TPB Paper No.10089
for consideration by the
Town Planning Board
on 1.4.2016
Planning and Design Study on the Redevelopment of Government Sites at
Sai Yee Street and Mong Kok East Station – Feasibility Study
Proposed Development Design Schemes
PURPOSE
This paper seeks Members’ view on the three proposed development design
schemes formulated under the “Planning and Design Study on the Redevelopment of
Government Sites at Sai Yee Street and Mong Kok East Station – Feasibility Study”
(“the Study”).
BACKGROUND
2. Planning Department (PlanD) completed the study on “Area Improvement
Plan for the Shopping Areas of Mong Kok” (the AIP Study) in 2009 and one of the
long-term recommendations was to redevelop the government sites at Sai Yee Street
(currently occupied by the facilities of the Food and Environmental Hygiene
Department (FEHD) and Water Supplies Department (WSD) as well as a temporary
carpark) for a comprehensive development with a public transport terminus to
accommodate on-street public light buses (PLB) and cross-boundary (X-B) coaches
in the surroundings of Mong Kok, with other development atop.
3. To implement the recommendation under the AIP Study, PlanD commissioned
Ove Arup & Partners HK Ltd. to undertake the Study in March 2015. The Study
aims to investigate the development potential of the government sites together with
the adjoining Platform Area in front of the Mong Kok East Station (the East Station)
concourse for a comprehensive development which includes residential,
commercial/office/hotel, open space and/or government, institution or community
(GIC) uses, and to make recommendations to enhance the public realm and public
transport facilities in the area. Findings and recommendations of the Study will
serve as a basis for subsequent Outline Zoning Plan (OZP) amendment and land
disposal.
THE SITE AND SURROUNDING AREA
4. The government sites are located at the junction of Sai Yee Street and Argyle
Street, currently occupied by the FEHD offices-cum-vehicle depot, WSD compound
(including a Water Resources Education Centre and a Regional Office) and a
temporary public car park (the Site) (Plans 1 to 3). The Site has an area of about
2
1.18 ha1. The existing facilities of FEHD and WSD will be demolished and the
demolition works is scheduled for completion in end 2020. According to the draft
Mong Kok OZP No. S/K3/30 (the Mong Kok OZP), the Site is zoned “Government,
Institution or Community” (“G/IC”) and “Other Specified Uses (OU) (Multi-storey
Car/Lorry Park)” subject to a building height restriction of 6 storeys, and “OU
(Railway Station Development)” subject to a building height restriction of 71mPD.
A 30m-wide building gap above 23mPD is designated under the OZP running in the
north of the Site to align with Mong Kok Road, creating an east-west air path for
wind penetration in the area (Plan 4).
5. Areas to the east of the Site are Luen Wan Street and the land vested to the
Kowloon-Canton Railway Corporation (KCRC) under the KCRC Ordinance (Cap.
372) for operational purposes of railways. On the vested land, the at-grade level
(about 6mPD) is occupied by the KCRC freight yard2 and decked over by a platform
(at about 22mPD) on top of which are a public transport interchange (PTI), Mong
Kok Government Offices (MKGO) (12-storey), MKGO’s open carpark and a vacant
site (the Platform Area). Luen Wan Street is the only access to the Platform Area
(Plan 5).
6. Area to the north, west and south (Plan 6) consists of high-density mixed
developments of commercial, residential and GIC uses. Near the Site is a cluster of
local attractions which are popular for both locals and tourists. They include
“Goldfish Street” and “Ladies Market” on Tung Choi Street, “Sneakers Street” and
the street market on Fa Yuen Street, and the “Flower Market and Bird Garden” on
Prince Edward Road West/Flower Market Road.
7. The Site is also located at a transport hub well served by a wide variety of
public transport. The East Station and the existing PTI are in its close proximity
while Mong Kok and Prince Edward Mass Transit Railway (MTR) stations are within
walking distance. There are a number of on-street public light bus (PLB) stands in the
surroundings. X-B coach termini and stopping points also scatter near the Site.
OPPORTUNITIES & CONSTRAINTS
Opportunities
Mong Kok Identity
8. Mong Kok is one of the major shopping areas and entertainment destinations
for locals and tourists. There is a traditional characteristics of vibrancy including
array of markets, small shops and food stalls along street-fronts. The area is also a
popular entertainment and social networking place for the youngsters, with cinemas,
karaokes, billiard parlours and restaurants, etc. Redevelopment of the Site would
provide opportunity to enhance the identity of Mong Kok as a tourist, shopping and
entertainment destination.
1 The original site area is about 1.3 ha. After the proposed set-back of the Site for road widening as
mentioned in the later part of this Paper, the area for development is about 1.18 ha. 2 The freight yard which was previously used by freight rail is currently used as a storage area for
railway equipment and other railway related purposes.
3
Prime location for commercial development
9. Currently in shortfall, Grade A Office requires not only prime location well
served by public transport but also relatively large site area. The Site which is
located in the urban core has an area of about one hectare. With Grand Century Place
(office and shopping mall) and Royal Plaza Hotel nearby, the development of Grade
A office, hotel, shop and services and place of entertainment at the Site could enhance
the identity of Mong Kok as a commercial node, as well as a tourist attraction and
shopping centre creating synergy to form an icon at this prime location.
Improvement to Public Realm
10. Mong Kok is a transport hub well served by all kinds of public transport
including the X-B transport. It is patronised by a large number of visitors and daily
commuters. Roads are approaching their capacities and there is limited opportunity
in this old urban area for road widening/improvement. Traffic congestion is usual
and the situation is complicated by the on-street PLB stands and X-B coach termini
cum stopping points. On the pedestrian linkage aspect, the existing Mong Kok
Road footbridge provides connection between the East Station and the Mong Kok
MTR Station. At present, no direct access from the East Station to Mong Kok Road
thru the Site is available as the direct access is physically blocked by the FEHD depot
and WSD compound. Pedestrian can only route through the footbridge at Bute
Street (located to the north of the Site) to join the Mong Kok Road Footbridge which
leads to Mong Kok MTR Station. Apart from longer walking distance, it makes the
Bute Street footbridge which provides connection to the Prince Edward MTR Station
very busy (Plan 7).
11. According to the population profile, there are more elderly people and
low-income families in the area as compared with the territorial average, which gives
rise to a need for more GIC facilities. According to the Hong Kong Planning
Standards and Guidelines (HKPSG), there is a deficit of about 19 ha in total for the
local open space and district open space in the Mong Kok area. The improvement to
the public realm in terms of traffic condition, living environment and provision of
GIC facilities in this well developed urban area requires new land. Redevelopment
of the Site provides such an opportunity.
Landscaping Enhancement on Platform Area
12. While pursuing development involving the KCRC vested land would require
the resolution of legal issues, it is stated in the KCRC Ordinance3 that the
Government reserves the right to “use” exclusively and to permit other persons to use
the Platform Area above the rail. The Platform Area can be explored for
landscaping enhancement, public open space and provision of pedestrian connection
to link up the East Station with other areas in Mong Kok.
3 Paragraph 10(b)(iii) of Part II of Schedule 2 of the KCRC Ordinance (Cap. 372) refers.
4
Constraints
Traffic Noise
13. Being bounded by the heavily trafficked Sai Yee Street and Argyle Street and
with the existing PTI on the Platform Area and the uncovered part of East Rail in the
vicinity, the Site is subject to noise impact arising from road traffic, rail and the PTI,
as well as air quality impact from traffic emission. If the Site is proposed for air
/noise sensitive users, in particular residential use or GIC facilities with open-window
requirement, careful planning and design with adequate mitigation measures (such as
set-back from the roads and single aspect buildings) are required.
