TOP 3: Report from EERA SECRETARIAT · 2018. 5. 16. · EERA –DTU side event 24/05 at Nordic...
Transcript of TOP 3: Report from EERA SECRETARIAT · 2018. 5. 16. · EERA –DTU side event 24/05 at Nordic...
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 1
www.eera-set.eu
EERA is an official part of the EU SET-Plan.
http://setis.ec.europa.eu/
EERA JP on Energy StorageSteering Committee Meeting
[SCM-12]
TOP 3: Report from EERA SECRETARIATHolger Ihssen (Helmholtz Association, EERA SEC)
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 2
50 000 +Experts
250 +Organisations
30Countries
All 10SET Key Actions
All 9ETIPS and other platforms
35%Cross-cutting & societal challenges
4 out of 7Mission Innovation Challenges … so far
16 Joint Research Programs
EERA Status
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 3
Management Structure
New Management bodies
• ExCoop (Operative ExCo committee)
• POL (Policy Working Group)• COM (Communication
Working Group)• STRAT (Strategy Working
Group)• INCO (Int”l Cooperation
Working Group)( pending)
New focused functional management bodies within EERA statutory governance led to strongly enhanced effectiveness
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 4
EERA in EC Projects
ECRIA INSHIP
Integrating National Research Agendas on Solar Heat for Industrial Processes
Start 01-01-17, 48 months, 28 partner
ECRIA SmILES
Smart Integration of Energy Storages in Local Multi Energy Systems for Maximising the Share of Renewables in Europe’s Energy Mix
Start 01-12-16, 36 months, 6 partners
INTENSYS4EU
Integrated Energy System – A path way for Europe
Start 01-11-16, 48 months, 9 main beneficiaries
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 5
EERA input to FP9 :
”Achieving zero-carbon emission growth by 2050”
Through an internal
collaborative consultation, a
dedicated temporary “EERA
Mission Task Force” synthetized
15 inputs from JPs into a single
EERA Global Mission proposed
to EC in December 2017
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 6
www.eera-set.eu
EERA is an official part of the EU SET-Plan.
http://setis.ec.europa.eu/
EERA
Activity Plan 2018
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 7EERA General Assembly, 18 April 2018, Brussels
2018 in a nutshell
2018 : Transition and increasing activity level and scope for EERA.
Revised Strategy (STRAT)
Consolidating positioning as Research Pillar of EU SET Plan / Expanding reach within EU eco-system
Increased support to JPs
New governance and management structures fully operational in Q1 2018.
Functional approach with increased focus and effectiveness
No change to EERA statutory governance
Restored recognition of EERA’s key role in SET Plan
End of current CSA (EERASE3) and doubling of funding for next CSA (2019 – 2021) : “SET-4-21”
Transition from a pure “Partner led” secretariat to a balanced ”Self-standing AISBL structure” supported by SEC partners
EERA named participant to SET Plan Implementation Working Groups and supporting LC-SC3-JA-2 calls
Expanding Impact in SET Plan execution / EU Energy Transition
Permanent SET Plan SG invited member ; reaching out to MS representatives and decision makers
14 out of the 16 Joint Programmes are actively delivering on 14 of the 15 SET Plan Temporary / Implementation Working Groups
Opening strategic collaboration opportunities with DG ENER
“Connecting” with DG Connect (FET Flags)
International Cooperation
Nordic Clean Energy Week - MI-3 / CEM-9
EU-Africa collaboration Project
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 8
For EERA members
Unique network and knowledge sharing, communication and dissemination platform
Be part of the strategic leadership of European energy research
Strategic interaction with EU, advice on funding instruments; setting R&D priorities in the context of EU’s Multiannual Financial Framework (MFF)
Breeding ground for new initiatives such as FET -Flagships, EU-Africa partnership, emergence of a Social Science and Humanities (SSH) platform, partnership with Energy oriented Centre of Excellence for Computing Applications (EoCoE), …
Influence EU and National funding priorities
Better response to calls and tenders; access to a forum for shaping EU proposals
For the European Commission (EC)
One stop shop for energy research matters and role of “Trusted Advisor"
Providing spontaneous high quality & independent reports and white papers on energy transition
Hub for international co-operation
”Brains & Muscle" to trigger action, mobilizing MS/AC resources towards the SET-Plan Implementation Plans (IPs)
For Members States & Associated Countries (MS/AC)
Providing a knowledge sharing platform leveraging MS/AC efforts
Mobilizing knowledge and resources, such as use of Research Infrastructures, data, implementing researcher mobility
Support National strategies through the EERA institutional membership
For Industry
Representing a pool of knowledge, ideal for starting new projects
Providing sectorial and cross sectorial scientific workshops
EERA General Assembly, 18 April 2018, Brussels
A revised Strategy
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 9EERA General Assembly, 18 April 2018, Brussels
Delivering on EU SET Plan (1/2)
2018 – Critical Year for SET Plan : Execution Phase
In 2017, the EC has launched 15 Temporary Working Groups (TWG) covering the 10 SET Plan key actions
Set Plan Steering Group 21 March 2018: 8 Implementation Plans (IP) endorsed – 7 to be endorsed in June
TWG transformed into Implementation Working Groups (IWG’s) for IPs execution
Role of EERA in Implementation Plans (JPCs)
EERA had a recognized instrumental role in 14 out of 15 TWGs
EERA “named participant” in the forming of IWGs
EERA “named participant” in 6 EC calls (CSA) for supporting IWG’s
Role of EERA in the SET Plan Governance (AISBL)
Permanent invited member to SET Plan Steering Group
Engaging with member SET Plan countries representatives
Major Effort with “MS Reference Group” in supporting EU alignment
Interdisciplinary and cross-sectorial approach
Towards achievement of EERA’s stated global Grand Challenge of” Zero-Carbon Emission Growth by 2050”.
