Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

25
Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Transcript of Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Page 1: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Toshiba IR Test Apparatus Project

Ahmad Nazri Fadzal

Zamir Izam

Nurfazlina Kamaruddin

Wan Othman

Page 2: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Project Goal Create a test program that can verify the

TV is outputting the correct IR signals to VCR and DVD that are connected through IR blaster cable

4 different VCR and DVD brands will be tested

Page 3: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Requirements Two modes: Database mode and Test

mode Database mode

Receive signal from TV, analyze, and store its characteristic

Allow operator to designate a “name” Signal begins on the first signal

transition and ends after 1s of no transitions

Page 4: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Requirements (continued) Test mode

Allow operator to select a sequence of signals from the database mode

START and STOP capabilities Handle no more than a 1s “silent”

transition between each new test signal Log pass/fail results to User Interface

and text file output

Page 5: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Test model

Page 6: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

GLINK Use to connect cable

box and VCR

Page 7: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Block diagram for capturing signal from VCR player

Page 8: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

TheaterNet Use to connect DVD

player

Page 9: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Block diagram for capturing signal from DVD player

Page 10: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Software

Programming

Database Mode Test Mode

Page 11: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Database Mode

Database Mode

Sampling

• Start and stop trigger

• Edit signal feature

Storage Analyzing

Save

Name file

• Library

Graphical display

• Time length

• Bit length

Page 12: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Test mode

Test Mode

Retrieve Signal

• Start and stop trigger

• Edit signal feature

Test output signal

Statistic GraphicalDisplay

• Compare

• Result-pass/fail

•Pulse width

•Bit length

Normal plot

Expected & Actual signal plot on same plot

Load signal

Select signal from library

Page 13: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Operational concept Sample 4 different DVD and VCR brands:

Toshiba Panasonic JVC Sony

Theaternet Sample 8 functions for each DVD brand (Power, Play, Stop, FF, REW, Pause, Skip, Search) Each test function will be sampled 3 times (3 rep/test)

Page 14: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

GLINK Sample 3 functions for each VCR brand (Power, Stop, and Record) Each test function will be sampled 3 times (3

rep/test)

Page 15: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Block Diagram for Database Mode

Page 16: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Database Mode Front Panel

Page 17: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.
Page 18: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Library file of Toshiba DVD PLAY Signal

Page 19: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Block Diagram for Test Mode

Page 20: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Test Mode Front Panel

Page 21: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.
Page 22: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.
Page 23: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.
Page 24: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.
Page 25: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.

Next week plan Start and Stop Trigger

Signal analysis