‘ Towards Zero Energy‘ Pearl River Tower Russell Gilchrist RIBA SOM Practice Leader Chicago USA Chicago, USA SOM © CTBUH Copyright

Transcript of Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350...

Page 1: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

‘ Towards Zero Energy‘Pearl River Tower

Russell Gilchrist RIBA

SOM Practice LeaderChicago USAChicago, USA

SOM© CTBUH Copyright

Page 2: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

WHAT IS ZERO ENERGY?WHAT IS ZERO ENERGY?

© CTBUH Copyright

Page 3: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

ZERO ENERGY BUILDING

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 4: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

“NET POSITIVE” ENERGY BUILDING

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 5: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

A HISTORY OF ELECTRIFIED BUILDINGS….THREE MEN THAT CHANGED HISTORYTHREE MEN THAT CHANGED HISTORY

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 6: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

18541854CRYSTAL PALACE EXPOSITION

ELISHA GRAVES OTISELISHA GRAVES OTIS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 7: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

PEARL STREET STATION

18821882

THOMAS EDISON

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 8: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

J.L. HUDSON DEPARTMENT STORE DETROIT MICHIGANDETROIT, MICHIGAN

19241924

WILLIS HAVILAND CARRIER

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 9: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

SIMPLE MATH

ZERO ENERGY BUILDINGZERO ENERGY BUILDING

+ Elevators (1854)+ Elevators (1854)+ Electric Lighting (1890)+ HVAC Systems (1924)+ Electric Equipment (1928)q p

HIGH ENERGY BUILDINGHIGH ENERGY BUILDING= HIGH ENERGY BUILDINGHIGH ENERGY BUILDING=

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 10: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

IMPACT ON THE ENVIRONMENTIMPACT ON THE ENVIRONMENT

© CTBUH Copyright

Page 11: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

IMPACT OF BUILDINGS ON THE ENVIRONMENT

BUILDINGS

rbon

40%

Energy-useTRANSPORTATION

tric

tons

of c

ar

INDUSTRY

milli

on m

et

Source: US Department of EnergySource: US Department of Energy

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 12: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

RESPIRATORY DISEASE HAS INCREASED 50%HAS INCREASED 50%IN THE LAST DECADE.

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 13: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

The sulphur dioxide produced in coal combustion poses an immediate threat to the health of China's citizens, contributing to about 400,000 premature deaths a year.

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 14: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

CHINA: TODAYCHINA: TODAY

© CTBUH Copyright

Page 15: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

With plans on the books to urbanize half the Chinese population by 2020, energy consumption will soar. City p p y , gy p yresidents in China use 250 percent more power than their rural counterparts.

The Nation (May 7, 2007 issue)

of P

eopl

eM

illio

ns

(UN Estimates 2003)

Skidmore, Owings & Merrill LLP

(UN Estimates, 2003)© CTBUH Copyright

Page 16: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

THE AIR WE BREATHE

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 17: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

China is to build 400 coal-fired power stationscoal fired power stations over the next 10 years.

ONE EVERY 9 DAYSONE EVERY 9 DAYS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 18: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

Asia is the world’s biggest construction market. China's real estate market has been booming, with investment in domestic real-estate projects rising to exceed $110 Billion Currentlyreal-estate projects rising to exceed $110 Billion. Currently, 50% of all new construction globally is happening in China.

Design Intelligence Sep/October 2009

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 19: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

PEARL RIVER TOWERPEARL RIVER TOWER

© CTBUH Copyright

Page 20: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

PERFORMANCEPERFORMANCEPERFORMANCEPERFORMANCEPERFORMANCEPERFORMANCE

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 21: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

HIGH PERFORMANCE ARCHITECTURE ?