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 10EERA General Assembly, 18 April 2018, Brussels
Delivering on EU SET Plan (2/2)
EERA contribution and Implementation Plans status as of 21 March 2018
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 11
Initial Discussions with DG S. Ristori – Bratislava Dec 2017
DG ENER calling for the development of a comprehensive joint action plan and strategy to strengthen the cooperation between DG Energy with EERA and its members in the context of :
1. Analysis of the technology needs of the energy transition in terms of R&I (development of technologies towards the 2050 decarbonisation objective including assessment of existing European level modelling schemes such as PRIMES
2. Development a systematic approach and methodology for setting R&I priorities (including criteria, parameters, assumptions, relevant weighting)
3. Impact assessment of the investments in clean energy R&I (macro-economic, energy competitiveness, carbon abatement)
Target: Memorandum Of Understanding Collaboration Framework
Operational roadmap including priorities and key deliverables
EERA General Assembly, 18 April 2018, Brussels
Opening new perspectives – DG ENER
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 12EERA General Assembly, 18 April 2018, Brussels
EC Projects
Remarkable although selective increase in participation to EC projects / Proposals
Strict focus on EERA strategy and EERA AISBL function: Mobilization, coordination, dissemination
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 14EERA General Assembly, 18 April 2018, Brussels
Bridging Programs for Energy Transition (2/2)
EERA Scientific Workshop
EERA Scientific Workshop
18 April 2019
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 15
A high level Political Conference consolidating the role of EERA in the SET Plan and the challenges ahead
High Level Representatives from: EU Parliament - DG RTD, DG ENER, DG CNCT – SET Plan Countries – Civil
Society – EERA Management and JPCs
How does the energy research community in general, and EERA in particular, contribute to the execution
of the SET-Plan Implementation Plans?
How should EERA coordinate with the Members States (MS’s) and Associated Countries (AC’s)
governments leading on this exercise and with the private sector?
How can the Implementation Plans be integrated in the transition from H2020 to FP9?
What are the key “mega-trends” affecting the transition to a low carbon energy regime in Europe.
10 YEAR Anniversary Political Conference
EERA General Assembly, 18 April 2018, Brussels
The Square
Brussels Convention
Centre
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 16
10 Years Anniversary Political Conference
EERA General Assembly, 18 April 2018, Brussels
2. EU Alignment: Pre-requisite to a low carbon
competitive Europe
1. Research Enabling Energy Transition
4. Mega-Trends in Energy Transition
3. EERA Catalyzing EU alignment
6. Visions for a sustainable energy future
5. Systemic Nature of Energy Transition
26 June 2018
27 June 2018
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 17
International Collaboration - “Lab to Fab”
International Collaboration
Natural area of focus for EERA : Paris Agreement and Mission Innovation.
EERA JPs in 4 of the 7 “Innovation Challenges”
EERA – DTU side event 24/05 at Nordic Clean Energy Week hosting MI-3 / CEM-9
EERA key partner in the CSA “PRE-LEAP” – EU-Africa Collaboration on RES
“Lab To Fab”
“Lamy Report” aka “Lab-Fab-App” report released in 2017 ; EU failure to transfer knowledge from Lab to Fab
“Rethinking” potential EERA role and relationship with industrial platforms (in particular ETIPS, EMIRI, …), EIT Innoenergy, …
Reflecting on new forms of thematic multi-stakeholders conferences, workshops and brokerage events.
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 18
EERA AISBL in Future
2018 – A turning point in EERA Operations
1st year of exercise of the new Chair and Executive Committee elected in May 2017
2nd year of exercise of the first Secretary General appointed in the very end of 2016
End of EERASE3 – Proposal for SET-4-21
New Governance / Management instruments
ExCoop , STRAT, INCO
POL, COM
Reinforcing EERA AISBL Staffing
New Premises
EERA General Assembly, 18 April 2018, Brussels
• Adel El Gammal
• Elena Dufour
• Roberta Giaimo
• [Marine
Manzinello]
• COM manager
• Project Manager
• Abigail Mizzi
(intern)
• Marie von Kempis
(intern)
Conference Room
(up to 60p)Office Space
(up to 12)
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 19
EERA Services for the JPs
Increased Support to the JP’s and to the EERA community
Central collection of JP fees by EERA AISBL : 7 JP’s
Increased the scope and level of operational services to JPs
Hiring and hosting JP administrative support resources centrally within EERA AISBL.
