Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town...

20
Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi Associates IN ASSOCIATION WITH: Harrison Engineering June 20, 2012 COUNTY OF MARIN PREPARED FOR: Town of Tiburon, Marin County, and Association of Bay Area Governments

Transcript of Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town...

Page 1: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Town of TiburonFINAL

Bay Trail Gap Study PREPARED BYAlta Planning + Design and Parisi Associates

IN ASSOCIATION WITHHarrison Engineering

June 20 2012

COUNTY OF

MARIN

PREPARED FORTown of Tiburon Marin County and Association of Bay Area Governments

Tiburon Bay Trail Gap Study | June 20 2012 | Page i

Objective Scope and Potential Evaluation Criteria Page 1

San Francisco Bay Trail Page 2

Conceptual Improvements Page 3

Wayfi nding Page 17

Appendix 1

Appendix 1A Issues Maps Appendix 1B Existing Conditions Opportunities and Constraints Maps and Sign Inventory Appendix 1C Parking Survey and Pedestrian Bicycle and Vehicular Count Results Appendix 1D Preliminary Environmental Analysis Appendix 1E Preliminary Cost Estimates

Appendix 2

Appendix 2A Supplemental Assessment of East Strawberry Drive and Harbor Cove Way

Town CouncilJim Fraser Mayor

Emmett OrsquoDonnell Vice MayorRichard CollinsAlice Fredericks

Frank Doyle

Parks Open Space amp Trails CommissionPeter Winkler Chair

Michael McMullen Vice ChairPark Allen

Robert McDermottPhilip Feldman

Technical Advisory CommitteeDan Watrous Project Manager Planning Manager Town of Tiburon

Nicholas Nguyen Director of Public Works amp Town Engineer Town of TiburonCarey Lando Senior Transportation Planner County of Marin DPW

Maureen Gaff ney Bay Trail Planner Association of Bay Area Governments

Consultant TeamRandy Anderson Principal Alta Planning + Design

David Parisi PE TE Project Manager Parisi AssociatesKristin Maravilla PlannerDesigner Alta Planning + Design

Nancy Dakin Woltering Environmental Planner Alta Planning + DesignRandell Harrison PE Harrison Engineering Inc

This feasibility study is funded by an Association of Bay Area Government (ABAG) grant ABAG manages the San Francisco Bay Trail program

ContentsAcknowledgements

Tiburon Bay Trail Gap Study | June 20 2012 | Page 1

Objective Scope and Potential Evaluation Criteria

Emergency Access and Response Ability to meet the requirements of local emergency agencies to respond to fi re police or medical emergencies on the route and provide the safety and security features identifi ed

Bikeway and Community Connections Direct and convenient access to other routes and destinations paths or bikeways schools parks commercial or employment areas

User Experience Route provides views of scenic areas and minimizes exposure to noise and exhaust

FunctionalityEffi ciency Function for the intended and likely user groups based on adopted local state or federal design criteria and ability to address potential confl icts between user groups pedestrians bicyclists and persons with disabilities

Right of Way AvailabilityIssues Requirements to secure additional right-of-way andor agreements from other parties to complete the path improvements

Possible Environmental Issues Possible issues related to geologic stability storm drainage biological or cultural resources aesthetics noise water quality or other factors typically addressed during the state or federal environmental review process

Adjacent Property Issues Issues related to path construction or users on adjacent properties and conceptual feasibility to address these issues (eg tree impacts visible retaining walls local vehicularbicyclepedestrian access and circulation on-street parking retention landscaping driveway accessconfl icts)

Neighborhood Compatibility Potential for traffi c calming and ability to maintain neighborhood privacy and views

Cost The relative cost of implementation of the alternatives ndash including studies planning fi nal design permitting acquisition and construction The evaluation will also consider the relative certainty of the estimated cost based on available information

Potential for Funding Ability to meet the requirements of potential funding sources (eg are the facility types considered part of the Bay Trail)

Permitting Requirements Potentially required permits from State and Federal agencies the likelihood of obtaining permits and the impact on cost and schedule

Maintenance Operation Requirements The relative requirements and feasibility of maintaining and managing the facility including ability of the responsible party(ies)

This Bay Trail Gap Closure Study represents an important opportunity for the Town of Tiburon in coordination with the Bay Trail County of Marin and Caltrans to prepare a plan for closing a key gap in the San Francisco Bay Trail System as well as the Townrsquos and Marin Countyrsquos local and regional bike and pedestrian circulation systems

The objective of the feasibility study is to evaluate and develop concepts to enhance service of bicycle and pedestrian traffi c between McKegney Green to Strawberry Drive including portions of Tiburon Boulevard and Greenwood Beach RoadGreenwood Cove Drive

The major elements of the feasibility study are the analysis and preliminary design of a clear and continuous Bay Trail route for bicyclists pedestrians and other trail users Ideally the trail would be a separated Class I path meeting Bay Trail guidelines but there are many challenges and opportunities to be addressed in how the trail can actually be confi gured as it passes through the various land uses and terrain along the corridor The draft concepts presented here follow the Bay Trail design guidelines as well as Caltrans engineering standards for the Design of Class I paths and associated design elements contained in Chapter 1000 of the Highway Design Manual

This feasibility study is funded by an Association of Bay Area Government (ABAG) grant ABAG manages the San Francisco Bay Trail program

Potential Evaluation Criteria for Selecting the Preferred Tiburon Bay Trail AlignmentThe following draft evaluation criteria are based on input gathered during the fi rst stage of the Study (not listed in particular order)

Objective and Scope

M

d

Richardson BayAudubon Center

StrawberryPoint School

se

MMMMMMM

dd

Richardson BayRichardson Bayrb CAudubo CA dAA b C tAudubon Center

StrawberryStrawberryPoint SchPoint School

se

McKegney Field

BlackiesPasture

Town of TiburonMarin County

Town of TiburonMarin County

Tiburon Blvd

E St

raw

berr

y D

r

Reed Ran

Virginia Dr

Juno Rd

Bay

Vis

Stewart DrBrunini W

ay

Trest

le G

len B

lvd

Greenwood Beach Rd

Greenwood Cove Dr

dere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Andrew Dr

Irving Ct

Silverado Dr

cilia Way

Comstock D

r

Harbor Cove Way Barbaree Way

Janet Way

Pamela

Ct

Upper North

Ter

Cec

Southridge Dr

Har

riet W

ay

Salt

Lnd

g

Town of TiburonMarin County

Town of TiburonMarin County

a Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

LegendBay Trail

Unimproved Bay Trail

Tiburon Bay Trail Gap Study Area

Page 2 | June 20 2012 | Tiburon Bay Trail Gap Study

San Francisco Bay Trail

What facilities can be part of the Bay Trail

What facilities are not considered part of the Bay Trail

What is ldquoBay Trailrdquo What is notWhile the goal of the Bay Trail is a Class I paved fully separated multi-use pathway as close to the shoreline as possible in certain locations this is simply infeasible (Port of Oakland San Francisco International Airport military installations etc) When a multi-use path is not possible the Bay Trail Steering Committee may considermdashon a case by case basismdashthe acceptance of Class II bike lanes and sidewalks as an acceptable solution A Class III bike route (simply signage and striping) is not acceptable as either proposed or complete Bay Trail As such a Class III bike route facility is not eligible for grant funding and would be considered a gap in the Bay Trail

