EU Importer & Maintenance • Jinlong Europe • Zandvoorstraat 10/6• 2800 Mechelen• Belgium Tel: ++ 32/15 285454 – Fax: ++32/15 209680 • Jinlong Europe UK & Ireland • 2 nd Floor, Titan Court, 3 Bishop Square - Hatfield• AL10 9NA Hertfordshire• U.K. Tel: ++ 44/1707 226 522 – Fax: ++44/1707 226 001 Manufacturer: Fushun Yongmao Construction Machinery C° Ltd. China CONCISE MANUAL TOWER CRANE ST5515B

Transcript of Tower Crane St 5515 b Concise Rcvc.1.0

Page 1: Tower Crane St 5515 b Concise Rcvc.1.0

EU Importer & Maintenance • Jinlong Europe • Zandvoorstraat 10/6• 2800 Mechelen• Belgium Tel: ++ 32/15 285454 – Fax: ++32/15 209680 • Jinlong Europe UK & Ireland • 2nd Floor, Titan Court, 3 Bishop Square - Hatfield• AL10 9NA Hertfordshire• U.K. Tel: ++ 44/1707 226 522 – Fax: ++44/1707 226 001 Manufacturer: Fushun Yongmao Construction Machinery C° Ltd. China

CONCISE MANUAL TOWER CRANE ST5515B

Page 2: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 2 - RCVC1.0ENG

Page 3: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 3 - RCVC1.0ENG

Page 4: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 4 - RCVC1.0ENG

Page 5: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 5 - RCVC1.0ENG

Page 6: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 6 - RCVC1.0ENG

Page 7: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 7 - RCVC1.0ENG

Page 8: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 8 - RCVC1.0ENG

PREFACE

Dear Customer,

Jinlong Europe, a revolutionary evolution!

Reliability, quality, safety, and high technology are the success of Yongmao’s topless tower cranes all over the world.

In Europe all our cranes are CE approved. This is the result of a constant technological research.

The absence of tie-bars allows an optimized erection (quicker and safer).

The use of small sized mobile cranes saves air space. The best solution for installation in job sites next to airports or in the city with several cranes in use and interfering working areas.

Because of our relentless efforts to improve our products, technical updates are from time to time necessary. Therefore, the technical data in this manual are subject to change without warning.

Topless tower cranes, a revolutionary evolution.

Jinlong Europe

Zandvoorstraat 10/6 2800 Mechelen• Belgium

Tel: ++ 32/15 28 54 54 – Fax: ++32/15 20 96 80

Jinlong Europe UK & Ireland

2nd Floor, Titan Court, 3 Bishop Square – Hatfield

AL10 9NA Hertfordshire

U.K.

Tel.: ++ 44/1707 226 522 – Fax: ++44/1707 226 001

Page 9: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 9 - RCVC1.0ENG

TABLE OF CONTENTS

CHAPTER 1. TECHNICAL DATA .....................................................................................11

1.1. SPECIFICATIONS............................................................................................................................................... 12 1.1.1. ST 5515 B – 6 ton ............................................................................................................................................ 12 1.1.2. ST 5515 B 8 ton .............................................................................................................................................. 15

1.2. PREPARING THE CONSTRUCTION SITE..................................................................................................... 18 1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY ............................................................................................... 18

1.2.1.1. INTRODUCTION .................................................................................................................................... 18 1.2.1.2. DIMENSIONS.......................................................................................................................................... 19

1.2.2. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS................................................................... 24 1.2.2.1. PREPARATION........................................................................................................................................ 24 1.2.2.2. GROUNDPRESSURE.............................................................................................................................. 25 1.2.2.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION.............................................................. 26 1.2.2.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS ..................................................... 27 1.2.2.5. INSTALLING THE CRANE FOUNDATION ......................................................................................... 28 1.2.2.6. SYMBOLS ............................................................................................................................................... 30

1.2.3. CENTRAL BALLAST .................................................................................................................................... 32 1.2.3.1. INTRODUCTION .................................................................................................................................... 32 1.2.3.2. CENTRAL BALLAST (STANDARD) .................................................................................................... 33 1.2.3.3. CENTRAL BALLAST DETAILS............................................................................................................ 34

1.2.4. COUNTER-JIB BALLAST............................................................................................................................. 38 1.2.4.1. INTRODUCTION .................................................................................................................................... 38 1.2.4.2. COUNTER-JIB BALLAST DIMENSIONS ............................................................................................ 39

1.3. RE-REEVING (SEE FIG 1.3.1-1) ........................................................................................................................ 41 1.3.1. FROM DUAL REEVING TO SINGLE REEVING ........................................................................................ 41 1.3.2. FROM SINGLE REEVING TO DUAL REEVING ........................................................................................ 43 1.3.3. CHANGING THE FALLS OF A SINGLE TROLLEY ................................................................................... 45

1.3.3.1. FROM DUAL REEVING TO SINGLE REEVING................................................................................. 45

CHAPTER 2 . WINCH UNIT ............................................................................................ 47

2.1. SYMBOLS:............................................................................................................................................................ 48 Vb. 24 PQC15............................................................................................................................................................ 48

2.2. COMPOSITION OF THE WINCH UNIT: ........................................................................................................ 48

2.3. DESCRIPTION..................................................................................................................................................... 50

