  • 7/28/2019 Total q'ty

    1/32

    Total Q'ty Up to nowPercentage

    completed (%)

    1 Bored pile, SCM pile (nos) 263 263 100%

    2 Excavation of foundation (m3) 19,161 19161 100%

    3 Concrete of foundation(m3) 2,740 890 32%

    4 Pipe installation (D2420) - - -

    5 Back filling - - -

    No Description

    Boiler 3

  • 7/28/2019 Total q'ty

    2/32

    Bored pile (nos)

    Excavation (m3)

    Concrete (m3)

  • 7/28/2019 Total q'ty

    3/32

    Summary Qua

    Total Q'ty Up to nowPercentage

    completed (%)Total Q'ty Up to now

    Percentage

    completed (%)

    139 139 100% 263 263 100%

    11,556 0% 19,161 0%

    1,101 0% 2,740 0%

    - - - - - -

    - - - - - -

    Back of boiler 3 Boiler 4

  • 7/28/2019 Total q'ty

    4/32

    Total Up to now

    263 Completed

    19,161 17,245

    2,740 385

  • 7/28/2019 Total q'ty

    5/32

    tity

    As of

    Total Q'ty Up to nowPercentage

    completed (%)Total Q'ty Up to now

    Percentage

    completed (%)

    139 139 100% 792 792 100%

    11,556 0% 85,379 0%

    1,101 0% 11,186 0%

    - - - - - -

    - - - - - -

    Turbine Building & deaerator bay &Back of boiler 4

  • 7/28/2019 Total q'ty

    6/32

  • 7/28/2019 Total q'ty

    7/32

    7/9/2013

    Total Q'ty Up to nowPercentage

    completed (%)Total Q'ty Up to now

    Percentage

    completed (%)

