackwork between 100m. 4chs.and 99m. 45chs. Possession given up to passT.C.F.D. trains. Other trains to travel on PelawMain line. On track machines in use.

15 00 to 23 00. Trackwork at 43m.p. On trackmachines in use.

08 00 to 22 00. Bridgework No.5B. Crane andoff track machines in use.

08 00 to 17 00. Earthwork between 62% m.o. and63m. 5chs. Off track machines in use.

08 00 to 17 00. Earthwork between lm. 19chs,and lm. 24chs. Off track machines in use.

07 00 to 17 00. Trackwork between 1/4 a n d 3 A r n . p .

Page 14: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-14SECTKIN B - TEMPORARY ENGINEERING WORKS — continuedAt or between L i n e s affected

SOUTH HETTON COLLIERY TO RYHOPE GRANGESUNDAY 17 NOVEMBERSeaton and D o w n and Uplivhooe Grange

HENDON BRANCHDAILY UNTIL FURTHER NOTICEHendon Jn. A l lSUNDAY 17 NOVEMBERHendon

Urlay Nook andEaglescliffe (South Jn.)Thornaby East Jn. andNewport East Jno

Up HendonBLOCKED

LONDONDERRY BRANCHDAILY UNTIL FURTHER NOTICEHendon S i d i n g s

Londonderry U p Main

PALLION YARD TO HENDON JN.DAILY UNTIL FURTHER NOTICEPall ion Yard S i n g l eand HendonPall ion Yard S i n g l eand HendonPallion Yard and S i n g l eHendonHendon sin. A l l

PELAW TO SOUTH SHIELDSDAILY UNTIL FURTHER NOTICEHarton D o w n Main

SUNDAY 17 NOVEMBERPelaw and D o w n and UpHarton B L O C K E D

DARLINGTON (SOUTH JN.) TO SALTBURNDAILY UNTIL FURTHER NOTICEDarlington (South Jo.) D o w nand Oak Tree sin.Oak Tree Jri. and U pDarlington South sin.

Down and Up

Down and Up MainUp Goods No.1

Remarks

07 30 to 1700. Bridgework No.65.

08 00 to 18 00. Demolition a t lm. 48chs. 74/25

08 00 to 16 00. Trackwork between lm. 30chs.and lm. 42chs.

08 00 to 16 00. Trackwork. Off track machinesin use.07 00 to 17 00. Trackwork between 1/2 a n d O n t o .Off track machines in use.

08 00 to 16 00. Trackwork. Off track machinesin use.08 00 to 16 00. Bridgework 21. Off track machinesin use.08 00 to 17 00. Earthwork at Om. 70chs. Crane andoff track machines in use. 7 4 / 2 6

08 00 to 18 00. Demolition at Om. 76chs. 74/25

08 00 to 18 00. Demolition between 5m. 7chs.and 5m. 25chs. Off track machines in use.

08 00 to 17 00. Bridgework No.14.

08 00 to 16 00. Platform work at Dinsdale.74/44

08 00 to 16 00. Demolishing concrete structuresat Om. 72chs. Off track machines in use.74/46Commencing Monday 18 November.07 00 to 17 00. Earthwork and cable laying atAllen's West. Off track machines in use.08 00 to 18 00. Bridgework No.281 Crane andoff track machines in use.

Page 15: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-15SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

DARLINGTON (SOUTH JN)SATURDAY 16 NOVEMBERWhitehouse andSandbankSATURDAY 16 to SUNDAYSouth Bank

Grangetown andRedcar

SUNDAY 17 NOVEMBERTees Yard

Lines affected

SUNDAY 17 NOVEMBERTees D o w n and Up MainRedcar D o w n and Up MainMONDAY 18 to TUESDAY 19 NOVEMBERRedcar and Grangetown U p Main(Tod Point Jn.) B L O C K E DTUBDAY 19 to WEDNESDAY 20 NOVEMBERGrangetown (Tod Point U p MainJn.) and Grangetown

THURSDAY 21 NOVEMBERSouth Bank and U p MainGuisborough Jn. B L O C K E D

TO SALTBURN continued.