Mission of the San Francisco Bay Trail ProjectThe Bay Trail Project is a nonprofi t organization administered by the Association of Bay Area Governments (ABAG) that plans promotes and advocates for the implementation of a continuous 500-mile multi-use bicycling and hiking path around San Francisco Bay When complete the trail will pass through 47 cities all nine Bay Area counties and cross seven toll bridges To date slightly more than half the length of the Bay Trail alignment has been developed

Bay Trail Grant FundsIn Marin 36 of 95 Bay Trail miles are complete Through various park bond funds provided by the State Coastal Conservancy the Bay Trail grant program helps speed completion of the trail by funding planning design and construction of trail segments Since the early 1990rsquos Bay Trail grants in excess of $20000000 have funded 13 such projects in Marin

San Francisco Bay Trail Facility Types Facilities Not Considered Part of the San Francisco Bay Trail

Bay Trail

Existing

ProposedStudy Area

Class I shared-use paths

Streets with a combination of Class II bike lanes and sidewalks

Streets with a combination of Class III bike routes and sidewalks

Bicycle boulevards with sidewalks

Tiburon Bay Trail Gap Study | June 20 2012 | Page 3

Bay Trail Gap Study Segments (East to West)Segment 1 McKegney Field to Blackiersquos Pasture parking lotSegment 2 Blackiersquos PastureGreenwood Beach Road connectionSegment 3 Greenwood Beach Road from eastern terminus to TownCounty boundary)Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon BoulevardSegment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry DriveSegment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive intersection to Harbor Cove Way Segment 7 Harbor Cove WaySegment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Conceptual Improvements Study Segments

Page 4 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot

12rsquo

12rsquo

12rsquo

Multi-use path

Eastboundmulti-use path

Bi-directional pedestrian path

6rsquo

6rsquo

6rsquo

Buff er

Buff er

Buff er

10rsquo

10rsquo

10rsquo

Multi-use path

Westbound multi-use path

Bi-directional bikeway

Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed for westbound pedestrians and bicyclists the southern portion would be signed for eastbound pedestrians and bicyclists Estimated construction cost $30000

Existing Section

Bay Trail Segment ConceptsOption A

Option B Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed as a bi-directional bikeway the southern portion would be signed as a bi-directional pedestrian path Estimated construction cost $30000

Existing Condition Bay Trail (looking west)Description The Bay Trail route consists of a 16- to 28-foot wide travel way that is used by pedestrians bicyclists and vehicles accessing the wastewater treatment plant and public restrooms located east of Blackiersquos Pasture Where the path is approximately 28-feet wide (between the Marin County Bike Route 10Marin County Bike Route 17 junction and the southern wastewater treatment plant ingressegress) the path includes an approximately 6-foot wide striped median buff er

Bay Trail (looking west)

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 2: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page i

Objective Scope and Potential Evaluation Criteria Page 1

San Francisco Bay Trail Page 2

Conceptual Improvements Page 3

Wayfi nding Page 17

Appendix 1

Appendix 1A Issues Maps Appendix 1B Existing Conditions Opportunities and Constraints Maps and Sign Inventory Appendix 1C Parking Survey and Pedestrian Bicycle and Vehicular Count Results Appendix 1D Preliminary Environmental Analysis Appendix 1E Preliminary Cost Estimates

Appendix 2

Appendix 2A Supplemental Assessment of East Strawberry Drive and Harbor Cove Way

Town CouncilJim Fraser Mayor

Emmett OrsquoDonnell Vice MayorRichard CollinsAlice Fredericks

Frank Doyle

Parks Open Space amp Trails CommissionPeter Winkler Chair

Michael McMullen Vice ChairPark Allen

Robert McDermottPhilip Feldman

Technical Advisory CommitteeDan Watrous Project Manager Planning Manager Town of Tiburon

Nicholas Nguyen Director of Public Works amp Town Engineer Town of TiburonCarey Lando Senior Transportation Planner County of Marin DPW

Maureen Gaff ney Bay Trail Planner Association of Bay Area Governments

Consultant TeamRandy Anderson Principal Alta Planning + Design

David Parisi PE TE Project Manager Parisi AssociatesKristin Maravilla PlannerDesigner Alta Planning + Design

Nancy Dakin Woltering Environmental Planner Alta Planning + DesignRandell Harrison PE Harrison Engineering Inc

This feasibility study is funded by an Association of Bay Area Government (ABAG) grant ABAG manages the San Francisco Bay Trail program

ContentsAcknowledgements

Tiburon Bay Trail Gap Study | June 20 2012 | Page 1

Objective Scope and Potential Evaluation Criteria

Emergency Access and Response Ability to meet the requirements of local emergency agencies to respond to fi re police or medical emergencies on the route and provide the safety and security features identifi ed

Bikeway and Community Connections Direct and convenient access to other routes and destinations paths or bikeways schools parks commercial or employment areas

User Experience Route provides views of scenic areas and minimizes exposure to noise and exhaust

FunctionalityEffi ciency Function for the intended and likely user groups based on adopted local state or federal design criteria and ability to address potential confl icts between user groups pedestrians bicyclists and persons with disabilities

Right of Way AvailabilityIssues Requirements to secure additional right-of-way andor agreements from other parties to complete the path improvements

Possible Environmental Issues Possible issues related to geologic stability storm drainage biological or cultural resources aesthetics noise water quality or other factors typically addressed during the state or federal environmental review process

Adjacent Property Issues Issues related to path construction or users on adjacent properties and conceptual feasibility to address these issues (eg tree impacts visible retaining walls local vehicularbicyclepedestrian access and circulation on-street parking retention landscaping driveway accessconfl icts)

Neighborhood Compatibility Potential for traffi c calming and ability to maintain neighborhood privacy and views

Cost The relative cost of implementation of the alternatives ndash including studies planning fi nal design permitting acquisition and construction The evaluation will also consider the relative certainty of the estimated cost based on available information

Potential for Funding Ability to meet the requirements of potential funding sources (eg are the facility types considered part of the Bay Trail)

Permitting Requirements Potentially required permits from State and Federal agencies the likelihood of obtaining permits and the impact on cost and schedule

Maintenance Operation Requirements The relative requirements and feasibility of maintaining and managing the facility including ability of the responsible party(ies)

This Bay Trail Gap Closure Study represents an important opportunity for the Town of Tiburon in coordination with the Bay Trail County of Marin and Caltrans to prepare a plan for closing a key gap in the San Francisco Bay Trail System as well as the Townrsquos and Marin Countyrsquos local and regional bike and pedestrian circulation systems

The objective of the feasibility study is to evaluate and develop concepts to enhance service of bicycle and pedestrian traffi c between McKegney Green to Strawberry Drive including portions of Tiburon Boulevard and Greenwood Beach RoadGreenwood Cove Drive

