Transcript of TOC.CW.LA3.S06.1
TOC.CW.LA3.S06.1
TABLE OF CONSTRUCT
Construct : S06 Network Facilities Setup
Aspect : LA3.S06.1 Crimp and Test UTP Cables
Instrument : Demonstration
SCORE CRITERIA EVIDENCE NOTE
2
1. Crimp a Straight Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568B wiring
schematic order for both ends.d. Cut and insert the wires into a RJ45 connector.e. Crimp the cable using a crimping tool.
2. Check the straight cable is crimped successfully using a cable tester.
3. Crimp a Crossed Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568A wiring
schematic order for one end AND 568B wiring schematic order for the other end.
d. Cut and insert the wires into a RJ45 connector.e. Crimp the cable using a crimping tool.
4. Check the crossed cable is crimped successfully using a cable tester.
Complete all FOUR tasks.
Crimped straight and
crossed cables.
At least 1 meter of UTP cable is recommended.
Candidate may refer to the wiring schematic manual in the Learning Module.
The cables must be labelled and kept in a safe place
Values: Precise Confident Abide
1
1. Crimp a Straight Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568B wiring
schematic order for both ends.d. Cut and insert the wires into a RJ45 connector.e. Crimp the cable using a crimping tool.
2. Check the straight cable is crimped successfully using a cable tester.
3. Crimp a Crossed Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568A wiring
schematic order for one end AND 568B wiring schematic order for the other end.
d. Cut and insert the wires into a RJ45 connector.e. Crimp the cable using a crimping tool.
4. Check the crossed cable is crimped successfully using a cable tester.
Complete TWO to THREE tasks.
Crimped straight and
crossed cables.
At least 1 meter of UTP cable is recommended.
Candidate may refer to the wiring schematic manual in the Learning Module.
The cables must be labelled and kept in a safe place
Values: Precise Confident Abide
TOC.CW.LA3.S06.1
SCORE CRITERIA EVIDENCE NOTE
0
1. Crimp a Straight Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568B wiring
schematic order for both ends.d. Cut and insert the wires into a RJ45 connector.e. Crimp the cable using a crimping tool.
2. Check the straight cable is crimped successfully using a cable tester.
3. Crimp a Crossed Cablea. Skin off the cable jacket.b. Untwist and straighten each wire.c. Arrange the wires according to the 568A wiring
schematic order for one end AND 568B wiring schematic order for the other end.
d. Cut and insert the wires into a RJ45 connector.e. Crimp the cable using a crimping tool.
4. Check the crossed cable is crimped successfully using a cable tester.
Complete any ONE task.
Crimped straight and
crossed cables.
At least 1 meter of UTP cable is recommended.
Candidate may refer to the wiring schematic manual in the Learning Module.
The cables must be labelled and kept in a safe place
Values: Precise Confident Abide