Down and Up MainBLOCKED

17 NOVEMBER23 30 Sat to 06 00 SunUp MainBLOCKED06 00 to 16 00 SunUp MainBetween TrainsDown and Up MainBLOCKED

TEES, THORNABY EAST JN. TO GUISBOROUGH JN. (GOODS LINES)DAILY UNTIL FURTHER NOTICETees Yard A l l

Down Goods No. 2,Up Goods No. 2,and engine li n e sBLOCKEDUp HumpSecondary SortingSidings and DownDeparturesBLOCKED

Tees D o w n and Up Goods

MIDDLESBROUGH (GUISBOROUGH JN.) TO WHITBYDAILY UNTIL FURTHER NOTICENorth Ormesby and D o w n and UpNunthorpe

Remarks

00 01 to 05 00. Trackwork between 16 and 17m.p.Trains to travel on goods lines. Crane in use.

23 30 to 16 00. Earthwork. Off track machinesin use.

23 30 Sat to 06 45 Sun. Trackwork between 18m.72chs. and 19m. 7chs. Cranes in use. 6K48, 00 01Redcar to Consett to be retimed.

08 00 to 16 00. S. & T. work.07 30 to 16 30. Trackwork.

23 30 Mon to 05 15 Tue. Trackwork between 21m.33chs. and 20m. 48chs. On track machines in use.

23 30 Tue to 05 15 Wed. Trackwork between 19m.76chs. and 18m. 72chs. On track machines inuse.

00 01 to 05 00. Trackwork between 17m. llchs.and 15m. 79chs. Trains to travel on Goods line.On track machines in use.

08 00 to 18 00. Bridgework No.28B. Craneand off track machines in use.

08 00 to 18 00. Bridgework No. 28B.

08 00 to 16 00. S & I work.

Bridgework No. 13A. Crane and off track machinesin use.

Page 16: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-16SECTION B—TEMPORARY ENGINEERING WORKS—continuedAt or between L i n e s affected

MIDDLESBROUGH (GUISBOROUGH T O WHITBY — continuedSUNDAY 17 NOVEMBERBattersby andGlaisdale

GlaisdaleGlaisdale andSleights

Hexham andHaltwhistl eHow Mill andCorby Gates

MONDAY 18 NOVEMBERWarden andHaydon BridgeTUESDAY 19 NOVEMBERHow Mill andCorby Gates

SingleBLOCKEDUp and Down MainSingleBLOCKED

LONGBECK (SALTBURN WEST M. ) TO BOULBY (CLEVELAND POTASH SIDINGS)DAILY UNTIL FURTHER NOTICESaltburn West ..In. S i n g l e 0 8 00 to 16 00. Work on viaduct at 28m. 16chs.and Crag Hall O f f track machines in use.

NEWCASTLE TO CARLISLE (PETTERIL BRIDGE JIV.) EXCLUSIVE.DAILY UNTIL FURTHER NOTICEHexham and Warden D o w n and Up

SUNDAY 17 NOVEMBERBlaydon and 0 4 30 to 14 00Prudhoe D o w n

BLOCKED04 30 to 11 00UpBLOCKED11 00 to 14 00UpBetween TrainsDown

06 15 to 20 00Down MainBLOCKED06 15 to 10 30Up MainBLOCKED10 30 to 20 00Up MainBetween Trains

Down

Down

TUESDAY 19 and WEDNESDAY 20 NOVEMBERPrudhoe and D o w nHexham B L O C K E D

THURSDAY -2 1 N O V EM B E R

Blaydon and D o w nPrudhoe B L O C K E D

Remarks

07 00 to 17 00. Trackwork between 19m.p. and20m. 58chs. Crane in use.07 30 to 16 30. S & I work.

07 00 to 16 30. Bridgework No.50. ViaductInspection unit in use.

08 00 to 17 00. Bridgework No. 81A. Crane in use.(74/29)

04 30 to 14 00. Trackwork between 3m. 78chs. and4m. 41chs. 11 00 to 14 00 Single line workingover Up. On track machines in use.

06 00 to 16 00. Gauging van in use between 20m.70chs. and 37m. 27chs.06 15 to 20 00. Trackwork between 54m. 43chs.and 54m. 73chs. 10 30 to 20 00 Single lineworking over Up Main. Crane in use.

08 00 to 16 00. Trackwork between 24m 56chs and25m 6chs. On track machines in use.

08 00 to 16 00. Trackwork between 541/2 and 55 m.p.On track machines in use.

