Town Municipal Council, Sidlaghatta Public Disclosure Schedule 2013 - 2014

Transcript of Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement &...

Page 1: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Town Municipal Council, Sidlaghatta

Public Disclosure Schedule

2013 - 2014

Page 2: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Content

Sl.no Particulars Page. no1 Urban planning including town planning 5-62 Regulation of Land- use and Construction of Buildings 7-83 Planning for Economic and Social development 94 Roads and Bridges 10-115 Water Supply- Domestic, Industrial and Commercial 12-146 Public Health, Sanitation, Conservancy and SWM 15-238 Urban forestry, protection of environment and ecology 24-2510 Slum Improvement & Up-gradation 26-2711 Urban Poverty Alleviation 28

12Provision of urban amenities and facilities- parks, gardens and playgrounds

29-30

13Promotion of cultural, educational, and aesthetic aspects

31

14Burials and burial grounds, cremations, cremation grounds and electric crematoriums

32

15 Cattle pounds, prevention of cruelty to animals 33

16Vital Statistics including registration of births and deaths

34-35

17Public amenities including street lighting, parking lots, bus stops and public conveniences

36-37

TMC, Sidlaghatta

Page 3: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

18 Regulation of slaughter houses and tanneries 38

TMC, Sidlaghatta

Page 4: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Formats for Disclosure

TMC, Sidlaghatta

Page 5: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Functions under 12th Schedule1. URBAN PLANNING INCLUDING TOWN PLANNING

Sl.No

Functions asper 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has tobe disclosed

Level of Disclosure (ULB/Ward)

Frequency ofDisclosure

Reference Remarks

1 Urban Planning including town Planning

1. Town Planning Authority

2. Urban Development Authority (UDA)

3. Municipal Planning Authority

(i) Report and Maps of Master Plans including Zoning Regulations

Plan in force now ULB 1. Annually2. To be notified as and when changes done

Table 1.1

(ii) Maps of Planning Districts

Plan in force now ULB 1. Annually2. To be notified as and when changes done

(iii) Details of provisional and finally approved layouts (Survey No, name of owner, Site details)

Previous three financial years including current year

ULB Half Yearly Table.1.2

4. ULB (iv) Report and maps of Comprehensive Development Plan (CDP)

Current plan ULB 1. Annually2. To be notified as and when changes done

TMC, Sidlaghatta

Page 6: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 1.1: Report and Maps of Master Plans including Zoning Regulations(Please fill in following information)Sl.No

Name of the reports related to Master Plan, Zoning Regulation andCDP

Enclosure in PDF

Maps related to Master Plan, Zoning Regulations, Planning District and CDP

Enclosure in PDF

1 - Enclosure - Enclosure

2 - Enclosure - Enclosure

3 - Enclosure - Enclosure

Table 1.2: Number of provisional and final approved layouts(Please fill in following information)

Years Number of provisional layouts Number of approved layouts Details of layout as enclosure

Current year -2013-14 - - Enclosure as per the format

Current year 11-2012-13 - - Enclosure as per the format

Current year 1- 2011-12 - - Enclosure as per the format

TMC, Sidlaghatta

Page 7: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Format:

Details of Provisional and final approved layouts Sl. No Name of

LayoutWhether provisional/approved Number of sites in the approved layout Name of the

owner/developer of the layout30*40 40*60 Odd sites

1 - - - - - -

2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGSSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency ofDisclosure

Reference Remarks

2 Regulation of Land- use and Construction of Buildings

UDA/ULB (i) Details of Building Commencement & Completion Certificate (Total application received, total permission granted, location details)

Previous three years including current year-2012-13

ULB Annually Table 2.1 (a)& Table.2.1 (b)

(ii) Details of Industries and commercial complexes approved (Survey No., Type, Name of the owner)

Previous three Financial years including current year-2013-14

ULB Annually Table 2.2

TMC, Sidlaghatta

Page 8: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 2.1 (a): Details of Building Commencement & Completion CertificateTotal number of application received for building plan approval from past three years

