Total Maintenance Documentation
-
Upload
kurt-kleidon -
Category
Documents
-
view
277 -
download
2
description
Transcript of Total Maintenance Documentation
![Page 1: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/1.jpg)
Date Quote #
10/12/2010 Q101210JEB
S/N# Model # S/N# Model #
13967 14055 AFV-N-W-Hc22-10-DR/LH
13999 AFV-B-S-6-16/14-DLH 14056
14000 14080 AFV-N-S-S6-DLH
14036 AFV-N-W-Hc22-10-DR/LH 14081 AFV-B-S-6-16/14-DLH
14050 AFV-N-S-S7/16-DLH 14209
Terms: F.O.B. Bedford, Ohio (Parts manufactured in Japan)
1) Freight Prepaid and Added to Invoice
2) Duty & Broker Fees Collect
3) Shipment 5-6 Weeks (ARO) Hinge Plate Guide Bushing Nut Stopper
4) Payment Net 30 Days (USF)
5) This quotation is Valid for 30 Days
Terms: F.O.B. Bedford, Ohio
1) Shipment 1-2 Days (ARO) Magnet Assy Spindle Assy Head Assy
2) Freight prepaid and Added to Invoice
3) Payment Net 30 Days (USF)
4) This quotation is Valid for 30 Days
Joseph E. Brunk
Inside Sales Manager
Ph: (440) 439-8081 Ext#16
Fx: (440) 439-8217
or Bolt so the information can be forwarded to Dengensha Japan for manufacturing of the
replacement part to the exact specifications it was originally designed for.
AFV-N-W-S6-DR/LH
AFV-N-W-Hc22-10-DR/LH
Quotation
NOTE: Parts quoted that have a number in parenthesis, (Example: PFU-0012-(13967), this
identifies the "Serial Number" of the corresponding feeder. This replacement part must be
ordered exactly as it appears on the quotation. The Serial Numbers tell us the size of the Nut
AFV-N-W-S6-DR/LH
AFV-N-S-S6-DLH
DENGENSHA AMERICA CORP.7647 FIRST PLACE DRIVE
![Page 2: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/2.jpg)
Part Number Description Price F.O.B./DeliveryPFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(13967) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(13967) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#13967 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-W-S6-DR/LH M4KB210-08-B-4-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-0300-V-(13967) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(13967) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-2-(13967) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
Part Number Description Price F.O.B./Delivery
PFK-5100-(13999) Chuck Assembly DEMO Bedford, OH 5-6 WeeksPFK-5101-1-(13999) Jaws R/L DEMO Bedford, OH 5-6 WeeksPFK-5104 Compression Spring DEMO Bedford, OH 1-2 DaysPFK-5105 Torsion Spring DEMO Bedford, OH 1-2 Days#15 (15x23) Round Vinyl Tube DEMO Bedford, OH 1-2 DaysPFU-5003 Guide Bushing DEMO Bedford, OH 1-2 DaysPFU-5001 Spindle DEMO Bedford, OH 1-2 Days4B9880 Cap Tip DEMO Bedford, OH 1-2 Days4B9686 Insulation Guide DEMO Bedford, OH 1-2 Days4B9885 Electrode Holder DEMO Bedford, OH 1-2 Days4C4804 Collar DEMO Bedford, OH 1-2 Days
S/N#13999 4C4802 Guide Pin DEMO Bedford, OH 1-2 Days
AFV-B-S-6-16/14-DLH 4B7175 Cap Screw DEMO Bedford, OH 1-2 Days4D1073 Bolt DEMO Bedford, OH 1-2 Days12IP-77MM Insulation Pipe DEMO Bedford, OH 1-2 Days61W Insulation Washer DEMO Bedford, OH 1-2 DaysCMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 1-2 DaysCMK2-FA-20-50 Air Cylinder DEMO Bedford, OH 1-2 DaysSSD-25-25-DG Air Cylinder DEMO Bedford, OH 1-2 DaysM4KB210-08-B-3-212872- DC24V Solenoid Valve DEMO Bedford, OH 1-2 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 1-2 DaysHJ2-DC24V Relay DEMO Bedford, OH 1-2 DaysE2E-X8MD1-5M Proximity Switch DEMO Bedford, OH 1-2 DaysE2E-X8MD1-2M Proximity Switch DEMO Bedford, OH 1-2 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 1-2 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 1-2 DaysPFS-0206-S-(13999) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFT-5010-(13999) Lower Electrode Assembly DEMO Bedford, OH 5-6 Weeks
![Page 3: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/3.jpg)
Part Number Description Price F.O.B./DeliveryPFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14000) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14000) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
S/N#14000 CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysAFV-N-S-S6-DLH SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days
M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-1000-V-(14000) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(14000) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-2-(14000) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
