TOC_WAF_RF_2012

34
TOC.CW.LA1.S01.1 TABLE OF CONSTRUCT Construct : S01 Computer Security Measures Aspect : LA1.S01. 1 Apply Correct Security Procedures Using Antivirus Instrument : Demonstration MARK CRITERIA EVIDENCE NOTE 2 1. Choose antivirus software to be used. Write the name of the antivirus software. Completed ACF.CW.LA1.S01.1. Use any antivirus software available e.g. Kaspersky, McAfee Virus Scan, Norton Antivirus, Trend Micro PC- Cillin, Dr Solomon, AVG, etc. Scan area can be specific folder, floppy disk, or flash memory. Candidate can print screen the scan summary. If no virus is detected, criterion four is considered done. Write “No action taken”. Values: Confident Responsible 2 2. Start the antivirus software and select area to be scanned. State the area selected. 2 3. Scan the selected area. Copy scan summary. 2 4. Choose and apply any or all of the following when virus is detected – delete/remove, clean/heal, quarantine/mov e to vault. State action taken 8 TOTAL MARK

Transcript of TOC_WAF_RF_2012

Page 1: TOC_WAF_RF_2012

TOC.CW.LA1.S01.1

TABLE OF CONSTRUCT

Construct : S01 Computer Security Measures

Aspect : LA1.S01.1 Apply Correct Security Procedures Using Antivirus

Instrument : Demonstration

MARK CRITERIA EVIDENCE NOTE

2

1. Choose antivirus software to be used.

Write the name of the antivirus software.

Completed ACF.CW.LA1.S01.1.

Use any antivirus software available e.g. Kaspersky, McAfee Virus Scan, Norton Antivirus, Trend Micro PC-Cillin, Dr Solomon, AVG, etc.

Scan area can be specific folder, floppy disk, or flash memory.

Candidate can print screen the scan summary.

If no virus is detected, criterion four is considered done. Write “No action taken”.

Values:

Confident

Responsible

2

2. Start the antivirus software and select area to be scanned.

State the area selected.

23. Scan the selected

area.

Copy scan summary.

2

4. Choose and apply any or all of the following when virus is detected – delete/remove, clean/heal, quarantine/move to vault.

State action taken

8 TOTAL MARK

Page 2: TOC_WAF_RF_2012

TOC.CW.LA1.S01.2

TABLE OF CONSTRUCT

Construct : S01 Computer Security Measures

Aspect : LA1.S01.2 Apply Correct Security Procedures Using Anti-Spyware

Instrument : Demonstration

MARK CRITERIA EVIDENCE NOTE

2

1. Choose anti-spyware software to be used.

Write the name of the anti-spyware software.

Completed ACF.CW.LA1.S01.2

Suggested anti-spyware software: Lavasoft Ad-Aware SE Personal.

Print screen can be used to display scan summary.

If no spyware is detected, criterion four is considered done. Write “No action taken”.

Values: Confident

Responsible

2

2. Start the anti-spyware software and choose a scan mode.

State the scan mode selected.

23. Scan the selected

area.

Copy scan summary.

2

4. Choose and apply any of the following when spyware is detected - remove/quarantine the identified object(s).

State the action taken.

8 TOTAL MARK

Page 3: TOC_WAF_RF_2012

TOC.CW.LA1.AS02.1

TABLE OF CONSTRUCT

Construct : S02 Impact of ICT on Society

Aspect : LA1.S02.1 Locate and present information on impact of ICT on society

Instrument : Verbal Presentation

MARK CRITERIA EVIDENCE NOTE

1

1. Locate information from more than one source. Write the number of sources referred.

Completed ACF.CW.LA1.S01.2

Suggested anti-spyware software: Lavasoft Ad-Aware SE Personal.

Print screen can be used to display scan summary.

If no spyware is detected, criterion four is considered done. Write “No action taken”.

Values: Confident

Responsible

2

2. Present the information in 5 to 10 slides.Write the number of slides used.

5

3. Presentation includes:a. Topicb. Contentc. Conclusiond. Sources of

reference

Submit a soft copy or hard copy of the presentation.