Existing Road Capacity
14. According to the broad traffic assessment under the Study, even without any
redevelopment at the Site, the critical junctions at Sai Yee Street/Mong Kok Road and
Sai Yee Street/Argyle Street would reach their full capacity by 2027 due to the natural
growth in the background traffic.
GUIDING PLANNING AND DESIGN PRINCIPLES
15. Guiding planning and design principles have been formulated for the Site
before deriving the proposed development design schemes. They are summarised
below:
(a) Development Need
Optimise development potential according to site context and
constraints
Re-provisioning of the existing public facilities affected by the
redevelopment4
(b) Connectivity
Create a multi-level pedestrian network connecting the East Station,
Mong Kok MTR Station and the nearby local/tourist attractions
Enhance the walkability and connectivity of pedestrians
(c) Meeting Community Demand
Provide the needed GIC and social welfare facilities to serve the local
community
Provide public transport facilities to improve traffic condition in the
surrounding area
(d) Good Urban Design
Promote visual and air permeability through provision of visual and air
ventilation corridors at strategic locations
4 Based on the draft development design schemes to be discussed at the later part of this Paper, the
affected facilities include the temporary car park adjoining WSD compound (70 parking spaces),
the public toilet on Luen Wan Street and the ancillary car park to the MKGO (35 parking spaces).
5
Reduce overshadowing the adjacent development around the Site
especially the school to its immediate north
Foster a strong sense of place through building design and streetscape
improvement
Respect the Sustainable Building Design Guidelines
Respect the “20% Building Free Zone” and views to the ridgeline of
Beacon Hill and Lion Rock unless with sufficient justifications5
(e) Provision of Open Space
Provide quality open space at convenient location with easy access for
public enjoyment
(f) Greening and Landscaping
Provide quality public realm and landscaped linkages with the
surrounding open space and greenery
Preserve the Old &Valuable Trees (OVTs) and mature trees bearing the
character of OVTs for integration with the public open space
Observe the requirement on site coverage of greenery
(g) Mong Kok Identity
Development concept to take into account Mong Kok’s character and
identity
Promote liveliness in terms of activities at street level
Create a landmark and focal point to foster Mong Kok’s identity as the
shopping and entertainment destination for locals and tourists
COMMON COMPONENTS IN THE DEVELOPMENT DESIGN SCHEMES
16. Redevelopment of the Site presents an opportunity to enhance the public
realm, by creating space for the necessary GIC, open space and transport facilities. The following common components are proposed for all the development design
schemes (Plan 8):
(a) Transport and Pedestrian Facilities
- a two-storey PTI for provision of about 60 PLBs and 20 X-B coach
spaces (gross floor area (GFA) of 8,000m2) mainly for relocating
on-street PLB stands currently located on the sections of Fa Yuen Street
and Tung Choi Street between Argyle Street and Mong Kok Road and
the section of Fife Street between Fa Yuen Street and Sai Yee Street,
and the X-B coach termini cum stopping points currently operating in
Prince Edward and Mong Kok (Plan 9)
- widening of carriageway for the respective sections of Sai Yee Street,
Argyle Street and Luen Wan Street abutting the Site. In general, an
additional lane will be provided for each of the afore-said road sections.
5 According to the HKPSG, there are a total of 8 Strategic Viewing Points (SVP). Two of which are
with visual relationship with the Site, one from Central Pier No.7 in Central and the other from Sun
Yat Sen Memorial Park in Sheung Wan. The “20% Building Free Zone” is bounded by 145mPD
and 185mPD from the SVP at Central Pier No.7, and 185mPD and 205mPD from that at the Sun
Yat Sen Memorial Park.
6
Footpaths along the three respective road sections will be widened to
4.5m (Plan 10)
- public carpark of 80 spaces (70 for reprovisioning the existing
temporary carpark currently within the Site and 10 for commercial
vehicles which include heavy goods vehicles and coaches)
- multi-levels pedestrian connection to the existing and planned
footbridge systems
(b) GIC Facilities (total GFA about 5,000m2)
- a day care centre for the elderly
- a neighbourhood elderly centre
- an integrated children and youth services centre
- an integrated community centre for the mental wellness
- a public toilet (reprovisioning of existing one at Luen Wan Street (Plan
1))
(c) OVTs and Open Space
- the OVT in the temporary carpark and the two mature trees in the
WSD compound, all of which are Ficus microcarpa (Chinese banyan),
to be preserved in-situ (Plan 5)
- to provide public open space, in particular at-grade and at podium deck
to integrate with the OVTs and the existing sitting-out area on Luen
Wan Street
- on the Platform Area to provide a large public open space (3,200m2) at
the southern part which is currently occupied by the ancillary carpark
to MKGO and a vacant piece of land. Landscaping works are also
proposed for general enhancement of the Platform Area
(d) Building Gap
- to maintain the building gap of 30m-wide above 23mPD as wind/view
corridor (requirement on the current OZP) for better ventilation and
visual permeability (Plan 5)
PROPOSED DEVELOPEMNT DESIGN SCHEMES
17. As one of the study objectives is to improve the public realm, all the
proposed development design schemes share similar components on the provision of
public facilities as the core part. The Study has examined whether the core part
should mix with residential or commercial development. Residential development
is compatible with the existing mixed-use of Mong Kok and provides a choice for
people who enjoy city life. However, the Site, being surrounded by roads and
railway, is subject to noise impact arising from road traffic, rail and the existing PTI,
as well as air quality impact from traffic emission. Mitigation measures are required
to mitigate the possible adverse impacts on residential development with
open-window requirement.
18. Taking advantage of its location within a transport hub and the vibrant
character of Mong Kok, commercial development including Grade A office, hotel,
shop and services and place of entertainment at the Site could enhance the identity of
7
Mong Kok as a commercial and entertainment node, as well as a tourist attraction and
shopping centre creating synergy to form an icon at this prime location. From the
development intensity point of view, the maximum plot ratio (PR) for high-density
residential development under the OZP is 9 while that for commercial development is
12. In terms of enhancing Mong Kok identity and maximising development
potential of the Site, commercial use is recommended for the Site. Besides, sites
suitable for residential use may be identified in other areas.
Common Elements Among All Schemes
19. The Study has proposed three development design options (Schemes A, B
and C) with PR 12 for commercial development mixed with public facilities. The
proposed GIC and transport facilities are similar under all schemes. Two levels of
new PTIs with a total GFA of 8,000m2 will be provided, with about 60 PLB spaces
on the ground floor (G/F) and 20 X-B coach spaces on the first basement floor (B1/F).
On the podium, the second and third levels will partly be for GIC uses6 and partly for
retail shops. In the basement, the second to fourth basement levels will mainly be
used for car parking purpose (Plan 8). The proposed ingress/egress for the G/F PTI
is on Sai Yee Street while B/F facilities is on Luen Wan Street, a different street, for
traffic diversion.
20. All the schemes share the same planning concept with a Piazza at the
junction of Sai Yee Street and Argyle Street, integrating with the three valuable trees
to be preserved in-situ as a focal point for event activities and a social gathering place
(Plan 11).