Part Number Description Price F.O.B./DeliveryPFU-0006-10X12-(14036) Round Guide Bushing DEMO Bedford, OH 5-6 WeeksPFC-0024-(14036) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0028-10-10X12-(14036) Spindle Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFU-0023-2 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0026 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0022-(14036) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days13-25 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14036 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-W-Hc22-10-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-0100-V-(14036) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0021-(14036) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0021-2-(14036) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
![Page 4: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/4.jpg)
Part Number Description Price F.O.B./DeliveryPFU-0005-13 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14050) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0011-7/16-13-(14050) Spindle Assy (300mm Stroke) DEMO Bedford, OH 5-6 WeeksPFU-0014-2-13 Hinge Plate Assembly DEMO Bedford, OH 5-6 WeeksPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14050) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days14-20 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-300 Air Cylinder (300mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14050 SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-S-S7/16-DLH M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-1000-V-(14050) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(14050) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-3-(14050) Feed Unit Assy (300mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
Part Number Description Price F.O.B./DeliveryPFU-0005-9 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14052) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-8-9 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-9 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14052) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days8-14 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14052 SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-S-S8-DLH M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-1000-V-(14052) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0017-(14052) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0020-2-(14052) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
![Page 5: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/5.jpg)
Part Number Description Price F.O.B./DeliveryPFU-0006-10X10 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0024-(14055) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0028-10-10X10-(14055) Spindle Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFU-0023-2 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0026 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0022-(14055) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days13-25 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14055 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-W-Hc22-10-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 DaysHJ2-DC24V Relay DEMO Bedford, OH 2-3 DaysE2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 DaysDGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 DaysC1020-8-FL Air Regulator DEMO Bedford, OH 2-3 DaysRV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 DaysPFC-0100-V-(14055) Chute Track (A) Assembly DEMO Bedford, OH 5-6 WeeksPFC-0021-(14055) Chute Track (B) Assembly DEMO Bedford, OH 5-6 WeeksPFU-0021-2-(14055) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 WeeksPFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 DaysPFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
Part Number Description Price F.O.B./DeliveryPFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 DaysPFC-0022-(14056) Nut Stopper DEMO Bedford, OH 5-6 WeeksPFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 DaysPFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 DaysPFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 DaysPFU-0012-(14056) Head Assembly DEMO Bedford, OH 5-6 WeeksPFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 DaysS/N#14056 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-W-S6-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 Days
HJ2-DC24V Relay DEMO Bedford, OH 2-3 Days
E2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 Days
DGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 Days
C1020-8-FL Air Regulator DEMO Bedford, OH 2-3 Days
RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 Days
PFC-0100-V-(14056) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks
PFC-0017-(14056) Chute Track (B) Assembly DEMO Bedford, OH 5-6 Weeks
PFU-0020-2-(14056) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks
PFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 Days
PFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
![Page 6: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/6.jpg)
Part Number Description Price F.O.B./Delivery
PFU-0005-7 Round Guide Bushing DEMO Bedford, OH 2-3 Days
PFC-0022-(14080) Nut Stopper DEMO Bedford, OH 5-6 Weeks
PFU-0010-6-7 Spindle Assy (200mm Stroke) DEMO Bedford, OH 2-3 Days
PFU-0014-2-7 Hinge Plate Assembly DEMO Bedford, OH 2-3 Days
PFU-0018 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 Days
PFU-0012-(14080) Head Assembly DEMO Bedford, OH 5-6 Weeks
PFU-0007 Magnet Assembly DEMO Bedford, OH 2-3 Days
6-12 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 Days
S/N#14080 SCPD2-16-10-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-S-S6-DLH M4KB210-08-B-3-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days
(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 Days
HJ2-DC24V Relay DEMO Bedford, OH 2-3 Days
E2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 Days
DGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 Days
C1020-8-FL Air Regulator DEMO Bedford, OH 2-3 Days
RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 Days
PFC-1000-V-(14080) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks
PFC-0017-(14080) Chute Track (B) Assembly DEMO Bedford, OH 5-6 Weeks
PFU-0020-2-(14080) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks
PFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 Days
PFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days
Part Number Description Price F.O.B./Delivery
PFK-5100-(14081) Chuck Assembly DEMO Bedford, OH 5-6 Weeks
PFK-5101-1-(14081) Jaws R/L DEMO Bedford, OH 5-6 Weeks
PFK-5104 Compression Spring DEMO Bedford, OH 1-2 Days
PFK-5105 Torsion Spring DEMO Bedford, OH 1-2 Days
#15 (15x23) Round Vinyl Tube DEMO Bedford, OH 1-2 Days
PFU-5301 Spindle DEMO Bedford, OH 1-2 Days
PFU-5003 Guide Bushing DEMO Bedford, OH 1-2 Days
4B9880 Cap Tip DEMO Bedford, OH 1-2 Days
4B9686 Insulation Guide DEMO Bedford, OH 1-2 Days
4B9885 Electrode Holder DEMO Bedford, OH 1-2 Days
4C4804 Collar DEMO Bedford, OH 1-2 Days
4C4802 Guide Pin DEMO Bedford, OH 1-2 Days
4B7175 Cap Screw DEMO Bedford, OH 1-2 Days
S/N#14081 4D1073 Bolt DEMO Bedford, OH 1-2 Days
AFV-B-S-6-17/14-DLH 12IP-77MM Insulation Pipe DEMO Bedford, OH 1-2 Days
61W Insulation Washer DEMO Bedford, OH 1-2 Days
CMK2-FA-25-300 Air Cylinder (300mm Stroke) DEMO Bedford, OH 1-2 Days
CMK2-FA-20-50 Air Cylinder DEMO Bedford, OH 1-2 Days
SSD-25-25-DG Air Cylinder DEMO Bedford, OH 1-2 Days
M4KB210-08-B-3-212872- DC24V Solenoid Valve DEMO Bedford, OH 1-2 Days
(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 1-2 Days
HJ2-DC24V Relay DEMO Bedford, OH 1-2 Days
E2E-X8MD1-5M Proximity Switch DEMO Bedford, OH 1-2 Days
E2E-X8MD1-2M Proximity Switch DEMO Bedford, OH 1-2 Days
DGN-2 Printed Circuit Board DEMO Bedford, OH 1-2 Days
RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 1-2 Days
PFS-0206-S-(14081) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks
PFT-5010-(14081) Lower Electrode Assembly DEMO Bedford, OH 5-6 Weeks
![Page 7: Total Maintenance Documentation](https://reader036.fdocuments.in/reader036/viewer/2022072107/568c3bdf1a28ab0235abc870/html5/thumbnails/7.jpg)
Part Number Description Price F.O.B./Delivery
PFU-0006-10X10 Round Guide Bushing DEMO Bedford, OH 2-3 Days
PFC-0024-(14209) Nut Stopper DEMO Bedford, OH 5-6 Weeks
PFU-0028-10-10X10-(14209) Spindle Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks
PFU-0023-2 Hinge Plate Assembly DEMO Bedford, OH 2-3 Days
PFU-0026 Hinge Spring (Set R/L) DEMO Bedford, OH 2-3 Days
PFU-0022-(14209) Head Assembly DEMO Bedford, OH 5-6 Weeks
PFU-0007-R30 Magnet Assembly DEMO Bedford, OH 2-3 Days
13-25 Vinyl Tube (3M Length) DEMO Bedford, OH 2-3 Days
CMK2-FA-25-200 Air Cylinder (200mm Stroke) DEMO Bedford, OH 2-3 Days
S/N#14209 SSD-25-50-DG Air Cylinder DEMO Bedford, OH 2-3 Days
AFV-N-W-Hc22-10-DR/LH M4KB210-08-B-5-212872-DC24V Solenoid Valve DEMO Bedford, OH 2-3 Days
(AHK22224) HL2-H-DC24V Relay DEMO Bedford, OH 2-3 Days
HJ2-DC24V Relay DEMO Bedford, OH 2-3 Days
E2E-X8MD1 Proximity Switch (2M Length) DEMO Bedford, OH 2-3 Days
DGN-2 Printed Circuit Board DEMO Bedford, OH 2-3 Days
C1020-8-FL Air Regulator DEMO Bedford, OH 2-3 Days
RV30YN-20S-B20K Variable Resistor DEMO Bedford, OH 2-3 Days
PFC-0100-V-(14209) Chute Track (A) Assembly DEMO Bedford, OH 5-6 Weeks
PFC-0021-(14209) Chute Track (B) Assembly DEMO Bedford, OH 5-6 Weeks
PFU-0021-2-(14209) Feed Unit Assy (200mm Stroke) DEMO Bedford, OH 5-6 Weeks
PFB-0040-C Vinyl Dust Cover (Only) DEMO Bedford, OH 2-3 Days
PFB-FRAME Frame Only DEMO Bedford, OH 2-3 Days