Todd & ledson introduction presentation shorter

28
PRACTICE INTRODUCTION

Transcript of Todd & ledson introduction presentation shorter

Page 1: Todd & ledson introduction presentation   shorter

PRACTICE INTRODUCTION

Page 2: Todd & ledson introduction presentation   shorter

INTRODUCTION-One of largest and longest established construction consultancies in the North West.

-Independently owned and managed.

-Regional base with projects throughout the UK.

-Commitment to provision of high quality service.

-Commitment to delivering value for money.

-Resources and approach suitable for projects from under £100k to over £100m.

-Professional service on every scheme, with a personal, helpful & friendly, proactive, responsive & reliable, and transparent attitude throughout.

Page 3: Todd & ledson introduction presentation   shorter

SERVICES

•Cost Management / Quantity Surveying

•Project Management

•Project Coordination

•Employers Agent

•CDM Coordination

•Development / Project Monitoring

•Feasibility Studies / Option Appraisals

•Development Appraisals

•Funding / Grant Applications

•Sustainability & Whole Life Costing

•Risk Management

•Value Management / Value Engineering

•Services to Contracting Clients

We offer a full range of Cost and Project Management services including the following:

Page 4: Todd & ledson introduction presentation   shorter

LOCATIONS

We have current and recent projects throughout the UK.

Liverpool LondonMartins Building,    The BridgeWater Street,    12-16 Clerkenwell RoadLiverpool,    LondonL2 3SX EC1M 5PQ

Page 7: Todd & ledson introduction presentation   shorter

ACCREDITATIONS

We provide a high quality of service, as demonstrated by our accreditations, certifications, and qualifications, which include:

Page 8: Todd & ledson introduction presentation   shorter

HEALTHCARESt Catherines Hospital, Birkenhead

Construction Cost – £27m

Role – Trust P21 Cost Advisor and measurement service to PSCP

Page 9: Todd & ledson introduction presentation   shorter

HEALTHCARE

Leighton HospitalClient – Mid Cheshire Hospitals NHS TrustConstruction Cost

Ward Refurbishments - £1.2m per 2 wardsCorridor Improvements - £3mTheatre Block - £14m

Role – P21 Trust Cost Advisor

Health Centres, Southport & Bootle

Construction Cost – £1mRole – Quantity Surveyor

Ward Refurbishment, Aintree

Construction Cost – Two projects of £0.6m and £3.8mRole – Quantity Surveyor

Nathan House, Christies Hospital

Client – Christies Hospital / HCA

Construction Cost – £1mRole – Quantity Surveyor / Employers Agent

Page 10: Todd & ledson introduction presentation   shorter

HEALTHCAREGeneral Improvements, Walton

Construction Cost – £0.4mRole – Quantity Surveyor

New Multi Storey Car ParkChristies Hospital

Construction Cost – £8mRole – Quantity Surveyor to Stage G

Page 11: Todd & ledson introduction presentation   shorter

HEALTHCARE

St Josephs Hospice, ThorntonClient – St Josephs HospiceConstruction Cost – £1mRole – Quantity Surveyor

St Johns Hospice, ThorntonClient – St Johns HospiceConstruction Cost – £1mRole – Quantity Surveyor

Hereford Therapy CentreClient – Martha TrustConstruction Cost – £3mRole – Quantity Surveyor

Page 12: Todd & ledson introduction presentation   shorter

These projects were completed by Steve Moule, Partner of Todd & Ledson, for previous employers.

Marybone Student Village, LiverpoolConstruction Cost – £24m (three phases)

Lime Street Student Village, Liverpool

Construction Cost – £28m

Cambridge Court Student Village, LiverpoolClient – Downing DevelopmentsConstruction Cost – £5.8m

STUDENT ACCOMMODATION

Page 13: Todd & ledson introduction presentation   shorter

OUT OF TOWN RETAIL

Manchester Fort Shopping Park, Cheetham Mill

Construction Cost - Phased – phased

Role - Quantity Surveyor on Design & Build projects

Croft Retail & Leisure Park, Bromborough

Construction Cost - Phased – total over £18m Role - Quantity Surveyor on Design & Build Projects

Page 14: Todd & ledson introduction presentation   shorter

SHOPPING CENTRES

Midsummer Place, Milton Keynes

Phased – various project sizes

Meadowhall Shopping Centre, SheffieldConstruction Cost - £90m Role – Quantity Surveyor / Employers Agent