2.4. HOISTING WINCH OPERATING PRINCIPLE.............................................................................................. 52 2.4.1. BRAKE ADJUSTMENT ................................................................................................................................ 53 2.4.2. MAINTAING THE HOISING WINCH UNIT................................................................................................ 56 2.4.3. GEARBOX ...................................................................................................................................................... 57

CHAPTER 3. SLEWING MECHANISM ........................................................................... 58

3.1. SYMBOLEN: (EX. RTC 95) ................................................................................................................................ 59 3.1.1. DESCRIPTION: .............................................................................................................................................. 59

3.2. SLEWING UNIT................................................................................................................................................... 60 3.2.1. DESCRIPTION ............................................................................................................................................... 60 3.2.2. OPERATION ................................................................................................................................................... 61 3.2.3. RTC SCHEMATIC DIAGRAM ...................................................................................................................... 63

Page 10: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 10 - RCVC1.0ENG

3.2.4. MALFUNCTIONS .......................................................................................................................................... 65

CHAPTER 4. TROLLEY WINCH ..................................................................................... 67

4.1. SYMBOLEN.......................................................................................................................................................... 68

4.2. COMPOSITION OF THE TROLLEY WINCH UNIT ..................................................................................... 69

4.3. TROLLEY BRAKE .............................................................................................................................................. 71 4.3.1. DESCRIPTION (fig. 4.3.1-1): ........................................................................................................................ 71

4.4. WIRING DIAGRAM............................................................................................................................................ 73

Page 11: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 11 - RCVC1.0ENG

CHAPTER 1. TECHNICAL DATA

Page 12: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 12 - RCVC1.0ENG

1.1. SPECIFICATIONS 1.1.1. ST 5515 B – 6 ton

Fig.1.1.1-1 Table 1.1.1-1 (6 ton)

R Fall R (max)m

C (max) t 15 20 25 30 35 40 45 50 55

IV 16.24 6.0 6.0 4.66 3.52 2.77 2.23 1.84 1.53 1.28 1.08 55

II 31.50 3.0 3.0 3.00 3.00 3.00 2.65 2.25 1.95 1.70 1.50

IV 18.38 6.0 6.0 5.42 4.13 3.27 2.66 2.20 1.81 1.58 50

II 35.81 3.0 3.0 3.00 3.00 3.00 3.00 2.62 2.23 2.00

IV 20.75 6.0 6.0 6.00 4.80 3.83 3.14 2.63 2.23 45

II 40.51 3.0 3.0 3.00 3.00 3.000 3.00 3.00 2.65

IV 23.00 6.0 6.0 6.00 5.24 4.19 3.45 2.89 40

II 40.00 3.0 3.0 3.00 3.00 3.00 3.00 3.00

IV 24.29 6.0 6.0 6.00 5.80 4.56 3.85 35

II 35.00 3.0 3.0 3.00 3.00 3.00 3.00

IV 24.69 6.0 6.0 6.00 5.91 4.75 30

II 30.00 3.0 3.0 3.00 3.00 3.00

Page 13: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 13 - RCVC1.0ENG

Fig.1.1.1-2

Table 1.1.1-2

Type Fixed type Mobile type

In service Out of service In service Out of service

F1 70t 89t F2 98t 118t F3 66t 92t

Hoisting capacity 45t 52t

Freestanding Anchorage (to a building)

Page 14: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 14 - RCVC1.0ENG

MECANISME Table 1.1.1-3

Name Code m/min t m/min t kW

24PQC15

0-8.5

0-40

0-80

3 3

1.5

0-4.3 0-20 0-40

6 6 3

400m >400m*

24/24/5.5

Hoisting

QJ63B

0-8.5

0-40

0-80

3 3

1.5

0-4.2 0-20 0-40

6 6 3

280m >280m* 24/24/5.4

Trolleying DTC55 0→57 55Nm

RTC190 0-0.7rpm 2x95Nm Slewing

YMD50 0-0.7rpm 2x5.5

Travelling RT 12.5-25m/min 2x5.2

* Please contact us

Page 15: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 15 - RCVC1.0ENG

1.1.2. ST 5515 B 8 ton

Fig. 1.1.2-1

Page 16: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 16 - RCVC1.0ENG

Table 1.1.2-1 ( 8 ton)