The major elements of the feasibility study are the analysis and preliminary design of a clear and continuous Bay Trail route for bicyclists pedestrians and other trail users Ideally the trail would be a separated Class I path meeting Bay Trail guidelines but there are many challenges and opportunities to be addressed in how the trail can actually be confi gured as it passes through the various land uses and terrain along the corridor The draft concepts presented here follow the Bay Trail design guidelines as well as Caltrans engineering standards for the Design of Class I paths and associated design elements contained in Chapter 1000 of the Highway Design Manual

This feasibility study is funded by an Association of Bay Area Government (ABAG) grant ABAG manages the San Francisco Bay Trail program

Potential Evaluation Criteria for Selecting the Preferred Tiburon Bay Trail AlignmentThe following draft evaluation criteria are based on input gathered during the fi rst stage of the Study (not listed in particular order)

Objective and Scope

M

d

Richardson BayAudubon Center

StrawberryPoint School

se

MMMMMMM

dd

Richardson BayRichardson Bayrb CAudubo CA dAA b C tAudubon Center

StrawberryStrawberryPoint SchPoint School

se

McKegney Field

BlackiesPasture

Town of TiburonMarin County

Town of TiburonMarin County

Tiburon Blvd

E St

raw

berr

y D

r

Reed Ran

Virginia Dr

Juno Rd

Bay

Vis

Stewart DrBrunini W

ay

Trest

le G

len B

lvd

Greenwood Beach Rd

Greenwood Cove Dr

dere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Andrew Dr

Irving Ct

Silverado Dr

cilia Way

Comstock D

r

Harbor Cove Way Barbaree Way

Janet Way

Pamela

Ct

Upper North

Ter

Cec

Southridge Dr

Har

riet W

ay

Salt

Lnd

g

Town of TiburonMarin County

Town of TiburonMarin County

a Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

LegendBay Trail

Unimproved Bay Trail

Tiburon Bay Trail Gap Study Area

Page 2 | June 20 2012 | Tiburon Bay Trail Gap Study

San Francisco Bay Trail

What facilities can be part of the Bay Trail

What facilities are not considered part of the Bay Trail

What is ldquoBay Trailrdquo What is notWhile the goal of the Bay Trail is a Class I paved fully separated multi-use pathway as close to the shoreline as possible in certain locations this is simply infeasible (Port of Oakland San Francisco International Airport military installations etc) When a multi-use path is not possible the Bay Trail Steering Committee may considermdashon a case by case basismdashthe acceptance of Class II bike lanes and sidewalks as an acceptable solution A Class III bike route (simply signage and striping) is not acceptable as either proposed or complete Bay Trail As such a Class III bike route facility is not eligible for grant funding and would be considered a gap in the Bay Trail

Mission of the San Francisco Bay Trail ProjectThe Bay Trail Project is a nonprofi t organization administered by the Association of Bay Area Governments (ABAG) that plans promotes and advocates for the implementation of a continuous 500-mile multi-use bicycling and hiking path around San Francisco Bay When complete the trail will pass through 47 cities all nine Bay Area counties and cross seven toll bridges To date slightly more than half the length of the Bay Trail alignment has been developed

Bay Trail Grant FundsIn Marin 36 of 95 Bay Trail miles are complete Through various park bond funds provided by the State Coastal Conservancy the Bay Trail grant program helps speed completion of the trail by funding planning design and construction of trail segments Since the early 1990rsquos Bay Trail grants in excess of $20000000 have funded 13 such projects in Marin

San Francisco Bay Trail Facility Types Facilities Not Considered Part of the San Francisco Bay Trail

Bay Trail

Existing

ProposedStudy Area

Class I shared-use paths

Streets with a combination of Class II bike lanes and sidewalks

Streets with a combination of Class III bike routes and sidewalks

Bicycle boulevards with sidewalks

Tiburon Bay Trail Gap Study | June 20 2012 | Page 3

Bay Trail Gap Study Segments (East to West)Segment 1 McKegney Field to Blackiersquos Pasture parking lotSegment 2 Blackiersquos PastureGreenwood Beach Road connectionSegment 3 Greenwood Beach Road from eastern terminus to TownCounty boundary)Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon BoulevardSegment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry DriveSegment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive intersection to Harbor Cove Way Segment 7 Harbor Cove WaySegment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Conceptual Improvements Study Segments

Page 4 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot

12rsquo

12rsquo

12rsquo

Multi-use path

Eastboundmulti-use path

Bi-directional pedestrian path

6rsquo

6rsquo

6rsquo

Buff er

Buff er

Buff er

10rsquo

10rsquo

10rsquo

Multi-use path

Westbound multi-use path

Bi-directional bikeway

Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed for westbound pedestrians and bicyclists the southern portion would be signed for eastbound pedestrians and bicyclists Estimated construction cost $30000

Existing Section

Bay Trail Segment ConceptsOption A

Option B Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed as a bi-directional bikeway the southern portion would be signed as a bi-directional pedestrian path Estimated construction cost $30000

Existing Condition Bay Trail (looking west)Description The Bay Trail route consists of a 16- to 28-foot wide travel way that is used by pedestrians bicyclists and vehicles accessing the wastewater treatment plant and public restrooms located east of Blackiersquos Pasture Where the path is approximately 28-feet wide (between the Marin County Bike Route 10Marin County Bike Route 17 junction and the southern wastewater treatment plant ingressegress) the path includes an approximately 6-foot wide striped median buff er

Bay Trail (looking west)

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 3: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 1

Objective Scope and Potential Evaluation Criteria

Emergency Access and Response Ability to meet the requirements of local emergency agencies to respond to fi re police or medical emergencies on the route and provide the safety and security features identifi ed

Bikeway and Community Connections Direct and convenient access to other routes and destinations paths or bikeways schools parks commercial or employment areas

User Experience Route provides views of scenic areas and minimizes exposure to noise and exhaust

FunctionalityEffi ciency Function for the intended and likely user groups based on adopted local state or federal design criteria and ability to address potential confl icts between user groups pedestrians bicyclists and persons with disabilities

Right of Way AvailabilityIssues Requirements to secure additional right-of-way andor agreements from other parties to complete the path improvements

Possible Environmental Issues Possible issues related to geologic stability storm drainage biological or cultural resources aesthetics noise water quality or other factors typically addressed during the state or federal environmental review process

Adjacent Property Issues Issues related to path construction or users on adjacent properties and conceptual feasibility to address these issues (eg tree impacts visible retaining walls local vehicularbicyclepedestrian access and circulation on-street parking retention landscaping driveway accessconfl icts)

Neighborhood Compatibility Potential for traffi c calming and ability to maintain neighborhood privacy and views

Cost The relative cost of implementation of the alternatives ndash including studies planning fi nal design permitting acquisition and construction The evaluation will also consider the relative certainty of the estimated cost based on available information

Potential for Funding Ability to meet the requirements of potential funding sources (eg are the facility types considered part of the Bay Trail)

Permitting Requirements Potentially required permits from State and Federal agencies the likelihood of obtaining permits and the impact on cost and schedule

Maintenance Operation Requirements The relative requirements and feasibility of maintaining and managing the facility including ability of the responsible party(ies)

This Bay Trail Gap Closure Study represents an important opportunity for the Town of Tiburon in coordination with the Bay Trail County of Marin and Caltrans to prepare a plan for closing a key gap in the San Francisco Bay Trail System as well as the Townrsquos and Marin Countyrsquos local and regional bike and pedestrian circulation systems