00 45 to 05 00 daily. Trackwork between 13m 70chsand 18m 35chs. Single line working over Up. Ontrack machines in use.

00 30 to 05 00. Trackwork between 3m 78chs and83A imp. Single line working over Up. On track

machines in use.

Page 17: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-17SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

NEWCASTLE TO CARLISLE (PETTERIL BRIDGE Al.)FRIDAY 22 NOVEMBERNewcastle (Forth „In.) D o w n Mainand Scotswood B L O C K E D

GATESHEAD (GRENSFIELD JN. DUNSTON LINES) TO BLAYDON VIA NORWOODDAILY UNTIL FURTHER NOTICENorwood Jn. D o w n and Up

BlaydonBlaydon and U p BlaydonNorwood Jn.SUNDAY 17 NOVEMBERNorwood „In. and D o w n BlaydonBlaydon B L O C K E D

DUNSTON STAITHSDAILY UNTIL FURTHER NOTICEDunston Staiths S i d i n g s

HALTWHISTLE TO ALSTONDAILY UNTIL FURTHER NOTICEHaltwhistle and S i n g l eAlston

Lines affected

BACKWORTH TO MORPETH VIA SEGH ILLDAILY UNTIL FURTHER NOTICEBed lington South D o w n and Upand Newsham NorthSATURDAY 16 NOVEMBERNewsham North and D o w n and UpBedlinnton SouthSUN DAY 17 NOVEMBERNewsham North and D o w n and UpBedlington South B L O C K E D

WEDNESDAY 20 and THURSDAY 21 NOVEMBERHolywell and D o w n and UpNevvsham South

BEDLINGTON TO LYNEMOUTH COLLIERY (N.C.B.)DAILY UNTIL FURTHER NOTICEAshington D o w n and Up

Remarks

EXCLUSIVE—continued

00 15 to 05 45. Trackwcrk between 01/4 m.p. and lm55chs. Trains diverted via Norwood Jn. andBlaydon. On track machines in use.

08 00 to 18 00. Bridgework Nos.18A and 19. Offtrack machines in use.08 00 to 18 00. Earthwork between 4m. 64chs. and4m. 51chs. Off track machines in use.

07 00 to 17 00. Trackwork between 3m lOchs and3m 45chs.

08 00 to 16 30. Trackwork. Off track machines inuse.

08 00 to 17 00. Earthwork at 12m. 16chs. Off-trackmachines in use.

08 00 to 16 30. Platform work at Bebside station.Off track machine i n use. 7 4 / 3 4

08 00 to 16 00. Earthwork at Plessey Roadcrossing.

07 00 to 17 00. Earthwork between 1 43A m . p . a n d15m. 06chs. Trackwork at 14m. 65chs. Off trackmachines in use. 08 00 to 16 00. Earthworkat Plessey Road crossing.

08 00 to 16 00 daily. Trackwork between 8 and12 rn.p. On track machines in use. Hartley autobarriers manned.

08 00 to 17 00. Bridgework No.5 and buildingat 3m. ichs. Off track machines in use.

Page 18: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-18SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

NEWSHAM TO ISABELLA COLLIERYDAILY UNTIL FURTHER NOTICENewsham South S i d i n g sand Isabella Colliery

Line affected R e m a r k s

CAMBOIS BRANCHDAILY UNTIL FURTHER NOTICEWinning and D o w n and UpFreemans m a c h i n e s in use.

07 30 to 16 30. Trackwork. Off track machine inuse.

08 00 to 1800. Bridgework No.1A. Off track

Page 19: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

SECTION C

SIGNALLING AND PERMANENT WAY ALTERATIONS

DETAILS OF WORK REFERRED TO IN SECTION B

* Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned;

SUNDAY 17 NOVEMBER — NORTHALLERTONThe facing c-o s s o v er D o wn S lo w to Down Fast at 28 miles 1426 yards will be resited 132 yards further

south and the facing crossover Down Fast to Down Longlands at 28 miles 1561 yards will be resited 54yards further south. A green aspect will be added to signal N142 when applying Down Slow to DownFast. ( 4 9 )

DETAILS OF WORK ALREADY CARRIED OUT

ADDISONThe Down Main Home Signal has been re-sited as a straight post signal, together with Peth Lane DownDistant below, 50 metres on the approach side of the Addison Crossing. ( 4 7 )

