Total Maintenance Documentation

7
Date Quote # 10/12/2010 Q101210JEB S/N# Model # S/N# Model # 13967 14055 AFV-N-W-Hc22-10-DR/LH 13999 AFV-B-S-6-16/14-DLH 14056 14000 14080 AFV-N-S-S6-DLH 14036 AFV-N-W-Hc22-10-DR/LH 14081 AFV-B-S-6-16/14-DLH 14050 AFV-N-S-S7/16-DLH 14209 Terms: F.O.B. Bedford, Ohio (Parts manufactured in Japan) 1) Freight Prepaid and Added to Invoice 2) Duty & Broker Fees Collect 3) Shipment 5-6 Weeks (ARO) 4) Payment Net 30 Days (USF) 5) This quotation is Valid for 30 Days Terms: F.O.B. Bedford, Ohio 1) Shipment 1-2 Days (ARO) 2) Freight prepaid and Added to Invoice 3) Payment Net 30 Days (USF) 4) This quotation is Valid for 30 Days Joseph E. Brunk Inside Sales Manager Ph: (440) 439-8081 Ext#16 Fx: (440) 439-8217 [email protected] or Bolt so the information can be forwarded to Dengensha Japan for manufacturing of the replacement part to the exact specifications it was originally designed for. AFV-N-W-S6-DR/LH AFV-N-W-Hc22-10-DR/LH Quotation NOTE: Parts quoted that have a number in parenthesis, (Example: PFU-0012-(13967), this identifies the "Serial Number" of the corresponding feeder. This replacement part must be ordered exactly as it appears on the quotation. The Serial Numbers tell us the size of the Nut AFV-N-W-S6-DR/LH AFV-N-S-S6-DLH DENGENSHA AMERICA CORP. 7647 FIRST PLACE DRIVE

description

Complete spare parts manual with prices and availability customized for your equipment and provided at no charge. Includes maintenance log, CD and updates as needed. Visuals simplify part identification.

Transcript of Total Maintenance Documentation

Page 1: Total Maintenance Documentation

Date Quote #

10/12/2010 Q101210JEB

S/N# Model # S/N# Model #

13967 14055 AFV-N-W-Hc22-10-DR/LH

13999 AFV-B-S-6-16/14-DLH 14056

14000 14080 AFV-N-S-S6-DLH

14036 AFV-N-W-Hc22-10-DR/LH 14081 AFV-B-S-6-16/14-DLH

14050 AFV-N-S-S7/16-DLH 14209

Terms: F.O.B. Bedford, Ohio (Parts manufactured in Japan)

1) Freight Prepaid and Added to Invoice

2) Duty & Broker Fees Collect

3) Shipment 5-6 Weeks (ARO) Hinge Plate Guide Bushing Nut Stopper

4) Payment Net 30 Days (USF)

5) This quotation is Valid for 30 Days

Terms: F.O.B. Bedford, Ohio

1) Shipment 1-2 Days (ARO) Magnet Assy Spindle Assy Head Assy

2) Freight prepaid and Added to Invoice

3) Payment Net 30 Days (USF)

4) This quotation is Valid for 30 Days

Joseph E. Brunk

Inside Sales Manager

Ph: (440) 439-8081 Ext#16

Fx: (440) 439-8217

[email protected]

or Bolt so the information can be forwarded to Dengensha Japan for manufacturing of the

replacement part to the exact specifications it was originally designed for.

AFV-N-W-S6-DR/LH

AFV-N-W-Hc22-10-DR/LH

Quotation

NOTE: Parts quoted that have a number in parenthesis, (Example: PFU-0012-(13967), this

identifies the "Serial Number" of the corresponding feeder. This replacement part must be

ordered exactly as it appears on the quotation. The Serial Numbers tell us the size of the Nut

AFV-N-W-S6-DR/LH

AFV-N-S-S6-DLH

DENGENSHA AMERICA CORP.7647 FIRST PLACE DRIVE

Page 2: Total Maintenance Documentation

Part Number Description Price F.O.B./DeliveryPFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(13967) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(13967) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#13967 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-W-S6-DR/LH M4KB210-08-B-4-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-0300-V-(13967) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(13967) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-2-(13967) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Part Number Description Price F.O.B./Delivery