2

4. Display cooperation.a. Write the names

of group members.

b. Verbal verification from group members OR assessor’s observation.

10 TOTAL MARK

Page 4: TOC_WAF_RF_2012

TOC.CW.LA2.S03.1

TABLE OF CONSTRUCT

Construct : S03 PC Assembling

Aspect : LA2.S03.1 Assemble the components of a PC

Instrument : Demonstration

MARK CRITERIA EVIDENCE NOTE

21. Fix the processor

correctly.Write processor specification.

Completed ACF.CW.LA2.S03.1

CAUTION: Assessor must make sure that the processor is properly fixed by the candidate to avoid permanent damage to it.

Installation of floppy drive OR optical drive is required if and only if they come with the PC.

Candidates must connect all necessary cables.

Values: Accurate Confident Responsible

22. Fix the RAM

correctly.Write RAM capacity.

2

3. Install the power supply unit correctly.Write power (W) and voltage (V) of unit.

24. Install the hard disk

correctly. Write hard disk capacity.

2

5. Install the floppy drive AND/OR optical drive correctly.Write drive(s) installed.

16. Boot up the computer

successfully.

2

7. Check BIOS setup.a. Hard disk

detectedb. Floppy drive

AND/OR optical drive detected

13 TOTAL MARK

TOC.CW.LA2.SO4.1

Page 5: TOC_WAF_RF_2012

TABLE OF CONSTRUCT

Construct : S04 Software Installation

Aspect : LA2.S04.1 Install operating system, application software and utility program

Instrument : Demonstration

MARK CRITERIA EVIDENCE NOTE

3

1. Install an operating system.Write the name of the operating system installed.

Completed ACF.CW.LA1.S01.2

Suggested anti-spyware software: Lavasoft Ad-Aware SE Personal.

Print screen can be used to display scan summary.

If no spyware is detected, criterion four is considered done. Write “No action taken”.

Values: Confident

Responsible

3

2. Install application software.Write the name of the application software installed.

3

3. Install a utility program.Write the name of the utility program installed.

9 TOTAL MARK

TOC.CW.LA2.S05.1

Page 6: TOC_WAF_RF_2012

TABLE OF CONSTRUCT

Construct : S05 Current and Future Development of Open Source Software and Latest Development in ICT

Aspect :LA2.S05.1

Explain the latest open source software available and the latest development in ICT

Instrument : Written Assignment

MARK CRITERIA EVIDENCE NOTE

41. Explain the latest open

source OSa. Meaningb. TWO examples

Written Assignment

Candidate works in groups of 2 to 4 to conduct study AND/OR for discussion.

Written assignment MUST be done individually.

Refer to WAF.CW.LA2.S05.1.

Suggested duration:2 to 4 weeks

Values: Appreciate Cooperate Confident

4

2. Explain the latest open source application software

a. Meaning b. TWO examples

4

3. Explain the latest development in ICT

a. ONE hardwareb. ONE software

44. Explain pervasive

computinga. Meaning b. TWO examples

2

5. Follow required written assignment format:a. content formatb. document format

2

6. Display cooperation.

a. Write the names of group members.

b. Verbal verification from group members or assessor’s observation.

20 TOTAL MARK

WAF.CW.LA2.S05.1

Page 7: TOC_WAF_RF_2012

WRITTEN ASSIGNMENT FORMAT

LEARNING AREA: COMPUTER SYSTEM

Construct : S05 Current and Future Development of Open Source Software and Latest Development in ICT

Aspect :LA2.S05.1

Explain the latest open source software available and the latest development in ICT

Instrument : Written Assignment

Instruction:

Work in groups of two to four to find information and discuss on the latest open source software available and the latest development in ICT. Complete this written assignment individually.

You are given two to four weeks to complete this assignment.

