TOPOLOBAMPOTOPOLOBAMPOA New Port In the Pacific OceanA New Port In the Pacific Ocean
LOCATIONTopolobampo is located in the north of Sinaloa, on the Pacific Ocean in Mexico.
19º04’002” NORTH 104º19’005” WEST
LOCATION
•SINALOA•BAJA CALIFORNIA SUR•SONORA•CHIHUAHUA
STATES OF HINTERLAND
TOPOLOBAMPOTOPOLOBAMPO
I
LIMITS OF THE PORT
CERRO SAN CARLOS
TOPOLOBAMPO BAY
SECRETARIADE MARINA
DARSENA
CERRODE GALLINAS
LIMITE DE RECINTO PORTUARIO
LIMITE D
E RECINTO PO
RTUARIO
CERRODEL CHIVERO
CERRODEL RODADERO
ZONAHABITACIONALTOPOLOBAMPO
CERRODEL VIGIA
PLANTATERMOELECTRICA
C.F.E.
(SEMATUR)TRANSBORDADORES
CLUB NAUTICO
ESCUELA T CNICA No. 9É
PEMEX
CFE
A LOS MOCHIS
BASCULA
Federal Government granted in concession to API an area of 301 hectares; 191 zone of water, and 110 zone of land.
AREAS OF THE PORT OF TOPOLOBAMPO
1. Propetopo Dock no.12. Propetopo Dock no. 23. General Cargo Dock4. Ferry Dock5. Fishing Dock (Cooperative Society)
6. Standard Dock7. Repair Dock (Bercovich)8. Pemex Dock9. Nautical Club Dock10. Food Processing Dock (Batamote)11. East Fishing Dock12. North Fishing Dock13. Maritime Gas Station Dock
14. Container Dock15. Transoceanic Dock16. General Cargo Yard17. Transit Warehouse No.118. Main Warehouse No. 219. Shed20. Topolob ampo Transoceanic Terminal21. Administrative Building of API
22. Sematur Yard23. Reserve Zone24. Propetopo Terminal25. APIs Ferry Dock’26. Container Dock27. Custom house28. Cemex Dock and Installations
Reglas de Operación Anexo No. III
ZONE OF EXTENSION
CERRO SAN CARLOS
TOPOLOBAMPO BAY
SECRETARIADE MARINA
DARSENA
CERRODE GALLINAS
LIMITE DE RECINTO PORTUARIO
LIMITE DE REC
INTO PO
RTUARIO
CERRODEL CHIVERO
CERRODEL RODADERO
ZONAHABITACIONALTOPOLOBAMPO
CERRODEL VIGIA
PLANTATERMOELECTRICA
C.F.E.
(SEMATUR)TRANSBORDADORES
CLUB NAUTICO
ESCUELA T CNICA No. 9É
PEMEX
CFE
A LOS MO
CHIS
BASCULA
260.0
Extension (hectares)Area to incorporate
CERRO SAN CARLOS
SECRETARIADE MARINA
DARSENA
CERRODE GALLINAS
LIMITE DE RECINTO PORTUARIO
LIMITE DE REC
INTO PO
RTUARIO
CERRODEL CHIVERO
CERRODEL RODADERO
ZONAHABITACIONALTOPOLOBAMPO
CERRODEL VIGIA
PLANTATERMOELECTRICA
C.F.E.
(SEMATUR)TRANSBORDADORES
CLUB NAUTICO
ESCUELA T CNICA No. 9É
PEMEX
CFE
A LOS MOC
HIS
BASCULA
VVI
I
VIII. 2
VIII ..1
II IV
VII
IX
III
DOCKAGE AREAS
I. GENERAL CARGO DOCK
II. CONTAINERS DOCK
III. PEMEX DOCK
IV. TRANSOCEANIC DOCK
V. FERRY TERMINAL DOCK
VI. CEMEX DOCK
VII. FERRY YARD DOCK
VIII. PROPETOPO DOCKS NO. 1 & 2
IX. FISHING DOCK
X. CATAMARAN DOCK
X
INFRASTRUCTURE & SERVICES
N.D.6.5048.502T PierNº 1 DOCKProductos Pesqueros de Topolobampo N.D.8.5054.001MarginalNº 2 DOCK
Marginal
Marginal
T Pier
T Pier
Marginal
Marginal
T Pier
PIER TYPE
10,978,0001,156.708TOTAL
288,000 4.0070.001DOCKCEMEX
1,300,00011.00135.001DOCKTerminal Transoceánica
1,200,0009.0098.701FERRIES YARD
960,000 8.50170.001FERRIES TERMINAL
1,500,00012.00240.001CONTAINERS
730,0009.5099.001GENERAL CARGO
API
5,000,00013.00400.002DOCKPEMEX
CAPACITY (TONS)
DESIGN DEPTH(meters)
LENGHT OF BERTHS(meters)
DOCKAGE POSITIONS TERMINAL / DOCK
STORAGE AREAS
WAREHOUSES 3,860 m2
YARDS 144,800 m2
SHEDS 2,240 m2
FACILITIES
MARITIME MARITIME SIGNALLINGSIGNALLING
ZONA DE FONDEO
HERVIDERO
BAJO DE GUADALUPE CERRO SAN
CARLOS
PUNTA MAPAN
2
9
10
11
12
13
15
14 19
18
17
16
21
20
22
23
24
26
2527
28
29
65
87
32
33
34
35
30
37 313
4
36
II I
HARBOR AREAS.
