www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 1 www.eera-set.eu EERA is an official part of the EU SET-Plan. http://setis.ec.europa.eu/ EERA JP on Energy Storage Steering Committee Meeting [SCM-12] TOP 3: Report from EERA SECRETARIAT Holger Ihssen (Helmholtz Association, EERA SEC)

Transcript of TOP 3: Report from EERA SECRETARIAT · 2018. 5. 16. · EERA –DTU side event 24/05 at Nordic...

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 1

    www.eera-set.eu

    EERA is an official part of the EU SET-Plan.

    http://setis.ec.europa.eu/

    EERA JP on Energy StorageSteering Committee Meeting

    [SCM-12]

    TOP 3: Report from EERA SECRETARIATHolger Ihssen (Helmholtz Association, EERA SEC)

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 2

    50 000 +Experts

    250 +Organisations

    30Countries

    All 10SET Key Actions

    All 9ETIPS and other platforms

    35%Cross-cutting & societal challenges

    4 out of 7Mission Innovation Challenges … so far

    16 Joint Research Programs

    EERA Status

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 3

    Management Structure

    New Management bodies

    • ExCoop (Operative ExCo committee)

    • POL (Policy Working Group)• COM (Communication

    Working Group)• STRAT (Strategy Working

    Group)• INCO (Int”l Cooperation

    Working Group)( pending)

    New focused functional management bodies within EERA statutory governance led to strongly enhanced effectiveness

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 4

    EERA in EC Projects

    ECRIA INSHIP

    Integrating National Research Agendas on Solar Heat for Industrial Processes

    Start 01-01-17, 48 months, 28 partner

    ECRIA SmILES

    Smart Integration of Energy Storages in Local Multi Energy Systems for Maximising the Share of Renewables in Europe’s Energy Mix

    Start 01-12-16, 36 months, 6 partners

    INTENSYS4EU

    Integrated Energy System – A path way for Europe

    Start 01-11-16, 48 months, 9 main beneficiaries

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 5

    EERA input to FP9 :

    ”Achieving zero-carbon emission growth by 2050”

    Through an internal

    collaborative consultation, a

    dedicated temporary “EERA

    Mission Task Force” synthetized

    15 inputs from JPs into a single

    EERA Global Mission proposed

    to EC in December 2017

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 6

    www.eera-set.eu

    EERA is an official part of the EU SET-Plan.

    http://setis.ec.europa.eu/

    EERA

    Activity Plan 2018

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 7EERA General Assembly, 18 April 2018, Brussels

    2018 in a nutshell

    2018 : Transition and increasing activity level and scope for EERA.

    Revised Strategy (STRAT)

    Consolidating positioning as Research Pillar of EU SET Plan / Expanding reach within EU eco-system

    Increased support to JPs

    New governance and management structures fully operational in Q1 2018.

    Functional approach with increased focus and effectiveness

    No change to EERA statutory governance

    Restored recognition of EERA’s key role in SET Plan

    End of current CSA (EERASE3) and doubling of funding for next CSA (2019 – 2021) : “SET-4-21”

    Transition from a pure “Partner led” secretariat to a balanced ”Self-standing AISBL structure” supported by SEC partners

    EERA named participant to SET Plan Implementation Working Groups and supporting LC-SC3-JA-2 calls

    Expanding Impact in SET Plan execution / EU Energy Transition

    Permanent SET Plan SG invited member ; reaching out to MS representatives and decision makers

    14 out of the 16 Joint Programmes are actively delivering on 14 of the 15 SET Plan Temporary / Implementation Working Groups

    Opening strategic collaboration opportunities with DG ENER

    “Connecting” with DG Connect (FET Flags)

    International Cooperation

    Nordic Clean Energy Week - MI-3 / CEM-9

    EU-Africa collaboration Project

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 8

    For EERA members

    Unique network and knowledge sharing, communication and dissemination platform

    Be part of the strategic leadership of European energy research

    Strategic interaction with EU, advice on funding instruments; setting R&D priorities in the context of EU’s Multiannual Financial Framework (MFF)