TYNEMOUTH SOUTHThe ground disc signals applying Shunting Up Main to Down Platform or Down Main and Shunting Up Mainto Up Platform, or No. 4 dock, or No. 5 dock, or dock sidings have been abolished and replaced by twominiature arm signals applying to the same routes on a straight post 19 yards further from the signal boxwith the lower arm 14 feet above rail level. ( 4 7 )

WALKERWalker signal box has been abolished together with all points and signals worked therefrom except thepoints from Up Main to sidings which has been operated by ground frame released by Annetts Key fromCarylIle signal box.A double sided notice board has been erected 85 yards from the ground frame on the Ship Yard Siding lineworded "BR. engines not to pass this point" on the side facing the Goods Yard and on the other side"STOP. Proceed if line is clear". ( 4 7 )

BERWICKThe notice board worded "ENGINES MUST NOT PASS THIS BOARD EXCEPT ON AUTHORITY OFSIGNALMAN" applicable to movements into the Down Goods Loop No. 2 has been removed temporarily.Drivers of trains working into this Loop must stop short of the connections leading to the Down Yard.

BELFORDThe facing Main to Main crossover at 51m. 38chs. has been temporarily secured out of use until furthernotice, pending replacement. ( U F N )

Page 20: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

SECTION DNN-20

GENERAL INSTRUCTIONS AND NOTICES

* b e n o t e s new or amended item4-•

* *I tems marked thus will not appear in future issues and a note must be taken of them by all concerned.

MISCELLANEOUS NOTICES

*YORK N.C.L. DEPOTFrom Tuesday 19 November, No.3 Warehouse Line will be abandoned and the new access to the GoodsWarehouse will be via a re-routed No.2 Warehouse Line.

HEATON STATIONUntil further notice, Heaton Station Roof is being demolished. Drivers of stopping trains on DownTynemouth to bring their trains to a stand at marker provided and drivers of stopping trains on UpTynemouth to draw forward so that rear vehicle is clear of access ramp.

SEAHAM STATIONUntil further notice the platforms at Seaham are being resurfaced. Drivers of stopping trains to obeyboard showing 'Trains Stop Here'.Handsianalman in attendance.

McNEILS OCCUPATION LEVEL CROSSINGUntil further notice there will be greatly increased use o f the occupation crossing situated betweenWear Valley Junction and Harperley by Contractor's vehicle conveying sand and gravel.

HARTLEPOOL SOUTH DURHAM STEEL AND IRON CO. LTD. SOUTH WORKSA temporary timber crossing has been brought into use between the South Works Signal Box and —A "Grid Sidings which is being used extensively by road vehicles.

HEATON SIDINGS

The following work is taking place between the hours of 08 00 and 17 00 Daily and until further notice,recovering redundant sidings and assets, demolishing redundant buildings, rerouting S. & T. cables andrewiring. Disconnections as required to points and signals in Heaton interlocking area. Off trackmachines in use.

SOUTH BANKThe West end of the Up Platform is being rebuilt.

Drivers of stopping trains to bring their trains to a stand at the marker board provided.:

CROW HOUSE LEVEL CROSSING : THORNLEY COLLIERY BRANCHIncreased use is taking place of Crow House level crossing at lm. 07chs.

Page 21: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-21

SECTION D GENERAL INSTRUCTIONS AND NOTICES — continuedMISCELLANEOUS NOTICES—continued

BILLINGH AM BECK BRANCHA temporary level crossing has been brought into use over the single line at 63m. 14chs. adjacent tobridge No. 5B.A crossing keeper will be in attendance.

HEATON CARRIAGE SIDINGSA temporary level crossing over the Up Benton Goods and Portobello Sidings has been brought into use.A lookout man is in attendance.

PENSHAW NORTH TO LAMBTON COKE WORKS — NCB ARRIVAL AND DEPARTURE LINESContractors will be carrying out Permanent Way alterations and constructing a new underbridge in thevicinity of the existing accommodation road crossing adjacent to the weighbridge office.In addition contractors will be constructing a new accommodation road crossing 50 yards South of theexisting crossing. All Drivers and Guards to exercise great care and keep a sharp lookout for hand-signalmen and lookoutmen in attendance.