Main channel 36 feet deep
Width of 200 meters
Turning Basin on the front of container dock,
36 ft depth and 450 meters diameter
Depth 12 m. Length 22.224 km
Depth 12 m. (In front of the container dock)
Depth 10 m. (In front of the general cargo and Ferries docks)
80,000 lbs. Containers hoist 1
8,000 lbs. Hoist 5
6,000 lbs. Hoist 2
25,000 lbs. Tractor trucks 2
5,000 lbs. Tractors 5
24 tons. Chutes 4
12 tons. Chutes 8
1.5 yd3 suction pipes 5
40 & 80 tons. Scales 2
2.5 yd3 Clams 12
5 yd3 Clams 4
Case 580-C excavator 1
EQUIPMENT
SERVICES •DOCKAGE •BERTHING •PILOT SERVICE•TOWAGE•LIGHTERAGE•MOORING AND UNMOORING•DRINKING WATER•VICTUALLING•LOADING AND UNLOADING•OIL SUPPLY •EQUIPMENT RENTAL•OUTLET FOR CONTAINERS•STORAGE•PLATFORM SCALE 80 TM.•LUGGAGE HANDLING•FUEL SUPPLY •GARBAGE DISPOSAL •FUMIGATION •LAUNDRY•TELEPHONE, FAX, INTERNET.•365 DAY AT YEAR 24 HRS/DAY
COMMUNICATIONS ROUTES
Regarding the highway system, Topolobampo has access to a highway network that it connects to the port with the entire country; the region has a four lane highway that cross all the State of Sinaloa from Mazatlán in south to the border with Sonora State in the north.
ROADWAYSROADWAYS
MEXICO, D.F. 1,541 km 1,653 kmGUADALAJARA, JAL. 961 km 998 kmHERMOSILLO, SON. 510 km 526 kmNOGALES, SON. 787 km 801 kmMEXICALI, B.C.N. 1,198 km 1,188 kmCHIHUAHUA, CHIH. 930 km 674 kmOJINAGA, CHIH. 1,130 km 941 km
DISTANCES BETWEEN TOPOLOBAMPO AND OTHER IMPORTANT DISTANCES BETWEEN TOPOLOBAMPO AND OTHER IMPORTANT CITIES OF MEXICO IN KILOMETERSCITIES OF MEXICO IN KILOMETERS
CITY ROADWAYS RAIL WAY
COMMUNICATIONS
AIRPORT. The International airport is just 15 minutes away from Topolobampo. Daily departures and arrivals from the most important cities in México (Mexico City, Guadalajara, Mazatlán, Hermosillo, Tijuana) and the United States (Phoenix, Los Angeles)
RAILWAYS.- The railroad line for cargo and passengers is operated by FERROMEX. It has 199 km of railways in the State and it connects the Port of Topolobampo with the state of Chihuahua. This railroad links the north of Sinaloa (Ocean Pacific door) with the northcentral region of Mexico and with the U.S. This is the shortest route between the Pacific and the south central region of the U.S. and some points of the Gulf of México, such as Galveston, Texas.
TOPOLOBAMPO BAY
SECRETARIADE MARINA
DARSENA
CERRODE GALLINAS
LIMITE DE RECINTO PORTUARIO
CERRODEL CHIVERO
CERRODEL RODADERO
ZONAHABITACIONALTOPOLOBAMPO
CERRODEL VIGIA
PLANTATERMOELECTRICA
C.F.E.
(SEMATUR)TRANSBORDADORESCLUB NAUTICO
ESCUELA T CNICA No. 9É
PEMEX
CFE
A LOS MOCHIS
BASCULA
RAIL ROAD COMMUNICATIONS INSIDE THE PORT
Pera 1,277 mts. (circuit )Extensi n 1,478 mts. ó
Total 2,755 mts.CAPACITY OF 40 RAILROAD CARS ON MOVING OR 60 STOP CARS.
• The use of mechanized equipment in maneuvers of load and unload has allowed surpass our productivity standards.