The objective of the feasibility study is to evaluate and develop concepts to enhance service of bicycle and pedestrian traffi c between McKegney Green to Strawberry Drive including portions of Tiburon Boulevard and Greenwood Beach RoadGreenwood Cove Drive

The major elements of the feasibility study are the analysis and preliminary design of a clear and continuous Bay Trail route for bicyclists pedestrians and other trail users Ideally the trail would be a separated Class I path meeting Bay Trail guidelines but there are many challenges and opportunities to be addressed in how the trail can actually be confi gured as it passes through the various land uses and terrain along the corridor The draft concepts presented here follow the Bay Trail design guidelines as well as Caltrans engineering standards for the Design of Class I paths and associated design elements contained in Chapter 1000 of the Highway Design Manual

This feasibility study is funded by an Association of Bay Area Government (ABAG) grant ABAG manages the San Francisco Bay Trail program

Potential Evaluation Criteria for Selecting the Preferred Tiburon Bay Trail AlignmentThe following draft evaluation criteria are based on input gathered during the fi rst stage of the Study (not listed in particular order)

Objective and Scope

M

d

Richardson BayAudubon Center

StrawberryPoint School

se

MMMMMMM

dd

Richardson BayRichardson Bayrb CAudubo CA dAA b C tAudubon Center

StrawberryStrawberryPoint SchPoint School

se

McKegney Field

BlackiesPasture

Town of TiburonMarin County

Town of TiburonMarin County

Tiburon Blvd

E St

raw

berr

y D

r

Reed Ran

Virginia Dr

Juno Rd

Bay

Vis

Stewart DrBrunini W

ay

Trest

le G

len B

lvd

Greenwood Beach Rd

Greenwood Cove Dr

dere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Andrew Dr

Irving Ct

Silverado Dr

cilia Way

Comstock D

r

Harbor Cove Way Barbaree Way

Janet Way

Pamela

Ct

Upper North

Ter

Cec

Southridge Dr

Har

riet W

ay

Salt

Lnd

g

Town of TiburonMarin County

Town of TiburonMarin County

a Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

LegendBay Trail

Unimproved Bay Trail

Tiburon Bay Trail Gap Study Area

Page 2 | June 20 2012 | Tiburon Bay Trail Gap Study

San Francisco Bay Trail

What facilities can be part of the Bay Trail

What facilities are not considered part of the Bay Trail

What is ldquoBay Trailrdquo What is notWhile the goal of the Bay Trail is a Class I paved fully separated multi-use pathway as close to the shoreline as possible in certain locations this is simply infeasible (Port of Oakland San Francisco International Airport military installations etc) When a multi-use path is not possible the Bay Trail Steering Committee may considermdashon a case by case basismdashthe acceptance of Class II bike lanes and sidewalks as an acceptable solution A Class III bike route (simply signage and striping) is not acceptable as either proposed or complete Bay Trail As such a Class III bike route facility is not eligible for grant funding and would be considered a gap in the Bay Trail

Mission of the San Francisco Bay Trail ProjectThe Bay Trail Project is a nonprofi t organization administered by the Association of Bay Area Governments (ABAG) that plans promotes and advocates for the implementation of a continuous 500-mile multi-use bicycling and hiking path around San Francisco Bay When complete the trail will pass through 47 cities all nine Bay Area counties and cross seven toll bridges To date slightly more than half the length of the Bay Trail alignment has been developed

Bay Trail Grant FundsIn Marin 36 of 95 Bay Trail miles are complete Through various park bond funds provided by the State Coastal Conservancy the Bay Trail grant program helps speed completion of the trail by funding planning design and construction of trail segments Since the early 1990rsquos Bay Trail grants in excess of $20000000 have funded 13 such projects in Marin

San Francisco Bay Trail Facility Types Facilities Not Considered Part of the San Francisco Bay Trail

Bay Trail

Existing

ProposedStudy Area

Class I shared-use paths

Streets with a combination of Class II bike lanes and sidewalks

Streets with a combination of Class III bike routes and sidewalks

Bicycle boulevards with sidewalks

Tiburon Bay Trail Gap Study | June 20 2012 | Page 3

Bay Trail Gap Study Segments (East to West)Segment 1 McKegney Field to Blackiersquos Pasture parking lotSegment 2 Blackiersquos PastureGreenwood Beach Road connectionSegment 3 Greenwood Beach Road from eastern terminus to TownCounty boundary)Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon BoulevardSegment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry DriveSegment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive intersection to Harbor Cove Way Segment 7 Harbor Cove WaySegment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Conceptual Improvements Study Segments

Page 4 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot

12rsquo

12rsquo

12rsquo

Multi-use path

Eastboundmulti-use path

Bi-directional pedestrian path

6rsquo

6rsquo

6rsquo

Buff er

Buff er

Buff er

10rsquo

10rsquo

10rsquo

Multi-use path

Westbound multi-use path

Bi-directional bikeway

Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed for westbound pedestrians and bicyclists the southern portion would be signed for eastbound pedestrians and bicyclists Estimated construction cost $30000

Existing Section

Bay Trail Segment ConceptsOption A

Option B Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed as a bi-directional bikeway the southern portion would be signed as a bi-directional pedestrian path Estimated construction cost $30000

Existing Condition Bay Trail (looking west)Description The Bay Trail route consists of a 16- to 28-foot wide travel way that is used by pedestrians bicyclists and vehicles accessing the wastewater treatment plant and public restrooms located east of Blackiersquos Pasture Where the path is approximately 28-feet wide (between the Marin County Bike Route 10Marin County Bike Route 17 junction and the southern wastewater treatment plant ingressegress) the path includes an approximately 6-foot wide striped median buff er

Bay Trail (looking west)

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 4: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 2 | June 20 2012 | Tiburon Bay Trail Gap Study

San Francisco Bay Trail

What facilities can be part of the Bay Trail

What facilities are not considered part of the Bay Trail

What is ldquoBay Trailrdquo What is notWhile the goal of the Bay Trail is a Class I paved fully separated multi-use pathway as close to the shoreline as possible in certain locations this is simply infeasible (Port of Oakland San Francisco International Airport military installations etc) When a multi-use path is not possible the Bay Trail Steering Committee may considermdashon a case by case basismdashthe acceptance of Class II bike lanes and sidewalks as an acceptable solution A Class III bike route (simply signage and striping) is not acceptable as either proposed or complete Bay Trail As such a Class III bike route facility is not eligible for grant funding and would be considered a gap in the Bay Trail

Mission of the San Francisco Bay Trail ProjectThe Bay Trail Project is a nonprofi t organization administered by the Association of Bay Area Governments (ABAG) that plans promotes and advocates for the implementation of a continuous 500-mile multi-use bicycling and hiking path around San Francisco Bay When complete the trail will pass through 47 cities all nine Bay Area counties and cross seven toll bridges To date slightly more than half the length of the Bay Trail alignment has been developed

Bay Trail Grant FundsIn Marin 36 of 95 Bay Trail miles are complete Through various park bond funds provided by the State Coastal Conservancy the Bay Trail grant program helps speed completion of the trail by funding planning design and construction of trail segments Since the early 1990rsquos Bay Trail grants in excess of $20000000 have funded 13 such projects in Marin