Total number of License granted from past three years

2013-14 2012-13 2011-12 2013-14 2012-13 2011-12

45 30 50 36 28 42

Table 2.1 (b): Details of the building plan approval for three years

TMC, Sidlaghatta

Page 9: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Format for enclosure Ref Table 2.1.b

Table 2.2: Details of approved Industries/Commercial Areas

TMC, Sidlaghatta

2013-2014Enclosure

2012-2013 Enclosure

2011-2012 Enclosure

- -

Mention year

Site area(Sq/feet) Built-up area(Sq/feet)

Location details

Ward Street name Property Number/ Survey Number- - - - - -

Page 10: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

2013-2014 Enclosure

2012-2013 NA

2011-2012 NA

Format reference to table 2.2

TMC, Sidlaghatta

Details Ward Number Street Name Survey Number Site Area(Sq/feet)

Built-up area (Sq/feet)

Owner name

Cur

rent

FY

1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

rent

FY

1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

rent

FY

1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

rent

FY

1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

rent

FY

1

Cur

rent

FY

-1

Cur

rent

FY

-2

Cur

rent

FY

1

Cur

rent

FY

-1

Cur

rent

FY

-2

Details in enclosure

- - - - - -- - - - - - - - - - - - -

Page 11: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENTSl.No

Functions as per12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has tobe disclosed

Level of Disclosure(ULB/Ward)

Frequencyof Disclosure

Reference

Remarks

3 Planning for Economic and Social development

ULB List and brief of the Social and Economic Development Schemes.-eg; 18% scheme, Ashraya and suchother Govt. programsDetails of budget allocation and expenditure of these schemesDetails of Beneficiaries

Previous three financial years including current year

ULB Annually Table 3.1

Table 3.1List and brief of the social and economic Development Schemes for three years

Current FY 2013-14

Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1 22.75% Scheme 40.25 16.10 Enclosure2 SJSRY 10.40 8.90 Enclosure3 Vajpayee - - Enclosure

Current FY-1 2012-13

Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1 22.75% Scheme 54.82 49.29 Enclosure2 SJSRY 12.53 10.74 Enclosure3 Vajpayee - - Enclosure

Current FY-2 2011-12

TMC, Sidlaghatta

Page 12: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed

1 22.75% Scheme 51.43 36.43 Enclosure

2 SJSRY 11.94 11.85 Enclosure

3 Vajpayee - - Enclosure

TMC, Sidlaghatta

Page 13: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

4. ROADS & BRIDGES 2013-14

Sl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

4 Roads and Bridges

ULBs & UDA (i) Total Road Length (type of road, its length and width)

Current status ULB/Ward Annually Table 4.1 MIS

(ii) Details of Roads proposed & executed forcarpeting/ re-carpeting.

Current year ULB Annually Table 4.2 (a) and 4.2 (b)

(iii) Percentage of footpath to the total roadlength of main roads

current status ULB Annually Table 4.3

Table 4.1: Road types

Total existing road length in kms

Water bound macadam

(WBM)

Bituminous Cement Concrete (CC) Mud road Total

- - 0.25KM - 0.25 KM

Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in 2013-2014 Year

TMC, Sidlaghatta

Page 14: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

(year to be mentioned numeric like 2010-11)

Type of road Total Road length approved and

tendered for carpeting in kms

Total Road length

approved and tendered for

re-carpeting in kmWater bound macadam (WBM) - -

Bituminous - -Cement Concrete (CC) 0.25 KM- 0.25 KM

Mud road - -Total 0.25 Km 0.25Km

Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in 2012-2013 year (year to be

mentioned numeric like 2010-11)

Format for enclosure reference table 4.2.b

Road length Approved and tendered for carpeting, WBM,

Bituminous and CC road (newly surfacing of the roads)