Supporting external communication, notably harmonization of approaches and integration into an EERA portal website.
Providing enhanced internal secure collaborative, storage and back up services.
EERA General Assembly, 18 April 2018, Brussels
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 20
An overview of Events
2018JAN
DEC
PR #31
STRAT #1
ExCo #31
General Assembly
JPC #18
Scientific WS #2
EERA side event at Nordic Clean EW
SSM #4
10th
Anniversary Conference
Deadline SET-4-2021
End EERASE3
Deadline JA-2
Deadline Fet-Flag
15/02
28/02
07/03
18/04
19/04
24/05
20/02
05 & 06/06
26 & 27/06
Summer Break
31/08
11/09
01/10
PR #32
ExCo #32
TbdTbd
JPC #19
Tbd
EERA General Assembly, 18 April 2018, Brussels
Start PRE-LEAP
01/07
Workshop with Eastern countries
08/05
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 21
SET Plan Implementation Plans – 21/03/2018
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 22
Support to the realisation of the Implementation Plans of the SET Plan ( JA2 – Calls )
… [The SET Plan Implementation] strategy relies on a strengthened partnership among SET Plan countries and the stakeholders from both the industrial (including the European Technology and Innovation Platforms, ETIPs) and research communities (including the EERA)
Proposals will support, when appropriate, the execution/realisation of a SET Plan Implementation Plan prepared by one of the following SET Plan Temporary Working Groups (TWGs):
1. Solar thermal energy (CSP / STE) Estela
2. Offshore wind: Pending
3. Photovoltaics (PV) ETIP - PV
4. Ocean energy OEE / IWG
5. Deep geothermal systems IWG
6. Carbon Capture and Storage Pending
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 23EERA General Assembly, 18 April 2018, Brussels
Non JA-2 JPs
1. BioEnergy
2. E3S
3. Energy Efficiency Industrial Processes
4. Energy System Integration
5. Energy Storage
6. Fuel Cells & Hydrogen
7. Nuclear Materials
8. Smart Cities
9. Smart Grids
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 24
www.eera-set.eu
EERA is an official part of the EU SET-Plan.
http://setis.ec.europa.eu/
EERA
Strategy Update
18 April 2018 - Brussels
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 25
Rationale for STRAT
EERA Strategy needs to be updated to address a new reality:• The existence of an AISBL, Sec. Gen and staff
• Delivery towards the SET Plan: from TWG’s IWG’s
• Participation to JA-2 CSA, FET Flagship, Battery Alliance,..
• Changing priorities and structure of new funding context: FP9
• Mission Innovation and international Cooperation
EERASE 4 (SET-4-2021) = manage change of expectations from EERASE3 and how we can make best use of such an instrument for European energy research
Need to define and anchor who we are, for whom and what we will like to be
Customer orientation, value proposition
Independency, sustainability and role
Establish our platform and tools, vehicles to make this happen through:
The AISBL
The projects we are running and participating to through our JPs
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 26
STRAT Composition
Chair: N. Røkke
Coordinator: A. El Gammal
ExCo member: B. Bach / ( ? )
ExCo member: P. Korting
JPC: P. Hauge Madsen (Wind)
Production Support: E. Dufour + M. Manzinello
31st ExCo meeting 7 March 2018 , Brussels
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 27
Work Plan & Format
Format – PPT based- short and normative- descriptive~10 pages – also web based
ScheduleFeb/March 2018: Framework, existing strategy, new drivers, vision, mission, pillars
7 March: Check direction with ExCo
April 2018: first draft
Early May 2018: 2nd STRAT meeting - Copenhagen
June 2018: Anchor in summer strategy meeting
Debate and test in our 10th anniversary conference in June
July 2018: 2nd draft version of strategy- Brussels - Doodle in progress
Fall 2018: Finalise- send to all partners for review- Doodle to be sent out medio September
ExCo fall 2018: Launch of new strategy
|
31st ExCo meeting 7 March 2018 , Brussels
-
www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 28
Strengths
• Size (50.000 Energy reseachers)
• Representing the energy community (250 orgs, 30 countries)
• Access to key SET- Plan country Stakeholders
• Recognised by the EC: named stakeholder
• Programmes for all priority areas
• AISBL- Sec.General – presence in Brussels
Opportunities
• low carbon-> zero emission
• Energy transition
• Delivering on the Set plan IWG
• Member State alignment- at institutional level
• Deliveringings towards more DGs: RTD, ENER, MOVE, CNECT, GROW..)
• Connecting with more stakeholdersEUA, ETIPs, JU, KIC InnoEnergy)
• Named beneficiary: SET-4-2021, JA-2
• FP9 and FET Flagships
Threats
• FP9 – budget size and structure
• Sustainabilty – funding structure
• Loss of interest by lack of project instruments
• Associated to the SET Plan performance/existence
• EUREC ?
• Failing to delivering on SET Plan IP
Weaknesses
• Unclear value proposition (internal/external)
• Non-transparent programme activities
• Reliance of EU funding (AISBL)
• Limited resources
• Not fully recognized by the Set Plan countries
• Limited commitment and leverage of Members funding
SWO
T A
nal
ysis