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 22: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

HIGH-PERFORMANCE ARCHITECTURE

• Regulate Pressure Differentials• Regulate Pressure Differentials• Maximize Visual Transmittance• Minimize Solar Radiation• Invoke Power Potential• Invoke Power Potential

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 23: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

DaylightingSTRATEGIES

Energy Efficient Equipment

Underfloor Ventilation with Radiant Ceiling

High Performance Facade

Wind Turbines

Photovoltaics

On-Site Generation

100%

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 24: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FOUR STEPS TO OPTIMAL HIGH PERFORMANCE BUILDINGS

REDUCTION

PASSIVE ABSORPTION

RECLAMATIONABSORPTION

GENERATIONG O

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 25: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FOUR STEPS TO OPTIMAL HIGH PERFORMANCE BUILDINGS

S 1

• R di t C li

Step 1

• Radiant Cooling• High Performance Glazing• Daylight Responsive Controls• High Efficacy LightingREDUCTION High Efficacy Lighting• Demand Based Ventilation• Low Discharge Ventilation• High Efficiency Plant

REDUCTION

High Efficiency Plant• High Efficient Office Equipment

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 26: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FOUR STEPS TO OPTIMAL HIGH PERFORMANCE BUILDINGS

S 2• Chiller Heat Recovery

Step 2• Chiller Heat Recovery• Generator Heat Recovery• Exhaust Air Heat Recovery• Condensate RecoveryRECLAMATION Condensate RecoveryRECLAMATION

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 27: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FOUR STEPS TO OPTIMAL HIGH PERFORMANCE BUILDINGS

S 3• Building Wind Turbines

Step 3• Building Wind Turbines• Integrated Photovoltaics• Geo-Condenser Cooling

PASSIVE ABSORPTION

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 28: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FOUR STEPS TO OPTIMAL HIGH PERFORMANCE BUILDINGS

S 4• Micro Turbines

Step 4

GENERATION

• Micro Turbines

GENERATION

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 29: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

CHINA

• AreaTotal: 9,596,960 sq km qLand: 9,326,410 sq kmWater: 270,550 sq km

• Population

China

Guangzhou

• Population1,313,973,713 (est. July)

• ClimateHong KongExtremely diverse; tropical

in south to sub arctic in north.

- CIA World Fact book

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 30: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

GUANGZHOU CITY, CHINA

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 31: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

GUANGZHOU CITY, CHINA

• AreaTotal: 7,434 sq km q

• Population8,000,000 + New Town

• ClimateSub-Tropical

Pearl River Tower Site

Pearl River

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 32: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

CLIMATE & SITE

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 33: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

TRANSFORMED, INTEGRATED,

HIGH PERFORMANCE,

ENVIRONMENTALLY ENVIRONMENTALLY

RESPONSIBLE DESIGN

Pearl River TowerGuangzhou China

Skidmore, Owings & Merrill LLP

Guangzhou, China© CTBUH Copyright

Page 34: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

BASE CASE

2.2 million sq. ft.2.2 million sq. ft. Headquarters BuildingChinese Energy Code Compliant Building

20,854,997,467 Lbs of CO22

CO2 Molecule

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 35: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

CAPTURING SOLAR RADIATIONCAPTURING SOLAR RADIATION

© CTBUH Copyright

Page 36: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

SOLAR RADIATION

Units1800+1800+

1720-1800

1640-1720

1560-1640

1480-1560

1400-1480

1320-1400

1240-1320

1180-1240

1080-1180

Skidmore, Owings & Merrill LLP

1000-1080© CTBUH Copyright

Page 37: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

BIPV ‘s

BUILDINGINTEGRATEDPHOTO VOLTAICSPHOTO-VOLTAICS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 38: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

BIPV’s – EAST FAÇADE & TURBINE APERTURES

Skidmore, Owings & Merrill LLP

BIPV s EAST FAÇADE & TURBINE APERTURES© CTBUH Copyright

Page 39: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

HARVESTING NATURAL LIGHTHARVESTING NATURAL LIGHT

© CTBUH Copyright

Page 40: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

ENTRY LOBBY- NORTH ENTRANCE

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 41: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

OFFICE AREAS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 42: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

HARNESSING WIND ENERGYHARNESSING WIND ENERGY

© CTBUH Copyright

Page 43: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

WIND ANALYSIS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 44: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

WIND GENERATION

P = V3

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 45: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