    106 106 100% 4970 4395 88%

    9,785 50 1% 66,931 15,111 23%

    911 0% - - -

    - - - 1063 180 17%

    - - - 57,157 9,679 17%

    Central Control Building Main Cooling Water Piping

  • 7/28/2019 Total q'ty

    8/32

  • 7/28/2019 Total q'ty

    9/32

    Remarks

  • 7/28/2019 Total q'ty

    10/32

  • 7/28/2019 Total q'ty

    11/32

    4.77

  • 7/28/2019 Total q'ty

    12/32

  • 7/28/2019 Total q'ty

    13/32

  • 7/28/2019 Total q'ty

    14/32

  • 7/28/2019 Total q'ty

    15/32

  • 7/28/2019 Total q'ty

    16/32

  • 7/28/2019 Total q'ty

    17/32

  • 7/28/2019 Total q'ty

    18/32

  • 7/28/2019 Total q'ty

    19/32

  • 7/28/2019 Total q'ty

    20/32

    HAI PHONG 2 - 2 x 300 MW - THERMAL POWER PROJECT

    PROGRESS OF CONCRETE PILING WORKS

    Sl No AREA SCOPEUP TO LAST

    MONTH

    DURING THIS

    MONTHCUMULATIVE BALANCE

    Percentage

    Completed

    1 Coal Handling System: - -

    a Transfer Tower A 36 - 24 24 12 66.67%

    h Coal Handling Trestle 2 48 22 10 32 16 66.67%

    o Coal Sampling room 18 1 14 15 3 83.33%

    p Coal Storage shed 325 50 74 124 201 38.15%

    2 ESP / Ash handling / FGD control building 36 12 18 30 6 83.33%

    3 Turbine building, deaerator & Bunker Bay 792 534 213 747 45 94.32%

    4 FGD absorber 50 25 18 43 7 86.00%

    5 Water Treatment Plant Building 92 76 16 92 - 100.00%

    6

    air flue rack & circling pumping house (FGD

    area) 244 - 244 0.00%

    3,120 1,950 402 2,352 768 75.38%

    PROGRESS OF SOIL & CEMENT MIX PILING WORKS

    Sl No AREA SCOPEUP TO LAST

    MONTH

    DURING THIS

    MONTHCUMULATIVE BALANCE

    Percentage

    Completed

    1 Main Cooling Water Piping 4,970 4,395 - 4,395 575 88.43%

    2 Coal Storage yard 53,323 10,100 10,119 20,219 33,104 37.92%

    3 Waste Water Treatment Plant 189 - 34 34 155 17.99%

    4 Clarifier Tanks 399 - 399 399 - 100.00%

    5 Filter Water Storage Tanks 1,170 - 210 210 960 17.95%

    6 Chemical Dosing Room 441 - 115 115 326 26.08%

    7 Boiler make up water treatment 780 453 453 327 58.08%

    8 Sewage water treatment plant 87 - 87 0.00%

    - -

    - -

    - -

    TOTAL

  • 7/28/2019 Total q'ty

    21/32

    - -

    - -

  • 7/28/2019 Total q'ty

    22/32

    Remarks

    start from 30/05/2011

    start from 09/05/2011

    start on 24/May

    start from 01/05/2011

    start on 14/April

    start on 6/Feb & finished on

    20/6 and 5/July

    start on 30/March

    finished on 3/May

    Remarks

    start from 16/06

    start from 11/06 and finish on 23/06/2011

    start from 4/06

    start from 17/06

    start from 14/06

  • 7/28/2019 Total q'ty

    23/32

    Area of foundation

    Area Remarks

    CT 1 6.42 10.471

    3 10.471

    4 6.4

    5 10.471

    6 2.56

    7 10.471

    8 10.471 20.942

    9 6.4

    10 10.471 20.942

    11 16 32

    12 12.8

    13 10.471 20.942

    14 10.471

    15 6.4

    16 6.4

    17 10.471

    18 2.56

    19 6.4

    20 6.4

    21 6.4

    22 6.423 6.4

    24 6.4

    25 6.4

    26 6.4

    SJ 1 46.4

    2 10.98

    3 14.4

    SJ a 1 46.4

    2 10.98

    3 14.4

    CT a 1 6.4

    2 10.471

    4 6.4

    5 10.471

    6 2.56

    7 10.471

    8 10.471

    Back of Boiler 3 (4)

  • 7/28/2019 Total q'ty

    24/32

    9 6.4

    10 10.471

    11 10.471

    12 12.8

    13 10.471

    14 10.47115 6.4

    16 6.4

    17 10.471

    18 2.56

    19 6.4

    20 6.4

    21 6.4

    22 6.4

    23 6.4

    24 6.4

    25 6.4

    26 6.4

    Total (m2) 550

    h (m) 2

    Volume (m3) 1,101

    CT 1 25.6

    2 132.0

    3 21.2

    4 16

    4 165 25.6

    6 140.8 281.6

    7 25.6

    8 64.4 128.8

    9 34.32

    10 6.4 12.8

    10 6.4

    11 19.2 38.4

    12 25.6

    13 102.4 204.814 34.32

    SJ 1 34.9

    1 34.9

    3 16.0

    Cta 1 39.7

    2 132.0

    4 16

    Boiler 3(4)