Content Format

1.0 Introduction

(meaning of open source software, hardware, software, etc)

2.0 The Latest Open Source Operating System (OS)

2.1 Meaning of open source OS

2.2 Examples of open source OS

(explain two examples)

3.0 The Latest Open Source Application Software

3.1 Meaning of open source application software

3.2 Examples of open source application software

(explain two examples)

4.0 The Latest Development in ICT

4.1 Hardware

(state specification OR special features of ONE hardware and compare it to previous model(s))

4.2 Software

(state year/date of release, special features of ONE software and compare it to previous version(s))

5.0 Pervasive Computing

5.1 Meaning of pervasive computing

5.2 Examples of pervasive computing

(explain two examples)

6.0 Conclusion

Reference

(give at least two sources of reference)

Document Format cover page

o Candidate’s detailso Title: The latest Open Source Software Available and the Latest Development in ICT

page margin - top, bottom, left, and right: 1”, paper size - A4 line spacing - 1.5 lines typeface - Times New Roman, font size- - 12 pts (content), and14 pts for title/heading number of pages - 3 to 10

TOC.CW.LA3.S06.1

Page 8: TOC_WAF_RF_2012

TABLE OF CONSTRUCT

Construct : S06 Network Facilities Setup

Aspect : LA3.S06.1 Crimp and Test UTP Cables

Instrument : Demonstration

MARK CRITERIA EVIDENCE NOTE

2

1. Crimp a Straight Cable Skin off the cable jacket. Untwist and straighten each

wire. Arrange the wires according to

the 568B wiring schematic order for both ends.

Cut and insert the wires into a RJ45 connector.

Crimp the cable using a crimping tool.

(assessment done on final product)

Crimped straight and

crossed cables.

At least 1 meter of UTP cable is recommended.

Candidate may refer to the wiring schematic manual in the Learning Module.

The cables must be labelled and kept in a safe place

Values: Precise Confident Abide

22. Check the straight cable is

crimped successfully using a cable tester.

2

3. Crimp a Crossed Cable Skin off the cable jacket. Untwist and straighten each

wire. Arrange the wires according to

the 568A wiring schematic order for one end AND 568B wiring schematic order for the other end.

Cut and insert the wires into a RJ45 connector.

Crimp the cable using crimping tool.

(assessment done on final product)

24 Check the crossed cable is

crimped successfully using a cable tester.

8 TOTAL MARK

TOC.CW.LA3.S06.2

Page 9: TOC_WAF_RF_2012

TABLE OF CONSTRUCTConstruct : S06 Network Facilities Setup

Aspect : LA3.S06.2 Configure and Test Network Connection

Instrument : Demonstration

MARK CRITERIA EVIDENCE NOTE

21. Set an IP Address.

Write the IP address.

Completed ACF.CW.LA3.S06.2

IP Address and Subnet Mask given by the assessor.

Values: accurate confident responsible abide

22. Set a Subnet Mask.

Write the subnet mask.

1

3. Choose another computer to test the configuration.Write the IP address of the computer.

34. Ping the other

computer.Copy the ping result.

8 TOTAL MARK

TOC.CW.LA3.S07.1

TABLE OF CONSTRUCT

Page 10: TOC_WAF_RF_2012

Construct : S07 Current and Future Development in Networks and Communications.

Aspect : LA3.S07.1 Describe the Latest Development in Networks and Communications

Instrument : Written Assignment

MARK CRITERIA EVIDENCE NOTE

8

1. Describe Mobile Computing

a. definition

b. specifications, services, frequencies

Written Assignment

Candidates work in groups of 2 to 4 to conduct the study and for discussion.

Written assignment must be done individually.Suggested duration:2 to 4 weeks

Refer to Written Assignment Format in WAF.CW.LA3.S07.1

Values: cooperate responsible

abide

4

2. Describe Internet Technology and Services a. VoIPb. BLOG

8

3. Describe types of network a. PAN, b. VPN, c. WLAN, d. WIMAX

2

4. Follow required written assignment format:a. content formatb. document format

2

5. Display cooperation.

a. Write the names of group members.

b. Verbal verification from group members or assessor’s observation

24 TOTAL MARK

WAF.CW.LA3.S07.1

WRITTEN ASSIGNMENT FORMAT

Page 11: TOC_WAF_RF_2012

LEARNING AREA : COMPUTER NETWORKS AND COMMUNICATIONS

Construct : S07 Current and Future Development in Networks and Communications

Aspect : LA3.S07.1 Describe the Latest Development in Networks and Communications

Instrument : Written Assignment

Instruction:

Work in groups of two to four to find information and discuss on the latest development in Networks and Communications. Complete this written assignment individually.