21. On the pedestrian linkages, walkways will be provided with a view to
allowing efficient, comfortable and barrier-free connection to link up the East Station
with the Mong Kok MTR Station, and the planned footbridge along Argyle Street7
accessible to other local attractions including “Sneakers Street” and “Ladies Street”
to the further south-west. Two landscaped walkways each with a minimum width of
15m across Luen Wan Street connecting the Platform Area with the Site will be
proposed to enhance connectivity. In addition, the proposed open space on the
Platform Area will be linked up with the proposed Piazza and the planned footbridge
along Argyle Street (Plan 11).
22. The main differences among the schemes mainly lie in the building height,
visual permeability and provision of open space (Plan 12).
Scheme A
23. The Scheme aims to explore the potential of distributing the GFA generated
from a maximum PR 12 while preserving the “20% Building Free Zone” from the
6 Among the required GIC facilities, 3 of them have a location requirement to be provided within
24m from the ground level, namely day care centre of the elderly, neighborhood elderly centre and
the integrated community centre for mental wellness. 7 The planned footbridge system along Argyle Street, which is being studied by Highways
Department, will extend from Sai Yee Street south of the Site to Tong Mi Road in Tai Kok Tsui on
the west.
8
ridgeline backdrop.
24. The proposed building under Scheme A will incorporate three commercial
towers on top of the 3-storey podium and 4-level of basement, with the uniform
height of 145mPD (including roof-top structures and about 30 storeys). About
7,000 m2 will be proposed for open space use, including a publicly accessible Piazza
at the junction of Sai Yee Street and Argyle Street and an open space on the podium
deck at 23mPD which is at similar level to the Platform Area with pedestrian
connection provided. A large open space will be provided at the southern part of the
Platform Area.
25. The proposed building height preserves the “20% Building Free Zone”
from the ridgeline (Plans 13 and14). However, the uniform building height results in
a monotonous building height profile and a relatively bulkier built-form with large
footprints.
26. The building will form an almost continuous “wall” along Sai Yee Street
blocking the Fife Street view (Plan 18) towards the greenery on Kadoorie Hill. The
need for larger tower footprints also minimizes the potential for the podium level to
host a large publicly accessible open space which would be located along the
pedestrian route from the East Station to Mong Kok’s commercial areas. Furthermore,
145mPD tower at the northern part of the Site will overshadow the adjacent CCPAS
School.
27. Overall, Scheme A is beneficial in terms of preserving the ridgeline
backdrop when appreciated from the two strategic viewing points on Hong Kong
Island. However, larger tower footprints are likely to have adverse impacts on the
pedestrian level with both air ventilation performance and visual permeability
affected.
Scheme B
28. Scheme B aims to explore development with a PR 12 that balances between
the macro, city-scale consequences of the proposed commercial development on
Kowloon’s urban form and the local impacts on the pedestrian environment of the
district.
29. Under this Scheme, the building blocks are arranged to increase visual
permeability and limit adverse impacts on pedestrian-level air ventilation. As such,
two high-rise towers reaching 165mPD (35 storeys) and 230mPD (50 storeys)
respectively are proposed. Instead of having a 3-storey podium extending all along
Sai Yee Street as in Scheme A, the part of podium facing Fife Street will be
single-storey. The taller 230mPD tower will only have a limited podium extent that is
set back to minimize its impact on ground floor public open space. Above the podium,
to the north edge of the Site and adjacent to the CCPAS School a lower block
reaching about 35mPD (5 storeys) will house GIC facilities.
30. When viewed from the two strategic viewpoints on Hong Kong Island, the
proposed 230mPD tower will extend beyond the “20% Building Free Zone” from the
9
ridgeline to reach a height similar to Langham Place. The second 165mPD tower will
partially intrude into the “20% Building Free Zone” but will not breach the ridgeline
(Plans 13 and 14). The smaller GIC block to the north will reach a height almost
equal to the CCPAS School and will therefore avoid overshadowing the school
building.
31. The podium along Sai Yee Street, decreasing from 3-storey to single-storey,
can reduce the adverse impacts on the streetscape and the pedestrian experience. The
lower podium height will also preserve views along Fife Street to the vegetated
slopes of Kadoorie Hill and will also allow the creation of a large, publicly accessible
open space of about 1,600m2
on the podium level overlooking the Piazza at the
junction of Sai Yee Street and Argyle Street. Together, the Piazza and podium-level
open space will create a spatially unified public area and bring the total public open
space under Scheme B to 8,800m2.
32. In attempting to minimize adverse impacts on the pedestrian environment
and local streetscape and to release lower floor areas for public open space, the
proposed buildings under Scheme B intrudes into the “20% Building Free Zone”. It
decreases the building volume along the relatively narrow Sai Yee Street to allow
existing view corridors to be preserved and minimise adverse impacts of the new
building on air ventilation.
Scheme C
33. Mong Kok is characterized by a large deficit in both district and local open
space and a congested urban form with limited visual permeability. Scheme C
therefore aims to explore development with a PR 12 that maximizes open space and
the benefits on the local streetscape while creating a new commercial heart for the
district that participates in the emerging iconic Kowloon skyline.
34. In Scheme C, most of the commercial GFA is concentrated in a single tower
and a podium configuration that follows a similar massing as that under Scheme B.
The single commercial tower reaches a height of about 350mPD (including roof-top
structures, 75 storeys). The adopted building height will breach the ridgeline when
viewed from Hong Kong Island’s strategic viewing points and is expected to create a
new, highly visible centre to mark a new heart for the district’s commercial areas.
35. Both the northern and southern parts of the Site will host low-rise buildings
of 4 to 6 storeys. The northern low-rise block will be located on the podium and will
house GIC facilities while the southern block will provide the landing point for the
proposed landscaped walkway across Luen Wan Street from the Platform Area and
can be designed as an iconic building feature, compatible with the Piazza at the
corner of Argyle Street and Sai Yee Street.
36. To improve visual permeability and air ventilation, the Scheme adopts a
similar stepped podium as Scheme B that reduces in height towards the south and
allows the Fife Street view towards Kadoorie Hill to be preserved. Through the
concentration of the majority of GFA within the single 350mPD tower, the ground
coverage will be further reduced as compared with Scheme B to release more open
10
area for public enjoyment. The proposed Piazza is extended further east, enveloping
an area from Sai Yee Street to Luen Wan Road of approximately 3,200m2
Furthermore, on the podium level and adjacent to the Piazza, a publicly accessible
open space reaching 2,000m2 will further enhance the sense of ground level openness,
and limit the adverse impacts of the building bulk on pedestrians.
37. The proposed tower under Scheme C will intrude substantially above the
ridgeline. This Scheme seeks to explore the enhancement of visual permeability and
maximization of open space provision at ground level in one of the Hong Kong’s
most heavily populated and congested districts with a view to bringing an overall
benefits to the local community. In addition to the local benefits, this Scheme will
also generate a new visual marker to delineate the district’s east edge while creating
the opportunity for a new iconic skyline for Kowloon.
Major Development Parameters
38. Major development parameters for Schemes A, B and C are summarised in
Table 1 below:
Table 1 – Major Planning Parameters
Scheme A
Scheme B
Scheme C
Site Area 1.18 ha
PR 12
GFA (m2)
Commercial 125,000
GIC 5,000
PTI & Public Carpark 11,000
Total 141,000
Open Space (m2)*
7,000 (2,500 for Piazza)
8,800 (2,700 for Piazza)
9,700 (3,200 for Piazza)
Building Height (mPD)
(Roof-top)
three blocks in
the same height
of 145mPD
three blocks in the
respective heights
of 35mPD,
165mPD and
230mPD
three blocks in the
respective heights
of 30mPD,
40mPD and
350mPD
No. of Storeys all 30 5, 35 and 50 4, 6 and 75 *The proposed open space includes those in the Site and that on the southern part of the Platform Area.
