Toilet Partition
-
Upload
albertjopson -
Category
Documents
-
view
46 -
download
0
description
Transcript of Toilet Partition
_-1, i
#C O STAIN NTERNATIOI'{AL LINTITED
AL YAMAh{AII - I{UIT{TER PROJECT
FACILITIES 5 to 9, 14' 15 & L7
DETAIL METHOD STATEMENT
rRef
Title
cIL/DMSi9.400
TOILET PARTITION
CC}iTROLLT'ilco?Y No 1 Ot
-
O RIGIN AL
tdF"CO STAIN INTEKNATIONAL LIMITED
# IILTNTER PROJECT FACILITIES 5 to 9, 14, 15 &
Title: Detail Method Statentent MS/9.400 Toilet Partition
TABLE OF COI{TEI{TS
17
Date:Rev 0
13.9.95
1.0
2.0
3.0
4.0
5.0
SCOPE
PRE-INSTALI-ATIOI{
I].{STALLATION
RE\'ISION & A.MEhiDMENT RECORD
APPENDICES
3
3
3
4
4
,e*,***.
oI. 'I.
. COSTAIN INTERNATIONAL LIMITEDg AI- YAMAh4AH - HLINTER PROJECT FACILITIES 5 tO g,14, T5 &.17
Rev 0Title: Detail Method Statement CIL/DMS/9.400 Toilet Partition Date : 13.9.95
1.0 SCOPE
t. i This Detail Method Statement covers the operations involved in rh; installation of ToiletPartitions in Rooms 40, 50 and i26 of facility 06 and Rooms 006,024 and 120 of faciiity08.
2.A PRE-IN'STALLATIOn-'
2-l Inqpect paneis and finings for damege; damaged items wiil be returned to the stores.
2.2 Check that the conect number ofpanels, doors and hardware are available.
(/' __,. 2.3 Check walls and floors for plumb and level.(-
2.4 Protect adjacent areas &om damage, panicular attention will be made where tiles -havebeen laid.
3.0 INSTALLATIO]V
3. 1 The partition system and associated fittings and fi-xtures will be insalled in accord.ancenith the manufacrurers printed instructions.
3.2 Free standing panitions wiil be instaned on stainless steel legs.
3.3 Care will be taken to ensure that partitions and cubicles are fixed straieht and true to line,level and plumb.
3.4 Ail divisions will be assembled at 90 degrees ro doors.
3.5 Doors wili be hung venically and have a uniform edge clearance along their entire length.
3.6 Sealants and caulking, where required, wil be coiour matched to the toilet cubicles.
3'7 Hard*'are wili be as suppiied by the cubicle manufacturer and fitted in accordance withtheir instructions,
CO S TAIN INTERNATIONAL LItr{ITEDAr YAI'{AI\4AH - HLTNTER PROJECT FACILITIES 5 to g, t4, 15 &
Title: Detaii Method Statemenr CILIDMS/9.400 Toilet partition
t7
Date'Rev 0
r 3.9.95
4.0 RIVISION & AI{EI\DNfENT RECORI)
This document has been revised and amended as follows
APPEN.:DICES
Quaiity Control Checklist Toilet Partitions - CILiQCC 19.4OO
(_
5.0
5.1
Doc.Ref CIL-QCC-9.400
Rer"ision: 0
Sheet No. I
QUALITY COI{TROL CMCKLISTAl Yamamah Project - Hunter Phase 3
COSTAINInternational Limited
TOILET PAR.TITIOIT{
DMS No: 9.400
ITP NO:
LOCATION:
ITEM:
DR.AWING NO:
Checklist ComPlete
Signed
Signed
Signed
( For Sub-Contractor ) Date :
( For Costain International ) Date :
( Engtneers RePresentative ) Date :
( Tick boxes as aPPlicable )
Check units for damage
Check walls and floor for plumb and ievel
Adjacent areas protected
Correct number of PanelsCorrect number a:rd tlPe of fningsManufacturers instructions are avail able
Panels are plumb and level
Doors have uniform gaP
Sealants correctly and neatly applied
Hardware has been finedHinges not bindingLocks and bolts fit neatly in their keeps
All screws and bolts ate tightPanels and cioors are cleaa
Area is left clean and tidy
s/c.
nInnDI
C.I,L. ERCI{ECK ITEMS
PRE-
APPLICATION
1
tr!TTnn
!ITn!!!Ttr
nIT!trtr!xLJ
APPLICATION
09_400_0.Doc