Road length Approved and Tendered for

re-carpeting, WBM, Bituminous and CC

TMC, Sidlaghatta

Type of road Total Road length

approved and tendered for

carpeting in kms

Total Road length approved and

tendered for re-carpeting in km

Water bound macadam (WBM) - Enclosure as per the format given belowBituminous

-Enclosure as per the format given below

Cement Concrete (CC) 0.3 km Enclosure as per the format given below

Mud road-

Enclosure as per the format given below

Page 15: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

road

Type of road Ward Number Street Name Length of

road in Kms

Type of

Road

Ward

Number

Street Name Length of road

in Kms

- - - - - - - -

Table 4.3: Footpath coverage to main roads

Total length of the main roads in ULB Jurisdiction : 70 KM

Total length of the footpath built against main road : Nil

TMC, Sidlaghatta

Page 16: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIALSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

5 Water Supply- Domestic, Industrial and Commercial

Water Board/ ULB

(i) Percentage of total water supply (Surfaced, Underground and external source)

current status ULB Level Half yearly Table 5.1 SLB1

(ii)Total number of connection & percentage of Coverage (Household/ public stand posts/ Commercial and Industrial Connection), quantity of w/s

current status ULB Level Half yearly Table 5.2 SLB

(iii) Frequency and Timing for Water Supply.

current status ULB Level Half yearly Table 5.3 SLB

(iv) Quality of Water Supply(percentage of samples complied with the Water Act norms)

current status ULB Level Half yearly Table 5.4 SLB

(v) Cost Recovery in Water Supply Services (Revenue Generated per KL of water/Cost incurred per KL of Water Supplied)

Previous three financial years including current year

ULB Level Annually Table 5.5 SLB

(vi) Water tariff Current status ULB Level Annually Table 5.6

1

TMC, Sidlaghatta

Page 17: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Format 5.1 -Per capita production of water

Water supplied through Surface Source 5.13 in MLD Water Supplied through Underground Source --1.77----in MLD

Water supplied through external source - in MLD

Format 5.2- Water Supply Coverage

Total Number of Households -6900-- in numbers

Number of house holds with direct water supply connections ----2610----- in numbers

Total number of Public Stand Posts ------190---- in numbers Total number of industrial connections - in numbers

Format 5.3- frequency & Timings of water supply Frequency and Timing for Water Supply

Number of days of water supply per week in

Normal season

Number of hours of water supply on any supplied day (Normal

season)

5 Days 1 hr

TMC, Sidlaghatta

Page 18: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Format 5.4- Quality of water supply

Total number of water samples collected at the consumer end - in Numbers/6 months Number of water samples that meet potable water standards - in Numbers/6 months

Format 5.5- Cost recovery in water supply (same as in SLB)

TMC, Sidlaghatta

Expenditure1 Total contractual (if outsourced) cost for Bore wells, O & M of

piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, salaries of Contract labours, vehicles etc)

Current Year(2013-2014)

Current FY-1 (2012-13)

CurrentFY -2(2011-2012)

2 Total expenditure borne by ULB on Bore wells, O & M of piped network, O & M of vented dam/ Impounding structure/ Jack well/ Intake well, valves, replacement of distribution network, supplying of spare materials, vehicles etc

68.0 55.0 30.0

3 Salaries of employees under water supply (Permanent and Dailywages

9.34 81.18 15.02

4 Purchase of items (for water treatment, for pumping machinery and spare parts if any

- - -

5 Electricity Bill for water supply (Surface source and Ground water)

- - -

Revenue1 Amount collected out of current year demand 43.12 - -2 Amount collected for providing new connection 0.45 - -

Page 19: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Format 5.6- Water Tariff Water Tariff

Present water charges (which ever is applicable)

Flat rate ( mention the rate)

slab Rate (Mention the slab)

Rs.80/- per month for Residential Rs.160/- per month for Commercial

TMC, Sidlaghatta

Page 20: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENTSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

6 Public Health, Sanitation, Conservancy andSWM

ULBs/ Water Board/ UDA

(i) Street Sweeping (road wise street sweeping schedule)