WIND TURBINE GENERATORS

Upper Tunnel

10 2030

40320330

340350 0

110 20

3040320

330340 350 0

1

Lower Tunnel

40

50

60

70290

300

310

3200.8

0.6

0.4

40

50

60

70290

300

310

3200.8

0.6

0.4

80

90

100260

270

280 0.2 80

90

100260

270

280 0.2

110

120

130230

240

250 110

120

130230

240

250

Tunnel Wind Speed (V/Vref) Approach Wind Speed (V/Vref)

140150

160170180190200

110220 140

150160170180190

200110

220

Skidmore, Owings & Merrill LLP

Tunnel Wind Speed (V/Vref) Approach Wind Speed (V/Vref)© CTBUH Copyright

Page 46: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

STATIC PRESSURE

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 47: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

VELOCITY VECTORS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 48: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

WIND TURBINE GENERATORS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 49: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

VERTICAL AXIS WIND TURBINES

+

Battery

-

Batte

+

ry

-

+

Wind Turbines Battery

-

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 50: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

WIND LOADING - CLADDING

Pressure Tap TubingPressure Tap Tubing

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 51: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

ON SITE CO-GENERATIONON SITE CO-GENERATION

© CTBUH Copyright

Page 52: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

INSTALLATION OF MICRO-TURBINES

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 53: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

OCCUPANCY COMFORTOCCUPANCY COMFORT

© CTBUH Copyright

Page 54: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

SENSE OF SENSE OF WELL-BEINGWELL-BEING

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 55: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

© CTBUH Copyright

Page 56: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

RADIANT COOLING WITH DISPLACEMENT VENTILATION

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 57: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 58: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

RADIANT COOLING & FLOOR-FED VENTILATION SYSTEMS

28

26

24

22

20

18

16

14

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 59: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

Radiant Cooling

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 60: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

“INSIDE – OUT” RETURN AIR PATHS

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 61: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

RADIANT COOLING WITH FLOOR FED VENTILATION (FFV)

85.0

84.0

83 083.0

82.0

81.0

80.0

79.0

78 078.0

76.0

75.0

74.0

73.0

72 072.0

71.0

70.0

69.0

68.0

CO1S02r – 0.3 cfm/sf, T = 31C (88F), 65F ceiling (base simulation)CO1S02r – 0.3 cfm/sf, T = 31C (88F), 65F ceiling (base simulation)CO1S02r – 0.3 cfm/sf, T = 31C (88F), ½ Return Air at PerimeterCO1S02r – 0.3 cfm/sf, T = 31C (88F), 63F Chilled CeilingCO1S02r – 0.3 cfm/sf, T = 88F, 65F ceiling, Chilled Ceiling at 55w/mCO1S02r – 0.3 cfm/sf, T = 88F, 63F ceiling, Chilled Ceiling at 55w/m

67.0

66.0

65.0

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 62: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FAÇADE SYSTEMSFAÇADE SYSTEMS

© CTBUH Copyright

Page 63: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

HIGH PERFORMANCE GLAZING & SHADING SYSTEMS

envelope asenvelope as thermal regulator

Solar energy is collected within the building’s double wall façade. The energy is transferred to the mechanical floors and is used as the heating for the dehumidification system

Skidmore, Owings & Merrill LLP

dehumidification system.© CTBUH Copyright

Page 64: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

DOUBLE SKIN FAÇADE

• Determine suitability of glazing• Evaluate optimal blind strategy • Identify ventilation strategyy gy• Quantify cavity flow rates• Underfloor Air Distribution• Radiant Cooling g• Assess impact on offices

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 65: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

SOLAR RADIATION [W/M2]

Nov 11Angle ~ 46º

Aug 08Angle ~ 77º Angle 46Angle ~ 77

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 66: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

HUMIDITYINFILTRATION AND CONTROLHUMIDITYINFILTRATION AND CONTROLINFILTRATION AND CONTROLINFILTRATION AND CONTROL

© CTBUH Copyright

Page 67: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

STACK EFFECT INFILTRATION- SUMMER

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 68: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

STACK EFFECT INFILTRATION - WINTER

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 69: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