Page 15: Todd & ledson introduction presentation   shorter

LEISURE

Mere Golf & Country ClubClient – Mere Golf & Country ClubConstruction Cost - £12mRole – Project Manager, Employers Agent, Quantity Surveyor

Hotels

Page 16: Todd & ledson introduction presentation   shorter

LEISURE

Express by Holiday Inn, ChesterClient – Chester Race CompanyConstruction Cost - £4.5mRole – Quantity Surveyor / Employers Agent

Hotels

ChristchurchClient – RreefConstruction Cost - £4mRole – Project Manager, Quantity Surveyor and Employers Agent

Coloseum Leisure Park, CheshireClient – Legal & GeneralConstruction Cost - £3mRole –Quantity Surveyor and Employers Agent

Page 17: Todd & ledson introduction presentation   shorter

LEISURE

Kings Dock Mill, LiverpoolConstruction Cost - £22mRole – Bank Development Monitoring

Hotels

Indigo Hotel, NewcastleConstruction Cost - £6m

Holiday Inn ExpressConstruction Cost - £10m

Role – Bank Development Monitoring

Page 18: Todd & ledson introduction presentation   shorter

Crosby Lakeside Adventure Centre

Construction Cost - £8mRole – Quantity Surveyor

Pierhead Ferry Terminal BuildingConstruction Cost - £10mRole – Quantity Surveyor and Employers Agent

LEISURE

Page 19: Todd & ledson introduction presentation   shorter

LEISURE

Toxteth Firefit CentreConstruction Cost - £6mRole – Quantity Surveyor / Employers Agent

Colwyn Bay Watersports CentreClient – Colwyn BayConstruction Cost - £2.5mRole – Quantity Surveyor

Page 20: Todd & ledson introduction presentation   shorter

COMMERCIALNew Build

Women’s International Centre for Economic Development, LiverpoolClient – Train 2000Construction Cost - £4mRole – Quantity Surveyor on Two Stage Procurement

Page 21: Todd & ledson introduction presentation   shorter

COMMERCIALRefurbishment

Liverpool Digital / Liverpool Innovation ParkConstruction Cost – phased total £16mRole – Quantity Surveyor

Page 22: Todd & ledson introduction presentation   shorter

COMMERCIALFit Out

Mann Island, Liverpool

Construction Cost – Fit Out - £6mRole – Quantity Surveyor

St Paul’s Square, Liverpool

Construction Cost - £7mRole – Quantity Surveyor

Page 23: Todd & ledson introduction presentation   shorter

INDUSTRIAL

Pharmaceutical Distribution Centre, StokeClient – AAH PharmaceuticalsConstruction Cost - £13mRole – Quantity Surveyor on Design & Build

Carpet Distribution Centres – Tamworth, Leeds, BridgendClient – Headlam CarpetsConstruction Cost – Total of over £15mRole – Quantity Surveyor on Construction Management Contracts

Page 24: Todd & ledson introduction presentation   shorter

INDUSTRIAL

Food Distribution Centres – throughout UKConstruction Cost – total in excess of £80mRole – Quantity Surveyor, primarily on Construction Management Contracts

Elm Bridge Road, Ellesmere PortClient – Northern TrustConstruction Cost - £2mRole – Quantity Surveyor

Page 25: Todd & ledson introduction presentation   shorter

RESIDENTIALSocial Housing

Mather Avenue, LiverpoolConstruction Cost – £2.4mRole – Quantity Surveyor and Project Manager under NEC Contract

Langdale Place, BlackpoolConstruction Cost – £5.4mRole – Quantity Surveyor and Employers Agent

Page 26: Todd & ledson introduction presentation   shorter

St Dunstans, LlandudnoClient – St Dunstans

Construction Cost – £6mRole – Quantity Surveyor

Talbot Road, BlackpoolClient – Great Places Housing Association

Construction Cost – £3.5mRole – Quantity Surveyors / Employers Agent

Shot Tower, ChesterConstruction Cost – £5mRole – Quantity Surveyor /

Employers Agent

RESIDENTIAL

Page 27: Todd & ledson introduction presentation   shorter

EDUCATIONCampus ImprovementsConstruction Cost – Phased - £6mRole – Quantity Surveyor on Framework Agreement

Framework AgreementRole – Quantity Surveyor on Framework Agreement

Page 28: Todd & ledson introduction presentation   shorter

OTHER PROJECTS

St Helens InfrastructureClient – St Helens CouncilConstruction Cost – £3mRole – Quantity Surveyor

Elim ChurchClient – Elim Pentecostal ChurchConstruction Cost – £1.7mRole – Quantity Surveyor