Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, 2014. ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade

description

ToF -LR HV upgrade. Current status: 1) 2 Caen crates (right 1 and 2) replaced with BG crates 2) Both crates connected via RS485 link to computer in counting room 3) Connection established, beta version of monitoring program working well . ToF -LR HV upgrade. All hardware finished!. - PowerPoint PPT Presentation

Transcript of ToF -LR HV upgrade

Page 1: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna 8th of April, 2014.

ToF-LR Upgrade

Jovan Puzović,Faculty of Physics, Belgrade

Page 2: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 2 out of 24Jovan Puzović, Belgrade SHINE team

ToF-LR HV upgrade- Current status:

1) 2 Caen crates (right 1 and 2) replaced with BG crates

2) Both crates connected via RS485 link to computer in counting room

3) Connection established, beta version of monitoring program working well

Page 3: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 3 out of 24Jovan Puzović, Belgrade SHINE team

ToF-LR HV upgrade

All hardware finished!

Page 4: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 4 out of 24Jovan Puzović, Belgrade SHINE team

ToF-LR HV upgrade

- Crate R3 already in CERN, wait to be installed, Crate R4 still in Belgrade

- All distributors (HV readout) have to be calibrated!

- Finishing of the work foreseen for August this year

Page 5: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 5 out of 24Jovan Puzović, Belgrade SHINE team

Pixels repair

- ToF (especially ToF-L) performance decreases with time,too many pixels on ToF-L out of order, repair needed

- Currently, 98 pixels on ToF-L don't work, and 24 on ToF-R (our analysis, based on ToF online monitoring program)

- Szymon analysis (pp80, more sophisticated) and our new analysis (pp158, 2009) show even worst situation!

Page 6: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 6 out of 24Jovan Puzović, Belgrade SHINE team

ToF-LR pixel efficiency

Page 7: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 7 out of 24Jovan Puzović, Belgrade SHINE team

Pixels statistic

February 2013, Be @ 30 GeV

Page 8: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 8 out of 24Jovan Puzović, Belgrade SHINE team

Pixels statistic

Left side: 81 dead pixels (9.1%) (~70 PMT!)17 almost dead (1.9%)-------------------------------98 not working (11.0%)

Right side: 20 dead pixels (2.2%) (~16 PMT!) 4 almost dead (0.5%)-------------------------------24 not working (2.7%)

Page 9: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 9 out of 24Jovan Puzović, Belgrade SHINE team

Cassette inspection

Page 10: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 10 out of 24Jovan Puzović, Belgrade SHINE team

Broken PMT

Page 11: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 11 out of 24Jovan Puzović, Belgrade SHINE team

Spare parts

• We found some spare PMTs with scintilators

6 cm – 1 pcs (needed ~30)7 cm – 17 pcs (needed ~30)8 cm – 25 pcs (needed ~30)

-------------- 43 pcs (needed ~90)

• Replacing foreseen for middle of August (13.8 - 23.8)

Page 12: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 12 out of 24Jovan Puzović, Belgrade SHINE team

New parts

- FEU-87 doesn’t produce any more

- No leftovers in Dubna!

- Replacement: Hammamatsu R3478 from Buda wall (~400 pieces with HV voltage dividers, optical coupled with grease, can be use again)

- Smaller then FEU, mechanically can be adapted to fit in existing cassette (photocatode 15mm instead of 22!)

Page 13: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 13 out of 24Jovan Puzović, Belgrade SHINE team

New parts

Page 14: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 14 out of 24Jovan Puzović, Belgrade SHINE team

Hammamatsu PMT- Wavelength (Peak): 420nm- Dynode Stages: 8

(FEU-87 11!)- Anode to Cathode Supply Voltage: 1700V- Max Anode to Cathode Voltage: 1800V- Gain Typ.: 1.7 x 106 - Rise Time Typ.: 1.3 ns

- Assembled with our ToF-LR scintilators an tested (cosmic)- Nominal HV (1700V) too high (gain too high)! Use ~1000V- More current consumption (~30%) compared to FEU-87!

Page 15: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 15 out of 24Jovan Puzović, Belgrade SHINE team

Hammamatsu PMT

Page 16: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 16 out of 24Jovan Puzović, Belgrade SHINE team

Hammamatsu PMT

Page 17: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 17 out of 24Jovan Puzović, Belgrade SHINE team

PMT from the right wall

Page 18: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 18 out of 24Jovan Puzović, Belgrade SHINE team

PMT from the right wall

Page 19: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 19 out of 24Jovan Puzović, Belgrade SHINE team

Pulse shape

Page 20: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 20 out of 24Jovan Puzović, Belgrade SHINE team

Amplitude spectra

Page 21: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 21 out of 24Jovan Puzović, Belgrade SHINE team

Conclusion

- Hammamatsu PMTs performed very well during testing (in spite of their smaller photocatode)

- Seems that its possible to produce replacement for broken pixels on the ToF left wall based on Hammamatsu PMTs

- However, lots of problems are foreseen!

Page 22: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 22 out of 24Jovan Puzović, Belgrade SHINE team

Conclusion

- A lot of mechanical work needed!- new cassettes have to be produced (12 of them)- new scintilators wanted- electrical cables have to be extended- mechanical support for (smaller) PMTs for tight fit to existing space in cassette- light guides for laser calibration system needed- replacing the old cassette with the new one, then use good FEU-87 pixels as spare part for the rest of the wall- HV calibration needed! - Current consumption?

Page 23: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 23 out of 24Jovan Puzović, Belgrade SHINE team

Conclusion

- Price (in CHF and man power) cannot be estimate at the moment – mostly for traveling expenses and men work!

- Further study needed – how to mechanically adapt smaller PMTs to tight fit in existing cassette space?

- Cost-benefit analysis needed: what we will get and how much does it cost!

Page 24: ToF -LR HV upgrade

Faculty of Physics, University of Belgrade

Collaboration meeting, Dubna, 8.4.2014.Page 24 out of 24Jovan Puzović, Belgrade SHINE team

Thank you!