THE PATH TO ZERO ENERGY

40000000

BaselineReduction

Reclamation

25000000

30000000

35000000

Reclamation

Absorption

G ti

5000000

10000000

15000000

20000000 Generation

-5000000

0

asel

ing

Cool

ing

azin

g

men

t

atur

es

ghtin

g

onsi

ve Pl

ant

e Ve

nt

cove

ry

ted

PV

urbi

nes

oolin

g

ratio

n

Pear

l Des

ign

Ba

Radi

ant C

gh P

erfo

rman

ce G

la

h Ef

ficie

ncy

Equi

p

"No

Flow

" Fe a

Hig

h Ef

ficie

ncy

Lig

Day

light

Res

pCo

ntro

ls

Hig

h Ef

ficie

ncy

Dem

ad B

ase

Hea

t Rec

Inte

grat

Win

d Tu

Geo

ther

mal

Co

On-

Site

Gen

e

Skidmore, Owings & Merrill LLP

Hig

Hig

h© CTBUH Copyright

Page 70: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

THE PATH TO ZERO ENERGY

40000000

BaselineReduction

Reclamation

25000000

30000000

35000000

Reclamation

Absorption

5000000

10000000

15000000

20000000

0

5000000

ign

Bas

elin

g

dian

t Coo

ling

nce

Gla

zing

Equi

pmen

t

ow" F

eatu

res

ncy

Ligh

ting

t Res

pons

ive

ontr

ols

cien

cy P

lant

d B

ase

Vent

eat R

ecov

ery

nteg

rate

d PV

Win

d Tu

rbin

es

Pear

l Des Ra

d

Hig

h Pe

rfor

man

Hig

h Ef

ficie

ncy

"No

Flo

Hig

h Ef

ficie

n

Day

light Co

Hig

h Ef

fic

Dem

ad He In W

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 71: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

Base Case:

Design Case:2.2 million sq. ft. Headquarters BuildingChinese Energy Code Compliant Building

20,854,997,467 Lbs of CO2

CO2 Molecule8,759,098,936 Lbs of CO2

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 72: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

FOCUS:FOCUS:How do we balance a payback timeline with first costs?

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 73: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

ENERGY CONSUMPTION (KWH/SQM)

6

4

5

658% Overall Reduction

2

3

4

0

1

2

0Cooling Pumps Fans Lighting

Baseline Case Design Case

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 74: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

EFFICIENCY OF MATERIALS

21 Meters

Skidmore, Owings & Merrill LLP

Base Case Design Case© CTBUH Copyright

Page 75: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

5 Additional Floors(100,000 sq ft.)

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 76: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

IMPROVED NET TO GROSS AREA RATIO USING WATER BASED COOLINGCOOLING

8% Less Core per Floor

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 77: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

CUMULATIVE INVESTMENT IMPACT OF SUSTAINABLE MEASURES

500000Decreased Cost of EnergyI d R t f Additi l Fl

300000

400000

Increased Rent from Additional FloorsIncreased Rent from Floor Efficiency

200000

300000

RM

B

Payback Occurs in 4.8 Years

0

100000

-1000000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Skidmore, Owings & Merrill LLP

YEAR© CTBUH Copyright

Page 78: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

SITE PHOTOGRAPHS SEPT 09

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 79: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

SITE PHOTOGRAPHS OCT 09

Skidmore, Owings & Merrill LLP

© CTBUH Copyright

Page 80: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4

CIVILIZATIONS LEAVE MARKS ON THE EARTH BY WHICH THEY ARE KNOWN AND JUDGED. “IN LARGE MEASURE THE NATURE OF THEIR IMMORTALITY IS GAUGED BY HOW WELL THEIR IMMORTALITY IS GAUGED BY HOW WELL THEIR BUILDERS MADE PEACE WITH THE ENVIRONMENT.”THE ENVIRONMENT.”

- NATHANIEL OWINGSTHE AMERICAN AESTHETIC 1969THE AMERICAN AESTHETIC 1969© CTBUH Copyrig

ht

Page 81: Towards Zero Pearl River Tower · WIND TURBINE GENERATORS Upper Tunnel 10 20 30 320 40 330 340 350 0 1 10 20 30 320 40 330 340 350 0 1 Lower Tunnel 50 60 290 70 300 310 0.8 0.6 0.4