R Fall R(max) m

C(max) t 15 20 25 30 35 40 45 50 55

IV 12.5 8.0 6.50 4.64 34.3 2.72 2.17 1.74 1.44 1.22 1.08 55

II 24.0 4.0 4.00 4.00 3.83 3.09 2.50 2.12 1.84 1.64 1.50

IV 13.2 8.0 6.85 5.01 3.95 3.02 2.41 1.97 1.68 1.51 50

II 26.3 4.0 4.00 4.00 4.00 3.42 3.00 2.56 2.16 1.91

IV 13.6 8.0 7.29 5.56 4.40 3.56 2.93 2.46 2.12 45

II 29.7 4.0 4.00 4.00 4.00 3.96 3.33 2.86 2.52

IV 14.2 8.0 7.64 5.76 4.52 3.78 3.18 2.73 40

II 31.3 4.0 4.00 4.00 4.00 4.00 3.58 3.13

Fig. 1.1.2-2

Page 17: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 17 - RCVC1.0ENG

Table 1.1.2-2

Type Fixed type Mobile type

In service Out of service In service Out of service

F1 70t 89t F2 98t 118t F3 66t 92t

Hoisting capacity 45t 52t

MECHANISME SPECIFICATIONS

Table 1.1.2-3

Name Code m/min t m/min t kW

24PQC20 0-6.5 0-30 0-60

4 4 2

0-3.2 0-15 0-30

8 8 4

340m >340m*

24/24/5.5 Hoisting

QJ80 0-40 0-80

4 2

0-20 0-40

8 4

360m >360m* 30/30

Trolleying DTC95 0→57 95Nm

YMD50 0-0.7rpm 2x5.5 Slewing

RTC190 0-0.7rpm 2x95Nm

Travelling RT 12.5-25m/min 2x5.2

* Please contact us

Page 18: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 18 - RCVC1.0ENG

1.2. PREPARING THE CONSTRUCTION SITE 1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY 1.2.1.1. INTRODUCTION This brochure provides the dimensions of the space requirements for the

crane. It consists of two sections:

- The entire crane with indication of the most important

dimensions.

- The crane is shown in three parts:

− Foundation anchors and undercarriage

− Mast composition

− Range and jib length

Based on the provided dimensions, you can prepare the assembly of the crane. ATTENTION: The provided dimensions do not take account of

sagging under load or any manufacturing tolerances.

Page 19: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 19 - RCVC1.0ENG

1.2.1.2. DIMENSIONS

1.2.1.2.1. TOTAL CRANE

Page 20: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 20 - RCVC1.0ENG

1.2.1.2.2. FOUNDATION ANCHORS

150

1. 6m

1. 6m

Concrete blocks

Page 21: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 21 - RCVC1.0ENG

1.2.1.2.3. UNDERCARRIAGE

RP ST5515

A 4.50m

B 6.31m

C 0.29m

D 0.42m

E 4.18m

F 2.94m

G 2.94m

H 2.44m

I 2.44m

Z 4.50m

K 5.75m

G IF H

A

B

Z KE

DC

Page 22: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 22 - RCVC1.0ENG

1.2.1.2.4. Main mast and telescopic cage

E1

D1

NxC1

K1H1C1

B1

A1

F1

G1

RP ST5515

A1 1.60m

B1 7.50m

C1 3.00m

D1 6.79m

E1 2.09m

F1 3.61m

G1 3.63m

H1 1.07m

K1 0.96m

Page 23: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 23 - RCVC1.0ENG

1.2.1.2.5. Jib

Rep (m)

A 55.5m

B 15.63m

C 1.2m

D 1.6m

E 3.2m

F 1.80m

H 2.35m

N 1.2m

Rep (m)

a 56.25m

b 15.63m

Page 24: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 24 - RCVC1.0ENG

1.2.2. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS 1.2.2.1. PREPARATION

The concrete foundatation of the foundation anchors must be executed on basis of the parameters in Table 1-2-2-21.

ATTENTION: THE LISTED PARAMETERS ARE MINIMUM VALUES TO BE OBSERVED, TAKING ACCOUNT OF THE STABILITY REQUIREMENTS OF THE CRANE.

PLEASE CONTACT US IN CASE OF DEVIATING CONDITIONS2.

1 To be provided by the customer. 2 Jinlong Europe -Zandvoorstraat 10/6 - 2800 Mechelen• Belgium Tel: ++ 32/15 28 54 54 – Fax: ++32/15 20 96 80

Jinlong Europe UK & Ireland - 2nd Floor, Titan Court, 3 Bishop Square – Hatfield -AL10 9NA Hertfordshire -U.K. -Tel.: ++ 44/1707 226 522 – Fax: ++44/1707 226 001

Page 25: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 25 - RCVC1.0ENG

1.2.2.2. GROUNDPRESSURE

C: Composition crane mast (fixed type) R: Reaction force H: Max free standing height (in m) TRACT: Track P: Total weight COMP: Pressure M: Max. weight ES: In service HS: Out of service ET : Shearing force

Table 1-2-2-2

E s H s

R R C H P M ET

TRACT COMPP M ET

TRACT COMP

m Kg Kg.m Kg Kg Kg Kg Kg.m Kg Kg Kg

1+0+1 10.25 51200 98596 1631 33740 59340 41200 72760 3988 24045 44645

1+1+1 13.25 52350 102842 1764 35457 61632 42350 72760 4413 23757 44932

1+2+1 16.25 53500 107486 1897 37362 64112 43500 72760 4838 23470 45220

1+2+1 19.25 54650 112529 2030 39455 66780 44650 72760 6013 23182 45507

1+4+1 22.25 55800 117970 2162 41736 69636 45800 72760 6438 22895 45795

1+5+1 25.25 56770 123571 2284 4437 72522 46770 72760 6827 22652 46037

1+6+1 28.25 57740 129537 2406 46711 75581 47740 72760 7362 22410 46280

1+7+6 31.25 58710 135868 2527 49457 78812 48710 84478 7897 27699 52054

1+8+1 34.25 59680 142563 2649 52374 82214 49680 108852 8432 38962 63802

1+9+1 37.25 60650 149623 2770 55464 85789 50650 134832 8967 50982 76307

1+10+1 40.25 61620 157047 2892 58727 89537 51620 162415 9502 69760 89570

1+11+1 43.25 62590 164837 3013 62161 93456 52590 191603 10036 77295 103590

1+12+1 46.25 63560 172990 3135 65767 97547 53560 222395 10571 91588 118363

Page 26: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 26 - RCVC1.0ENG

1.2.2.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION

C: Composition of the crane mast (fixed type) H: Height under the hook in m PS: Ground pressure in 10N/cm2