Current status as per action plan

ULB/Ward Half Yearly

Table 6.(a).1 & 6.(a).2

SWM Action Plan

(ii) General statistics on Solid Waste Management (Generation quantity, Details of the Secondary Collection Points, landfill location, user fee)

current status ULB Annually Table 6.(a).3.1&6.(a).3.2

SWM MIB

(iii) Percentage of HH covered under Door-to-Door Collection

current status ULB Half Yearly

Table 6.(a).4

SLB and MIB

(iv) Percentage of households participating in segregation

current status ULB Half Yearly

Table6.(a).5

(v) Extent of Scientific treated and Disposal of MSW (%)

current status ULB Annually Table 6.(a).5

SLB and MIB

(vi) Cost recovery under SWM (Revenue generated per ton of SW/ Expenditure per ton of SWM (in Rs.))

Previous three financial years including current year

ULB Annually Table 6.(a).6

SLB

Sewerage & Drainage:

TMC, Sidlaghatta

Page 21: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

(vii) Percentage of coverage of UGD

current status ULB Annually Table 6.(b).1

SLB

(viii) Percentage of WasteWater Treated

current status ULB Annually Table 6.(b).2

SLB

(ix) Percentage of extent of reuse and recycle of treated waste water

current status ULB Annually Table 6.(b).3

SLB

(x) Cost recovery under UGD (Revenue generatedunder UGD/ Expenditure under UGD (in Rs.))

previous three financial years including current year

ULB Annually Table 6.(b).4

SLB

Storm Water Drains

(xi) Statistics of storm Water Drains ( location, length and its cleaning frequency)

current status ULB Annually Table 6.(c).1

(xii) % age roadside drains to road length ( Paved and unpaved)

current status ULB Annually Table 6.(c).2

SLB

(xiii) Incidences of Water Logging and Flooding (No.s of cases per year/ total number of identified points)

current status ULB Annually Table 6.(c).3

SLB

Public Health (if applicable)

(xiv) No of Municipal Hospitals and its location details

Current Status ULB Annually Table 6.(d).1.1And 1.2

TMC, Sidlaghatta

Page 22: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

(xv) Facilities available &OPD Timings

Current Status ULB Annually

(xvi) Number of cases of vector Born Diseases per 1000 population

ULB Annually Table 6.(d).2

(xvii) Number of cases of Water Born Diseases per 1000 population

Annually

TMC, Sidlaghatta

Page 23: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 6(a).1 Private sector participation details for SWMPackage Number Scope of work Name of the

contractorContract period (dd/mm/yyyy to dd/mm/yyyy)

Contract value in Rs. In lakhs

- - - - -

Table 6(a).2Street Sweeping Schedule

Package number

ward number Road IDif available

Road name

Road lengthin Kms

Sun Mon Tue Wed Thu Fri Sat

01 1,2,3,4,5,6,7,8,9,10,11,15,20,14 A* type 7 Kms..…A type..…B type 12 Kms..…C type 20 Kms..…D type -..

Source: SWM Action Plan

Table 6(a).3.1

TMC, Sidlaghatta

Page 24: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Details Handled by SHG (No.s)

Handled by Service Provider, if applicable (No.s)

Handled by ULB (No.s)

Handled by RWA/NGO (No.s)

Non slum Household’s 7912 - - -

Slum Household’s Nill - - -commercial establishments 658 - - -

Bulk generators 06 - - -

Expected User fee generation (demand) No - - -

Table.6 (a) 3.2General statistics on Solid Waste ManagementTotal Quantity of waste generated in the city per day(TPD)

Total Quantity of waste Collected (TPD)

User fee Slab details enclosed

Resolution date passed from Council

Land fill location Number of secondary transportation vehicles under SWM

20 TPD 14 TPD - 12-01-2010 Hithala Halli 2

Secondary storage containers Location Map

Enclosure

Source: SWM Action Plan

TMC, Sidlaghatta

Page 25: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 6(a).4Number of Households participating in segregation 5578 Households

Table 6(a).5 Scientific Disposal of MSW

Total waste collected & transported to disposal sites 14 tons/day

Total waste processed in scientific manner 4 tons/day

Table 6(a).6 Cost recovery under SWM in Rs Lakhs

Expenditure1. Salary of the employees under SWM 3.60

2 Total Contractual cost if outsourced under MSWM for hiring services, vehicles or equipments, O& M of vehicles, fuel cost, labour cost etc.

