 TOPOLOBAMPO TOPOLOBAMPO A New Port In the Pacific Ocean A New Port In the Pacific Ocean

Transcript of TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16....

Page 1: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

TOPOLOBAMPOTOPOLOBAMPOA New Port In the Pacific OceanA New Port In the Pacific Ocean

Page 2: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

LOCATIONTopolobampo is located in the north of Sinaloa, on the Pacific Ocean in Mexico.

19º04’002” NORTH 104º19’005” WEST

LOCATION

•SINALOA•BAJA CALIFORNIA SUR•SONORA•CHIHUAHUA

STATES OF HINTERLAND

TOPOLOBAMPOTOPOLOBAMPO

Page 3: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

I

LIMITS OF THE PORT

CERRO SAN CARLOS

TOPOLOBAMPO BAY

SECRETARIADE MARINA

DARSENA

CERRODE GALLINAS

LIMITE DE RECINTO PORTUARIO

LIMITE D

E RECINTO PO

RTUARIO

CERRODEL CHIVERO

CERRODEL RODADERO

ZONAHABITACIONALTOPOLOBAMPO

CERRODEL VIGIA

PLANTATERMOELECTRICA

C.F.E.

(SEMATUR)TRANSBORDADORES

CLUB NAUTICO

ESCUELA T CNICA No. 9É

PEMEX

CFE

A LOS MOCHIS

BASCULA

Federal Government granted in concession to API an area of 301 hectares; 191 zone of water, and 110 zone of land.

Page 4: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

AREAS OF THE PORT OF TOPOLOBAMPO

1. Propetopo Dock no.12. Propetopo Dock no. 23. General Cargo Dock4. Ferry Dock5. Fishing Dock (Cooperative Society)

6. Standard Dock7. Repair Dock (Bercovich)8. Pemex Dock9. Nautical Club Dock10. Food Processing Dock (Batamote)11. East Fishing Dock12. North Fishing Dock13. Maritime Gas Station Dock

14. Container Dock15. Transoceanic Dock16. General Cargo Yard17. Transit Warehouse No.118. Main Warehouse No. 219. Shed20. Topolob ampo Transoceanic Terminal21. Administrative Building of API

22. Sematur Yard23. Reserve Zone24. Propetopo Terminal25. APIs Ferry Dock’26. Container Dock27. Custom house28. Cemex Dock and Installations

Page 5: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   Reglas de Operación                 Anexo  No. III

ZONE OF EXTENSION

CERRO SAN CARLOS

TOPOLOBAMPO BAY

SECRETARIADE MARINA

DARSENA

CERRODE GALLINAS

LIMITE DE RECINTO PORTUARIO

LIMITE DE REC

INTO PO

RTUARIO

CERRODEL CHIVERO

CERRODEL RODADERO

ZONAHABITACIONALTOPOLOBAMPO

CERRODEL VIGIA

PLANTATERMOELECTRICA

C.F.E.

(SEMATUR)TRANSBORDADORES

CLUB NAUTICO

ESCUELA T CNICA No. 9É

PEMEX

CFE

A LOS MO

CHIS

BASCULA

260.0

Extension (hectares)Area to incorporate

Page 6: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   CERRO SAN CARLOS

SECRETARIADE MARINA

DARSENA

CERRODE GALLINAS

LIMITE DE RECINTO PORTUARIO

LIMITE DE REC

INTO PO

RTUARIO

CERRODEL CHIVERO

CERRODEL RODADERO

ZONAHABITACIONALTOPOLOBAMPO

CERRODEL VIGIA

PLANTATERMOELECTRICA

C.F.E.