WAY FORWARD
39. In addition to the Town Planning Board, it is scheduled to consult Yau Tsim
Mong District Council on 31.3.2016. Consultation will also be conducted with the
related stakeholders such as KCRC and MTRC as well as the residents and users in
the surroundings (for examples the schools and commercial buildings) in Q2 2016.
11
Taking into consideration the views from Members and the public, the proposed
development design schemes will be refined as appropriate with a view to
recommending a revised scheme for further technical assessments and to recommend
the implementation strategy to guide future rezoning and land disposal. The Study
findings will be reported back to the Board in due course.
ADVICE SOUGHT
40. Members are invited to offer views on the three proposed development
design schemes.
ATTACHMENTS
Plan 1 The Site
Plan 2 Aerial Photo
Plan 3 Site Photo
Plan 4 Zonings on the Mong Kok Outline Zoning Plan
Plan 5 The Site Conditions
Plan 6 The Site and Surrounding Areas
Plan 7 Existing and Planned Pedestrian Footbridge
Plan 8 Common Elements among All Schemes
Plan 9 Proposed Public Transport Interchange
Plan 10 Proposed Set-back for Road Widening
Plan 11 Proposed Pedestrian Connection
Plan 12 Proposed Development Design Schemes: Block Layout and 3-D
Images
Plan 13 Visual Impact on Ridgeline- Photomontage Viewed from the Strategic
Viewing Point at Pier 7 in Central
Plan 14 Visual Impact on Ridgeline- Photomontage Viewed from the Strategic
Viewing Point at Sun Yat Sen Memorial Park in Sheung Wan
Plan 15 Visual Impact on Pedestrian - Photomontage Viewed from the junction
of Sai Yee Street and Argyle Street
Plan 16 Visual Impact on Pedestrian - Photomontage Viewed from Existing
Argyle Street Footbridge
Plan 17 Visual Impact on Pedestrian - Photomontage Viewed from Mong Kok
East Station PTI
Plan 18 Visual Impact on Pedestrian - Photomontage Viewed from Fife Street
Planning Department
April 2016
Ý‹
Ý‹
Ý‹
Ý‹ Stand
Stand
169
184
181
190
182
179
167
179-177
198
206-200
196
173
180 165
171
177-175
171
189-183
163
178-176
165
188
186
192
194
FP
Ramp
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
15.9
21.7
21.5
21.5
39.4
53.0
36.7
36.2
12.2
6.5
H
H
H
H
H
H
H
H
L
L
H
L
P
s
!
t
!
Fa Yuen
Commercial
Building
Kai W
an
Building
Kin
g H
ing
B
uilding
Peony
Court
Chun P
o H
ouse
Kw
ok C
hai
Building
Mongkok
Building
Chee H
ing
Building
6B
-6A
85
136B
162
81-79
33-37
103
67
56-62
82
91
76
1B
19-11
109
7
161-157
126-120
58
70-66
98
73-81
160-158
127
107-111
151
74
91-89
129
59
116
153
92-90
149
151
106
97
170
123
19H
112
130A-130
141
135
97
63
114
71
127A
104
86-80
38
1C
121
161A
150
161A
46
40-46
6
93
150
100
149A
-147
87-81
9B
-9
65
135-129
135B
-135A
62
92
105
148-142
152
115
14A
-12
102-100B
128
90
128
19
77-75
28-30
164
77
83
143
28-30
19B-19G1
115-111
166
111
97
79
121-117
148
16
91A
-91
69
102-96
126
99
86-84
110
108
80-84
88
94
71
107
116-104
50-56
145
36-38
73-71
125
139
31
48
159
131
17A
-17
72-78
73
119
107
109
84-74
104
38-44
122-118
95
154
78
99C
-99
113
105
61
153
89
136A
-132
126A
73
72
52-54
168
156
88-96
145
39-41
80-86
133
111A
141
127-123
93-99
172
139-137
99-101
100
124
87
147
95
37-37A
143A
8
87
123-107
157
60
69
93
15
75-77
73A
124B
-124A
91
18
102A
-C
155
48
140
93
117
83
75
113
138
83
30-36
64-70
33-35
118
89
105-101
143
85
123A 1
30B
-128A
50
80
81
174A
-B
137
161
72-62
163A
-163
155
64
103
32
72
174
117-121
95
CUL
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
EW
ä·K¯]¡F
D
D
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
8.6
5.3
6.1
19.2
10.0
6.1
29.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
19.6
9.7
10.6
36.3
28.5
7.4
24.8
34.0
21.7
15.7
6.0
37.0
14.2
6.0
6.2
5.9
5.7
17.9
29.1
5.4
5.6
5.8
6.3
14.0
12.4
7.6
17.3
5.9
6.5
5.3
5.9
21.7
6.9
16.9
7.1
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
19.2
12.7
21.6
5.9
17.0
6.2
13.6
32.2
14.7
15.9
36.2
21.3
36.3
14.8
12.4
5.1
6.9
6.4
7.3
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
HH
H
H
H
H
HH
HH
H H
H
H
HH
H
H
H
HH
H
H
HH
HH
H
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H H
H
H
HH
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H H
H
H
H
H
H
HH
H
L
H
H
L
L
L
L
H
L
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
L
L
L
L
L
H
H
L
L
L
L
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
L
L
L
L
H
L
L
H
H
H
H
L
L
L
L
L
L
L
L
LL
L
L
L
L
L
L
H
L
L
L
L
H
L
L
H
L
L
L
H
L
L
H
L
L
H
L
L
LL
L
H
L
L
H
L
L
H
H
L
L
H
H
H
WT
WT
WT
REFERENCE No.
METRES METRES0 80
SCALE 1 : 2 000
40 40
YIM
PO
FO
NG
ST
RE
ET
ARGYLE STREET
SA
I YE
E S
TR
EE
T
FA
YU
EN
ST
RE
ET
FA
YU
EN
ST
RE
ET
TU
NG
CH
OI S
TR
EE
T
Mong Kok
Government
Offices
PE
AC
E A
VE
NU
E
Temporary
Car Park
MONG KOK ROAD
Public
Transport
Terminus
Grand Century Place
Plan 1
HA
K P
O S
TR
EE
T
Queen Elizabeth
School
LU
EN
WA
N S
TR
EE
T
Water
Supplies
Department
Compound
BUTE STREET
Ele
vate
d R
oad L
uen W
an S
treet S
itting-o
ut A
rea
SA
I YE
E S
TR
EE
T
Vacant
FIFE STREET
DBS Sports Ground
Food and Environmental
Hygiene Department Depot
CW
EW
EW
EW
Open-air
Car Park of the
Government
Offices
EW
EW
PLANNING
DEPARTMENT
Mong Kok
East Station
with railway
underneath
Diocesan Boys’ School (DBS)
Primary Division
Hong Kong & Kowloon
Chiu Chow Public
Association
Secondary School
M/HOLS/16/27
EXTRACT PLAN PREPARED ON 21.3.2016
BASED ON SURVEY SHEETS No.
11-NW-14D AND 19B
Existing
Public Toilet
Glen Haven
The Site
THE SITE
Grand Century Place
Public
Transport
Terminus
Mong Kok
Government
Offices
MONG KOK ROAD
SA
I YE
E S
TR
EE
T
FA
YU
EN
ST
RE
ET
TU
NG
CH
OI S
TR
EE
T
Temporary
Car Park
ARGYLE STREET
YIM
PO
FO
NG
ST
RE
ET
PE
AC
E A
VE
NU
E
REFERENCE No.