PRODUCTIVITY
MINERAL BULK
AGRO BULK
GENERAL
CARGO TYPE
Productivity Parameters (TONS/HR/ VESSEL)
272.4
412.5
120.3
2004 Real
162.8170.0
350.2350.0
95.870.0
2003 RealSTANDARD
SEAPORT STATISTICS
20002001
20022003
2004
2005 (*)
0100200300400500600700800900
1,0001,1001,2001,3001,4001,5001,6001,7001,8001,9002,0002,1002,2002,3002,4002,5002,6002,7002,8002,9003,0003,1003,2003,3003,4003,5003,6003,7003,8003,9004,0004,100
CARGO MOVEMENT BY TYPE 20002005
Fila 13Fila 10Fila 11Fila 12
Fila 9
(*) Includes January May
thousandtons
VESSELS ARRIVALSDuring the period from January to May of 2005, the port has received 286 vessels, which represents 49% from the total 589 programmed in this year
During the last two years, Topolobampo Port, has presented a good opportunity for investment, new projects have been developed, the most important being the following:
Yacht Marina Club
Regular RO/RO cargo
CEMEX Terminal (cement)
Terminal Transoceanica de Topolobampo (dry bulk cargo terminal)
Ferry Terminal
Regular cruise line
PORT BUSINESSES
YACHT MARINA CLUB
With an investment of 1.3 million U.S. Dlls. 16 dockage position22 hangar, one lighthouse, 5 palapas, one security booth, and swimming pool.
“California Star” Vessel
Cost of 65 millons U.S. Dlls. Capacity of 2,000 lineal meters of RO/RO Cargo1,000 passengers
2003
2004
728,935 tons. 127,000 passengers
979,927 tons. 179,061 passengers
CEMENT TERMINAL
The group of CEMEX, installed in Topolobampo the mechanization plant of cement, with an investment of 1.2 million dollars, which has two silos with capacity to storage 1000 tons. each. This terminal receive the product from Sonora and send it to La Paz, B.C.S.During 2004 this terminal managed 184,000 tons.
PORT BUSINESSES
This terminal started operations in the port in October 1998. T.T.T. is handling minerals and grains in bulk, it owns a 135 m berth and a 20 thousand ton capacity warehouse.During 2004, TTT handled 320,445 tons of dry bulk cargo.
TERMINAL TRANSOCEÁNICA DE TOPOLOBAMPO (T.T.T.)
Port Businesses
Investment of 2.17 million U.S. dollars
Dredged, ferry dock, building of terminal, and Harbor Master Office.
Prepared to receive ferries and cruise ships in the future.
FERRIES TERMINAL
Last December 2004, the Holland America Line called on Topolobampo.
The Ryndam vessel, arrived to Topolobampo on the 26th and the 29th of December, with 2,500 passengers.
One of the principal characteristics of the port is the link to the Copper Canyon in the State of Chihuahua, and this will be the most important place to visit for the tourists.
CRUISE LINES ATTRACTION
• Infrastructure for handling general cargo, agricultural, mineral bulk, & containers.
• Modernization and enlargement of the installations allow to receive bigger vessels and increase the capacity.
• International transport of goods to attend the north and northwest of Mexico and the south of the United States of America.
• Domestic Traffic
• Development of regular services for containers and tourism.
Investment opportunities
In the present year, important private investment projects are schedule to be development in the port:
Installation of Natural Liquefied Gas Terminal.
Nautical Scale
Real Estate Development and two yacht club
Dry bulk Terminal with two silos
Installation of warehouse specialized in handling of dry bulk cargo
Warehouse mechanization for dry bulk cargo handle.
INVESTMENT PROJECTS 2005
INVESTMENT PROJECTS 2005Natural Liquefied Gas Terminal
• The main objective of this project is to supply this energetic to the electricity generation industry in the State of Chihuahua.
• Investment in the port is considered in $ 350.0 million US dlls.
Hotel
Restaurant
Nautical Club
Repair of boats and other services.
Investment of 5.0 million U.S. Dlls.
area of 5.2 hectares
76 Dockage positions
Commercial Center
NAUTICAL SCALE
INVESTMENT PROJECTS 2005Real Estate and Yacht Club
• The real estate complex includes the construction of condominiums, yacht club, tennis court, pool, gym, spa, among others. The amount of investment is calculated in $7.23 million US dlls. Plus $ 0.30 million US dlls., in the second yacht club project.
Real State
INVESTMENT PROJECTS 2005Dry Bulk Cargo Terminal and Mechanized Warehouse
• Investment of $3.63 million US dlls., in first stage of construction.
• Includes two silos with storage capacity of 20,000 tons., and mechanization in load and unload maneuver.
• Investment amount in mechanization calculated in $0.90 million US dlls.
•In other project, the firm ARMEX will invest $ 0.54 million US dlls., in the construction of a warehouse specialized in fertilizers handled.
Thank you for visiting the Port of Topolobampo!!!
CONTACT INFORMATION
General Director A.P.I. Topolobampo, S.A. De C.V. Tel/fax. 52(668) 8620127 & 8620494Email: [email protected] site: http://www.apitopo.com.mx
DR. FRANCISCO SALVADOR L PEZ BRITOÓ
Harbor Master Tel/fax 52(668) 8620128 & 8620588
CAP. ALEJANDRO LIMA HIDALGO
COMMERCIALIZATION [email protected]