You are given two to four weeks to complete this assignment.

Content format

1.0 Introduction

(Computer Networks and Communications)

2.0 Mobile Computing

2.1 Definition

2.2 Specification, services, and frequencies of Mobile Computing

(based on one product e.g. PDA, 3G mobile phone)

3.0 Internet Technology and Services

3.1 VoIP

3.2 BLOG

4.0 Types of network.

4.1 PAN

4.2 VPN

4.3 WLAN

4.4 WIMAX

5.0 Conclusion

(Computer Networks and Communications)

Reference

(give at least two sources of reference)

Document Format (use Word Processor)

cover page

o Candidate’s details

o Title: The Latest Development in Networks and Communications

page margin - top, bottom, left, and right: 1”, paper size - A4

line spacing: 1.5 lines

typeface - Times New Roman, font size - 12 pts (content), 14 pts for title/heading

number of pages - 3 to 10

TOC.CW.LA4.S08.1TABLE OF CONSTRUCT

Construct : S08 Multimedia Development

Aspect : LA4.S08.1 Apply All The Phases Of Multimedia Production To Produce An

Page 12: TOC_WAF_RF_2012

Interactive Educational Multimedia Project.

Instrument : Project

MARK CRITERIA EVIDENCE NOTE

3

1. Analysis PhaseWrite the project title, objective and target audience.

Completed RF.CW.LA4.S08.1

and a soft copy of the product.

The multimedia product must be interactive, educational and include all five multimedia elements.

Choose any topic from any subjects taught in school: ICT Bahasa Malaysia Bahasa Inggeris Mathematics Science, etc

Authoring Tools: Tool book Presentation s/w Web editor

Values: Creative Integrity

Responsible

22. Design Phase

Sketch storyboard.

1

3. Implementation PhaseDevelop a multimedia project based on the storyboard using an authoring tool.Write the name of the authoring tool used.

2

4. Testing PhaseTest the developed multimedia product.Complete the checklist.

7

5. Evaluation PhaseAsk assessor to evaluate the developed multimedia product.a. Content

match the project objective(s)

b. Interface user friendly interactive

c. Navigation all links/buttons

functioning correctly

d. Multimedia Elements text graphic audio video

c. animation

1

6. Publishing Phase Submit a softcopy of the multimedia product.Write the storage medium used and name of the main file or folder.

16 TOTAL MARK

RF.CW.LA4.S08.1REPORT FORM

LEARNING AREA : MULTIMEDIA

Page 13: TOC_WAF_RF_2012

Name of Candidate

IC No

Index No

Construct : S08 Multimedia Development

Aspect : LA4.S08.1 Apply All The Phases Of Multimedia Production To Produce An Interactive Educational Multimedia Project.

Instrument : Project

1. ANALYSIS PHASE

Project Title

Objective(s)

Target Audience

2. DESIGN PHASE (attach storyboard if space provided not enough)

3. IMPLEMENTATION PHASE

Authoring tool

Page 14: TOC_WAF_RF_2012

4. TESTING PHASE

CHECKLIST FORM

Items YES NO

A Content

Match the project goal

B Interface

User-friendly

Interactive

C

Navigation

All links/buttons functioning correctly

5. EVALUATION PHASE

(to be carried out by the assessor using ACF.CW.LA4.S08.1)

6. PUBLISHING PHASE

Storage Medium

Main File/Folder Name

Candidate’s Signature

------------------------------

TOC.CW.LA4.S09.1

TABLE OF CONSTRUCT

Construct : S09 Current and Future Development of Multimedia

Aspect : LA4.S09.1 Gather Examples of Immersive Multimedia In Education, Business or

Page 15: TOC_WAF_RF_2012

Entertainment

Instrument : Scrapbook

MARK CRITERIA EVIDENCE NOTE

21. Front cover includes

a. topic

b. name of candidate

Completed RF.CW.LA4.S09.1

AND

Scrapbook

Candidate compiles articles, pictures, drawings from different types of sources such as newspapers, magazines, Internet, etc into a scrapbook based on any of the following:

Immersive Multimedia in Education

Immersive Multimedia in Business

Immersive Multimedia in Entertainment

Scrapbook must be done individually.