METRES METRES0 80
SCALE 1 : 2 000
40 40Plan 2
FIFE STREET
Queen Elizabeth
School
BUTE STREET
FA
YU
EN
ST
RE
ET
SA
I YE
E S
TR
EE
T
Water
Supplies
Department
Compound
Luen W
an S
treet S
itting-o
ut A
rea
HA
K P
O S
TR
EE
T
Food and
Environmental
Hygiene
Department Depot
Vacant
DBS Sports Ground
PLANNING
DEPARTMENT
Open-air
Car Park of the
Government
Offices
Mong Kok
East Station
with railway
underneath
AERIAL PHOTO
Hong Kong & Kowloon
Chiu Chow Public
Association
Secondary School
Diocesan Boys’ School (DBS)
Primary Division
M/HOLS/16/27
EXTRACT PLAN PREPARED ON 21.3.2016
BASED ON AERIAL PHOTO No. CS58525
TAKEN ON 14.4.2015 BY LANDS DEPARTMENT
LU
EN
WA
N S
TR
EE
T
Glen Haven
The Site
LUEN
WA
N STREET
SA
I YE
E S
TR
EE
T
Elevated R
oad
Open-air Car Park of
the Government Offices
Luen W
an Street Sitting-out Area
Mong Kok
Government
Offices
Grand Century Place
Temporary
Car Park
Food and Environmental
Hygiene Department Depot
Water Supplies
Department Compound
Public
Transport Terminus
Queen Elizabeth
School
Pedestrian
Connection
to Argyle Street
Vacant
Mong K
ok R
oad F
ootb
ridge S
yste
m
(via
Sai Y
ee S
treet)
Luen Wan Street Footbridge
Mong Kok
East Station
with railway
underneath
Hong Kong & Kowloon
Chiu Chow Public Association
Secondary SchoolDiocesan
Boys’ School
(DBS)
SITE PHOTOREFERENCE No.
M/HOLS/16/27
PLANNING DEPARTMENT
Plan 3EXTRACT PLAN PREPARED ON 21.3.2016
BASED ON SITE PHOTOS TAKEN ON 3.8.2015
The Site
90
C
REFERENCE No.
Plan 4
PLANNING
DEPARTMENT
METRES METRES0100 100 200 SCALE 1 : 5 000
S/K3/30
S/K7/24
EXTRACT PLAN PREPARED ON 21.3.2016
BASED ON OUTLINE ZONING PLANS No.
S/K3/30 EXHIBITED ON 31.5.2013 AND
S/K7/24 APPROVED ON 8.9.2015M/HOLS/16/27
ZONINGS ON THE
MONG KOK OUTLINE ZONING PLAN
The Site
113
Ý‹
Ý‹
Ý‹
Ý‹ Stand
Stand
169
184
181
190
182
179
167
179-177
198
206-200
196
173
180 165
171
191
177-175
171
189-183
163
178-176
165
188
186
192
194
FP
Ramp
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
15.9
21.7
21.5
21.5
39.4
53.0
36.7
36.2
12.2
6.5
H
H
H
H
H
H
H
H
L
L
H
L
P
s
!
t
!
6B
-6A
85
136B
162
81-79
33-37
103
67
56-62
82
91
76
1B
19-11
109
7
161-157
126-120
58
70-66
98
73-81
160-158
127
107-111
151
74
91-89
129
59
116
153
92-90
149
151
106
97
170
123
19H
112
130A-130
141
135
97
63
114
71
127A
104
86-80
38
1C
121
161A
150
161A
46
40-46
6
93
150
100
149A
-147
87-81
9B
-9
65
135-129
135B
-135A
62
92
105
148-142
152
115
14A
-12
102-100B
128
90
128
19
77-75
28-30
164
77
83
143
28-30
19B-19G1
115-111
166
111
97
79
121-117
148
16
91A
-91
69
102-96
126
99
86-84
110
108
80-84
88
94
71
107
116-104
50-56
145
36-38
73-71
125
139
31
48
159
131
17A
-17
72-78
73
119
107
109
84-74
104
38-44
122-118
95
154
78
99C
-99
113
105
61
153
89
136A
-132
126A
73
72
52-54
168
156
88-96
145
39-41
80-86
133
111A
141
127-123
93-99
172
139-137
99-101
100
124
87
147
95
37-37A
143A
8
87
123-107
157
60
69
93
15
75-77
73A
124B
-124A
91
18
102A
-C
155
48
140
93
117
83
75
113
138
83
30-36
64-70
33-35
118
89
105-101
143
85
123A
72
130B
-128A
50
80
81
174A
-B
137
161
72-62
163A
-163
155
64
103
32
72
174
117-121
95
CUL
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
EW
ä·K¯]¡F
D
D
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
8.6
5.3
6.1
19.2
10.0
6.1
29.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
19.6
9.7
10.6
36.3
28.5
7.4
24.8
34.0
21.7
15.7
6.0
37.0
14.2
6.0
6.2
5.9
5.7
17.9
29.1
5.4
5.6
5.8
6.3
14.0
12.4
7.6
17.3
5.9
6.5
5.3
5.9
21.7
6.9
16.9
7.1
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
19.2
12.7
21.6
5.9
17.0
6.2
13.6
32.2
14.7
15.9
36.2
21.3
36.3
14.8
12.4
5.1
6.9
6.4
7.3
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
HH
H
H
H
H
HH
HH
H H
H
H
HH
H
H
H
HH
H
H
HH
HH
H
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H H
H
H
HH
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H H
H
H
H
H
H
HH
L
H
H
L
L
L
L
H
L
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
L
L
L
L
L
H
H
L
L
L
L
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
L
L
L
L
H
L
L
H
H
H
H
L
L
L
L
L
L
L
L
LL
L
L
L
L
L
L
H
L
L
L
L
H
L
L
H
L
L
L
H
L
L
H
L
L
H
L
L
LL
L
H
L
L
H
L
L
H
H
L
L
H
H
WT
WT
WT
LU
EN
WA
N S
TR
EE
T
6
12
15.9
6
(92 mPD)(72 mPD)
(28 mPD)
(28 mPD)
Existing OVTs
(86 mPD)
(51 mPD)
(76 mPD)
(42 mPD)
(58 mPD) mPD
mPD
22 mPD
mPD
mPD
REFERENCE No.
METRES METRES0 80
SCALE 1 : 2 000
40 40
ARGYLE STREET
SA
I YE
E S
TR
EE
T
FA
YU
EN
ST
RE
ET
FA
YU
EN
ST
RE
ET
TU
NG
CH
OI S
TR
EE
T
PE
AC
E A
VE
NU
E
Temporary
Car Park
MONG KOK ROAD
Plan 5
Queen Elizabeth
School
BUTE STREET
Ele
vate
d R
oad
SA
I YE
E S
TR
EE
T
VacantFIFE STREET
DBS Sports Ground
Open-air
Car Park of the
Government
Offices
PLANNING
DEPARTMENT
Potential OVTs
Platform Area with East Rail underneath
Mong Kok
Government
Offices
Building Gap above 23 mPDto facilitate air ventilationunder OZP
Existing OVTs
113
(71 mPD)
A
A B
Viewing Point of Site Photo
7.4Hong Kong & Kowloon
Chiu Chow Public
Association
Secondary School
Diocesan Boys’ School (DBS)Primary Division
(23 mPD)
(49 mPD)
Luen Wan Street
Sitting-out Area
EXTRACT PLAN PREPARED ON 21.3.2016
BASED ON SURVEY SHEETS No.