San Francisco Bay Trail Facility Types Facilities Not Considered Part of the San Francisco Bay Trail

Bay Trail

Existing

ProposedStudy Area

Class I shared-use paths

Streets with a combination of Class II bike lanes and sidewalks

Streets with a combination of Class III bike routes and sidewalks

Bicycle boulevards with sidewalks

Tiburon Bay Trail Gap Study | June 20 2012 | Page 3

Bay Trail Gap Study Segments (East to West)Segment 1 McKegney Field to Blackiersquos Pasture parking lotSegment 2 Blackiersquos PastureGreenwood Beach Road connectionSegment 3 Greenwood Beach Road from eastern terminus to TownCounty boundary)Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon BoulevardSegment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry DriveSegment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive intersection to Harbor Cove Way Segment 7 Harbor Cove WaySegment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Conceptual Improvements Study Segments

Page 4 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot

12rsquo

12rsquo

12rsquo

Multi-use path

Eastboundmulti-use path

Bi-directional pedestrian path

6rsquo

6rsquo

6rsquo

Buff er

Buff er

Buff er

10rsquo

10rsquo

10rsquo

Multi-use path

Westbound multi-use path

Bi-directional bikeway

Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed for westbound pedestrians and bicyclists the southern portion would be signed for eastbound pedestrians and bicyclists Estimated construction cost $30000

Existing Section

Bay Trail Segment ConceptsOption A

Option B Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed as a bi-directional bikeway the southern portion would be signed as a bi-directional pedestrian path Estimated construction cost $30000

Existing Condition Bay Trail (looking west)Description The Bay Trail route consists of a 16- to 28-foot wide travel way that is used by pedestrians bicyclists and vehicles accessing the wastewater treatment plant and public restrooms located east of Blackiersquos Pasture Where the path is approximately 28-feet wide (between the Marin County Bike Route 10Marin County Bike Route 17 junction and the southern wastewater treatment plant ingressegress) the path includes an approximately 6-foot wide striped median buff er

Bay Trail (looking west)

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 5: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 3

Bay Trail Gap Study Segments (East to West)Segment 1 McKegney Field to Blackiersquos Pasture parking lotSegment 2 Blackiersquos PastureGreenwood Beach Road connectionSegment 3 Greenwood Beach Road from eastern terminus to TownCounty boundary)Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon BoulevardSegment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry DriveSegment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive intersection to Harbor Cove Way Segment 7 Harbor Cove WaySegment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Conceptual Improvements Study Segments

Page 4 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot

12rsquo

12rsquo

12rsquo

Multi-use path

Eastboundmulti-use path

Bi-directional pedestrian path

6rsquo

6rsquo

6rsquo

Buff er

Buff er

Buff er

10rsquo

10rsquo

10rsquo

Multi-use path

Westbound multi-use path

Bi-directional bikeway

Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed for westbound pedestrians and bicyclists the southern portion would be signed for eastbound pedestrians and bicyclists Estimated construction cost $30000

Existing Section

Bay Trail Segment ConceptsOption A

Option B Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed as a bi-directional bikeway the southern portion would be signed as a bi-directional pedestrian path Estimated construction cost $30000

Existing Condition Bay Trail (looking west)Description The Bay Trail route consists of a 16- to 28-foot wide travel way that is used by pedestrians bicyclists and vehicles accessing the wastewater treatment plant and public restrooms located east of Blackiersquos Pasture Where the path is approximately 28-feet wide (between the Marin County Bike Route 10Marin County Bike Route 17 junction and the southern wastewater treatment plant ingressegress) the path includes an approximately 6-foot wide striped median buff er

Bay Trail (looking west)

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 6: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 4 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot

12rsquo

12rsquo

12rsquo

Multi-use path

Eastboundmulti-use path

Bi-directional pedestrian path

6rsquo

6rsquo

6rsquo

Buff er

Buff er

Buff er

10rsquo

10rsquo

10rsquo

Multi-use path

Westbound multi-use path

Bi-directional bikeway

Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed for westbound pedestrians and bicyclists the southern portion would be signed for eastbound pedestrians and bicyclists Estimated construction cost $30000

Existing Section

Bay Trail Segment ConceptsOption A

Option B Description Enhanced wayfi nding signage and markings The northern portion of the trail would be signed as a bi-directional bikeway the southern portion would be signed as a bi-directional pedestrian path Estimated construction cost $30000

Existing Condition Bay Trail (looking west)Description The Bay Trail route consists of a 16- to 28-foot wide travel way that is used by pedestrians bicyclists and vehicles accessing the wastewater treatment plant and public restrooms located east of Blackiersquos Pasture Where the path is approximately 28-feet wide (between the Marin County Bike Route 10Marin County Bike Route 17 junction and the southern wastewater treatment plant ingressegress) the path includes an approximately 6-foot wide striped median buff er

Bay Trail (looking west)

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 7: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 5

New ldquoShare Pathrdquo stencilsNew diagonal striping along median

Bay Trail Segment ConceptsOption A Sample Stencils

(Black and green contrast panels are optional)

Option B

Segment 1 McKegney Field to Blackiersquos Pasture Parking Lot (cont)

0 8 16Feet

0 8 16Feet

New bicycle only stencils and centerline stripe

Existing chevron striping along median

New pedestrian only stencils

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 8: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 6 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

10rsquo

10rsquo

10rsquo

2rsquo

2rsquo

2rsquo

4rsquo

4rsquo

2rsquo

Parking

Multi-use path

Multi-use path

Multi-use path

Buff er

Buff er Parking

30rsquo-8rdquo

23rsquo-8rdquo

20rsquo8rsquo

Travel way

Travel way

Travel way

Existing Section

Bay Trail Segment ConceptsOption A

Option B

Option C(South of Blackiersquos Grove)

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the access roadbull Parking impact Loss of 4 to 5 spacesbull Tree impact Nonebull Estimated construction cost $40000

Description Improve pedestrian and bicycle path along access road south of the parking lot pave gravel shoulder that serves as on-street parking and provide a 4-foot wide striped buff er between the 10-foot wide multi-use path and the parking aisle Move the existing fence approximately 4 feet to the southbull Parking impact Nonebull Tree impact 1 treebull Estimated construction cost $50000

Description Blackiersquos Pasture is served by an access road with on-street parking and two parking lots In addition to Blackiersquos Pasture and the Bay Trail the access road is used by service vehicles driving to and from the wastewater treatment plant and public restroom located east of Blackiersquos Pasture The Bay Trail route runs along the access road south of the southern parking lot Pedestrians bicyclists and motorists share this travel way An unpaved pedestrian path exists on the south side of Blackiersquos Grove

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection

Existing Condition Bay Trail (looking west)

Access way and gravel parking area south of Blackiersquos Pasture Parking Lot (looking west)

Blackiersquos Grove and pedestrian path (looking west)