(SEMATUR)TRANSBORDADORES

CLUB NAUTICO

ESCUELA T CNICA No. 9É

PEMEX

CFE

A LOS MOC

HIS

BASCULA

VVI

I

VIII.  2

VIII ..1

II IV

VII

IX

III

DOCKAGE AREAS

I. GENERAL CARGO DOCK 

II.  CONTAINERS DOCK

III. PEMEX DOCK 

IV. TRANSOCEANIC DOCK 

V.  FERRY TERMINAL DOCK  

VI. CEMEX  DOCK 

VII. FERRY YARD DOCK 

VIII. PROPETOPO  DOCKS NO. 1 & 2

IX. FISHING DOCK 

X. CATAMARAN DOCK

X

Page 7: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

INFRASTRUCTURE & SERVICES

N.D.6.5048.502T PierNº 1 DOCKProductos Pesqueros de Topolobampo N.D.8.5054.001MarginalNº 2 DOCK

­

Marginal

Marginal

T Pier

T Pier

Marginal

Marginal

T Pier

PIER TYPE

10,978,000­1,156.708­TOTAL

288,000 4.0070.001DOCKCEMEX

1,300,00011.00135.001DOCKTerminal Transoceánica

1,200,0009.0098.701FERRIES YARD

960,000 8.50170.001FERRIES TERMINAL

1,500,00012.00240.001CONTAINERS

730,0009.5099.001GENERAL CARGO

API

5,000,00013.00400.002DOCKPEMEX

CAPACITY (TONS)

DESIGN DEPTH(meters)

LENGHT OF BERTHS(meters)

DOCKAGE POSITIONS TERMINAL / DOCK

Page 8: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

STORAGE AREAS

WAREHOUSES 3,860 m2

YARDS 144,800 m2

SHEDS     2,240 m2

FACILITIES

Page 9: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

MARITIME MARITIME SIGNALLINGSIGNALLING

ZONA DE FONDEO

HERVIDERO

BAJO DE GUADALUPE CERRO SAN 

CARLOS

PUNTA MAPAN

2

9

10

11

12

13

15

14 19

18

17

16

21

20

22

23

24

26

2527

28

29

65

87

32

33

34

35

30

37 313

4

36

II    I

HARBOR AREAS.

Main channel 36 feet deep

Width of 200 meters

Turning Basin on the front of container dock,

36 ft depth and 450 meters diameter

Depth 12 m. Length 22.224 km

Depth 12 m. (In front of the container dock)

Depth 10 m. (In front of the general cargo and Ferries docks)

Page 10: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

 80,000 lbs. Containers hoist  1

 8,000 lbs. Hoist   5 

 6,000 lbs. Hoist   2 

 25,000 lbs. Tractor trucks   2

 5,000 lbs. Tractors   5

 24 tons. Chutes   4

 12 tons. Chutes   8 

 1.5 yd3 suction pipes    5

 40 & 80 tons. Scales    2 

 2.5 yd3 Clams                 12

 5 yd3 Clams   4

  Case 580-C excavator        1

EQUIPMENT

Page 11: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

SERVICES •DOCKAGE •BERTHING •PILOT SERVICE•TOWAGE•LIGHTERAGE•MOORING AND UNMOORING•DRINKING WATER•VICTUALLING•LOADING AND UNLOADING•OIL SUPPLY •EQUIPMENT RENTAL•OUTLET FOR CONTAINERS•STORAGE•PLATFORM SCALE 80 TM.•LUGGAGE HANDLING•FUEL SUPPLY •GARBAGE DISPOSAL •FUMIGATION •LAUNDRY•TELEPHONE, FAX, INTERNET.•365 DAY AT YEAR 24 HRS/DAY

Page 12: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

COMMUNICATIONS ROUTES

Regarding  the  highway  system,  Topolobampo  has  access  to  a  highway network that  it connects to the port with the entire country; the region has a four ­ lane highway that cross all the State of Sinaloa from Mazatlán in south to the border with Sonora State in the north.

ROADWAYSROADWAYS

MEXICO, D.F. 1,541 km 1,653 kmGUADALAJARA, JAL.    961 km    998 kmHERMOSILLO, SON.    510 km       526 kmNOGALES, SON.    787 km    801 kmMEXICALI, B.C.N. 1,198 km 1,188 kmCHIHUAHUA, CHIH.    930 km    674 kmOJINAGA, CHIH. 1,130 km    941 km

DISTANCES BETWEEN TOPOLOBAMPO AND OTHER IMPORTANT DISTANCES BETWEEN TOPOLOBAMPO AND OTHER IMPORTANT CITIES OF MEXICO IN KILOMETERSCITIES OF MEXICO IN KILOMETERS