11-NW-14D AND 19BM/HOLS/16/27
22 mPD
Water Supplies
Department Compound
Food and Environmental
Hygiene Department Depot
SITE PHOTOS TAKEN ON 27.10.2014
AND 8.3.2016
B
The Site
Grand Century Place
(92 mPD)
Public
Transport
Terminus
Mong Kok
East Station
with railway
underneath
A
THE SITE CONDITIONS
S/K3/30
90
C
Plan 6
REFERENCE No.
PLANNING DEPARTMENT
METRES METRES0 300 400200100 100
SCALE 1 : 6 000
500
Street
MarketGoldfish
Street
Ladies
Market
Street
Performance
S/K7/24
Local Attractions
MTR Entrance / Exit
On-street Public Light Bus Terminus
GOLDFISH STREET
FLOWER MARKET
STREET MARKET
ON STREET PUBLIC LIGHT BUS TERMINUS
LADIES MARKET
2
3
1
7
4
5
1 Viewing Point of Site Photo
1
2
3 4
5
6
7
Flower Market and
Bird Garden
EXTRACT PLAN PREPARED ON 21.3.2016 BASED ON
OUTLINE ZONING PLAN No.S/K3/30 EXHIBITED ON 31.5.2013
AND No.S/K7/24 APPROVED ON 8.9.2015
SITE PHOTOS 1, 2, 5-7 TAKEN ON 3.11.2015 AND
SITE PHOTOS 3, 4 TAKEN ON 3.8.2015
SNEAKERS STREET
Sneakers
Street
Existing Pedestrian Footbridges
On-street Cross-boundaryCoach Terminus / Stopping Points
6
M/HOLS/16/27
The Site
THE SITE AND SURROUNDING AREAS
ARGYLE STREET
ON STREET CROSS BOUNDARY
COACH TERMINUS / STOPPING POINTS
Planned Pedestrian Footbridges(Alignment Indicative)
Ý‹
Ý‹
Ý‹
Ý‹ Stand
Stand
169
184
181
190
182
179
167
179-177
198
206-200
196
173
180 165
171
177-175
171
189-183
163
178-176
165
188
186
192
194
FP
Ramp
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
15.9
21.7
21.5
21.5
39.4
53.0
36.7
36.2
12.2
6.5
H
H
H
H
H
H
H
H
L
L
H
L
P
s
!
t
!
6B
-6A
85
136B
162
81-79
33-37
103
67
56-62
82
91
76
1B
19-11
109
7
161-157
126-120
58
70-66
98
73-81
160-158
127
107-111
151
74
91-89
129
59
116
153
92-90
149
151
106
97
170
123
19H
112
130A-130
141
135
97
63
114
71
127A
104
86-80
38
1C
121
161A
150
161A
46
40-46
6
93
150
100
149A
-147
87-81
9B
-9
65
135-129
135B
-135A
62
92
105
148-142
152
115
14A
-12
102-100B
128
90
128
19
77-75
28-30
164
77
83
143
28-30
19B-19G1
115-111
166
111
97
79
121-117
148
16
91A
-91
69
102-96
126
99
86-84
110
108
80-84
88
94
71
107
116-104
50-56
145
36-38
73-71
125
139
31
48
159
131
17A
-17
72-78
73
119
107
109
84-74
104
38-44
122-118
95
154
78
99C
-99
113
105
61
153
89
136A
-132
126A
73
72
52-54
168
156
88-96
145
39-41
80-86
133
111A
141
127-123
93-99
172
139-137
99-101
100
124
87
147
95
37-37A
143A
8
87
123-107
157
60
69
93
15
75-77
73A
124B
-124A
91
18
102A
-C
155
48
140
93
117
83
75
113
138
83
30-36
64-70
33-35
118
89
105-101
143
85
123A 1
30B
-128A
50
80
81
174A
-B
137
161
72-62
163A
-163
155
64
103
32
72
174
117-121
95
CUL
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
EW
ä·K¯]¡F
D
D
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
8.6
5.3
6.1
19.2
10.0
6.1
29.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
19.6
9.7
10.6
36.3
28.5
7.4
24.8
34.0
21.7
15.7
6.0
37.0
14.2
6.0
6.2
5.9
5.7
17.9
29.1
5.4
5.6
5.8
6.3
14.0
12.4
7.6
17.3
5.9
6.5
5.3
5.9
21.7
6.9
16.9
7.1
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
19.2
12.7
21.6
5.9
17.0
6.2
13.6
32.2
14.7
15.9
36.2
21.3
36.3
14.8
12.4
5.1
6.9
6.4
7.3
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
HH
H
H
H
H
HH
HH
H H
H
H
HH
H
H
H
HH
H
H
HH
HH
H
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H H
H
H
HH
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H H
H
H
H
H
H
HH
L
H
H
L
L
L
L
H
L
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
L
L
L
L
L
H
H
L
L
L
L
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
L
L
L
L
H
L
L
H
H
H
H
L
L
L
L
L
L
L
L
LL
L
L
L
L
L
L
H
L
L
L
L
H
L
L
H
L
L
L
H
L
L
H
L
L
H
L
L
LL
L
H
L
L
H
L
L
H
H
L
L
H
H
WT
WT
WT
REFERENCE No.
METRES METRES0 80
SCALE 1 : 2 000
40 40
YIM
PO
FO
NG
ST
RE
ET
ARGYLE STREET
SA
I YE
E S
TR
EE
T
FA
YU
EN
ST
RE
ET
FA
YU
EN
ST
RE
ET
TU
NG
CH
OI S
TR
EE
T
Mong Kok
Government
Offices
PE
AC
E A
VE
NU
E
Temporary
Car Park
MONG KOK ROAD
Public
Transport
Terminus
Grand Century Place
HA
K P
O S
TR
EE
T
Queen Elizabeth
School
LU
EN
WA
N S
TR
EE
T
Water
Supplies
Department
Compound
BUTE STREET
Ele
vate
d R
oad L
uen W
an S
treet S
itting-o
ut A
rea
SA
I YE
E S
TR
EE
T
Vacant
FIFE STREET
DBS Sports Ground
Food and Environmental
Hygiene Department Depot
CW
EW
EW
EW
Open-air
Car Park of the
Government
Offices
Ingress / Egress
for Grand Century Place
EW
EW
PLANNING
DEPARTMENT
At-grade Crossing
Mong Kok
East Station
with railway
underneath
Diocesan Boys’ School (DBS)
Primary Division
Hong Kong & Kowloon
Chiu Chow Public
Association
Secondary School
EXTRACT PLAN PREPARED ON 21.3.2016
BASED ON SURVEY SHEETS No.
11-NW-14D AND 19B
EXISTING AND PLANNED
PEDESTRIAN FOOTBRIDGE
Plan 7M/HOLS/16/27
The Site
Existing Pedestrian Footbridge
Planned Pedestrian Footbridge(Alignment Indicative)
SAI YEE STREET
REFERENCE No.
PLANNING
DEPARTMENT
M/HOLS/16/27
PTI (Cross-boundary Coach)
Carpark
G/IC & Retail Shops
G/IC & Retail Shops
EXTRACT PLAN PREPARED ON 21.3.2016
CROSS SECTION
COMMON ELEMENTS
AMONG ALL SCHEMES
(Public Carpark & Ancillary Carpark
Basement
(4 Levels)
Podium
(3 Levels) <
<
including reprovisioning for MKGO)
PTI (PLB) + Street Shops
Tower
Plan 8
Piazza
Plan 9REFERENCE No.