Blackiersquos Grove

BlackiersquosPasture

Section line for Option C

Section line for Options A amp B

BlackiersquosPasture

Parking Lot

0 40 80Feet

30rsquo-8rdquo

Description Route Bay Trail south of Blackiersquos Pasture parking lot (avoiding Blackiersquos Grove) bull Parking impact Nonebull Tree impact Nonebull Trail alignment could affect the viewshed from Blackiersquos Grovebull Blackiersquos Grove is enjoyed for passive use Existing use of this area would be impacted by placing a trail in this locationbull Estimated construction cost $50000

Relocate fence approx 4 feet south

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 9: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 7

Option B Option C

Segment 2 Blackiersquos PastureGreenwood Beach Road Connection (cont)

Bay Trail Segment ConceptsOption A

23rsquo-8rdquo

23rsquo-8rdquo

Blackiersquos Grove Blackiersquos Grove Blackiersquos Grove

20rsquo-0rdquo

8rsquo-0rdquo

23rsquo-8rdquo

23rsquo-8rdquo 30rsquo-8rdquo

0 20 40Feet 0 20 40

Feet0 20 40

Feet

New 10-foot wide path

Existing edge of pavement

Parking aisle relocatedNew 10-foot wide path

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ers

New 4-foot wide striped raised (eg with a 6-inch curb) or

landscaped buff ersNew 5-foot wide pedestrian pathNew crosswalk

Existing fence to be removed Existing fence to be removed

New fence New fence

New 10-foot wide path

New 5-foot wide pedestrian pathNew crosswalkExisting edge of

pavement

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 10: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 8 | June 20 2012 | Tiburon Bay Trail Gap Study

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary

Existing Section

Bay Trail Segment Concepts

Existing Condition Greenwood Beach Road (looking west)

Ex e

dge o

f pav

emen

t

Ex e

dge o

f pav

emen

t

Greenwood Beach Road (looking west) (both photos)

Options considered but not to be pursuedbull 12-foot (+-) wide Class I path along north side of the roadwaybull Six-foot (+-) wide pedestrian path along north side of Greenwood Beach Road circumventing the northern boundary of the Tiburon Baptist Church property then connecting again to Greenwood Beach Road

Option A

Option C

Option B

Description Striped 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road shared lane use arrows (sharrows) Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1600 linear feet height varies from 05 to 101 feet (3 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2950000

Description Greenwood Beach Road is a collector street connecting to bicyclepedestrianemergency vehicle access on the east and transitions into Greenwood Cove Road at the TownCounty boundary on the west It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Greenwood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Widen travel way to 20 feetbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1200 linear feet height varies from 05 to 97 feet (4 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $2450000

Description Raised or separated 6-foot (+-) bi-directional pedestrian path along north side of Green-wood Beach Road (eg asphalt curbberm curb and sidewalk colored concrete sidewalk decomposed granite pathway with binder) sharrows Maintain 16- to 18-foot wide travel way with passing bays Remove double yellow centerline marking and add edgelinesbull Parking impact Some parking limitations along the north side of the road Parking would be allowed where adequate shoulder is available (non-sloped areas) and where parking pull-outs would be provided Parking demand on the north side of road is generally lowbull Retaining wall 1000 linear feet height varies from 05 to 6 feet (2 wall segments)bull Changes to the storm drain system could affect some existing vegetation that would need to be evaluated for potential wetlands New drains may require installation of erosion filtering components if they drain directly to the Baybull Estimated construction cost $1600000

8rsquo

8rsquo

8rsquo

8rsquo

6rsquo

6rsquo

6rsquo

Parking

Parking

Parking

Parking

Pedestrian path

Pedestrian path

Pedestrian path

16rsquo-19rsquo

20rsquo

20rsquo

16rsquo - 18rsquo

Travel way

Travel way

Travel way

Travel way

Stripe

Curb

Curb

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 11: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 9

Tiburon Blvd Tiburon Blvd

Greenwood Beach Rd

ove Dr Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

iTo

wn

of

Segment 3 Greenwood Beach Road from Eastern Terminus to TownCounty Boundary (cont)

Bay Trail Segment Concepts

24rsquo-0rdquo min

0 65 130Feet

Sample Retaining Walls

New 6-foot wide pedestrian path

Potential passing bay location

Potential gateway treatment

Option C (shown) allows for a minimum 16- to 18-foot travel way and an 8-foot wide parking aisle on the south side of Greenwood Beach Drive

Tiburon Baptist Tiburon Baptist ChurchChurch

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 12: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 10 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon BlvdGreenwood Beach Rd

Greenwood Cove Dr

Mar

in C

ount

y

Tow

n of

Tib

uron

Mar

in C

ount

y

Tow

n of

Tib

uron

Segment 3 Segment 4 Possible Gateway Treatment

Additional Concepts (Both Options) Crosswalk and possible gateway treatment near TownCountyAudubon property for options where pedestrian path on north side of Greenwood Beach Road ends at TownCounty boundary Consider Audubon parking lot improvements where parking ingressegress would cross the path

A gateway could provide the following benefi tsbull Traffic calmingbull Improved visibility of a new pedestrian and bicycle roadway crossingbull Identification of the shared nature of Greenwood Beach Road

The gateway could incorporate a TownCounty entry monument or gateway structure enhanced crossing treatments and landscaping

Monument signs and gateway structures

Enhanced crossing treatments

Signage curb extensions and high visibility crosswalk

Refuge median with plantings

Stampedtextured and colored crosswalkAudubon entrance Greenwood Beach RoadGreenwood Cove Drive at potential gateway location (looking west)

Landscaping

Potential gateway treatment at TownCounty limit or Audubon entrance

could include enhance crossing improvements a gateway structure

lighting andor landscaping

Possible pedestrian or shared-use path alignment

Existing sidewalk on the south side of

Greenwood Cove Drive

Begin existing sidewalk

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 13: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 11

Option ABay Trail Segment Concepts

Existing Section

Option B Description Six-foot (+-) wide bi-directional pedestrian walkway on north side of Greenwood Cove Drivesouth side of Tiburon Boulevard or between Greenwood Cove Drive and Tiburon Boulevard Walkway could be a natural surface (eg decomposed granite with binder) or asphalt Add sharrowsbull Parking impact Nonebull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Maintain fi ve-foot wide sidewalk Add sharrowsbull Parking impact Nonebull Tree impact Nonebull Estimated construction cost $30000

Existing Condition Greenwood Cove Drive (looking west)Description Greenwood Cove Drive is a collector road extending from Greenwood Beach Road at the TownCounty limit on the east and connecting with Tiburon Boulevard on the north It is part of the San Francisco Bay Trail Route and Marin County Bicycle Route 10

Option D

Option C

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drive Add six-foot walk way on north side of curbbull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of streetbull Tree impact up to 40 treesbull Retaining wall at east end 220 linear feet height varies from 05 to 57 feetbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 13)bull Estimated construction cost $550000

Description Five-foot (+-) wide bike lanes and eight-foot (+-) wide parking aisle on south side of Greenwood Cove Drive Two 11-foot wide vehicle travel lanes No change to existing fi ve-foot wide sidewalk Remove parking along north side of Greenwood Cove Drivebull Parking impact Parking prohibited for 1400 linear feet on north side however existing parking demand is limited and can be accommodated on south side of street Any proposed parking restrictions would require approval by the County of Marinbull Estimated construction cost $40000