CITY ROADWAYS RAIL WAY

Page 13: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

COMMUNICATIONS

AIRPORT. The  International    airport  is  just  15  minutes  away  from Topolobampo. Daily departures and arrivals  from  the most  important cities  in  México  (Mexico  City,  Guadalajara,  Mazatlán,  Hermosillo, Tijuana) and the United States (Phoenix, Los Angeles)

RAILWAYS.- The railroad line for cargo and passengers is operated by FERROMEX. It has 199 km of railways in the State and it connects the  Port  of  Topolobampo  with  the  state  of  Chihuahua.  This  railroad links  the north of Sinaloa  (Ocean Pacific door) with  the north­central region of Mexico and with the U.S. This is the shortest route between the Pacific and the south ­ central region of the U.S. and some points of the Gulf of México, such as Galveston, Texas.

Page 14: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

TOPOLOBAMPO  BAY

SECRETARIADE MARINA

DARSENA

CERRODE GALLINAS

LIMITE DE RECINTO PORTUARIO

CERRODEL CHIVERO

CERRODEL RODADERO

ZONAHABITACIONALTOPOLOBAMPO

CERRODEL VIGIA

PLANTATERMOELECTRICA

C.F.E.

(SEMATUR)TRANSBORDADORESCLUB NAUTICO

ESCUELA T CNICA No. 9É

PEMEX

CFE

A LOS MOCHIS

BASCULA

RAIL ROAD COMMUNICATIONS INSIDE THE PORT

Pera 1,277 mts. (circuit )Extensi n 1,478 mts. ó

Total 2,755 mts.CAPACITY OF 40 RAILROAD CARS ON MOVING OR 60 STOP CARS.

Page 15: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

• The  use  of  mechanized equipment  in  maneuvers of  load  and  unload  has allowed  surpass  our productivity standards.

PRODUCTIVITY

MINERAL BULK

AGRO BULK 

GENERAL 

CARGO TYPE

Productivity Parameters  (TONS/HR/ VESSEL)

272.4

412.5

120.3

2004             Real

162.8170.0

350.2350.0

95.870.0

2003  RealSTANDARD

Page 16: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

SEAPORT STATISTICS

20002001

20022003

2004

2005 (*)

0100200300400500600700800900

1,0001,1001,2001,3001,4001,5001,6001,7001,8001,9002,0002,1002,2002,3002,4002,5002,6002,7002,8002,9003,0003,1003,2003,3003,4003,5003,6003,7003,8003,9004,0004,100

CARGO MOVEMENT BY TYPE  2000­2005

Fila 13Fila 10Fila 11Fila 12

Fila 9

(*) Includes January ­ May

thousandtons

Page 17: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

VESSELS ARRIVALSDuring the period from January to May of 2005, the port has received 286 vessels, which represents 49% from the total 589 programmed in this year

Page 18: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

During  the  last  two  years,  Topolobampo  Port,  has  presented  a  good opportunity  for  investment,  new  projects  have  been  developed,  the  most important being the following:

  Yacht Marina Club

  Regular RO/RO cargo

  CEMEX Terminal (cement)

  Terminal Transoceanica de Topolobampo (dry bulk cargo terminal)

 Ferry Terminal 

  Regular cruise line

PORT BUSINESSES

Page 19: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

YACHT MARINA CLUB

With an investment of 1.3 million U.S. Dlls. 16 dockage position22 hangar, one lighthouse, 5 palapas, one security booth, and swimming pool.

Page 20: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

“California Star”  Vessel

Cost of 65 millons U.S. Dlls. Capacity of 2,000 lineal meters of RO/RO Cargo1,000 passengers 

    

2003

2004

728,935 tons.  127,000 passengers

979,927 tons.  179,061 passengers    

Page 21: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

CEMENT TERMINAL

The  group  of  CEMEX, installed  in  Topolobampo the  mechanization  plant  of cement, with an  investment of 1.2 million dollars, which has   two silos with capacity to storage 1000 tons. each. This  terminal  receive  the product  from  Sonora  and send  it  to  La  Paz,  B.C.S.During  2004  this  terminal managed 184,000 tons.