PLANNING DEPARTMENT
M/HOLS/16/27
GROUND FLOOR FOR PUBLIC LIGHT BUS BASEMENT FOR CROSS-BOUNDARY COACH
BUTE STREET Existing PTI
Ele
vate
d R
oad
LU
EN
WA
N S
TR
EE
T
Public
Light Bus
ARGYLE STREET
SA
I YE
E S
TR
EE
T
FIFE STREET
MONG KOK ROAD
CCPAS School
MONG KOK ROAD
FIFE STREET
SA
I YE
E S
TR
EE
T
LU
EN
WA
N S
TR
EE
T
Ele
vate
d R
oad
ARGYLE STREET
Existing PTI
BUTE STREET
PROPOSED PUBLIC TRANSPORT INTERCHANGE
Cross-boundary
Coach
EXTRACT PLAN PREPARED ON 21.3.2016
Ingress / Egress for Basement
Piazza Carpark and / or Shops
Trees for in-situ preservation
Grand Century Place
DBS Sports Ground
Diocesan Boys’ School (DBS)
Primary Division
Mong Kok
Government
Offices
Mong Kok
East Station
Mong Kok
Government
Offices
Mong Kok
East Station
DBS Sports Ground
Diocesan Boys’ School (DBS)
Primary Division
Grand Century Place
To G/FPTI
To ButeStreet
To ArgyleStreet
Platform Area
BusLayby
To a
nd F
rom
PT
I on P
latfo
rm A
rea
To UndergroundPTI andCar Park
YIM
PO
FO
NG
ST
REFERENCE No.
PLANNING
DEPARTMENT
M/HOLS/16/27
PROPOSED SET-BACK
FOR ROAD WIDENING
Plan 10EXTRACT PLAN PREPARED ON 18.3.2016
PROPOSED SET-BACK
ORIGINAL SITE BOUNDARY
PROPOSED SITE BOUNDARY
AFTER SET-BACK
REFERENCE No.
PLANNING
DEPARTMENT
M/HOLS/16/27
Potential OVTs
Existing OVTs
Legend
Plan 11EXTRACT PLAN PREPARED ON 21.3.2016
The Site
PROPOSED
PEDESTRIAN CONNECTION
REFERENCE No.
PLANNING DEPARTMENT
SCHEME BSCHEME A SCHEME C
AR
GY
LE S
TR
EE
T
AR
GY
LE S
TR
EE
T
AR
GY
LE S
TR
EE
T
40
35023
(Podium)
(GIC)
13
(Podium)
30(Retail)
(Commercial)
with Shop Frontage
PTI on G/F
with Shop Frontage
PTI on G/F
School
CCPAS
School
CCPAS
MKGO
SAI YEE STREET
ARG
YLE S
TREET
School
CCPAS
EXTRACT PLAN PREPARED ON 23.3.2016 M/HOLS/16/27
with Shop Frontage
PTI on G/F
Grand Century Place Grand Century Place
Grand Century Place
Station
East
Station
East
School
Queen Elizabeth
School
Queen Elizabeth
SAI YEE STREET
School
Queen Elizabeth
SAI YEE STREET
30 Storeys
30 Storeys
30 Storeys
35 Storeys
50 Storeys
75 Storeys
5 Storeys
6 Storeys
4 Storeys
to Study SiteIndicative Linkage
145
23(Podium)
145 (Podium)
23
145
(6 mPD)
(Commercial)
(Commercial)
(Commercial)
Tree to be preserved in-situ
Pedestrian Connection
to Study SiteIndicative Linkage
3523
(Podium)
13(Podium)
(GIC)
165
230
(6 mPD)
(Commercial)
(Commercial)
to Study SiteIndicative Linkage
Tree to be preserved in-situ
Pedestrian Connection
Tree to be preserved in-situ
Pedestrian Connection
LegendLegendLegend
Plan 12
ARG
YLE S
TREET
ARG
YLE S
TREET
BLOCK LAYOUT AND 3-D IMAGES
PROPOSED DEVELOPMENT DESIGN SCHEMES
Piazza Piazza
Piazza
(6 mPD)
(Alignment Indicative)
Footbridge under study
Planned Argyle Street
(Alignment Indicative)
Footbridge under study
Planned Argyle Street
(Alignment Indicative)
Footbridge under study
Planned Argyle Street
M/HOLS/16/27
PLANNING
DEPARTMENT
REFERENCE No.
EXTRACT PLAN PREPARED ON 21.3.2016
SCHEME A
SCHEME B
Victoria TowersLangham PlaceThe ArchThe Harbourside
International
Commerce
Centre
Victoria TowersLangham PlaceThe ArchThe Harbourside
International
Commerce
Centre
Victoria TowersLangham PlaceThe ArchThe Harbourside
International
Commerce
Centre
SCHEME C
Plan 13
VISUAL IMPACT ON RIDGELINE -
PHOTOMONTAGE VIEWED FROM
THE STRATEGIC VIEWING POINT
AT PIER 7 IN CENTRAL
M/HOLS/16/27
PLANNING
DEPARTMENT
REFERENCE No.
EXTRACT PLAN PREPARED ON 21.3.2016
SCHEME B
SCHEME A
The
Harbourside
Langham Place
Park Avenue
International
Commerce
Centre
Victoria Towers
The
Harbourside
Langham Place
Park Avenue
International
Commerce
Centre
Victoria Towers
The
Harbourside
Langham Place
Park Avenue
International
Commerce
Centre
Victoria Towers
The Cullinan
The Cullinan
The Cullinan
SCHEME C
Plan 14
VISUAL IMPACT ON RIDGELINE -
PHOTOMONTAGE VIEWED FROM
THE STRATEGIC VIEWING POINT
AT SUN YAT SEN MEMORIAL PARK
IN SHEUNG WAN
Bus Terminus
P
s
!
t
!
136B
103
56-62
91
76
126-120
58
160-158
107-111
91-89
116
92-90
151
106
97
112
141
114
71
104
86-80
161A
150
46
40-46
93
150
149A
-147
87-81
135-129
135B
-135A
92
148-142
152
14A
-12
102-100B
128
90
19
28-30
83
143
115-111
97
121-117
148
16
102-96
86-84
110
108
80-84
88
94
107
50-56
145
48
159
17A
-17
72-78
73
109
104
95
154
78
99C
-99
105
153
89
136A
-132
52-54
156
88-96
39-41
80-86
111A
127-123
93-99
139-137
99-101
100
87
95
37-37A
143A
123-107
157
93
15
75-77
73A
91
18
102A
-C
48
140
113
138
64-70
33-35
118
105-101
123A 1
30B
-128A
50
80
161
72-62
163A
-163
155
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
ä·K¯]¡F
D
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
5.3
6.1
19.2
10.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
9.7
10.6
7.4
34.0
21.7
6.0
37.0
6.0
6.2
5.9
5.7
17.3
5.9
6.5
5.3
6.9
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
5.9
6.2
32.2
14.7
21.3
14.8
12.4
6.9
Ú⁄h⁄
Bus Terminus
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
L
L
L
L
L
L
H
L
H
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
H
L
L
H
L
L
L
L
L
L
L
L
H
H
H
H
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
H
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
H
H
L
H
H
WT
EXTRACT PLAN PREPARED ON 21.3.2016
ARGYLE STREET
Mong Kok
Government Offices
SAI YEE STREET
EXISTING
Mong KokGovernment
Offices
SA
I YE
E S
TR
EE
T
ARGYLE STREET
View Point
SCHEME C
Mong Kok
Government Offices
SCHEME B
SCHEME A
M/HOLS/16/27
REFERENCE No.
