    MRC Bearings' TPM Journey: From Totally Painted Machines to Taking Pride in Our MachinesIn 1996 MRC Bearings, a unionized aerospace industry supplier, recognized it had a problem. Theywere behind on their orders. Their customers were pushing for shorter lead times and costreductions.

    Approximately eighty percent of their maintenance hours were dedicated to emergency work orders.In October of 1997 over one thousand, six hundred and sixty hours were consumed by unplannedmaintenance in just one area. Ten months later that number fell to less than thirty hours. That's overa 99% decrease.

    In another area they were able to achieve almost a 98% decrease in the number of unplannedmaintenance hours in an eight-month period. Greg Folts, Manager of Continuous Improvement atMRC attributes their remarkable success to having a hardworking, dedicated maintenance team andimplementing a Total Productive Maintenance (TPM) program.

    "We started slow, beginning with a small areathat was critical to our process but wasexperiencing chronic problems," said Folts. "Atfirst, a lot of people were skeptical and not reallyinterested in getting involved with TPM," he said."We had a core of people who were excitedabout TPM and we enlisted the help of peopleoutside of our organization to work with us,"Folts said. MRC worked with Marshall Institute toorganize their TPM efforts. He got our folks firedup about TPM." One of MRC's customers, Pratt-Whitney, also supported their efforts byfacilitating MRC's first TPM event and sharingtheir TPM practices with MRC..

    MRC began with a week-long TPM event. Folts explained they would begin by cleaning, inspecting,lubricating, and performing corrective work on a piece of machinery. Once a machine was cleaned, itwould be painted. At first, people were reluctant to participate in TPM events. As time went on,people began to notice what improvements were being accomplished under the TPM events. "Infact, the same people that were hesitating in the beginning were suddenly asking when theirmachine would be scheduled for a TPM event," Folts said.

  • 8/3/2019 Tpm Case Study

    2/4

    Rick Staples, an Electrician that has been involved with TPM since it's inception said, "The physical

    changes are easy to see. Our machines are more reliable, the area is cleaner and a lot more

    pleasant atmosphere to work in. Other changes, to those of us that work here every day, are not as

    easily detected. For instance; several people who were totally against TPM at the start, have now

    willingly participated in TPM workouts or equipment improvement teams.

    Another individual, who one told me to keep my TPM away from his machines, now is a fully trained

    TPM Coordinator in his area. It's these types of things that truly amaze me. The culture change is

    slow, but it's happening."

    MRC formed Equipment Improvement Teams

    (EITs) to work on resolving equipment-related

    issues. Folts credits the EITs with a success that

    was critical in their adoption of TPM. Heexplained they had a piece of equipment with

    chronic problems. It was breaking down monthly

    requiring three or four days each time to fix. He

    explains, "We were really frustrated by this

    problem, we kept fixing it only to see it break

    down again."

    The Equipment Improvement Team took on this

    problem and discovered the original manufacturer had used a sub-spec coupling on a drive unit. Theproblem was solved by upgrading to the proper coupling. This fix alone increased the efficiency on

    this piece of equipment by sixteen percent. "By taking the time to find the root of the failures, rather

    than just fixing the symptoms, we were able to solve this problem. In the years following this repair,

    the problem was completely eliminated. That success showed a lot of people in the company that

    TPM can make everyone's daily life easier as well as improving productivity," Folts said.

  • 8/3/2019 Tpm Case Study

    3/4

    After the initial success, followed by eight TPM events, MRC expanded their TPM efforts to their

    second facility. They created a TPM Steering Committee at their second site and also created a

    Policy group to coordinate the efforts of both facilities. The President of MRC Bearings, Bengt

    Nilsson joined the Policy group as an active member. "Having the company president working with

    us to drive TPM sent a clear message to everyone that this was not just another flavor of the monthprogram," said Folts.

    Don Russell was then solicited to assist in

    driving the process as the TPM Coordinator. "We

    have been very fortunate to have fantastic

    support from both management as well as our

    U.A.W Union personnel," said Russell. In a

    recent MRC company newsletter, President

    Nilsson is pictured shoulder to shoulder with theTPM Area Coordinators. TPM at MRC has been

    described as one of the most successful co-

    management programs ever started at MRC. Mr.

    Nilsson said, "I am very pleased and proud of

    how the whole organization, after the initial skepticism and hesitation, enthusiastically embraced the

    TPM concept. It is of utmost importance to have reliable and well maintained machinery in order to

    serve our customers well and to get on-time deliveries. A well developed TPM program is one of the

    cornerstones in our drive for manufacturing excellence."

    MRC trained ten TPM Area Coordinators who are dedicated to TPM one week each month. These

    TPM Coordinators organize TPM events in their areas, also lead EITs, and make sure the process

    keeps working. MRC has begun to create full-time TPM teams. One such team, comprised of Jeff

    Franklin, an Electrician and Jim Klugh, a Mechanic, and Jeff Johnson, an Operator, were able to

    correct a long-standing equipment problem which reduced the scrap produced by that equipment to

    almost zero.

    Folts and Russell attribute their success in implementing TPM to seven things. Russell said, "We

    realized early on that we couldn't do it all. So we identified a few areas that we felt were key, we did

    those things, and we did them well." The areas that MRC focused on were:

    Preventative maintenance

    1. Putting predictive maintenance process in place (i.e., vibration analysis equipment)

    2. Cleaning the machines, resulting in inspection

  • 8/3/2019 Tpm Case Study

    4/4

    3. Creating standards on the equipment for cleaning, lubrication, and daily checks

    4. Collecting data on downtime

    5. Creating Equipment Improvement Teams

    6. Creating TPM Area Coordinators

    From this experience, Russell suggests organizations beginning TPM programs start small and keep

    it simple.

    Did MRC learn any lessons implementing TPM? Folts said, "We learned that training is a key to

    being successful with TPM. We did some initial TPM awareness training for the organization, about

    one week of training with the operators, and some for the mechanics. But, looking back we could

    have had quicker success if we had done more training." Folts also credits their success to the

    support of their management, the U.A.W. union, the hard work of the people at MRC, involvement of

    Marshall Institute, and the support of their customers. "Ultimately this is a people issue and we are

    lucky to have the right people involved," he said.

    Thinking back about the initial resistance to TPM, Don Russell laughs and says, "At first a lot of folks

    here defined TPM as 'Totally Painted Machines'. Now I can say we all define TPM as 'Taking Pride

    in our Machines'."