Towards sustainable buildings Case studies of innovation and technologies

Istanbul - April 21 - 2011

Page 2: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

ASTALDI at a glance

• Astaldi is one of the most successful contractor in Italy and abroad, operating also as promoter of project finance initiatives and concessions manager.

Who is Astaldi?

• Transport infrastructures, water and renewable energy, civil and industrial buildings represent the Group’s key sectors, the ones where Astaldi operates as contractor and concession operator.

What does Astaldi?

• Listed on the Stock Exchange since 2002, Astaldi currently operates in 23 countries (Algeria, Brazil, Bolivia, Bulgaria, Chile, Costa Rica, El Salvador, Guatemala, Honduras, Italy, Nicaragua, Panama, Peru, Poland, Romania, Qatar, Saudi Arabia, Turkey, UAE, USA, Venezuela).

Where is Astaldi?

Page 3: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

How ASTALDI reduces its environmental impact

Photovoltaics

Trigeneration

Geothermics

Insulating materials

LEDs

Solar thermal collectors

Wind power

Passive solar technologies

Inverters

Bio-fuels

Water recycling

through the use of…

Page 4: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 1: ASTALDI head office in Rome, Italy (work in progress)

Energy Audit

Energy Saving Actions

Results

2,000 m2 of floor space

3 floors + basement

Population of 300 people

Page 5: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 1: ASTALDI head office in Rome, Italy (work in progress)

Energy Audit

Illumination29%

Servers14%

Computers3%

Printers2%

Ventilation5%

Pumps3%

Space heating11%

Space cooling8%

Cooking6%

Water heating4%

Others15%

Categories Energy consumed by the building

Illumination 536.571 kWh 100 TEP 29%

Servers 263.052 kWh 49 TEP 14%

Computers 58.993 kWh 11 TEP 3%

Printers 35.191 kWh 7 TEP 2%

Ventilation 85.053 kWh 16 TEP 5%

Pumps 59.258 kWh 11 TEP 3%

Space heating 45.251 Sm3 37 TEP 11%

Space cooling 153.624 kWh 29 TEP 8%

Cooking 120.540 kWh 23 TEP 6%

Water heating 75.640 kWh 14 TEP 4%

Others 276.966 kWh 52 TEP 15%

349 TEP 100%

Page 6: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 1: ASTALDI head office in Rome, Italy (work in progress)

Energy Saving Actions

Substitution of fluorescent lamps and halogen lamps with LEDs with an energy saving of illumination up to 60%.

External insulation: with the use of insulating materials based on nanotechnologies or natural fibers to increase the thermal resistance of the building.

Creating vertical gardens to improve thermal resistance and utilizing plants that absorb traffic pollution.

Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with 184 kW of power rating with an energy production of 200,000 kWh/year.

Installation of a thermal solar system with a capturing surface of 50 m2 to produce 2,500 l/day of hot water.

Installation of a trigenerator with a simultaneous production of electricity, heating and refrigeration with an energy saving of 25% compared with a separate production.

Page 7: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 1: ASTALDI head office in Rome, Italy (work in progress)

Results

60% of primary energy consumed

by the building will be saved by

the energy saving actions.

The building will produce energy

for itself.

Page 8: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 2: ASTALDI CONSTRUCTION head office in Davie (FL-USA)

PV system power rating: 24kW

168 PV thin film modules

Building-Integrated Photovoltaics

363 m2 of PV area

30,000 kWh/year

20 tCO2/year saved (USA conversion factor)

Page 9: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 2: ASTALDI CONSTRUCTION head office in Davie (FL-USA)

0

500

1000

1500

2000

2500

3000

3500

4000

January February March April May June July August September October November December

Em [kWh/month]

A real-time monitoring system serves as an educational tool and continuously measures and shows the real electricity production and environmental offsets of the PV system.

Page 10: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 2: ASTALDI CONSTRUCTION head office in Davie (FL-USA)

Other energy saving actions conducted through the use of the LEED guidelines

Installation on the roof of an insulation membrane with solar rays reflective capacities to reduce cooling energy consumptions.

Installations of high efficiency lighting.

Installation of motion control light sensors in common areas to minimize the amount of time lights are left on after employers walk away.

Introduction of more natural exterior light into internal office spaces through the use of interior office windows and reflective ceilings tiles.

Installation of in line instant-hot water heaters that heat only on demand and not all day long like a typical boiler.

• Leadership in L

• Energy &E

• EnvironmentalE

• DesignD

Page 11: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

7.000 m2 transparent surface

“Double skin” façade system with a mechanically ventilated air gap

High levels of sound insulation

Case study 3: Hospital in Mestre, Venice, Italy

Functional surface areas: total 96.425 m2

7 floors above ground level + 3 underground floors

Availability of 680 beds

Page 12: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

250.000 m2 green areas

Artificial lakes with water reserves

Case study 3: New hospital in Mestre, Venice, Italy

A winter garden inside the building

Page 13: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

1.800.000 kWh/year of clean energy

Saving of 340 tep/year

Saving of 870 tCO2/year

Case study 4: Metro C – “Graniti” Station, Rome, Italy (work in progress)

Photovoltaic modules on parking areas: 450 kWp

Building Integrated Photovoltaics on 8 buildings: 1 MW

Page 14: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 5: Nuovo Polo Fieristico, Milan, Italy

6 heat pumps with 1 MW of power rating

Geothermal system that uses well water as heat source

The system supplies heating and cooling to all buildings in the central corridor of the exhibition areas

Page 15: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Case study 6: Tuscan hospitals - Prato, Pistoia, Massa, Lucca – Italy (work in progress)

4 hospitals

Functional surface areas: total 200.000 m2

Availability of 1.710 beds

Cogeneration2.6 MWel

Photovoltaics

200 kW

Water recycling Inverters

Page 16: Towards sustainable buildingsdocuments.rec.org/projects/ALFRED_DE_PASCALI_ASTALDI.pdf · Photovoltaics: 2,544 CIS panels on roof, vertical walls and parking areas. A PV system with

Towards sustainable buildings Case studies of innovation and technologies

Istanbul - April 21 – 2011

Thanks for your attention!