PORT BUSINESSES

Page 22: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

This  terminal  started operations  in  the  port  in October  1998.  T.T.T.  is handling  minerals  and grains  in  bulk,  it  owns  a 135  m  berth  and  a  20 thousand  ton  capacity warehouse.During  2004,  TTT handled  320,445  tons  of dry bulk cargo.

TERMINAL TRANSOCEÁNICA DE TOPOLOBAMPO (T.T.T.)

Port Businesses

Page 23: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

   Investment of 2.17 million U.S. dollars

   Dredged, ferry dock, building of terminal, and Harbor Master Office. 

  Prepared to receive ferries and cruise ships in the future.

FERRIES TERMINAL 

Page 24: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

   Last December 2004, the Holland America Line called on Topolobampo. 

   The Ryndam vessel, arrived to Topolobampo on the  26th and the 29th of December, with 2,500 passengers.

   One of the principal characteristics of the port is the link to the Copper Canyon in the State of Chihuahua, and this will be the most important place to visit for the tourists.

CRUISE LINES ATTRACTION

Page 25: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

•   Infrastructure for handling general cargo, agricultural, mineral bulk, & containers.

•   Modernization and enlargement of the installations allow to receive bigger vessels and increase the capacity. 

•   International transport of goods to attend the north and northwest of  Mexico and the south of the United States of America. 

•   Domestic Traffic

•   Development of regular services for     containers and tourism.

Investment opportunities

Page 26: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

In  the present year,  important private  investment projects are schedule to be development in the port:

Installation of Natural Liquefied Gas Terminal.

Nautical Scale

Real Estate Development and two yacht club

Dry bulk Terminal with two silos

Installation of warehouse specialized in handling of dry bulk cargo

Warehouse mechanization for dry bulk cargo handle.

INVESTMENT PROJECTS 2005

Page 27: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

INVESTMENT PROJECTS 2005Natural Liquefied Gas Terminal

•  The  main  objective  of this  project  is  to  supply this  energetic  to  the electricity  generation industry  in  the  State  of Chihuahua.

•  Investment  in  the  port is considered in $ 350.0 million US dlls.

Page 28: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

Hotel

Restaurant

Nautical Club

Repair of boats  and other services.

Investment of 5.0 million  U.S. Dlls. 

       area of 5.2 hectares

76 Dockage positions

Commercial Center

NAUTICAL SCALE

Page 29: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

INVESTMENT PROJECTS 2005Real Estate and Yacht Club

• The real estate complex includes  the construction of condominiums, yacht club, tennis court, pool, gym, spa, among others. The amount of investment is calculated in $7.23 million US dlls. Plus $ 0.30 million US dlls., in the second yacht club project.

Real State

Page 30: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

INVESTMENT PROJECTS 2005Dry Bulk Cargo Terminal and Mechanized Warehouse

•  Investment of $3.63 million US dlls.,  in first stage of construction.

• Includes two silos with storage capacity of  20,000  tons.,  and  mechanization  in load and unload maneuver.

•  Investment  amount  in  mechanization calculated in $0.90 million US dlls.

•In other project, the firm ARMEX will invest $ 0.54 million US dlls., in the construction of a  warehouse  specialized  in  fertilizers handled.

Page 31: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

Thank you  for visiting the Port of Topolobampo!!!

Page 32: TOPOLOBAMPO - UAM Azcapotzalco · 2006-09-28 · 14. Container Dock 15. Transoceanic Dock 16. General Cargo Yard 17. Transit Warehouse No.1 18. Main Warehouse No. 2 19. Shed 20. Topolobampo

   

CONTACT INFORMATION

General Director A.P.I. Topolobampo, S.A. De C.V. Tel/fax. 52(668) 862­0127  &  862­0494Email:  [email protected] site: http://www.apitopo.com.mx

DR. FRANCISCO SALVADOR L PEZ BRITOÓ

Harbor Master Tel/fax 52(668) 862­0128 &  862­0588

CAP. ALEJANDRO LIMA HIDALGO

COMMERCIALIZATION [email protected]