Topping-up Diesel Using Filler Hoses

download Topping-up Diesel Using Filler Hoses

of 2

Transcript of Topping-up Diesel Using Filler Hoses

  • 8/12/2019 Topping-up Diesel Using Filler Hoses

    1/2

    Talisman Malaysia LimitedHS&E Section

    Job Safety Analysis

    Doc. No: PM3-HSE-GEN-PR-F-0 0!Re"ision: 0Date: J#ne $00%Pa e: A''en(i) 3

    JOB SAFETY ANALYSIS WORKSHEETS

    JOB SAFETY ANALYSIS DATE PERMIT NO:

    JOB Topping-up into diesel operated engines of mobile Equipment using Filler hoseWORK TEAM Welder/Rigger SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES

    1. Raise Flammable Release Work Permit for the job.

    onfli!t "ith others a!ti#ities.

    $. Pull the fuel hose to the mobile equipment. Trip/%lip/Fall Walk steadil&.'. (pen fuel !ap and insert hose end to the tankopening.

    )iesel spills. *nflammable +fire, ake sure the engine has stopped. et hot engine!ool do"n. %tandb& fire e tinguisher.

    0. (pen hose suppl& #al#e. )iesel spill. )iesel splash. oordinate "ith produ!tion to open #al#e slo"l&.se "alkie-talkie. )o not o#er fill. lean the floor ifthere is spillage.

    2. Repla!e fuel !ap. 3ot !apping properl& +!ap drop off, Ensure that fuel tank !ap has been put properl&.4. oil hose ba!k to original storage pla!e. Trip/%lip/Fall 5e a"are of tripping ha6ard.

    WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUALEXPERIENCE YES NO YES NO

    7a#e &ou done this job before8 / 9re &ou kno"ledgeable "ith the job to beperformed8 /

    7a#e &ou referred to te!hni!al dra"ing/#endorpro!edure/%%P8 / *s super#ision/e perien!ed assistan!e required8 /

    PPE YES NO YES NO

    7ard hat8 / Work #est8 /%afet& :lasses8 / 9pron8 /%afet& shoes8 / :oggle8 /Ear plugs8 / Fa!e shield8 /Right t&pe of glo#es8 / Respirator& prote!tion8 /

    %afet& harness8 /POTENTIAL HAZARDS YES NO YES NO

    %lipper& floor8 / Trapped pressure8 /ongested area8 / Pressuri6ed equipment/#essel ha6ard8 /Tripping8 / Fire/e plosion ha6ards8 /(#erhead "ork8 / Es!ape route8 /Working at height8 / %ho!k/ele!tri!it&/stati!8 /

    TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0

  • 8/12/2019 Topping-up Diesel Using Filler Hoses

    2/2

    Talisman Malaysia LimitedHS&E Section

    Job Safety Analysis

    Doc. No: PM3-HSE-GEN-PR-F-0 0!Re"ision: 0Date: J#ne $00%Pa e: A''en(i) 3

    %!affolding8 / 5reaker ra!k out8 /%e!ure ladder8 / ;al#e isolation8 /7ea#& load8 / :uard rotating equipment8 /

    7ammer strikes8 / Po"er tools ha6ards8 /Pin!h/trap finger< hand8 / 7igh noise area< double ear prote!tion8 /5a!k injur& ha6ard8 / %park/hot slag8 /%"inging obje!t8 / 5urn +heat/!hemi!al,8 /Falling obje!t8 / 3ear radioa!ti#e materials/sour!es8 /(thers !loseb&8 / En#ironmental spill8 /%harp obje!t8 / 7ose !onne!tion8 /E&e injur&8 / Wind&8 /:rating/de!k opening8 / )ust&8 /5lo!ked drains8 /

    Prepared b&=>......................... >> Re#ie"ed b&= >>>>>>>>>>.. losed out= ?????????????????????????

    TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0