M: Type of the fundation block

Part of the mast 1,6m x 1,6 m

M64N M74N M81N M101N C

H (m) P S P S P S P S

1+0+1 10.25 1.61 1.34 1.22 0.97

1+1+1 13.25 1.68 1.38 1.26 1.00

1+2+1 16.25 1.75 1.43 1.30 1.02

1+3+1 19.25 1.83 1.49 1.35 1.05

1+4+1 22.25 1.92 1.54 1.40 1.09

1+5+1 25.25 2.02 1.61 .1.45 1.12

1+6+1 28.25 2.12 1.69 1.51 1.15

1+7+1 31.25 2.24 1.76 1.57 1.19

1+8+1 34.25 2.37 1.85 1.64 1.23

1+9+1 37.25 2.52 1.95 1.72 1.28

1+10+1 40.25 2.35 2.00 1.40

1+11+1 43.25 2.50 1.64

1+12+1 46.25 1.95

Page 27: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 27 - RCVC1.0ENG

1600

500

500

150

1.2.2.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS

The foundation anchors are placed symmetrically in the foundation block and are to form a 1,6 m square, based on the dimensions of the mast to be erected.

The distance between the topside of the mounting plate and the topside of the foundation block must be 150 mm (see fig).

ATTENTION : Cutting or reducing the reinforcement in the foundation is prohibited.

1600

Page 28: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 28 - RCVC1.0ENG

1.2.2.5. INSTALLING THE CRANE FOUNDATION The foundation anchors are mounted by means of:

− 4 foundation anchors and 8 associated pins − 1 foundation framework and 8 associated pins − 1 standard mast section − 1 plumb line or measuring device

- Check the framework for any deformation during transport. The difference between respectively the diagonals and the bearing surface heights may be at the most 2 mm.

- Install the foundation anchor on the reinforcement and adjust by means of filling plates.

- Check perpendicularity in both directions after assembly of the lower mast section on the framework. Adjust if necessary.

- Pour the concrete block and wait until it is completely hardened before removing the mast section and the framework

Page 29: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 29 - RCVC1.0ENG

Perpendicular

Mast section

Axe

Fixing frame

Axe

Fixing frame Reinforced

concrete

Page 30: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 30 - RCVC1.0ENG

1.2.2.6. SYMBOLS Example of foundation (M101) M : Concrete foundation 101 N : Foundation weight in t. Upper reinforcement:

33 :number of rails HA :high strength reinforcement rods

33 HA 25x620 (e : 17) 25 :support diameter in mm

620 :rail length in cm

E :distance in cm Lower reinforcement:

ep : rod D : density V : volum (m3) L : length I : width H : height (cm)

NOTE : The density of the reinforced concrete is 350 kg/m3 or C30.

Page 31: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 31 - RCVC1.0ENG

1 33HA25x625 ( e=17)

1 33HA25x625 ( e=17)

560

560

2 33HA25x625 ( e=17)

2 33HA25x625 ( e=17)

135 70

555

555

55520 20

555

280

130

11x11HA16x155 ( e=51)3

M101N L=560cm; I=560cm; H=135cm; V=42m3

Page 32: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 32 - RCVC1.0ENG

1.2.3. CENTRAL BALLAST 1.2.3.1. INTRODUCTION

De centrale ballast consists of reinforced concrete blocks symmetrically placed on the undercarriage.

The blocks are marked with the letters C of D.

The central ballast must be composed according to the table below. The ballast is to be supplied by the client in accordance with:

- Standard chassis

- Fig. 1.2.3.3.1-1 en fig. 1.2.3.3.1-2

- Chassis YZ86X

- Fig. 1.2.3.3.2-1 en fig. 1.2.3.3.2-2

Page 33: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 33 - RCVC1.0ENG

1.2.3.2. CENTRAL BALLAST (STANDARD)

CP :Mast composition HC :Hook height in m NR :Number of layers ND :Number of blocks LE :Minimum required ballast in t LD :Obtained ballast RES :Reaction in service RHS :Reaction out of service RH :Horizontal reaction force R :Reaction

1.6 m x 1.6 m R RH

Fig. 1-4-1

R

RH

CP HC NR ND LE LD RES RHS RH

2+0+1 13.4m 4 8C+8D 42.4t 42.4t 44t 5.60t

2+1+1 16.4m 4 8C+8D 42.4t 42.4t 45t 5.66t

2+2+1 19.4m 4 8C+8D 42.4t 42.4t 47t 4.72t

2+3+1 22.4m 4 8C+8D 42.4t 42.4t 48t 5.78t

2+4+1 25.4m 4 8C+8D 42.4t 42.4t 49t 5.84t

2+5+1 28.4m 4 8C+8D 42.4t 42.4t 51t 5.90t

2+6+1 31.4m 4 8C+8D 42.4t 42.4t 52t 5.95t

2+7+1 34.4m 4 8C+8D 42.4t 42.4t 53t 6.01t

2+8+1 37.4m 4 8C+8D 42.4t 42.4t 55t 6.06t

2+9+1 40.4m 4 8C+8D 42.4t 42.4t 57t 59t 6.12t

2+10+1 43.4m 5 10C+10D 53.0t 53.0t 69t 6.17t

2+11+1 46.4m 6 12C+12D 63.6t 63.3t 79t 6.28t

D

B A

C C D

C

D

R

RH

Page 34: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 34 - RCVC1.0ENG

( ※)