    Breeding ground for new initiatives such as FET -Flagships, EU-Africa partnership, emergence of a Social Science and Humanities (SSH) platform, partnership with Energy oriented Centre of Excellence for Computing Applications (EoCoE), …

    Influence EU and National funding priorities

    Better response to calls and tenders; access to a forum for shaping EU proposals

    For the European Commission (EC)

    One stop shop for energy research matters and role of “Trusted Advisor"

    Providing spontaneous high quality & independent reports and white papers on energy transition

    Hub for international co-operation

    ”Brains & Muscle" to trigger action, mobilizing MS/AC resources towards the SET-Plan Implementation Plans (IPs)

    For Members States & Associated Countries (MS/AC)

    Providing a knowledge sharing platform leveraging MS/AC efforts

    Mobilizing knowledge and resources, such as use of Research Infrastructures, data, implementing researcher mobility

    Support National strategies through the EERA institutional membership

    For Industry

    Representing a pool of knowledge, ideal for starting new projects

    Providing sectorial and cross sectorial scientific workshops

    EERA General Assembly, 18 April 2018, Brussels

    A revised Strategy

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 9EERA General Assembly, 18 April 2018, Brussels

    Delivering on EU SET Plan (1/2)

    2018 – Critical Year for SET Plan : Execution Phase

    In 2017, the EC has launched 15 Temporary Working Groups (TWG) covering the 10 SET Plan key actions

    Set Plan Steering Group 21 March 2018: 8 Implementation Plans (IP) endorsed – 7 to be endorsed in June

    TWG transformed into Implementation Working Groups (IWG’s) for IPs execution

    Role of EERA in Implementation Plans (JPCs)

    EERA had a recognized instrumental role in 14 out of 15 TWGs

    EERA “named participant” in the forming of IWGs

    EERA “named participant” in 6 EC calls (CSA) for supporting IWG’s

    Role of EERA in the SET Plan Governance (AISBL)

    Permanent invited member to SET Plan Steering Group

    Engaging with member SET Plan countries representatives

    Major Effort with “MS Reference Group” in supporting EU alignment

    Interdisciplinary and cross-sectorial approach

    Towards achievement of EERA’s stated global Grand Challenge of” Zero-Carbon Emission Growth by 2050”.

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 10EERA General Assembly, 18 April 2018, Brussels

    Delivering on EU SET Plan (2/2)

    EERA contribution and Implementation Plans status as of 21 March 2018

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 11

    Initial Discussions with DG S. Ristori – Bratislava Dec 2017

    DG ENER calling for the development of a comprehensive joint action plan and strategy to strengthen the cooperation between DG Energy with EERA and its members in the context of :

    1. Analysis of the technology needs of the energy transition in terms of R&I (development of technologies towards the 2050 decarbonisation objective including assessment of existing European level modelling schemes such as PRIMES

    2. Development a systematic approach and methodology for setting R&I priorities (including criteria, parameters, assumptions, relevant weighting)

    3. Impact assessment of the investments in clean energy R&I (macro-economic, energy competitiveness, carbon abatement)

    Target: Memorandum Of Understanding Collaboration Framework

    Operational roadmap including priorities and key deliverables

    EERA General Assembly, 18 April 2018, Brussels

    Opening new perspectives – DG ENER

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 12EERA General Assembly, 18 April 2018, Brussels

    EC Projects

    Remarkable although selective increase in participation to EC projects / Proposals

    Strict focus on EERA strategy and EERA AISBL function: Mobilization, coordination, dissemination

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 14EERA General Assembly, 18 April 2018, Brussels

    Bridging Programs for Energy Transition (2/2)

    EERA Scientific Workshop

    EERA Scientific Workshop

    18 April 2019

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 15

    A high level Political Conference consolidating the role of EERA in the SET Plan and the challenges ahead

    High Level Representatives from: EU Parliament - DG RTD, DG ENER, DG CNCT – SET Plan Countries – Civil

    Society – EERA Management and JPCs

    How does the energy research community in general, and EERA in particular, contribute to the execution

    of the SET-Plan Implementation Plans?

    How should EERA coordinate with the Members States (MS’s) and Associated Countries (AC’s)

    governments leading on this exercise and with the private sector?

