Tomakomai CCS Demonstration Project in Japan...Dec 06, 2017 · :Japan CCS Co., Ltd. Project type...
Transcript of Tomakomai CCS Demonstration Project in Japan...Dec 06, 2017 · :Japan CCS Co., Ltd. Project type...
Copyright 2017 Japan CCS Co., Ltd. 1
Tomakomai CCS Demonstration Projectin Japan
Japan CCS Co., Ltd.
Carbon Sequestration Leadership ForumAbu Dhabi, United Arab Emirates
December 6, 2017
Copyright 2017 Japan CCS Co., Ltd. 2
AA
Projects / FY 2015 2016 2017 2018 2019 2020~
ACon-
structionCO2 Injection
0.1 ~ 0.2 Mt/year Post Injection
Monitoring
R&Ds(2) CO2 Capture Technologies
TomakomaiDemo Pj.
Practical use of
CCS tech.
Drilling Exploration wells
CCS Site Survey
Geological Survey
Overview of CCS Projects in Japan
A(1) Safety Evaluation Technologies
Verifying Safety Evaluation Technologies
Cost Reduction
Identifying CO2 Storage Site
Achieving Operation Abilities
Confirming CCS safety
Following Basic Energy Plan (2014), for the practical use of CCS technologyaround 2020, METI promotes Tomakomai Demonstration Project, R&D ofelemental technologies for CCS and surveys for potential CO2 storage sites.
2Source: Ministry of Economy, Trade and Industry (METI)
Copyright 2017 Japan CCS Co., Ltd. 3
JCCS Company Profile and CCS Project Framework
Project Framework - Functions of JCCS Company Profile
JAPAN CCS Co., Ltd.
Ministry of Economy, Trade and Industry (METI)
PrivateCompanies
CCS Related Companies, ( Domestic and Overseas )
Tomakomai CCS Demonstration Project (1)
Investigation of Potential Sites for CO2 Storage (2)
Universities
Contract
Technical Cooperation
Inve
stm
ent
SubcontractExecution
Execution
Pers
onne
l
Research Organizations
(Domestic and Overseas )
Date of Incorporation: May 26, 2008Business Description:Implementation of CCS demonstration project and investigation for potential storage sites in JapanCapital: 243 MM JPY Shareholders: 35 companies11 electric power, 5 engineering, 4 petroleum, 3 petroleum resource developing, 4 general trading, 2 iron and steel, 2 city gas, 1 chemical, 1 non-ferrous metal and cement, 1 steel pipe, 1 special tradingPresident: Shoichi Ishii, JAPEXDirectors: 8 representing the shareholders’ industriesNo. of Staff: approx. 100
Ministry of the Environment(MOE)
(1) Sponsored by METI(2) Jointly sponsored by MOE and METI.
Copyright 2017 Japan CCS Co., Ltd. 4
World First: CO2 injection from onshore site to
offshore sub-seabed reservoirsCO2 storage governed by Japanese
law reflecting London 1996 ProtocolFirst CCS project adjacent to urban
area of a populated city
Notable Technology: Two-stage CO2 absorption system
with low-pressure flash tower providing for low energy consumption
Injection interval length exceeding 1km to enhance injection efficiency
Extensive monitoring system for seismicity
Main Features of Tomakomai CCS Project
International Collaboration/Recognition: DOE-METI
Signed MOC (April 2015) UHR 3D seismic data acquisition by Univ.
of Texas at Tomakomai site (Aug. 2017) GCCSI
Designated as a Notable Project (June 2016)
CSLF Approved as a Recognized Project (Oct.
2016) Japan CCS was nominated regional
champion for Asia Pacific region
Copyright 2017 Japan CCS Co., Ltd. 5
Tomakomai CCS Demonstration Project (Fact Sheet)CO2 Stripping Tower CO2 Absorption Tower
Low-pressure Flash Tower
CO2 Compressors
Project Objectives Demonstrate the viability of a full CCS
system from capture to injection to storage Confirm existing technologies adopted in
the system work properly and efficiently Demonstrate that the CCS system is safe and
reliable Remove concerns about earthquakes by the
data collected Define areas to be improved or solved for
commercialization
Project : Tomakomai CCS Demonstration ProjectImplementer : Ministry of Economy, Trade and IndustryConsignee : Japan CCS Co., Ltd.Project type : CO2 Capture + Storage (below seabed)Scale : MiddleStatus : OperationYear of operation : 2016 Industry : Hydrogen ProductionCO2 capture type : Industrial separationCO2 capture volume: 600 tons/day (200,000 tons/year)CO2 recovery ratio : over 99.9%CO2 concentration : over 99%CO2 capture process: Two stage absorption system
+ Low-pressure Flash Tower Capture technology : Chemical Absorption (Activated Amine)Transport of CO2 : NoneStorage type : Deep Saline Aquifer (2 layers)New or retrofit : NewCapex : Aprox. 30 billion yen (without Tax)Location : Tomakomai, Hokkaido Prefecture, JapanFacility Construction: JGC, JAPEX, JFE Engineering
Copyright 2017 Japan CCS Co., Ltd. 6
Project Schedule
Preparation (FY2012-2015) Design and construction of facilities Drilling of injection and observation wells Installation of monitoring system
CO2 Injection and Monitoring (FY2016-2020) CO2 Injection (FY2016-2018) Monitoring (FY2016-2020)
Japanese Fiscal Year (April - March of following year)
Copyright 2017 Japan CCS Co., Ltd. 7
Features of Tomakomai ProjectOnshore to Offshore Injection
Deviated CO2 injection wells drilled from onshore site into offshore sub-seabed reservoirs. Saves drilling, operation
and maintenance costs Avoids disturbance of
harbor activities and marine environment
Public acceptance may be easier than onshore
Injection interval length of over 1 km to enhance injection efficiency
Copyright 2017 Japan CCS Co., Ltd. 8
Features of Tomakomai ProjectCCS Near Urban Area
Project site is adjacent to urban area of Tomakomai Population: 173,000 Vessel traffic: ferries, cargo
ships, oil tankers Fishing: largest catch of
surf clams in Japan
Extensive public outreach activities being conducted
Panel Exhibitions (5 times) CCS Forum (annually) Site Tours (2000+ visitors)
Public Outreach Activities in 2016
Kids’ Science Rooms (2 times)
Copyright 2017 Japan CCS Co., Ltd. 9
Features of Tomakomai ProjectEnergy Efficient CO2 Capture SystemLow Pressure Flash Tower utilizes depressurization and
thermal energy of water vapor of CO2 Stripping Tower to strip approximately 70% of CO2
CO2 capture energy is 1/2 to 1/3 of conventional capture system
Copyright 2017 Japan CCS Co., Ltd. 10
Summary of Early Results Full cycle CCS system is operating smoothly
No major operational issues with facilities CO2 capture system confirming energy efficiency
Injection into Moebetsu Formation (shallow reservoir) proceeding smoothly Injection causes only modest increase in bottom hole pressure, well below
operational limit Achieved injection of 100,000 tonnes in November 2017 Comprehensive monitoring being continued
Extensive public outreach activities are being conducted Receiving support of local government, local industries, local residents
Copyright 2017 Japan CCS Co., Ltd. 11
Thank you for your attention.