Values:

creative

responsible

appreciate

22. Scrapbook contains at

least SIX pages excluding front and back covers.

23. Collections are relevant

to the topic chosen.

24. State source and/or

date in the scrapbook.

25. Submit

RF.CW.LA4.S09.1

10 TOTAL MARK

Page 16: TOC_WAF_RF_2012

RF.CW.LA4.S09.1

REPORT FORM

LEARNING AREA : MULTIMEDIA

Name of Candidate IC No

Index No

Construct : S11 Current And Future Development Of Multimedia

Aspect :LA5.S11.1

Gather Examples of Immersive Multimedia In Education, Business Or Entertainment

Instrument : Scrapbook

Activity Log (record all activities carried out in compiling the scrapbook)

Date Activity Remarks

Candidate’s Signature

------------------------------

Page 17: TOC_WAF_RF_2012

TOC.CW.LA5.S10.1

TABLE OF CONSTRUCT

Construct : S10 Program Development

Aspect : LA5.S10.1 Apply Program Development Phases To Develop A Problem-Solving Program

Instrument : Practical Session

MARK CRITERIA EVIDENCE NOTE

4

1. Problem Analysis a. Write the problem

statement.b. List all the required

input itemsc. Write the expected

output.d. Write the formula to be

used.

Completed RF.CW.LA5.S10.1

ANDSubmitted program.

Duration of practical session: 2 periods

Choose any of the suggested projects (refer to APPENDIX B) or propose a new project.

Submit executable file

and/or project file and

form(s).

During evaluation, assessor runs the candidate’s program to validate the output in 4(b) using the data in 4(a).

Values:1. Accurate2. Confident3. Responsible4. Abide

6

2. Program Designa. Write the pseudocode.

ORDraw the flowchart.

b. Sketch the user interface design for input.

c. Sketch the user interface design for output.

2

3. CodingDevelop a program based on (1) and (2).Write the name of the project file.

6

4. Testing and Debugginga. State the test data used

for each input item listed in 1(b).

b. Write the output based on 4(a)

c. Compile the program. Write down the name of the executable file.

2 5. DocumentationSubmit report and soft

20 TOTAL MARK

Page 18: TOC_WAF_RF_2012

RF.CW.LA5.S10.1REPORT FORM

LEARNING AREA : PROGRAMMING

Name of Candidate

IC No

Index No

Construct : S10 Program Development

Aspect : LA5.S10.1 Apply Program Development Phases To Develop A Problem-Solving Program

Instrument : Practical Session

Assessment : 1 / 2 / 3 / _

1. Problem Analysis

a. Problem Statement

b. Required Input

c. Expected Output

d. Formula Used

2. Program Design

a. Pseudocode OR Flowchart

b. User Interface

Page 19: TOC_WAF_RF_2012

Design for Input

c. User Interface Design for Output

3. Coding

(refer to program submitted)

Project File Name: __________________

4. Testing and Debugging

a. State the data used for each input item listed in 1(b).

Input item (s) Input data

b. Write the output based on the input data in 4(a)

Output item(s) Actual Output

c. Name of the executable file

TOC.CW.LA5.S11.1

Page 20: TOC_WAF_RF_2012

TABLE OF CONSTRUCT

Construct : S11 Current And Future Development Of The Latest Programming Languages

Aspect : LA5.S11.1 Find Out The Latest Programming Languages

Instrument : Report

MARK CRITERIA EVIDENCE NOTE

21. Identify and name the two

latest programming languages

Completed RF.CW.LA5.S11.1

Report must be done individually.Suggested duration:

2 weeksValues:

Cooperate

Appreciate

12

2. Identify and state

a. the developer

b. when it was developed

c. purpose (why it was introduced)/application

d. platform

e. approach (structured/object-oriented/etc)

f. translator used

2 3. State the source of reference.