    How can the Implementation Plans be integrated in the transition from H2020 to FP9?

    What are the key “mega-trends” affecting the transition to a low carbon energy regime in Europe.

    10 YEAR Anniversary Political Conference

    EERA General Assembly, 18 April 2018, Brussels

    The Square

    Brussels Convention

    Centre

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 16

    10 Years Anniversary Political Conference

    EERA General Assembly, 18 April 2018, Brussels

    2. EU Alignment: Pre-requisite to a low carbon

    competitive Europe

    1. Research Enabling Energy Transition

    4. Mega-Trends in Energy Transition

    3. EERA Catalyzing EU alignment

    6. Visions for a sustainable energy future

    5. Systemic Nature of Energy Transition

    26 June 2018

    27 June 2018

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 17

    International Collaboration - “Lab to Fab”

    International Collaboration

    Natural area of focus for EERA : Paris Agreement and Mission Innovation.

    EERA JPs in 4 of the 7 “Innovation Challenges”

    EERA – DTU side event 24/05 at Nordic Clean Energy Week hosting MI-3 / CEM-9

    EERA key partner in the CSA “PRE-LEAP” – EU-Africa Collaboration on RES

    “Lab To Fab”

    “Lamy Report” aka “Lab-Fab-App” report released in 2017 ; EU failure to transfer knowledge from Lab to Fab

    “Rethinking” potential EERA role and relationship with industrial platforms (in particular ETIPS, EMIRI, …), EIT Innoenergy, …

    Reflecting on new forms of thematic multi-stakeholders conferences, workshops and brokerage events.

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 18

    EERA AISBL in Future

    2018 – A turning point in EERA Operations

    1st year of exercise of the new Chair and Executive Committee elected in May 2017

    2nd year of exercise of the first Secretary General appointed in the very end of 2016

    End of EERASE3 – Proposal for SET-4-21

    New Governance / Management instruments

    ExCoop , STRAT, INCO

    POL, COM

    Reinforcing EERA AISBL Staffing

    New Premises

    EERA General Assembly, 18 April 2018, Brussels

    • Adel El Gammal

    • Elena Dufour

    • Roberta Giaimo

    • [Marine

    Manzinello]

    • COM manager

    • Project Manager

    • Abigail Mizzi

    (intern)

    • Marie von Kempis

    (intern)

    Conference Room

    (up to 60p)Office Space

    (up to 12)

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 19

    EERA Services for the JPs

    Increased Support to the JP’s and to the EERA community

    Central collection of JP fees by EERA AISBL : 7 JP’s

    Increased the scope and level of operational services to JPs

    Hiring and hosting JP administrative support resources centrally within EERA AISBL.

    Supporting external communication, notably harmonization of approaches and integration into an EERA portal website.

    Providing enhanced internal secure collaborative, storage and back up services.

    EERA General Assembly, 18 April 2018, Brussels

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 20

    An overview of Events

    2018JAN

    DEC

    PR #31

    STRAT #1

    ExCo #31

    General Assembly

    JPC #18

    Scientific WS #2

    EERA side event at Nordic Clean EW

    SSM #4

    10th

    Anniversary Conference

    Deadline SET-4-2021

    End EERASE3

    Deadline JA-2

    Deadline Fet-Flag

    15/02

    28/02

    07/03

    18/04

    19/04

    24/05

    20/02

    05 & 06/06

    26 & 27/06

    Summer Break

    31/08

    11/09

    01/10

    PR #32

    ExCo #32

    TbdTbd

    JPC #19

    Tbd

    EERA General Assembly, 18 April 2018, Brussels

    Start PRE-LEAP

    01/07

    Workshop with Eastern countries

    08/05

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 21

    SET Plan Implementation Plans – 21/03/2018

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 22

    Support to the realisation of the Implementation Plans of the SET Plan ( JA2 – Calls )

    … [The SET Plan Implementation] strategy relies on a strengthened partnership among SET Plan countries and the stakeholders from both the industrial (including the European Technology and Innovation Platforms, ETIPs) and research communities (including the EERA)

