Top 10 Things that Can and Do Go Wrong at the

Department Level

CReATE ver. 05/13 © 2008 Florida State University. All rights reserved

Russell Lentz

Associate Director

Sponsored Research Services

Page 2: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number One

Failure to submit proposal to SRS for review and approval prior to submission to sponsor

Page 3: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Two

Principal Investigators, Chairs and/or Deans sign and accept award on behalf of FSU

Page 4: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Three Failure to obtain Chair

and Dean approval for cost sharing/matching commitments or requests for indirect costs waivers prior to submitting to SRS

Page 5: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Four Applying wrong indirect cost

rate in a proposal (i.e., using main campus rate when work will be

performed at NHMFL;

using off-campus rate when work will be performed on campus;

using OSA rate for a research project)

Page 6: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Five

Treating FSU faculty in proposal as a consultant

Page 7: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Six

Expectation of receiving a salary increase simply because proposal included funds to cover an increase

Page 8: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Seven

Performing work and/or delivering the results to a sponsor prior to receiving an award

Page 9: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Eight

Authorizing personnel without an appointment to work on a project

Page 10: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Nine

Subcontracting out more than 50% of an award

Page 11: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Ten

Making inappropriate charges to projects and untimely initiation of cost transfers

Page 12: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Eleven Documenting or

certifying an effort report without “a suitable means of verification” (i.e., first-hand knowledge) of work performance

Page 13: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Twelve

Failure to satisfy and/or properly document cost sharing commitments

Page 14: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Thirteen

Nepotism – PI employing relatives on a project

Page 15: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Number Fourteen

Relying on a program officer’s authorization for prior approvals required by terms of award

Page 16: Top 10 Things that Can and Do Go Wrong at the Department Level CReATE ver. 05/13 © 2008 Florida State University. All rights reserved Russell Lentz Associate.

Questions