900

250

420

750 1500 750

540

150

450

100500

1 2 3 4

250

2

1

220

R30

R10R30

R20

115 22

0

1.2.3.3. CENTRAL BALLAST DETAILS 1.2.3.3.1. STANDARD BALLAST

Fig. 1.2.3.3.1-1

All authorized dimensions: ±1cm Rep : Ref.nr.

∅ : Diameter in mm

N : Number

L.u : Length

L.t : Total lengh

Forme : Reinforcement type

M : Material

REP ∅ mm N L.u L.t For-

me M

1 40 2 500 1000

2 10 8 900 7200

3 10 4 2200 8800

4 10 3 1600 4800

Q23

5-B

Reinforced concrete P: 2800kg D: 2.3

Typ central ballast D

Page 35: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 35 - RCVC1.0ENG

( ※)

450

750

250

420

900

500

1500 750

500

540

1 2 3 4

250

100500

150

2

1

220

R30

R30 R10 115 22

0R20

Fig. 1.2.3.3-2

Typ central ballast C

All authorized dimensions ±1cm

Rep : Ref nr.

∅ : Diameter in mm

N : Number

L.u : Length in cm

L.t : Total length

Forme : Reinforcement type

M : Material

REP ∅ mm N L.u L.t For-

me M

1 40 2 500 1000

2 10 8 900 7200

3 10 4 2200 8800

4 10 3 1600 4800

Q23

5-B

Reinforcement

concrete P: 2500kg D: 2.3

Page 36: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 36 - RCVC1.0ENG

1.2.3.3.2. ALTERNATIVE BALLAST

Page 37: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 37 - RCVC1.0ENG

Page 38: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 38 - RCVC1.0ENG

1.2.4. COUNTER-JIB BALLAST 1.2.4.1. INTRODUCTION

The counter-jib ballast consists of various reinforced concrete blocks A, B or C. The counter-jib ballast is governed by the length of the jib. These blocks are suspended one by one at the rear of the counter-jib.

The ballast is to be supplied by the client. The drawings are enclosed.

In accordance with Fig. 1.5.2-1. During installation, care must be taken to ensure that they cannot be chipped or become loose while operating the crane.

The admissible tolerance is 50

0+

kg per block.

NOTE: We recommend weighting the concrete block and marking their weight with paint on a visible side of the block.

Page 39: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 39 - RCVC1.0ENG

1.2.4.2. COUNTER-JIB BALLAST DIMENSIONS

Length of the jib (m) 30 35 40 45 50 55 Length of the counter

jib(m) 14.89 14.89 14.89 14.89 14.89 14.89

Blocks D+E+B D+E+B D+2B+G D+E+B+G D+E+2B D+3EDuring working & telescoping

Weight in kg 8200 8200 9500 9800 10600 11200

Block type Density (t/m3) L (mm) Weight (kg) Tolerance

B 2.4 830 2400 +50Kg

D 2.4 1180 3100 +50Kg

E 2.4 990 2700 +50Kg

G 2.4 450 1600 +50Kg

Page 40: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 40 - RCVC1.0ENG

Page 41: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 41 - RCVC1.0ENG

1.3. RE-REEVING (SEE FIG 1.3.1-1) 1.3.1. FROM DUAL REEVING TO SINGLE REEVING

- Bring the trolley against the jib foot and fasten it.

- Lower the hoist hook down to the ground (vertical position).

- Remove the connecting pin (8), connecting arm (5) and single hook block (4).

- Reinstall the connecting pin (8) on the single hook block and secure it with cotter pins.

Fig. 1.3.1-1

8

9

4 3

5

Page 42: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 42 - RCVC1.0ENG

- Hoist the single hook block (4) against the trolley (jib) (see fig. 1-3-1-2).

- Remove the trolley connection pin (8) between both trolleys (1) and (2).

- When the trolley (2) is being run out, both trolleys become separated.

- Reinstall the connecting pin (8) and cotter pins (9) on the rear trolley.

- This concludes the transition from dual (4-rope) reeving to singel (2-rope) reeving.

Fig. 1-3-1-2

ATTENTION:

- If operating a significant amount of time with single reeving, the following periodic maintenance must be performed.

- Convert to dual reeving; let the trolley run a few times over the entire jib length while veering and hoisting the load hook over the entire hoisting height.

- Revert to single (2-rope) reeving

1 2

4

8

9

Page 43: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 43 - RCVC1.0ENG

1.3.2. FROM SINGLE REEVING TO DUAL REEVING

- Bring the front trolley (2) against the rear trolley (1) (opposite the jib foot).

- Press the switch button on the operating panel.

- Connect both trolleys with the connecting pin (8) and secure it with the cotter pins (9).

- Lower the single hook block (4) down to the ground.