Segment 4 Greenwood Cove Drive from TownCounty boundary to Tiburon Boulevard

Greenwood Cove Drive (looking west)

Setback varies

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 8rsquo 6rsquo

ParkingSide-walk

Parking Pedestrian path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo 5rsquo 5rsquo

ParkingSide-walk

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 6rsquo

ParkingSide-walk

Pedestrian pathSetback

varies

5rsquo 5rsquo

Bike lane

Bike lane

11rsquo 11rsquo

Travel lane Travel lane

8rsquo5rsquo 8rsquo

ParkingSide-walk

Parking

12rsquo 12rsquo

Travel lane Travel lane

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 14: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 12 | June 20 2012 | Tiburon Bay Trail Gap Study

9rsquo

8rsquo

8rsquo

8rsquo

8rsquo

12rsquo

12rsquo

20rsquo

13rsquo

9rsquo

8rsquo

12rsquo

12rsquo

12rsquo

12rsquo

Shoulder

Shoulder

Shoulder

Shoulder

Sidewalk

Class I path

Class I path

Travel lane

Travel lane

Travel lane

Travel lane

12rsquo

12rsquo

12rsquo

12rsquo

Travel lane

Travel lane

Travel lane

Travel lane

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive

Bay Trail Segment ConceptsOption A

Option B

Description Eight-foot (+-) side sidewalk along the south side of Tiburon Boulevard maintain Caltrans shoulder Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 68 feet bull Roadway excavation 130 cubic yards import 120 cubic yardsbull Pedestrian Bridge 1bull Tree impact 35 to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2100000

Description12-foot (+-) wide Class I path along the south side of Tiburon Boulevard maintain Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) Single span bridge over sloughbull Retaining wall 740 linear feet height varies from 05 to 107 feet bull Roadway excavation 80 cubic yards Import 330 cubic yardsbull Pedestrian Bridge 1bull Tree impact up to 45 treesbull Removal of eucalyptus trees would result in some visual impact and loss of privacy and could affect nesting habitat for birdsbull Would require BMPs to avoid sedimentation entering the sloughbull A drainage plan would be required to avoid site drainage into back yards of homesbull Minor modifications to Tiburon BlvdE Strawberry Dr intersection (see pg 13)bull Estimated construction cost $2550000

Eastbound Tiburon Boulevard (looking west)

Culverts under Tiburon Boulevard (looking northwest)

Existing SectionExisting Condition Eastbound Tiburon Boulevard (looking west)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH It is part of Marin County Bicycle Route 10

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 15: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 13

Tiburon Blvd

E Strawberry D

r

Bay Bl

a

Belvedere Dr

Greenwood Bay Dr

Greenw

o

od Cove Dr

0 40 80Feet

Segment 5 Tiburon Boulevard from Greenwood Cove Drive to E Strawberry Drive (cont)

Options A and B

Sample Footbridges

Marin County Bike Route 8

New bridge over existing culverts (see sample footbridge photos)

Drainage wayNew sidewalk (Option A) or path (Option B) to connect

with existing path along Greenwood Bay Drive and recommended facilities along Greenwood Cove Drive

The Cove Shopping Center

Redesign of right turn onto Greenwood Cove Drive may be needed to accommodate sidewalk (Option A) or path (Option B)

Segment 4 path (Options B and D) would continue within public right-of-way on south side of 76 gas station and could

connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring

minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) could connect with Belvedere Drive via a marked and signalized crosswalk across East Strawberry Drive at Tiburon Bouevard (requiring minor intersection modifi cations)

New sidewalk (Option A) or path (Option B) to connect with existing sidewalk on East Strawberry Drive

To Strawberry Point School

DaycareDaycare Westminster Westminster Presbyterian Presbyterian

ChurchChurch

Existing path along Greenwood Bay Dr

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 16: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 14 | June 20 2012 | Tiburon Bay Trail Gap Study

8rsquo TYP

8rsquo TYP

8rsquo TYP

8rsquo TYP

Pedestrian path

Travel way won-street parking

Travel way won-street parking

Pedestrian path

5rsquo-6rsquo

20rsquo

20rsquo

5rsquo-6rsquo

Option ABay Trail Segment Concept

Bay Trail Segment Concept

Description Pavement improvements and wayfi nding signage and markings bull Roadway excavation 160 cubic yardsbull Estimated construction cost $150000

Segment 6 Options considered but not to be pursuedbull Widen existing path to 12-foot (+-) wide Class I path

Option A Description No change

Segment 7 Options considered but not to be pursuedbull Shared lane markings not further considered due to approx 25 grade of roadway just east of E Strawberry Drbull Six-foot (+-) sidewalk along the north side of Harbor Cove Way maintain 20-foot wide travel waybull 12-foot wide (+-) Class I path along the north side of Harbor Cove Way maintain 20-foot wide travel way

Segment 6 San Francisco Bay Trail from Greenwood Bay DriveGreenwood Cove Drive Intersection to Harbor Cove WaySegment 7 Harbor Cove Way

Existing Section

Existing Section

Existing Condition Path (looking south)

Existing Condition Harbor Cove Way (looking west)

Description Part of the San Francisco Bay Trail route this fi ve- to six-foot wide asphalt path connects Greenwood Cove Drive in the north to a foot bridge in the south West of the foot bridge a four-foot wide path connects with Harbor Cove Way The public path is owned and maintained by Marin Cay Condominiums

Description Harbor Cove Way is a two-way residential street Parking is permitting along the majority of the south side of the street According to MarinMap the right-of-way width along Harbor Cove Way varies from approximately 34 to 42 feet Harbor Cove Way is part of the San Francisco Bay Trail Route

Path along Greenwood Bay Drive (looking south)

Harbor Cove Way (looking west)

Reconstruct path

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 17: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 15

8rsquo 4rsquo12rsquoShoulder Shoul-

derTravel lane

12rsquoTravel lane

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive

Existing Section

Option A(Section along Tiburon Boulevard)

Bay Trail Segment Concepts

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to approximately the TownCounty Boundary maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench) West of the TownCounty boundary 12-foot (+-) wide Class I path along north side of Greenwood Cove Drive bull Parking impact Parking prohibited for 1400 linear feet on north side of Greenwood Cove Dr however existing parking demand is limited and can be accommodated on south side of streetbull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 57 feet (lowered path)bull Tree impact up to 65 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $2800000 (at-grade path) to $3000000 (lowered path)

Description 12-foot (+-) wide Class I path along the south side of Tiburon Boulevard from Blackiersquos Pasture to Blackfi eld Drive intersection maintains Caltrans shoulder (path separated with barrier at highway elevation OR path below highway on bench)bull Parking impact Nonebull Retaining wall 1200 linear feet height varies from 05 to 58 feet (at-grade path) 1700 linear feet height varies from 05 to 51 feet (lowered path)bull Tree impact up to 75 treesbull Cantilever path over existing retailing wall 100 linear feetbull Emissions along arterial road would result in adverse conditions for many path usersbull Would require substantial grading and mitigation for erosionbull High speed corridor would not provide a relaxing recreation amenitybull As a commuter route existing and projected noise levels would be tolerable for path users as a recreation route noise levels would deter potential path usersbull Connects Blackiersquos Pasture with Strawberry Dr but lacks amenities for recreation usersbull Minor modifications to Tiburon BlvdGreenwood Cove Dr intersection (see pg 16)bull Estimated construction cost $3000000 (at-grade path) to $3100000 (lowered path)