-

3 Total expenditure borne by ULB on SWM for O & of M vehicles, purchase of tools and equipments, insurance cost for vehicles, landfill management cost like tipping fee etc.

-

Revenue1 Total Revenue generated under SWM

Sewerage

TMC, Sidlaghatta

Page 26: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table.6 (b) 1. UGD Coverage

Total Number of households with direct UGD Connections …6900……… in Numbers

Table.6 (b) 2 Percentage Waste Water treated

Total waste water collected at sewage treatment plant 0.5 in MLD

Quantity of waste water treated 0.5 in MLD

Table.6 (b) 3 extent of reuse and recycle of waste water

Quantity of waste water recycled & reused out of treated waste water -- in MLD (when mouse is moved on MLD then it

should show “million Liters per day”)

Table.6 (b) 4 Cost recoveries under UGD (Input screen)

Expenditure In Rs Lakhs 1. Electricity bill for sewage treatment plant2 Total salaries of ULB employees working in STP & UGD system 2.50

3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items, repair and replacement of spares, labor cost etc.)

-

Total O& M cost born by ULB under UGD and STP (purchase of items, repair and replacement of spares etc.)

-

Revenue1 Total revenue collected from UGD

-

Storm Water Drains

TMC, Sidlaghatta

Page 27: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table.6(c).1Statistics of storm water drains Name of major storm water drains Length in kms Cleaning frequency per annum

Settuguni Drain 0.8Bye pass Drain 1.2

Ashoka Raod Drain(Both sides) 1.2T.B.Raod(Both Sides) 1.4

2nd Karmik Nagar Main Road(Both Sides) 3.13rd Karmik Nagar Main Road(Both Sides) 3.1

Junior College Back Side 0.8Table.6 (c) 2Length of road side drains 59.3kms

Table.6 (c) 3Number of water logging and flooding cases per year in numbers 07

Total number of identified points in Numbers 03

Public Health to be filled by the ULBs if they are managing this function

TMC, Sidlaghatta

Page 28: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 6 (d).1.1Public HealthName of the Municipal hospitals

Location details Detail of facilitiesNumber of beds

Number of staff

OPD2 Timings of the OPD

Lab Facility (yes/No)

Others if any

- - - - - - -Table 6(d). 1.2Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000

population

- -

8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY

2 Out Patient department

TMC, Sidlaghatta

Page 29: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Sl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency ofDisclosure

Reference Remarks

8 Urban forestry, protection of environment and ecology

ULB Trees (if applicable)

(i) Number of tree cut/uprootedto the number of existing trees

current status

ULB Half Yearly Table 8.1

(ii) Number of sapling planted to the number of trees cut/uprooted to the number of existing trees

Current year ULB Half Yearly

Water bodies (if applicable)

(iii) Existing number, New Proposals for Revival of water bodies, budget and expenditure

current status

ULB Annual Table 8.2

Table.8.1 (To be filled by the ULBs if they are managing this function)

Urban forestry Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted

- - -

TMC, Sidlaghatta

Page 30: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table.8.2Protection of Environment and Ecology

Sl. No Name existing water bodies like lake, tanks, pond etc.

Proposed for revival in Yes/No Amount budgeted for revival in Rs.in lakhs

Expenditure metin Rs. in Lakhs

- - - - -Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned

10. SLUM IMPROVEMENT & UP-GRADATION

TMC, Sidlaghatta

Page 31: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Sl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

10 Slum Improvement & Up-gradation

ULB/UDA (i) Details on declaredand undeclared slums (numbers, location, number of households, population, area)

current status ULB/Ward Half yearly Table 10.1

(ii) Details of slum improvement schemes (schemes, slums benefited, budget and expenditure)

Previous three financial years including current year

ULB/Ward Half yearly Table 10.2.