- Connect both hook blocks (4 and 3) by means of the fittings (8, 9 and 10) (see Fig. 1-3-2-1).

- This concludes the transition from single to dual reeving.

8

9

Fig.1.3.2-1

1 2

4

3

6

Page 44: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 44 - RCVC1.0ENG

ATTENTION:

- Working in single reeving configuration with cranes installed above freestanding mast height.

- The crane is designed to work with single reeving up to the maximum freestanding height.

- In case of higher heights, an imbalance can occur. Please contact us on this. In that case, the hook blocks must be ballasted, which will lead to diminished hoisting capacities.

Page 45: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 45 - RCVC1.0ENG

1.3.3. CHANGING THE FALLS OF A SINGLE TROLLEY 1.3.3.1. FROM DUAL REEVING TO SINGLE REEVING

- Bring the trolley (1) against the jib foot.

- Lower the hoist hook to the ground (vertical position).

- Remove the connecting pin (3).

- Reinstall the connecting pin (3) on the single hookblock and secure it with cotter pins.

- Hoist the single hook block (2) slowly against the trolley jib.

- This concludes the transition from dual (4-rope) reeving to single (2-rope) reeving.

Page 46: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 46 - RCVC1.0ENG

A B

Dual reeving to single reeving

NOTE: Changing from 2 falls to 4 falls is the reverse procedure as mentioned above.

Page 47: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 47 - RCVC1.0ENG

CHAPTER 2 . WINCH UNIT

Page 48: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 48 - RCVC1.0ENG

2.1. SYMBOLS: PQC (EX. 24 PQC 15) Vb. 24 PQC15 2.2. COMPOSITION OF THE WINCH UNIT:

- Limiter (1) - Drum (2) - Gearbox (3) - Support frame (chassis) (4) - Motor (5) - Brake disc (6) - Cooling motor (7)

Fig. 5-1-1

Single wire Type Motor power in kW

Page 49: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 49 - RCVC1.0ENG

ATTENTION - Starting the hoisting movement: use low speed.

- Displacements between 2 hoisting movements: use medium or high speed.

- Positioning the load: Use low speed.

NOTE: - Hoisting speed selection is determined by:

- Weight and size of the load.

- Environmental factors.

- Stage of the hoisting movement.

Page 50: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 50 - RCVC1.0ENG

2.3. DESCRIPTION The cable drum is of the grooved type and is driven by a right-angled bevel gearbox. The driving motor is of the type TSYDE 180L – 2/4/16 with an output of 24/24/5,5 kW. The motor speeds are 2800 / 1400 / 300 rpm. The motor is fitted with an electromagnetic disk brake.

The hoisting limiter is of the type 0 x Z4/7 with a transmission ration i =

1: 274.

Page 51: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 51 - RCVC1.0ENG

Characteristics:

Operating range M5

Use category T4

Load category L2

Motor type YSYDE180L-2/4/16

Motor speed rpm 2800/1400/300 rpm

Hoisting speed and load m/min 80 40 8.5

t 1.5 3 3

m/min 40 20 4.2

t 3 6 6

Rope diameter 12 mm

Drum capacity 400m

Page 52: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 52 - RCVC1.0ENG

2.4. HOISTING WINCH OPERATING PRINCIPLE The hosting winch is equipped with a three-speed motor coupled to a mechanical gearbox.

At start-up, the brake is released, after which a selection can be made between:

- Low hoisting speed (PV)

- Medium hoisting speed (MV)

- High hoisting speed (GV)

When the hoisting movement is interrupted, a built in (0,5 – 1 sec) electric time delay prevents undue loading of the mechanical brake, in order to avoid abnormal wear.

Normally, the medium (MV) and high (GV) hoisting speeds are used.

Low hoisting speed (PV) should only be used to pick up or position loads and thus only for short times.

Page 53: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 53 - RCVC1.0ENG

2.4.1. BRAKE ADJUSTMENT Brake moment adjustment (fig. 5-1-2):

- Remove plate (53), pin (54) and lever (52).

- Undo bolt (29) and protection cover (40).

- Set the 3 adjusting screws (37) evenly. NOTE: When adjusting clockwise, the brake moment is increased. When unscrewing counter clockwise, the brake moment is

reduced.

ATTENTION: The brake moment must be adjusted in relation to the maximum permissible load.

Brake clearance adjustment:

- Remove protection cover (40).

- Loosen the electromagnet adjusting spring (39) and (45).

Optimum brake clearance is 0,7 – 0,8 mm with a maximum deviation of 0,05 mm.

After adjustment, attach the setscrews (39) and (45).

Page 54: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 54 - RCVC1.0ENG

Brake disc replacement:

- Remove protection cover (40).

- Undo the fitting screws (45) and remove the electromagnet (47).

- Undo the fitting screws (39) and (37) and remove the spring (35).

- Remove the pressure plate (59) and counter-pressure plate (33).

- Clean the brake mechanism.

- Replace the brake plate.

- Reinstall in reverse order.