PLANNING
DEPARTMENT
Plan 15
VISUAL IMPACT ON PEDESTRIAN -
PHOTOMONTAGE VIEWED FROM
JUNCTION OF SAI YEE STREET
AND ARGYLE STREET
Bus Terminus
P
s
!
t
!
136B
103
56-62
91
76
126-120
58
160-158
107-111
91-89
116
92-90
151
106
97
112
141
114
71
104
86-80
161A
150
46
40-46
93
150
149A
-147
87-81
135-129
135B
-135A
92
148-142
152
14A
-12
102-100B
128
90
19
28-30
83
143
115-111
97
121-117
148
16
102-96
86-84
110
108
80-84
88
94
107
50-56
145
48
159
17A
-17
72-78
73
109
104
95
154
78
99C
-99
105
153
89
136A
-132
52-54
156
88-96
39-41
80-86
111A
127-123
93-99
139-137
99-101
100
87
95
37-37A
143A
123-107
157
93
15
75-77
73A
91
18
102A
-C
48
140
113
138
64-70
33-35
118
105-101
123A 1
30B
-128A
50
80
161
72-62
163A
-163
155
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
ä·K¯]¡F
D
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
5.3
6.1
19.2
10.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
9.7
10.6
7.4
34.0
21.7
6.0
37.0
6.0
6.2
5.9
5.7
17.3
5.9
6.5
5.3
6.9
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
5.9
6.2
32.2
14.7
21.3
14.8
12.4
6.9
Ú⁄h⁄
Bus Terminus
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
L
L
L
L
L
L
H
L
H
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
H
L
L
H
L
L
L
L
L
L
L
L
H
H
H
H
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
H
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
H
H
L
H
H
WT
EXTRACT PLAN PREPARED ON 21.3.2016
EXISTING
LUEN WAN STREET
ARGYLE STREET
SCHEME A
SCHEME B
SCHEME C
M/HOLS/16/27
REFERENCE No.
PLANNING
DEPARTMENT
Mong KokEast Station
Mong KokGovernment
Offices
SA
I YE
E S
TR
EE
T
LU
EN
WA
NS
TR
EE
T
ViewPoint
ARGYLE STREET
Plan 16
VISUAL IMPACT ON PEDESTRIAN -
PHOTOMONTAGE VIEWED FROM
EXISTING ARGYLE STREET FOOTBRIDGE
Bus Terminus
P
s
!
t
!
136B
103
56-62
91
76
126-120
58
160-158
107-111
91-89
116
92-90
151
106
97
112
141
114
71
104
86-80
161A
150
46
40-46
93
150
149A
-147
87-81
135-129
135B
-135A
92
148-142
152
14A
-12
102-100B
128
90
19
28-30
83
143
115-111
97
121-117
148
16
102-96
86-84
110
108
80-84
88
94
107
50-56
145
48
159
17A
-17
72-78
73
109
104
95
154
78
99C
-99
105
153
89
136A
-132
52-54
156
88-96
39-41
80-86
111A
127-123
93-99
139-137
99-101
100
87
95
37-37A
143A
123-107
157
93
15
75-77
73A
91
18
102A
-C
48
140
113
138
64-70
33-35
118
105-101
123A 1
30B
-128A
50
80
161
72-62
163A
-163
155
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
ä·K¯]¡F
D
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
5.3
6.1
19.2
10.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
9.7
10.6
7.4
34.0
21.7
6.0
37.0
6.0
6.2
5.9
5.7
17.3
5.9
6.5
5.3
6.9
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
5.9
6.2
32.2
14.7
21.3
14.8
12.4
6.9
Ú⁄h⁄
Bus Terminus
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
L
L
L
L
L
L
H
L
H
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
H
L
L
H
L
L
L
L
L
L
L
L
H
H
H
H
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
H
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
H
H
L
H
H
WT
EXTRACT PLAN PREPARED ON 21.3.2016
SCHEME B
SCHEME A
SCHEME C
M/HOLS/16/27
REFERENCE No.
PLANNING
DEPARTMENT
ARGYLE STREET
SA
I YE
E S
TR
EE
T
PTI
View Point
Mong KokEast Station
Mong Kok
East Station Platform
EXISTING
Plan 17
VISUAL IMPACT ON PEDESTRIAN -
PHOTOMONTAGE VIEWED FROM
MONG KOK EAST STATION PTI
Bus Terminus
P
s
!
t
!
136B
103
56-62
91
76
126-120
58
160-158
107-111
91-89
116
92-90
151
106
97
112
141
114
71
104
86-80
161A
150
46
40-46
93
150
149A
-147
87-81
135-129
135B
-135A
92
148-142
152
14A
-12
102-100B
128
90
19
28-30
83
143
115-111
97
121-117
148
16
102-96
86-84
110
108
80-84
88
94
107
50-56
145
48
159
17A
-17
72-78
73
109
104
95
154
78
99C
-99
105
153
89
136A
-132
52-54
156
88-96
39-41
80-86
111A
127-123
93-99
139-137
99-101
100
87
95
37-37A
143A
123-107
157
93
15
75-77
73A
91
18
102A
-C
48
140
113
138
64-70
33-35
118
105-101
123A 1
30B
-128A
50
80
161
72-62
163A
-163
155
CUL
EW
FP
EW
CW
CW
EW
CW
EW
CW
CW
EW
ä·K¯]¡F
D
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W
�W
�W �W
�W
�W
�W
�W
�W
�W
�W
�W�W
�W
�W
�W
�W
�W
�W
�W
�W
�W
11.6
22.3
6.3
7.8
15.9
25.9
21.4
5.3
6.1
19.2
10.0
6.2
14.1
21.5
5.6
21.4
6.3
21.4
7.0
23.3
9.7
10.6
7.4
34.0
21.7
6.0
37.0
6.0
6.2
5.9
5.7
17.3
5.9
6.5
5.3
6.9
21.6
22.4
21.3
19.2
21.4
24.3
20.7
6.6
6.5
6.2
36.1
6.1
5.9
6.2
32.2
14.7
21.3
14.8
12.4
6.9
Ú⁄h⁄
Bus Terminus
c
c
c
c
c
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
H
HH
H
H
H
H H
H
H
H
H
H
HH
H
H
HH
H
H
H
H
H
H
H
H
H
H
H
H
H
L
L
L
L
L
L
H
L
H
L
L
L
L
L
L
H
L
L
L
H
L
L
L
L
L
L
H
L
L
H
L
L
L
L
L
L
L
L
H
H
H
H
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
H
L
L
H
L
L
L
H
L
L
L
L
L
L
L
H
H
H
L
H
H
WT
EXTRACT PLAN PREPARED ON 21.3.2016
REFERENCE No.
PLANNING
DEPARTMENT
Plan 18M/HOLS/16/27
SCHEME A
SCHEME B
SCHEME C
EXISTING
ViewPoint
FIFE STREET
ARGYLE STREET
SA
I YE
E S
TR
EE
T
MONG KOK RD
FIFE STREET
Food and
Environmental Hygiene
Department Depot
VISUAL IMPACT ON PEDESTRIAN -
PHOTOMONTAGE VIEWED FROM
FIFE STREET