16 TOTAL MARK

RF.CW.LA5.S11.1

Page 21: TOC_WAF_RF_2012

REPORT FORM

LEARNING AREA : PROGRAMMING

Name of Candidate IC No

Index No

Construct : S11 Current And Future Development Of The Latest Programming Languages

Aspect : LA5.S11.1 Find Out The Latest Programming Languages

Instrument : Report

Name of Latest Programming Language

1. 2.

Developer

Year Developed

Purpose

Platform

(OS)

Approach

Translator used

Special features (optional)

Source of Reference

Candidate’s Signature

------------------------------

TOC.CW.LA6.S12 1

Page 22: TOC_WAF_RF_2012

TABLE OF CONSTRUCT

Construct : S12 Database Development

Aspect : LA6.S12.1 Develop A Database Project

Instrument : Practical Session

MARK CRITERIA EVIDENCE NOTE

21. State the project

title and the objective(s) of the project.

Completed RF.CW.LA6.S12.1

ANDsoft copy of the

database project

Duration of practical session: 2 periods

Choose any of the suggested projects in APPENDIX C or propose a new project.

Draw a line to show the relationship between both tables.

Example:TABLE 1 TABLE 2

Field name

…….

1:M

or

M:N

or

1:1

Field name

…….

Values: accurate confident

responsible

8

2. Create all the required tables. a. Name each table.b. State the field

names for each table.

c. State the primary key(s).

d. Relate the tables.Draw a line to show the relationship.

23. Create a form for

each table.

2 4. Enter data into the tables.

2 5. Create a query from two tables.

26. Create a report

based on the query created.

27. Submit the report

form and a soft copy of the developed database project.

20 TOTAL MARK

RF.CW.LA6.S12.1

REPORT FORM

Page 23: TOC_WAF_RF_2012

LEARNING AREA : INFORMATION SYSTEM

Name of Candidate

IC No

Index No

Construct : S12 Database Development

Aspect : LA6.S12.1 Develop A Database Project

Instrument : Practical Session

Assessment : 1 / 2 / 3 / _

1. Project title

Objective(s)

2. Table 1 Table 2

Table name

Field names

Primary key

The relationship between both tables.

3. Name of forms

4. Number of records entered

Table ________________ Table ___________________

5. Criteria used for query

Field Name:Criteria:

6. Name of report

7. Name of file

Candidate’s Signature

------------------------------

TOC.CW.LA6.S13.1TABLE OF CONSTRUCT

Page 24: TOC_WAF_RF_2012

Construct : S13 Current And Future Developments In Information Systems

Aspect : LA6.S13.1 Find Out Current Developments In Computer Information Systems.

Instrument : Report

MARK CRITERIA EVIDENCE NOTE

21. Define web-based

application.

Completed RF.CW.LA6.S13.1

Report must be done individually.

Suggested duration: 2 weeks

Values: cooperate responsible

22. Give an example of web-

based application.State the function of the application.

13. Name a programming

language used to develop web-based application.

14. Name a DBMS used in

web-based application.

2/05. State an advantage of

web-based application compared to non web-based application.

16. State a vulnerability of

web-based application.

1 7. State source of reference.

10 TOTAL MARK

RF.CW.LA6.S13.1

REPORT FORM

Page 25: TOC_WAF_RF_2012

LEARNING AREA : INFORMATION SYSTEM

Name of Candidate

IC No

Index No

Construct : S13 Current And Future Developments In Information Systems

Aspect : LA6.S13.1 Find Out Current Developments In Computer Information Systems.

Instrument : Report

Definition of web-based application

An example of web-based application

Function of the application

An example of a programming language used to develop web-based application.

An example of a DBMS used in the web-based application.

An advantage of web-based application (compared to non web-based application)

A vulnerability of web-based application

Source of Reference

Candidate’s Signature

------------------------------