Page 55: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 55 - RCVC1.0ENG

29. Bolt 32. Bottom adapter 33. Brake plate holder 34. Brake plate casing 35. Compression spring 37. Spring adjustment screw 39. 45. Adjusting spring - electromagnet 40. Protection cover 46. Bolt 52. Lever 53. Nameplate 54. Shaft 55. Adjusting plate 59. Adapter 61. Mounting plate 47. Electromagnet

Fig. 5-1-2

Page 56: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 56 - RCVC1.0ENG

2.4.2. MAINTAING THE HOISING WINCH UNIT

Part Handling (daily)

Gearbox Check lube-oil level, add oil if necessary.

Rope Check rope for wear.

Fittings Check for correct installation and operation.

Limiter Check limiter for correct operation.

Lubrication points Lubricate lubrication points.

Page 57: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 57 - RCVC1.0ENG

2.4.3. GEARBOX

Fig. 5-1-3

The gearbox is lubricated with oil.

Check oil level every 200 operating hours.

Replace oil every 2400 operating hours.

Check brake clearance and brake moment weekly.

- The brake moment should be ≥ 175 N.m.

- Brake clearance is 0.8 mm.

The motor bearings must be replaced as soon as abnormal motor vibrations or increased motor noises are noticed.

If the motor spindle shows a clearance of 0.1 mm or more, the motor bearings must be replaced immediately.

Check bearing lubrication every 200 hours.

Lubricate with lithium grease if necessary.

Controleer de remspeling en het remmoment wekelijks

Fill opening

Oil level

Drain opening

Page 58: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 58 - RCVC1.0ENG

CHAPTER 3. SLEWING MECHANISM

Page 59: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 59 - RCVC1.0ENG

3.1. SYMBOLEN: (EX. RTC 95) R T C

3.1.1. DESCRIPTION:

Select the slewing speed suitable for the required movement. Gradually increase or decrease the slewing speed. Slow down gradually instead of stopping the load abruptly with the slew brake.

The slew brake may only be used to position the jib during hoisting at wind speeds < 13 m/s (46 km/h).

Avoid simultaneous slewing and hoisting to prevent damage to the hoist rope (rope twisting risk).

Couple (N.m) Current brake Voltage regulator Slewing mechanism

Page 60: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 60 - RCVC1.0ENG

3.2. SLEWING UNIT 3.2.1. DESCRIPTION

The RTC slewing unit consists of: ( zie fig.2.2.1-1):

- A motor with squirrel-cage armature turning at constant speed in the desired direction.

- An electrodynamic coupling/brake to perform the speed changes.

- A gearwheel in which the clutch engages directly on the slewing ring.

- Safety brakes mounted on the electrodynamic coupling/brake.

- Tacho-dynamo, for speed control.

- Slewing limiter.

- The crane can be put in weathervaning both manually and electrically.

Page 61: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 61 - RCVC1.0ENG

3.2.2. OPERATION

1/ Make the motor run in the desired direction.

2/ The brake releases.

3/ The electrodynamic brake inductor is supplied with direct current.

4/ An amperage change in the inductor produces a speed change. In that way, the desired speed can be obtained by means of the control box.

AT STANDSTILL:

- The power supply to the motor is switched off, power is supplied to the inductor of the electrodynamic brake and the jib is brought to a stop;

- The safety brake only locks when, in case of necessity, the operator presses the thereto-provided button.

ATTENTION: Stopping the jib by counter-slewing is prohibited.

At the end of the workday, the jib must be placed in weathervaning.

Page 62: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 62 - RCVC1.0ENG

1. Motor

2. Gearbox

3. Weathervaning mechanism

4. Slewing ring

5. Limit switch

6. Slewing brake

Fig. 2.2.1-1

Page 63: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 63 - RCVC1.0ENG

3.2.3. RTC SCHEMATIC DIAGRAM

1/ Benaming RP: Potentiometer IC: Signal amplifier 2/ Operation: The control signal of the potentiometer RP (slewing mechanisme RTC) is converted through the amplifier IC to a single and three-phase AC voltage that directly controls the driving motor. The slewing direction is controlled through a seperate signal.

+V

-V

RP

IC

IC IC

IC

Contactor clockwise direction

Contactor counterclockwise direction

Adjustable 3-phase

AC-supply

Voltage Feedback

Page 64: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 64 - RCVC1.0ENG

3/ Wiring diagram

RD

RG

RDi

A

B

C

AC48V RRa

RM

AC48V

Page 65: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 65 - RCVC1.0ENG

3.2.4. MALFUNCTIONS

1/ The slewing mechanism is provided with an electronic control device that:

- Controls slewing acceleration and deceleration - Prevents changing of the slewing direction by a control error

2/ If a malfunction occurs, working with the crane must be stopped and its cause must be eliminated.

Table 5-3-1

Operation Normal Abnormal

Slewing movement from “0” position on joystick

Slewing starts gradually up to its maximum speed

Slewing starts abruptly. The tower deforms

Slewing movement towards “0” position

The slewing movement slows down and stops after 7-10 seconds

Slewing stops instantly. The tower deforms

Shunt bridging Free slewing Slewing stops suddenly.

Page 66: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 66 - RCVC1.0ENG

NOTE: These malfunctions can have the following causes:

1/ Incorrect connection of the 380 VAC/48 VAC power supply; excessive voltage fluctuations.

2/ Potentiometer and joystick are not compatible or are incorrectly adjusted with reference to the resistance O-R/2.

3/ Check if the inverter is intact and operates properly within the parameters.

4/ Check the connections of each part for damage and/or improper tightening.