PFK-5100-(13999) Chuck Assembly DEMO Bedford, OH 5-6 WeeksPFK-5101-1-(13999) Jaws R/L DEMO Bedford, OH 5-6 WeeksPFK-5104 Compression Spring DEMO Bedford, OH 1-2 DaysPFK-5105 Torsion Spring DEMO Bedford, OH 1-2 Days#15 (15x23) Round Vinyl Tube DEMO Bedford, OH 1-2 DaysPFU-5003 Guide Bushing DEMO Bedford, OH 1-2 DaysPFU-5001 Spindle DEMO Bedford, OH 1-2 Days4B9880 Cap Tip DEMO Bedford, OH 1-2 Days4B9686 Insulation Guide DEMO Bedford, OH 1-2 Days4B9885 Electrode Holder DEMO Bedford, OH 1-2 Days4C4804 Collar DEMO Bedford, OH 1-2 Days

S/N#13999 4C4802 Guide Pin DEMO Bedford, OH 1-2 Days

AFV-B-S-6-16/14-DLH 4B7175 Cap Screw DEMO Bedford, OH 1-2 Days4D1073 Bolt DEMO Bedford, OH 1-2 Days12IP-77MM Insulation Pipe DEMO Bedford, OH 1-2 Days61W Insulation Washer DEMO Bedford, OH 1-2 DaysCMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 1-2 DaysCMK2-FA-20-50 Air Cylinder DEMO Bedford, OH 1-2 DaysSSD-25-25-DG Air Cylinder DEMO Bedford, OH 1-2 DaysM4KB210-08-B-3-212872- DC24V Solenoid Valve DEMO Bedford, OH 1-2 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 1-2 DaysHJ2-DC24V Relay DEMO Bedford, OH 1-2 DaysE2E-X8MD1-5M Proximity Switch DEMO Bedford, OH 1-2 DaysE2E-X8MD1-2M Proximity Switch DEMO Bedford, OH 1-2 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 1-2 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 1-2 DaysPFS-0206-S-(13999) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFT-5010-(13999) Lower Electrode Assembly DEMO Bedford, OH 5-6 Weeks

Page 3: Total Maintenance Documentation

Part Number Description Price F.O.B./DeliveryPFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14000) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14000) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

S/N#14000 CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysAFV-N-S-S6-DLH SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days

M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-1000-V-(14000) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(14000) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-2-(14000) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Part Number Description Price F.O.B./DeliveryPFU-0006-10X12-(14036) Round Guide Bushing DEMO Bedford, OH 5-6 WeeksPFC-0024-(14036) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0028-10-10X12-(14036) Spindle Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFU-0023-2 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0026 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0022-(14036) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days13-25 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14036 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-W-Hc22-10-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-0100-V-(14036) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0021-(14036) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0021-2-(14036) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Page 4: Total Maintenance Documentation

Part Number Description Price F.O.B./DeliveryPFU-0005-13 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14050) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0011-7/16-13-(14050) Spindle Assy (300mm Stroke) DEMO Bedford, OH 5-6 WeeksPFU-0014-2-13 Hinge Plate Assembly DEMO Bedford, OH 5-6 WeeksPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14050) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days14-20 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-300 Air Cylinder (300mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14050 SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-S-S7/16-DLH M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-1000-V-(14050) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(14050) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-3-(14050) Feed Unit Assy (300mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Part Number Description Price F.O.B./DeliveryPFU-0005-9 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14052) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-8-9 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-9 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14052) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days8-14 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14052 SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-S-S8-DLH M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-1000-V-(14052) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(14052) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-2-(14052) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Page 5: Total Maintenance Documentation

Part Number Description Price F.O.B./DeliveryPFU-0006-10X10 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0024-(14055) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0028-10-10X10-(14055) Spindle Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFU-0023-2 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0026 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0022-(14055) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days13-25 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14055 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-W-Hc22-10-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-0100-V-(14055) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0021-(14055) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0021-2-(14055) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Part Number Description Price F.O.B./DeliveryPFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14056) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14056) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14056 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-W-S6-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 Days

HJ2-DC24V Relay DEMO Bedford, OH 2-3 Days

E2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 Days

DGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 Days

C1020-8-FL Air Regulator DEMO Bedford, OH 2-3 Days

RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 Days

PFC-0100-V-(14056) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks

PFC-0017-(14056) Chute Track (B) Assembly DEMO Bedford, OH 5-6 Weeks

PFU-0020-2-(14056) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks

PFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 Days

PFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Page 6: Total Maintenance Documentation