  • 7/28/2019 Total q'ty

    25/32

    4 16

    5 25.6

    6 140.8

    7 25.6

    8 64.4

    10 6.411 19.2

    13 102.4

    Total (m2) 1370

    h (m) 2

    Volume (m3) 2,740

    CT 1 23.2

    2 25.6

    3 25.6

    4 23.25 25

    6 25

    7 25

    8 25

    9 10.5

    10 10.5

    11 10.5

    12 10.5

    13 10.5

    14 10.5

    15 10.515 10.5

    16 10.5

    16 10.5

    17 10.5

    18 10.5

    21 16

    22 25

    23 25

    24 16

    25 2526 25

    Total (m2) 455.252

    h (m) 2

    Volume (m3) 911

    No Item

    1 JA8 32.2

    Turbine

    Central control house

  • 7/28/2019 Total q'ty

    26/32

    2 JA2 25.76

    3 JX1 195.946

    4 JA12 34.4

    5 J1/A-2/11 6.4

    6 J1/A-5/12 6.4

    7 JA13 25.768 J1/A-13 6.4

    9 J1/A-2/13 6.4

    10 JA14 25.76

    11 J1/A-14 6.4

    12 J2/A-14 10.469

    13 J2A-2/13 6.4

    14 J2/A-13 6.4

    15 J2/A-4/12 6.4

    16 J2/A-12 6.4

    17 JJ2 461.64

    18 J1/A-8 6.4

    19 J1/A-1/8 6.4

    20 J2/A-8 6.4

    21 J2/A-1/8 6.4

    22 J3/A-8 6.4

    23 J3/A-1/8 6.4

    24 JB8 43.459

    25 J4/A-9 6.4

    26 JB9 25.76

    27 JN2 25.44

    28 JB10 25.7629 JB11 25.76

    30 JB12 25.76

    31 JB13 25.76

    32 JB14 25.76

    33 JC8 85.6

    34 JC9 64

    35 JC10 64

    36 JC11 64

    37 JC12 64

    38 JC13 64

    39 JC14 64

    40 JM5 98.977

    41 JM6 97.92

    42 JM7 97.92

    43 JM8 97.92

    44 JD8 85.6

    45 JD9 64

  • 7/28/2019 Total q'ty

    27/32

    46 JD10 64

    47 JD11 64

    48 JD12 64

    49 JD13 64

    50 JD14 64

    51 JE8 60.4852 JE14 25.76

    53 J1/A-2/4 6.4

    54 JA5 34.4

    55 J1A-5/5 6.4

    56 J1/A-6 6.4

    57 JA6 25.76

    58 J1/A-2/6 6.4

    59 J1/A-7 6.4

    60 JA7 25.76

    61 J2/A-5 6.4

    62 J2/A-4/5 6.4

    63 J2/A-? 6.4

    64 J2/A-2/6 6.4

    65 J2/A-7 6.4

    66 J3A-4/5 6.4

    67 J3A-5 6.4

    68 J3A-7 6.4

    69 J4A-5 6.4

    70 J4A-4/5 6.4

    71 J4A-??? 6.4

    72 J4A-2/6 6.473 J4A-7 6.4

    74 JB5 43.459

    75 JB6 43.459

    76 JB7 43.459

    77 JC5 64

    78 JC6 64

    79 JC7 64

    80 JM3 97.92

    81 JM4 97.92

    82 JD5 64

    83 JD6 64

    84 JD7 64

    85 JE7 32.2

    86 JA1 25.76

    87 JA2 25.76

    88 JX1 195.946

    89 J1/A-1 6.4

  • 7/28/2019 Total q'ty

    28/32

    90 J1/A-1/1 6.4

    91 J2/A-1 10.469

    92 J2A-1/1 6.4

    93 JJ1 461.64

    94 J3/A-1 10.469

    95 J3/A-1/1 6.496 J4A-1 6.4

    97 J4/A-2 6.4

    98 JB1 43.459

    99 JB2 43.459

    100 JB3 43.459

    101 JN1 25.44

    102 JB4 43.459

    103 JC01 66.78

    104 JC1 64

    105 JC2 64

    106 JC3 64

    107 JC4 64

    108 JM1 97.92

    109 JM2 97.92

    110 JD01 66.78

    111 JD1 64

    112 JD2 64

    113 JD3 64

    114 JD4 64

    115 JE1a 25.76

    116 JE1 25.76117 JDB1 31.954

    118 JDB1 31.954

    119 JDB1 31.954

    120 J3A6 2.832

    121 J3A2/6 2.832

    122 JDB1 31.954

    123 JDB1 31.954

    124 JDB1 31.954

    125 J3A6 2.832

    126 J3A2/6 2.832

    127 J3A-12 6.4

    128 J3A-4/12 6.4

    129 J3A-14 10.469

    130 J3A8 6.4

    Total (m2) 5,593

    h (m) 2

  • 7/28/2019 Total q'ty

    29/32

    Volume (m3) 11,186

  • 7/28/2019 Total q'ty

    30/32

  • 7/28/2019 Total q'ty

    31/32

    204.8

    34.32384.8 12.8

    38.4

    25.6

    128.8

    444.72

    889.44

    64.4

  • 7/28/2019 Total q'ty

    32/32

    6.4

    140.8

    211.6

    423.2