(iii) Beneficiary list undereach scheme

current status ULB/Ward Half yearly Table 10.2

(iv) Status of Basic Services in Slums(a) No of connections - Water Supply & sanitation (% coverage)(b) Length of Roads and drains (paved and unpaved) (c) No and % of houses (pacca and katcha houses)

current status ULB/Ward Half yearly Table 10.3

TMC, Sidlaghatta

Page 32: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)Details of declared slums Enclosure as per the format given BelowDetails of un declared slums Enclosure as per the format given Below

Format for enclosure as mentioned in table 10.1Details of declared and undeclared slums

Name of the slum Declared/ Undeclared

Extent in Sq. mt Population Number of Households

A.K. Colony Ward No.8

Declared 0.2 1300 525

A.K. Colony Ward No.9

Declared 0.2 1015 626

2nd Karmik Nagar Undeclared 0.15 798 450

Mehaboob Nagar Undeclared 0.18 777 387

1st Karmik Nagar Undeclared 0.2 648 390

Rehamath Nagar Undeclared 0.15 716 703

Ashraya Layout Undeclared 0.25 774 257

Nisar palya Undeclared 0.2 977 497

TMC, Sidlaghatta

Page 33: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

3rd Karmik Nagar Undeclared 0.14 883 622

Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)

Current YearName of the slum

Improvement SchemesTotal Number of Budget and under

each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosureSlums Beneficiaries

- - - enclosureCurrent Year – 1

Name of the slumImprovement Schemes

Total Number of Budget and under each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure

Slums Beneficiariesenclosure

Current Year – 2Name of the slum

Improvement SchemesTotal Number of Budget and under

each Scheme (in Rs Lakhs)

Expenditure met under each scheme( in Rs Lakhs)

Beneficiary list as enclosure

Slums Beneficiaries

- - enclosure

Table 10.3 Basic Service status in Slums

Status of Basic services in Slums

TMC, Sidlaghatta

Page 34: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Total number ofhouseholds with

direct watersupply

connections(numeric)

Total numberof publictaps/mini

water cisterns(numeric)

Total lengthof roads

paved andunpaved in

Kms

Totalhouseholds

connected toUGD

(numeric)

Totallength of

roadside

drains inKms

Totalnumber ofHH with

individualtoilets

(numeric)

Number ofFunctionalCommunity

Toilets(numeric)

Total number ofpacca/kaccha

houses(numeric)

800 30 800

Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)

TMC, Sidlaghatta

Page 35: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

11. URBAN POVERTY ALLEVIATIONSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

11 Urban Poverty Alleviation

ULBs /DMA/UDA

(i) Details of the UrbanPoverty Alleviation Schemes (eg. Components of SJSRY )

Current status ULB Annually Table 11.1

Table 11.1 Details of Urban Poverty Alleviation

Name of Schemesunder urban

poverty alleviation(multiple entries)

Budget for the schemes

Expenditure met for the scheme

Number of beneficiaries under the scheme

list of the beneficiaries to beenclosed

All the information in this table are the works undertaken by ULB” (plz Insert this without fail)

TMC, Sidlaghatta

Page 36: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDSSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

12 Provision of urban amenities and facilities- parks, gardens and playgrounds

ULBs/UDAs Playground/ Parks/Gardens

(i) Percentage of area under parks and gardens to the total ULB area

Current status ULB Annually Table 12.1

(ii) Percentage of developed parks and gardens (%)

Current status ULB Annually Table 12.1

(iii) Number, Location, Area, Amenities, details of the maintaining agency

Current Status ULB Annually Table 12.2 (a) and 12.2 (b)

Table.12.1. Area reserved under Parks & Gardens

1. Total ULB area 5.0 in Sq.kms

2. Area reserved under Parks & Gardens 4372.93 Sq.meters

3. Area of developed parks and gardens 195.04 in sq. mts

Table.12.2 (a) Amenities under parks & Gardens

TMC, Sidlaghatta

Page 37: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Locations of the park