Description Tiburon Boulevard through the Study Area is a major arterial consisting of a four-lane divided road The posted speed limit is 45 MPH

Option B(Eastern half of alignment see sections along Tiburon Boulevard aboveWestern half of alignment see section along Greenwood Cove Drive below)

Greenwood Cove Drive

Tiburon Boulevard

Eastbound Tiburon Boulevard (looking west) (both photos)

Existing Condition Eastbound Tiburon Boulevard (looking west)

8rsquo5rsquo 12rsquo

ParkingSide-walk

Class I path

12rsquo 12rsquo

Travel lane amp Class III bike route

Travel lane amp Class III bike route

8rsquo5rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

8rsquo12rsquo 4rsquo12rsquoShoul-

derShoulderClass I path Travel lane

12rsquoTravel lane

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 18: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 16 | June 20 2012 | Tiburon Bay Trail Gap Study

Tiburon Blvd

Tiburon Blvd

Tiburon Blvd

Blac

kfie

ld D

r

Greenwood Beach Rd

Greenwood Cove Dr

Cecilia Way

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Warrens Way

0 110 220Feet

A Class I path would cantilever over the existing retaining wall along Greenwood Beach Road for approximately 100 feet

The eastern half of Options A and B is aligned along the south side of Tiburon Boulevard

Segment 8 Options A and B would connect with existing and recommended facilities in Blackiersquos Pasture

The western half of Options B is aligned on the north side of Greenwood Beach

Road and Greenwood Cove Drive

Existing sidewalk on the south side of Greenwood Cove Drive

Possible gateway treatment

Segment 8 Options A and B would connect with existing and recommended facilities at the Tiburon Boulevard Blackfi eld Drive intersection

The western half of Option A is aligned along the south side of Tiburon Boulevard

Path could connect with Segment 5 via a marked and signalized crosswalk across Greenwood Cove Drive at Tiburon Boulevard (requiring minor intersection modifi cations)

Legend Option A Option B

Richardson BayRichardson BayAudubon CenterAudubon Center

amp Sanctuaryamp Sanctuary

Tiburon Baptist Tiburon Baptist ChurchChurch

Blackiersquos Pasture Blackiersquos Pasture Parking LotParking Lot

The Cove The Cove Shopping CenterShopping Center

Maintain access to bus stop from Greenwood Cove Drive

Segment 8 Tiburon Boulevard from Blackiersquos Pasture Road to Greenwood Cove Drive (cont)

Bay Trail Segment Concepts

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 19: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Tiburon Bay Trail Gap Study | June 20 2012 | Page 17

Wayfi nding Signage

Comprehensive and innovative map marking and signing systems (collectively ldquowayfi ndingrdquo) improve the experience of using trail and pathway networks A good wayfi nding system helps users know about fi nd follow and enjoy the trail The benefi ts of a wayfi nding system include

bull A Bay Trail identity that is recognizable and memorable

bull Improved awareness of the trail

bull Enhanced legibility for the public to find and follow the trail

bull A greater sense of security and comfort

bull Increased numbers of bicycle and walking trips

bull Better agency and inter-agency planning coordination and management

bull Improved emergency and maintenance access and coordination

A signage and directional system consisting of map kiosks Bay Trail medallions and signs directional wayfi nding signs and pavement markings already exists in the Study area Existing sign locations are shown on the Existing Conditions Opportunities and Constraints maps Photos of the signs are presented following that map set

A supplementary signage system for one combination of Study Segments has been developed with the intent of informing and educating users about the Bay Trail route and to help them fi nd their way The supplementary signage system includes the signs presented on this page Proposed sign locations are shown on the Conceptual Wayfi nding Signage Plan on the following page When placing signs it is important to avoid sign clutter and unnecessary

messages Signs should be located at entrances and intersections rather than placing sign elements intermittently along the route This would concentrate sign locations at trailheads (eg Blackiersquos Pasture) gateway entrances and decision points where intersecting trails meet Exceptions to this rule include confi rmation signs and accompanying regulatory information which is recommended to be at a small scale on bollard posts collocated with other signs or on paddle markers to avoid disrupting the trail experience

Direction signs guide users to destinations along trail These signs may include destination information (name distance and direction) Direction signs utilized in the Study Area include Bay Trail Marin County Bike Route and Public Shore signs

Wayfi nding systems typically include direction and confi rmation signs

Confi rmation signs provide en route reassurance of trail identity and visually mark the trail Confi rmation signs utilized in the Study Area include Bay Trail and Public Dock signs Additional Bay Trail and Public Shore confi rmation signs are recommended

Overview

Sign Placement

Direction Signs Confi mation Signs

Wayfi nding signs direct pedestrians and bicyclists along the Bay Trail route

Marin County Bicycle Route Sign

ABAG San Francisco Bay Trail

Confi rmation Sign

ABAG San Francisco Bay Trail

Direction Sign

BCDC Public Shore and Public Bock Direction Signs

BCDC Public Shore Confi rmation Sign

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment

Page 20: Town of Tiburonwalkbikemarin.org/documents/Bay Trail Gap Study - June... · 2012. 11. 13. · Town of Tiburon FINAL Bay Trail Gap Study PREPARED BY: Alta Planning + Design and Parisi

Page 18 | June 20 2012 | Tiburon Bay Trail Gap Study

McKegne

B

Richardson BayAudubon Center

amp Sanctuary

Richardson BayAudubon Center

amp Sanctuary

StrawberryPoint SchoolStrawberry

Point Schoollackies

Pasture

McKegne

BlackiesPasture

vd

E St

raw

berr

y D

r

Ree

Virginia Dr

Juno

Stewart DrBrunini Way

Trestle

Glen Blvd

Greenwood Beach Rd

Greenwood Cove Dr

vedere Dr

Cecilia Way

Jefferson Dr

Circle Dr

East Ter

Tiburon Blvd

Andrew Dr

Irving Ct

Silverado Dr

Way

Comstock D

r

Harbor Cove Way

Barbaree Way

Janet Way

Pamel

Upper North

Ter

Southridge Dr

Har

riet

Town of Tiburon

Marin County

Town of Tiburon

Marin County

Gre

enw

ood

Bay

Dr

Tiburon Blvd

Conceptual Wayfi nding Signage Plan

1

3

2

45

67

8

910

TownCounty BoundaryBay Trail RouteBicycle Route 8Bicycle Route 10Bicycle Route 17 BCDC Required Public AccessWayfi nding Sign(See Sign Inventory)

Direction Sign

Confi rmation Sign

Existing

Recommended Wayfi nding Signs

Legend

C

11

1213

14

15

16

17

1819

D

D

D

C

D

D

D

D

DC

C

C

C

C

This conceptual wayfi nding signage plan shows potential sign locations along one Study Segment combination Actual sign locations would be determined following selection of a preferred Bay Trail alignment