TOTAL Presentation | Business Forum Paris 2013
-
Upload
the-european-azerbaijan-society -
Category
Documents
-
view
218 -
download
4
description
Transcript of TOTAL Presentation | Business Forum Paris 2013
-
GAS DEVELOPMENT IN AZERBAIJAN Kevin Boyne
Technical Advisor to Senior Vice President for Continental Europe and Central Asia, Total Exploration Production
TEAS Business Forum, Paris, March 14th, 2013
-
AZERBAIJAN OIL FIRSTS
! First oil well in the world was drilled (not hand dug) in 1846 in Baku in Bibi Heybat oil field
! In 1900 Azerbaijan produced more than 50% of worlds oil - 11.4 million tons
! In 1897-1907 the 1st largest oil pipeline in the world was built from Baku to Batumi - 883 km
! About 80% of oil production during 2nd world war in former USSR was made in Baku (peak production 23,5 million tons in 1941)
! First offshore oil production in the world started in Azerbaijan (1924 Bibi Heybat beach, 1947 Oily Rocks - in open sea)
2 TEAS Business Forum, Paris, 14/03/2013
-
TPAO
Yalama1 & 2
AZERBAIJAN : CURRENT POTENTIAL MAINLY OFFSHORE
TEAS Business Forum, Paris, 14/03/2013 3
Key Exploration wells
Discovery Uncommercial discovery Shows Dry
!"##$ %&'"$ ()$*$ +,"-&'.-$
/*0%12$ !"#"$ %""%$ &'()*$
34516$ #++%$ !+,-$ ./0)1'($
78&8$)"90:$;16$ #+++$ %2#%$ ./$
5
-
TOTAL E&P IN AZERBAIJAN
Gas Export to SCP
Condensate Export to BTC
SCPco:10 %
BTCco: 5 %
ABSHERON : 40 % Operated Non Operated
SHAH DENIZ:10 %
4 TEAS Business Forum, Paris, 14/03/2013
-
5 TEAS Business Forum, Paris, 14/03/2013
4000
4500
5000
5500
6000
6500
7000
ABX-1A ABX-2.T1
BalVIIIBC
Additional HC column that could be proven by a Side-track to the N
N
Undiscovered potential
S
NKP FAS E
BAL VI-VII
BAL VIII
BAL X FAS B FAS D
BAL IX
HC columns proven by ABX-2.T1 and ABX-1
Structural spill point to the N
Possible delineation side-track
Additional deep prospectivity in Kalinsky
TD=6874 m/RT Below NKP
ABSHERON : THE ABX-2 WELL
-
6
Azerbaidjan - Gas Export
TANAP (Azerbaijan 80% Turkey 20%) !!Likely participations : SOCAR 51% + 29% offered to BP/
SH/Total (Total 5%) TPAO 15% + BOTAS 5% !!Mainly 56 with minimum 16 bcma initial capacity (scalable
to 32 bcma and more) !!Estimated Capex of USD 7 billion !!SOCAR is the operator of the project (operator)
Nabucco West (OMV (34,76%), FGSZ MOL (13,1%), Transgaz, Bulgargaz, BOTAS : 17,38% each !! NW route and delivery points unchanged !!10 bcma capacity scalable !! Estimated Capex 4 G! (48)
TAP (AXPO (ex EGL) 42.5%, Statoil 42.5%, E.ON 15%)
!!10 bcma capacity (+ expansion to 20 bcma) !!Estimated Capex 3,5 G! !!AXPO and Statoil ready to dilute. !!Funding Agreement and Option Agreement with
BP, SOCAR and Total signed !!Probable participations following exercise of
options : SOCAR 20%, BP 20%, Statoil 20%, Total 10%, AXPO 15%, E.ON 15%.
TEAS Business Forum, Paris, 14/03/2013