PILMOOR AND THIRSKIn connection with high speed diesel tests, transpenders which are housed in a plastic case measuring10" x 8" x 4" have been installed in the four footway at 200 metre intervals between 19m. 38chs.and 20m. 76 chs.

NEWCASTLE CENTRAL STATION (EAST END)Contractors will be working on roof above the Bay Platforms at the East End.

HEATON STATIONThe Down North platform has been damaged for approximately 40 yards at the West end. Drivers ofstopping trains to keep a sharp lookout and stop beyond marker provided.

PORT CLARENCE TO MONSANTO CHEMICAL SIDINGS BRANCHA temporary level crossing has been brought into use, over the single line in the vicinity of reclamationembankment.

MIDDLESBROUGH GOODS YARDTEMPORARY LEVEL CROSSING

An "Open" level crossing has been provided on the Marsh Branch side of Forty Foot Road open levelcrossing on the Cast Steel Bank line between the Middlesbrough Goods Yard and the Marsh Branch.Movements over the c ro ss in g-mu s t n o t e x c e e d 5 m . p . h . a n d t h e s h u n te r a c c o mp a n y i ng e ac h m o ve m en t

must precede the train on foot to safeguard the passage of the train over the level crossing.

Page 22: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

NN-22

SECTION D GENERAL INSTRUCTIONS AND NOTICES — continuedMISCELLANEOUS NOTICES — continued

LOCOMOTIVE HAULED AIR BRAKED PASSENGER COACHING STOCKWORKING ON EAST COAST MAIN LINE SERVICES

Difficulties have been experienced due to dragging brakes on Air Brake Passenger Trains working on theEast Coast Main line. In an endeavour to identify the causes it has been decided that, until further noticeall passenger trains working over the East Coast Main Line route will be operated on a single pipe airbrake system.

To operate the single pipe system the main reservoir pipe (yellow coupling head) WILL NOT be coupledas between the locomotive and the first vehicle. The main reservoir pipe on the locomotive and the firstvehicle must remain on the respective bracket-dummies and the cocks in the closed, position.The above instructions in no way alter the regulations for working the automatic air brake on locomotiveoperated trains as contained in the General Appendix.As, however, the main reservoir pipes are not connected it follows that the reading on the gauge in theGuard's brake for the main reservoir pipe will be zero.Disabled Trains Requiring Assistance in the Rear

In the event of a train requiring assistance in the rear it will be neceSsary to revert to the two pipesystem in order that assistance procedure as laid down in the General Appendix and drivers manualBR.33056/31 may be carried out.

Repairs in Motive Power Depots Carriage Sheds Wagon Repair Sheds and Warehouses — In connection withwork being carried out at the undermentioned places, scaffolding or projections may be provided orunusual excavations may be made in the ground:—

Location N a t u r e of Work D u r a t i o n C o m m e n-c i n g d a t eThornaby MPDThornaby MPD.

Thornaby MPO

Cambois MPD

Painting depot buildingsContractor providing roller shutterdoors on Nos.1 and 2 Straight ShedWest Roads, No.5 West Road repairshed, 5 and 6 Roads East and WestEnd Straight Shed and erectingScreen between 4 and 5 RoadStraight Shed.General work in association withconversion of Roads 5 and 6Straight Shed to Wagon Repair Shop.Track alterations and building workin progress.Constructing car park adjacent toamenity block, machines unloadingspoil from rail wagons.

Until further noticeUntil further notice.

Until further notice.

U.F.N.

A copy of this notice must be supplied to all Drivers, Guards, Signalmen and others concerned.M0.45/NN F . J . BURGEYork

Chief Operating Manager6 NOVEMBER, 1974Receipt of this notice need not be acknowledged. I f the NN Notice i s not received by the normal time

advise your Superior Officer by wire as fol l ow s .-- " N I L E S I G . N O T I C E N N

Page 23: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

o

Page 24: tqa Britidh Rail EASTERN REGION No.46 1filestore.limitofshunt.org.uk.s3.amazonaws.com/... · tqa Britidh Rail EASTERN REGION TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS

LET'S MAKE SAFETY TICK

T HROUGH RULES KNOWLEDGE

I NJURY FREE CONDITIONS

CONTROL OF UNSAFE PRACTICES

KEEPING ALERT