    Proposals will support, when appropriate, the execution/realisation of a SET Plan Implementation Plan prepared by one of the following SET Plan Temporary Working Groups (TWGs):

    1. Solar thermal energy (CSP / STE) Estela

    2. Offshore wind: Pending

    3. Photovoltaics (PV) ETIP - PV

    4. Ocean energy OEE / IWG

    5. Deep geothermal systems IWG

    6. Carbon Capture and Storage Pending

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 23EERA General Assembly, 18 April 2018, Brussels

    Non JA-2 JPs

    1. BioEnergy

    2. E3S

    3. Energy Efficiency Industrial Processes

    4. Energy System Integration

    5. Energy Storage

    6. Fuel Cells & Hydrogen

    7. Nuclear Materials

    8. Smart Cities

    9. Smart Grids

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 24

    www.eera-set.eu

    EERA is an official part of the EU SET-Plan.

    http://setis.ec.europa.eu/

    EERA

    Strategy Update

    18 April 2018 - Brussels

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 25

    Rationale for STRAT

    EERA Strategy needs to be updated to address a new reality:• The existence of an AISBL, Sec. Gen and staff

    • Delivery towards the SET Plan: from TWG’s IWG’s

    • Participation to JA-2 CSA, FET Flagship, Battery Alliance,..

    • Changing priorities and structure of new funding context: FP9

    • Mission Innovation and international Cooperation

    EERASE 4 (SET-4-2021) = manage change of expectations from EERASE3 and how we can make best use of such an instrument for European energy research

    Need to define and anchor who we are, for whom and what we will like to be

    Customer orientation, value proposition

    Independency, sustainability and role

    Establish our platform and tools, vehicles to make this happen through:

    The AISBL

    The projects we are running and participating to through our JPs

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 26

    STRAT Composition

    Chair: N. Røkke

    Coordinator: A. El Gammal

    ExCo member: B. Bach / ( ? )

    ExCo member: P. Korting

    JPC: P. Hauge Madsen (Wind)

    Production Support: E. Dufour + M. Manzinello

    31st ExCo meeting 7 March 2018 , Brussels

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 27

    Work Plan & Format

    Format – PPT based- short and normative- descriptive~10 pages – also web based

    ScheduleFeb/March 2018: Framework, existing strategy, new drivers, vision, mission, pillars

    7 March: Check direction with ExCo

    April 2018: first draft

    Early May 2018: 2nd STRAT meeting - Copenhagen

    June 2018: Anchor in summer strategy meeting

    Debate and test in our 10th anniversary conference in June

    July 2018: 2nd draft version of strategy- Brussels - Doodle in progress

    Fall 2018: Finalise- send to all partners for review- Doodle to be sent out medio September

    ExCo fall 2018: Launch of new strategy

    |

    31st ExCo meeting 7 March 2018 , Brussels

  • www.eera-es.eu JP ES SCM-12 │ 3 May 2018 │Eindhoven 28

    Strengths

    • Size (50.000 Energy reseachers)

    • Representing the energy community (250 orgs, 30 countries)

    • Access to key SET- Plan country Stakeholders

    • Recognised by the EC: named stakeholder

    • Programmes for all priority areas

    • AISBL- Sec.General – presence in Brussels

    Opportunities

    • low carbon-> zero emission

    • Energy transition

    • Delivering on the Set plan IWG

    • Member State alignment- at institutional level

    • Deliveringings towards more DGs: RTD, ENER, MOVE, CNECT, GROW..)

    • Connecting with more stakeholdersEUA, ETIPs, JU, KIC InnoEnergy)

    • Named beneficiary: SET-4-2021, JA-2

    • FP9 and FET Flagships

    Threats

    • FP9 – budget size and structure

    • Sustainabilty – funding structure

    • Loss of interest by lack of project instruments

    • Associated to the SET Plan performance/existence

    • EUREC ?

    • Failing to delivering on SET Plan IP

    Weaknesses

    • Unclear value proposition (internal/external)

    • Non-transparent programme activities

    • Reliance of EU funding (AISBL)

    • Limited resources

    • Not fully recognized by the Set Plan countries

    • Limited commitment and leverage of Members funding

    SWO

    T A

    nal

    ysis