Park Area in sq. mt

Amenities available under each park (yes/no) Contact details of the Maintaining Agency

Children play area

Seating facility

Track for walking/jogging

Facility for exercise

Name Contact number(numeric)

2Nd TMCLayout

4177.89 No No No No - -

Municipal Park@ PumpHouse

ChintamaniRoad

195.04 Yes Yes Yes No TMCSidlaghatta

08158-254404

Table 12.3.(b) Play ground details Locations of the playgrounds

playground Area in sq. mt Contact details of the Maintaining Agency

NIL NIL -- --

TMC, Sidlaghatta

Page 38: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTSSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

13 Promotion of cultural, educational, and aesthetic aspects

ULBs (i) Details of Communityhalls, Cultural Centers, marriage halls, municipal educational institutes

Current Status ULB Annually Table 13.1 (a) and 13.1.(b)

(ii) Details of advertisement hoardings, rates, revenue generated

Current Status ULB Annually Table 13.2.1and 13.2.2

Table 13.1.a Details of cultural Centers

TMC, Sidlaghatta

Community halls/Auditorium DetailsName Address Booking office

address andcontact details

NIL NIL

Name of the Municipal Educational Institutes Number of teachers in eachmunicipal Educational Institutes(in

numbers)

NIL NIL

Page 39: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 13.1 (b) Details of educational institutes (only if applicable)

Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)

Details of Advertisement hoardingsNumber of Hoardings Slab rates for

advertisement(As Enclosure)

Advertisement tax demand for the current year in Rs. inlakhs

Advertisement tax collected in the current year in Rs. in lakhs

2 5000 5000 5000

14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMSSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

14 Burials andburial grounds,cremations,cremationgrounds andelectriccrematoriums

ULBs (i) Numbers, type, Location of burial grounds and cremation facilities available, fee charged if any

Current Status ULB Annually Table 14.1 (a). and 14.1(b)

(ii) Details of facility of “Herse/ Corpse Vehicles”(number and contact details)

Current Status ULB Annually Table 14.2

TMC, Sidlaghatta

Page 40: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriumsDetails of Burial grounds, cremation grounds & electric crematoriums

Name of theCommunity

burial groundwith locations

Name andlocation of the

Crematoriums/Burial ground

Facilities available in the Crematoriums ( Yes / No)

Electric

Burning Burial Availability ofwood

Waterfacility

Cleaningfacility

Othersif any

Maintaining agency

Name Contactdetails

Multiple(entries)

1) Bypass Road No Yes Yes No Yes Yes No - -

2)Chintamani Road

No No Yes No No No No - -

3)Behind Pojamma Temple

No No Yes No No No No - -

4)Behind MUWSS

No No Yes No No No No - -

5)Behind Sewage treatment plant road

No No Yes No No No No - -

Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)

Fee slab for each crematoriums and burial grounds Enclosure- -

Table 14.2: Details of Hearse Vehicles

TMC, Sidlaghatta

Page 41: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

TMC, Sidlaghatta

Hearse/Corpse vehicle detailsNumber of hearse vehicles

availableFee details for the vehicle( in Rs)

Contact details to hire the vehicle

Maintaining agency

Contact Number Name Contact Number

- - - - -

Page 42: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALSSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

15 Cattle ponds, prevention of cruelty to animals

ULBs (i) Numbers of stray animals, vaccinated

Current Status ULB Annually Table 15.1 (a) and 15.1 (b)

(ii) List of ‘Kanji House’ (care centers for stray animals).

Current Status ULB Annually Table 15.1 (a)

Table.15.1.1 Details of stray animals (input & output screen are same)

Number of stray animals Number of stray dogs vaccinated

Location of Kanji House (care centers for Stray animals) if applicableDogs Cows Pig Others if applicable

- - - - - -

Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)

List of location of Veterinary hospitals As EnclosureList of Animal Welfare Association (if available) As EnclosureName and location of NGOs working for animal

welfare( if available)

As Enclosure

TMC, Sidlaghatta

Page 43: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHSSl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

16 Vital Statistics including registration of births and deaths

ULBs (i) General information pertaining to city (population, area, households etc.)