5/ Check if the control box still works within the given parameters.

Page 67: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 67 - RCVC1.0ENG

CHAPTER 4. TROLLEY WINCH

Page 68: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 68 - RCVC1.0ENG

4.1. SYMBOLEN

D T C (EX. DTC 55) REMARK: The trolley speed must be selected according to the

distance to be run. Increase and decrease speeds gradually.

Couple Voltage regulator, brake Voltage regulator Trolley winch

Page 69: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 69 - RCVC1.0ENG

4.2. COMPOSITION OF THE TROLLEY WINCH UNIT The DTC trolley winch unit consists of the following components (see fig. 3-2-1):

- Rope drum - Gearbox - Electric squirrel-cage motor - Electromagnetic brake - Disk brake

Three speeds are available: MV: Low speed, realized by a combination of actuation of the

electromagnetic brake and running of the motor at lower voltage (230 -260 V).

PV1: Medium speed, realized by partial actuation of the

electromagnetic brake and control of the motor voltage (380 V).

PV2: High speed; the motor is run at its rated voltage (380 V)

without excitation of the electromagnetic brake. The disk brake of the trolley winch unit is of the regular closed type (i.e. release through voltage control). Normal brake clearance is 0,8 – 1,2 mm. The brake clearance is set in an identical way as for the slewing motor. The brake torque is set by a spring screw Fig. 3-2-1 item 14.

Page 70: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 70 - RCVC1.0ENG

1. Outer support plate

2. Connecting rod

3. Drum and gear housing

4. Limit switch pin

5. Inner support plate

6. Limit switch, model DXZ-4/FW

7. Motor brake field excitation voltage DC-20 V

8. Motor, synch rev. 1500 rpm

9. Motor brake field excitation voltage DC-20 V

10. Protection cover locknut

11. Manual brake release lever

12. Fixing nut

13. Screw M8 for disc brake

14. Brake pressure adjusting spring.

15. Brake disc locknut

16. Protection

17. Spindle connection

18. Bearing type 80212

19. Transmission axle

20. Gear coupling, speed ratio r = 30.36

21. Bearing type 60209

22. Sealing ring

23. Trolley rope clamp

1315 1416

22

23

1 2 3 4 5 76 8 9 10 11 12

21 20 19 18 17

Fig. 3.2-1

Page 71: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 71 - RCVC1.0ENG

4.3. TROLLEY BRAKE 4.3.1. DESCRIPTION (fig. 4.3.1-1): The electromagnetic brake starts operating as soon as the power supply is cut. Brake clearance in the active range is automatically adjusted.

1. Operating principle

Fig. 4.3.1-1 Brakes:

When the current is cut, the electromagnetic attractive force disappears. The brake spring (2) pushes the pressure disc (6) back on the brake disc (5). This closes the brake. The brake is of the regular, closed type.

Releasing the brake:

When the excitation coils (1) is energized, the pressure disc (6) is attracted and the brake pressure spring (2) is pressed in. By this, the brake discs open up.

Brake clearance:

Normal brake clearance is 0.8 to 1.2 mm. Check the brake clearance for soiling (oil - grease).

Brake moment adjustment:

The brake moment was factory-set

Releasing the brake manually: The brake can be released manually by loosening the brake yoke (3).

1. excitation coil 2. Spring 3. Brake yoke nut 4. Movable plate 5. Brake plate 6. Pressure disc 7. Brake lining 8. Screw 9. Cover E. Brake clearance

Page 72: Tower Crane St 5515 b Concise Rcvc.1.0

ST5515 B CONCISE TOWER CRANE MANUAL

- 72 - RCVC1.0ENG

1/ Every 200 hours or once a month:

2/ Check brake clearance and brake moment, as well as the condition of the brake discs. Brake clearance is to be 0.8 – 1.2 mm.

3/ Attention: replace brake discs before they are completely worn.

4/ Check if there is any foreign matter in the brake and if it is free from oil and grease.

ATTENTION: The brake must immediately be inspected if: - It does not work properly - It is overheating - Abnormal vibrations are noticed - Braking torque is insufficient

Page 73: Tower Crane St 5515 b Concise Rcvc.1.0

ST 5515 B MANUEL CONDENSE

4.4. WIRING DIAGRAM

XD

GV

XD

Ar

XD

GV

XD

PVX

DPV

XD

AV

PD DA

V

SD DFa

DA

r

DM

V

DG

V

DPV

1

DM

V1

DPV

0档

RXDAr

SDAv SDM0

RDMr RXDAv

SDAr

SD

DPv 1 S

1 SDPv

Engaged when energized Holding position

Disengaged in the energized condition

Page 74: Tower Crane St 5515 b Concise Rcvc.1.0

ST 5515 B MANUEL CONDENSE

Importer EG-CE & Maintenance • Jinlong Europe • Zandvoorstraat 10/6• 2800 Mechelen• Belgium Tel: ++ 32/15 285454 – Fax: ++32/15 209680 • Jinlong Europe UK & Ireland • 2nd Floor, Titan Court, 3 Bishop Square - Hatfield• AL10 9NA Hertfordshire• U.K. Tel: ++ 44/1707 226 522 – Fax: ++44/1707 226 001 Manufacturer: Fushun Yongmao Construction Machinery C° Ltd. China

September 2007