TOTAL profile ls-Final

30

Transcript of TOTAL profile ls-Final

Page 1: TOTAL profile ls-Final
Page 2: TOTAL profile ls-Final
Page 3: TOTAL profile ls-Final
Page 4: TOTAL profile ls-Final
Page 5: TOTAL profile ls-Final
Page 6: TOTAL profile ls-Final
Page 7: TOTAL profile ls-Final

Certificate of Registration

Issuing Country: Bureau of Assessment Services LLC, P.O. Box: 116898, Al Karama, Dubai, United Arab Emirates.

Further clarification regarding the scope of the certificate and the applicability of ISO 9001:2008 requirements may be obtained byconsulting the organization.This certificate remains valid while the holder maintains the management system in accordance with the standard above, which will beaudited by Bureau of Assessment Services through surveillance audits. This certificate remains the property of Bureau of AssessmentServices. Lack of fulfillment of conditions as set out in the certification agreement may render this certificate invalid.

Certification ManagerBureau of Assessment Services

Certificate issue date : 09-October-2014

Certificate valid till : 08-October-2017

Certificate No : AE-BAS-Q0002477

The Quality Management System is applicable to:

ISO 9001:2008

This is to certify that

TotalElectrical & Mechanical LLC

P.O. Box: 31175, Office No. 405, City Tower #1, Sheikh Zayed Road,Dubai, United Arab Emirates.

has been assessed by Bureau of Assessment Services and hereby attests thatthe organization complies with the requirements of Quality Management Systemin accordance with

Industrial Electrical & Mechanical Projects, Electrical Fitting Contracting,Electrical & Mechanical Equipment Erection Projects, HV & EHV ElectricalProjects, Infra Electrical Projects, HVAC Projects, Fencing & Barbed WireProjects, Partition & False Ceiling Projects, Plumbing Projects, Flooring &Wall Tiles Works Projects and Plaster & Cladding Works Projects.

This certificate is validated throughannual surveillance

st 1 SurveillanceOctober-2015

nd 2 SurveillanceOctober-2016

ISO 9001REGISTERED

BAS

CB - 013

[EA/NACE: 28/43.29 & 43.39]

ACCREDITIONS & CERTIFICATIONS

Page 8: TOTAL profile ls-Final
Page 9: TOTAL profile ls-Final
Page 10: TOTAL profile ls-Final
Page 11: TOTAL profile ls-Final
Page 12: TOTAL profile ls-Final
Page 13: TOTAL profile ls-Final
Page 14: TOTAL profile ls-Final
Page 15: TOTAL profile ls-Final
Page 16: TOTAL profile ls-Final

MEYDAN

MEYDAN

MEYDAN

MEYDAN

MEYDAN

MEYDAN

MEYDAN

AL QAIZI VILLA

CONARES

CONARES

CONARES

CONARES

CONARES

CONARES

CONARES

CONARES

M +W for AL KHAZNADATA CENTRE DUBAI

M +W for AL KHAZNADATA CENTRE DUBAI

M +W for AL KHAZNADATA CENTRE DUBAI

51

525354555657

5859

606162636465

66

676869 TESTING & COMMISSIONING OF 14.5MW 11kV SYSTEMS

ELECTRCIAL WORKS AT MEYDAN SKY BUBBLE

ELECTRCIAL WORKS AT MEYDAN SKY BUBBLE

11kV PERMANENT DEWA POWER SUPPLY FOR 14.5MW

LV CABLES INSTALLATION BETWEEN ATS & GENERATOR PANELS

PERMANENT POWER SUPPLY INSTALLATION FOR MEYDAN PARADE RING

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

LV CABLES TERMINATION INSIDE REBAR MILL PLANT

DEWA 11kV POWER CABLE INSTALLATION JOB

CONARES DISPLAY STAND

LOAD CABLES FOR DEWA 5.9 MW PROJECT

EPC PROJECT FOR DEWA PERMANENT 11kV 5.9MW POWER

ELECTRCIAL WORKS FOR POND WATER PUMP

ELECTRCIAL WORKS FOR FIRE PUM

MEP WORKS FOR AL QAUZI VILLA

MEYDAN LAUNDRY PROJECT

RECTIFICATION OF DEWA WATERLINE

Page 17: TOTAL profile ls-Final

Rectification Of 225mm Water A/c Pipeline By Installaing Steel Sleeves Across The Road At Meydan Junction 2

2012 0.5

2012

2012

0.5

0.5

Meydan Hotel laundry works-MEP

Al Qaizi villa-sponsor villa 0.75

2014 0.75

Temp power supply to firepump at Meydan carpark 2013

0.52013

0.12013

0.252013

0.62013

0.22013

0.12012

0.52014

0.52014

0.12014

0.52014

1.52013

1.52013

0.12013

6.62013-14

Electrical works at Meydan Pond Water Pumping station

5.9MW Additional DEWA power supplytURNKEY Project for Conares

Load Cables supply and installation between TOTAL EM installed MDBand SIEMENS Make MCCs

Concrete foundation for CONARES display board

11kV Cable Installation from JAFZA Sounth 132kV Substation toConares Substation

LV cable termination

Concrete grouting works

Concrete grouting works

Concrete grouting works

Parade ring power supply

1C 630mm² cables installtion between ATS Panels and Generators

Supply, installation and testing of 3C 300mm² XLPE, STA, Cu, PVC Cables between 3Nos. 11kV Switchgears with 2 Nos. Incomer & 2 Nos. Outgoings and 6 Nos. of 2.5MVA Transformers

Electrcial works for sky BUBBLE RESTAURANT Level 8 LV distribution works.

Electrcial works for BUBBLE RESTAURANT Level 9 LV distribution works.

Testing and commissioning of 11kV and LV systems at AL khazana

Page 18: TOTAL profile ls-Final
Page 19: TOTAL profile ls-Final
Page 20: TOTAL profile ls-Final
Page 21: TOTAL profile ls-Final
Page 22: TOTAL profile ls-Final
Page 23: TOTAL profile ls-Final
Page 24: TOTAL profile ls-Final

Construction of DEWA Substation for Conares

Tesing & Commissioing of 11 KV Switchgears at Conares, Jafza, Dubai

Erection of LV Switchgears

Erection OF 2500KVA 11KV/.4KV Transformer

Page 25: TOTAL profile ls-Final

Installation of LV cables for the ATS panels at Al Khazna Data Centre Dubai

Testing of 11KV Breakers

Supply, Installation and Testing & Commissioning of 11KV Switchgears

Testing & Commissioning of 11kv Switchgears for Al Khazna Data Centre, Dubai

Page 26: TOTAL profile ls-Final
Page 27: TOTAL profile ls-Final
Page 28: TOTAL profile ls-Final

MEYDANCommon Utility Tunnel, Cable Installation -11kv

Page 29: TOTAL profile ls-Final
Page 30: TOTAL profile ls-Final