Current Status and recent censusdetails

ULB Annually Table 16.1 City website

(ii) List of citizen service centers with location

Current status ULB Annually Table 16.2

(iii) Total Births and Deaths recorded along with Birth and Death rates.

Current status ULB Half Yearly

Table 16.3

(iv) Citizen Charter to be published

Current status ULB Annually Table 16.4

Table 16.1: City General information as per recent census details (should be added in their respective ULB websiteCity General informationPresent population

Present area in sq.km

Total numberof households

Population density

Total male population

Total female population

Total SC/ST Population

Total Slum population

Literacy rate

51159 5.0 8835

Table 16.2: List of Citizen Service centersSl. No Address of the Citizen Service centers if applicable

enclosure

Table 16.3: Details of Birth & Death

TMC, Sidlaghatta

Page 44: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Total births recorded Total deaths recorded

Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below formatService Details Period of catering the

service

Procedure to

Apply

Officer inchargeDesignation Contact Number

Birth CertificateDeath certificate Property Tax ApplicationKhatha Certificate othersEnclosure if already citizen

charter being maintained

enclosure

TMC, Sidlaghatta

Page 45: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES

Sl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

17 Public amenities including street lighting, parking lots, bus stops and public conveniences

ULBs (i) number of street lights Current status ULB Annually Table 17.1 SLB

(ii) No. of Street Lights/ Km of Road Length (No.s)

Current status ULB Annually Table 17.1 SLB

(iv) Details of agency maintaining street lights (name and contact details)

Current status ULB Annually Table 17.2

(v) List of Authorized Parking Areas along with parking capacities and fee

Current status ULB Annually Table 17.3

(vi) Number and locationsof bus stops and public toilets (Community and commercial) with its user charge.

Current status ULB Annually Table 17.4

Table.17.1: Details of streetlightsTotal number of streetlights Types of streetlights with number

Tube light High Mast IncandescentCFL

Mercury vapor Sodium vapor

2523 405 9 800 0 680

TMC, Sidlaghatta

Page 46: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

Table 17.2: Details of Agency Maintaining StreetlightPackage Number Wards Covered details of the agency Maintaining the streetlights

Name Phone Number

- - - -

Table.17.3: Details of Parking Lots Details of parking lots

Enclosure as per the format

FormatParking lot location Parking Capacity Fee Slab

Two wheeler

Four wheeler

Two wheeler

Four wheeler

- - - -

Table.17.4 Details of toilets

Table17.5: Details of Bus stop

TMC, Sidlaghatta

Public toilets Community Toilets

Location Fee slab Location Fee slab- - - -

Location of Bus stop( As Enclosure)

Area Address

Page 47: Town Municipal Council, Sidlaghatta Public Disclosure Schedule · 10 Slum Improvement & Up-gradation 26-27 11 Urban Poverty Alleviation 28 12 Provision of urban amenities and facilities-

Manual on Public Disclosure Schedules

18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES

Table.18.1 (a): list of Slaughter houses

Table 18.1 (b): Details of Slaughter House

TMC, Sidlaghatta

Sl.No

Functions as per 12th Schedule

Agency Responsible with in their jurisdiction

Data to be Disclosed Period for which information has to be disclosed

Level of Disclosure (ULB/Ward)

Frequency of Disclosure

Reference Remarks

18 Regulation of slaughter houses and tanneries

ULBs (i) Number, Location of Slaughter House / Tanneries along with facilities available andcapacity

Current status ULB Annually Table 18.1(a) and (b)

Number of Slaughter Houses Functional

Number of slaughter houses Non functional

--

Location of the slaughter House

Whether the Slaughter house is been regulated by KSCB (Yes/No)

Capacity Number of animals slaughtered per week

FacilitiesWashing Medical

Examination

Removal of Waste

Others if any

- - - - - - - -