Part Number Description Price F.O.B./Delivery

PFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 Days

PFC-0022-(14080) Nut Stopper DEMO Bedford, OH 5-6 Weeks

PFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 Days

PFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 Days

PFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 Days

PFU-0012-(14080) Head Assembly DEMO Bedford, OH 5-6 Weeks

PFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days

6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 Days

S/N#14080 SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-S-S6-DLH M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days

(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 Days

HJ2-DC24V Relay DEMO Bedford, OH 2-3 Days

E2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 Days

DGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 Days

C1020-8-FL Air Regulator DEMO Bedford, OH 2-3 Days

RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 Days

PFC-1000-V-(14080) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks

PFC-0017-(14080) Chute Track (B) Assembly DEMO Bedford, OH 5-6 Weeks

PFU-0020-2-(14080) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks

PFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 Days

PFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days

Part Number Description Price F.O.B./Delivery

PFK-5100-(14081) Chuck Assembly DEMO Bedford, OH 5-6 Weeks

PFK-5101-1-(14081) Jaws R/L DEMO Bedford, OH 5-6 Weeks

PFK-5104 Compression Spring DEMO Bedford, OH 1-2 Days

PFK-5105 Torsion Spring DEMO Bedford, OH 1-2 Days

#15 (15x23) Round Vinyl Tube DEMO Bedford, OH 1-2 Days

PFU-5301 Spindle DEMO Bedford, OH 1-2 Days

PFU-5003 Guide Bushing DEMO Bedford, OH 1-2 Days

4B9880 Cap Tip DEMO Bedford, OH 1-2 Days

4B9686 Insulation Guide DEMO Bedford, OH 1-2 Days

4B9885 Electrode Holder DEMO Bedford, OH 1-2 Days

4C4804 Collar DEMO Bedford, OH 1-2 Days

4C4802 Guide Pin DEMO Bedford, OH 1-2 Days

4B7175 Cap Screw DEMO Bedford, OH 1-2 Days

S/N#14081 4D1073 Bolt DEMO Bedford, OH 1-2 Days

AFV-B-S-6-17/14-DLH 12IP-77MM Insulation Pipe DEMO Bedford, OH 1-2 Days

61W Insulation Washer DEMO Bedford, OH 1-2 Days

CMK2-FA-25-300 Air Cylinder (300mm Stroke) DEMO Bedford, OH 1-2 Days

CMK2-FA-20-50 Air Cylinder DEMO Bedford, OH 1-2 Days

SSD-25-25-DG Air Cylinder DEMO Bedford, OH 1-2 Days

M4KB210-08-B-3-212872- DC24V Solenoid Valve DEMO Bedford, OH 1-2 Days

(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 1-2 Days

HJ2-DC24V Relay DEMO Bedford, OH 1-2 Days

E2E-X8MD1-5M Proximity Switch DEMO Bedford, OH 1-2 Days

E2E-X8MD1-2M Proximity Switch DEMO Bedford, OH 1-2 Days

DGN-2 Printed Circuit Board DEMO Bedford, OH 1-2 Days

RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 1-2 Days

PFS-0206-S-(14081) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks

PFT-5010-(14081) Lower Electrode Assembly DEMO Bedford, OH 5-6 Weeks

Page 7: Total Maintenance Documentation

Part Number Description Price F.O.B./Delivery

PFU-0006-10X10 Round Guide Bushing DEMO Bedford, OH 2-3 Days

PFC-0024-(14209) Nut Stopper DEMO Bedford, OH 5-6 Weeks

PFU-0028-10-10X10-(14209) Spindle Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks

PFU-0023-2 Hinge Plate Assembly DEMO Bedford, OH 2-3 Days

PFU-0026 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 Days

PFU-0022-(14209) Head Assembly DEMO Bedford, OH 5-6 Weeks

PFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days

13-25 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days

CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 Days

S/N#14209 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days

AFV-N-W-Hc22-10-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days

(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 Days

HJ2-DC24V Relay DEMO Bedford, OH 2-3 Days

E2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 Days

DGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 Days

C1020-8-FL Air Regulator DEMO Bedford, OH 2-3 Days

RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 Days

PFC-0100-V-(14209) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks

PFC-0021-(14209) Chute Track (B) Assembly DEMO Bedford, OH 5-6 Weeks

PFU-0021-2-(14209) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks

PFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 Days

PFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days